Text

LIST OF EFFECTIVE PAGES CHAPTER 13 CONDUCT OF OPERATIONS PAGE AMENDMENT 13-1 33 13-i 33 13-ia 33 13-ii 33 13.1-1 33 13.2-1 33 13.3-1 22 13.4-1 22 13.5-1 33 13.6-1 22 13.7-1 2

13.8-1 33 13.8-2 deleted 33 13.8-2a deleted 33 13.8-3 deleted 33 13.8-4 deleted 33 13.8-4a deleted 33 13.8-4b deleted 33 13.8-5 deleted 33 13.8-5a deleted 33 13.8-5b deleted 33 13.8-5c deleted 33 13.8-6 deleted 33 13.8-6a deleted 33 13.8-7 33 13.8-8 33 13.8-9 33 13.8-10 33 13.8-11 33 13.8-12 33 13.8-12a 33 13.8-12b 33 13.8-13 33 13.8-14 33 13.8-15 33 13.9-1 29 UNIT 1 13-1 Amendment No. 33 (10/24)

TABLE OF CONTENTS CHAPTER 13 CONDUCT OF OPERATIONS SECTION TITLE PAGE 13.1 ORGANIZATIONAL STRUCTURE 13.1-1 13.2 TRAINING PROGRAM 13.2-1 13.3 EMERGENCY PLANNING 13.3-1 13.4 REVIEW AND AUDIT 13.4-1 13.5 PLANT PROCEDURES 13.4-1 13.6 PLANT RECORDS 13.6-1 13.7 INDUSTRIAL SECURITY 13.6-1 13.8 LICENSEE-CONTROLLED TECHNICAL SPECIFICATION REQUIREMENTS 13.8-1 13.8.1 Deleted 13.8-1 13.8.1.1 Deleted 13.8-1 13.8.1.2 Deleted 13.8-2 13.8.1.3 Deleted 13.8-3 13.8.1.4 Deleted 13.8-4 13.8.1.5 Deleted 13.8-4a 13.8.1.6 Deleted 13.8-4a 13.8.1.7 Deleted 13.8-4b 13.8.1.8 Deleted 13.8-5 13.8.1.9 Deleted 13.8-5 13.8.1.10 Deleted 13.8-5a 13.8.1.11 Deleted 13.8-5a 13.8.1.12 Deleted 13.8-5b UNIT 1 13-i Amendment No. 33 (10/24)

EC 299 478

TABLE OF CONTENTS CHAPTER 13 CONDUCT OF OPERATIONS SECTION TITLE PAGE 13.8.2 Deleted 13.8-5b 13.8.2.1 Deleted 13.8-5b 13.8.2.2 Deleted 13.8-5c 13.8.2.3 Deleted 13.8-6 13.8.2.4 Deleted 13.8-6a 13.9 NRC TS AMENDMENT RELATED 13.9-1 COMMITMENTS 13.9.1 Amendment 234 TSTF-422 Surveillance 13.9-1 Requirements UNIT 1 13-ia Amendment No. 33 (10/24)

EC 299 478

LIST OF TABLES CHAPTER 13 CONDUCT OF OPERATIONS SECTION TITLE PAGE 13.8.1-1 Deleted 13.8-7 13.8.1-2 Deleted 13.8-8 13.8.1-3 Deleted 13.8-9 13.8.1-4 Deleted 13.8-10 13.8.1-5 Deleted 13.8-11 13.8.1-6 Deleted 13.8-12 13.8.1-7 Deleted 13.8-12a 13.8.1-8 Deleted 13.8-12a 13.8.1-9 Deleted 13.8-12b 13.8.1-10 Reactor Coolant System Chemistry Limits 13.8-12b Surveillance Requirements 13.8.2-1 Deleted 13.8-13 13.8.2-2 Deleted 13.8-14 UNIT 1 13-ii Amendment No. 33 (10/24)

EC 299 478

EC 299 478 EC 299 478 CHAPTER 13 CONDUCT OF OPERATIONS 13.1 ORGANIZATIONAL STRUCTURE The Florida Power and Light Company Organization is provided in the FPL Quality Assurance Topical Report discussed in Section 17.2.

The plant-specific titles of those personnel fulfilling the responsibilities of the positions delineated in the St. Lucie Technical Specifications are listed below:

Technical Specification Generic Title Corresponding Plant Specific Title corporate officer with responsibility for overall plant nuclear safety Chief Nuclear Officer plant manager Site Vice President radiation protection manager Chemistry/ Radiation Protection Manager operations manager Operations Site Director assistant operations manager Operations Asst.

Manager - line shift supervisor Unit Supervisor 13.1-1 Amendment No. 33 (10/24)

13.2 TRAINING PROGRAM The Florida Power and Light St. Lucie facility training program is maintained under the direction of the training manager, and meets or exceeds the requirements and recommendations of Section 5.5 of ANSI/ANS-3.1 1978. St. Lucie plant training programs are accredited through the National Nuclear Accrediting Board (NNAB). National Academy for Nuclear Training (NANT) guidelines, which are endorsed by the NNAB, are utilized at St. Lucie.

Multi-Discipline Supervisors are required to meet or exceed the following requirements:

a. Education: Minimum of a high school diploma or equivalent.
b. Experience: Minimum of four years of related technical experience, which shall include three years power plant experience of which one year is at a nuclear power plant.
c. Training: Complete the Multi-Discipline Supervisor training program.

13.2-1 Amendment No. 33 (10/24)

EC 299 478

13.3 EMERGENCY PLANNING The St. Lucie Plant Radiological Emergency Plan is a separate document which has been previously submitted to the NRC for St. Lucie Unit 1. The Radiological Emergency Plan describes Florida Power and Light Company's plans for responding to all foreseeable emergencies which have resulted in, or have the potential to result in, the accidental release of radiation to the environment. The plan has been prepared to meet the requirements of 10 CFR 50.34(b)(6)(V), 10 CFR 50.47, 10 CFR 50.72 and 10 CFR 50 Appendix E. The purpose of this plan is to define and assign authority and responsibility in order to protect the health and safety of the public and plant personnel. This document is updated periodically.

13.3-1 Amendment No. 22 (05/07)

REFERENCES FOR SECTION 13.3

1.

Florida Power and Light Company, St. Lucie Plant Radiological Emergency Plan, Revision 49.

13.3-2 Amendment No. 22 (05/07)

13.4 REVIEW AND AUDIT Conduct of reviews and audits of operating phase activities is provided in the FPL Quality Assurance Topical Report described in Section 17.2.

13.4-1 Amendment No. 22 (05/07)

13.5 PLANT PROCEDURES Written plant procedures are established, implemented and maintained covering the applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Revision 2, February 1978, those required for implementing the requirements of NUREG-0737 and plant activities including refueling operations, surveillance and test activities of safety related equipment and the Fire Protection Program implementation.

Written procedures for Quality Control Program effluent monitoring are established, implemented, and maintained using the guidance in Regulatory Guide (RG) 1.21, "Measuring, Evaluating, and Reporting Radioactive Material in Liquid and Gaseous Effluents and Solid Waste," Revision 1, June 1974. In addition, written procedures for Quality Control Program environmental monitoring are established, implemented, and maintained using the guidance in RG 4.1, "Radiological Environmental Monitoring for Nuclear Power Plants," Revision 1, April 1975.

Procedures for personnel radiation protection are prepared consistent with the requirements of 10 CFR 20 and adherence is required for all operations involving personnel radiation exposure.

Written procedures shall be established, implemented, and maintained covering the Process Control Program (PCP).

Process Control Program (PCP)

Changes to the PCP:

1. Shall be documented and this documentation shall contain:

a). Sufficient information to support the change together with the appropriate analyses or evaluations justifying the change(s) and b). A determination that the change will maintain the overall conformance of the solidified waste product to existing requirements of Federal, State, or other applicable regulations.

2. Shall become effective after the approval of the Site Vice President.

13.5-1 Amendment No. 33 (10/24)

EC 299 478

13.6 PLANT RECORDS A recorded history of the plant is maintained in accordance with 10 CFR 50, Appendix B, Section XVII.

Complete records are retained as prescribed in the FPL Quality Assurance Topical Report described in Section 17.2, to assure the ability to reconstruct significant events and satisfy any statutory requirements which apply.

13.6-1 Amendment No. 22 (05/07)

13.7 INDUSTRIAL SECURITY The St. Lucie Plant Security Plan(1) has been previously submitted to the NRC pursuant to 10 CFR 2.790(d). The security plan outlines methods and procedures for the prevention or mitigation of consequences of industrial sabotage and other acts of vandalism, arson and civil disturbance which are inimical to the safe operation of the plant and the health and safety of the public. Due to the sensitive nature of this information the latest Plant Security Plan is available for NRC review but withheld from public disclosure.

REFERENCES FOR SECTION 13.7

1.

Florida Power and Light Company, St. Lucie Plant Security Plan submitted to NRC.

13.7-1 Am. 2-7/84

13.8 RELOCATED TECHNICAL SPECIFICATION REQUIREMENTS The specific technical specification requirements contained in this section were removed from St. Lucie Unit 1 Technical Specifications by means of approved License Amendments. These requirements are maintained in the Technical Requirements Manual (TRM). As such, changes to TRM requirements are considered to be changes to the UFSAR and processed accordingly.

13.8-1 Amendment No. 33 (10/24)

EC 299 478

Pages 13.8-2 through 13.8-6a have been deleted.

13.8-2 Amendment No. 33 (10/24)

EC 299 478

TABLE 13.8.1-1 SEISMIC MONITORING INSTRUMENTATION (Instrumentation located in St. Lucie Unit 1)

DELETED 13.8-7 Amendment No. 33 (10/24)

EC 299 478

TABLE 13.8.1-2 SEISMIC MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS (Instrumentation located in St. Lucie Unit 1)

DELETED 13.8-8 Amendment No. 33 (10/24)

EC 299 478

TABLE 13.8.1-3 METEOROLOGICAL MONITORING INSTRUMENTATION DELETED 13.8-9 Amendment 33 (10/24)

EC 299 478

TABLE 13.8.1-4 METEOROLOGICAL MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS DELETED 13.8-10 Amendment 33 (10/24)

EC 299 478

TABLE 13.8.1-5 EXPLOSIVE GAS MONITORING INSTRUMENTATION DELETED 13.8-11 Amendment No. 33 (10/24)

EC 299 478

TABLE 13.8.1-6 EXPLOSIVE GAS MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS DELETED 13.8-12 Amendment 33 (10/24)

EC 299 478

TABLE 13.8.1-7 LEFM CALORIMETRIC INSTRUMENTATION DELETED TABLE 13.8.1-8 REDUCED POWER LIMITS APPLICABLE TO INOPERABLE LEFM CALORIMETRIC INSTRUMENTATION DELETED 13.8-12a Amendment No. 33 (10/24)

EC 299 478 EC 299 478

TABLE 13.8.1-9 REACTOR COOLANT SYSTEM CHEMISTRY LIMITS DELTED TABLE 13.8.1-10 REACTOR COOLANT SYSTEM CHEMISTRY LIMITS SURVEILLANCE REQUIREMENTS DELETED UNIT 1 13.8-12b Amendment No. 33 (10/24)

EC 299 478 EC 299 478

TABLE 13.8.2-1 REACTOR PROTECTIVE INSTRUMENTATION RESPONSE TIMES DELETED 13.8-13 Amendment No. 33 (10/24)

EC 299 478

TABLE 13.8.2-2 ENGINEERED SAFETY FEATURES RESPONSE TIMES DELETED 13.8-14 Amendment 33 (10/24)

EC 299 478

TABLE 13.8.2-2 (Continued)

DELETED 13.8-15 Amendment No. 33 (10/24)

EC 299 478

13.9 NRC TS Amendment Related Commitments 13.9.1 Amendment 234, TSTF-422, Risk-Inform Requirements Regarding Selected Required Action End States The NRC SER for Amendment 234 required the following commitments be incorporated into the UFSAR:

1.

On an ongoing basis, the licensee will follow the guidance established in Section 11 of NUMARC 93-01, Nuclear Management and Resource Council, Revision 4A, April 2011.

2.

Upon implementation of the approved TS amendments, when TS required ACTION end state remains within the applicability of the TS, the licensee will follow the guidance established in WCAP-16364-NP, Revision 2, dated May 2010, with the exception that Section 11 of NUMARC 93-01, Revision 4A, will be utilized to meet 10 CFR 50.65(a)(4) requirements in lieu of NUMARC 93-01, Revision 3.

Both of these commitments are embodied in Procedure ADM-17.16, Implementation of the Configuration Risk Management Program.

UNIT 1 13.9-1 Amendment No. 29 (10/18)