NRC Update NUPIC General Membership Meeting September 10 - 11, 2024 Birmingham, AL Yamir Diaz-Castillo & Deanna Zhang Quality Assurance & Vendor Inspection Branch Office of Nuclear Reactor Regulation
Recent & Upcoming NRC Inspections 2
Recent:
Paragon Energy Solutions Energy Steel & Supply Company Bentley Systems Analysis & Measurement Services Fisher Controls International (this week)
Upcoming:
Framatome Fuels BWXT NUPIC Observation*
- Subject to funding.
NRC Inspections Findings 3
Westinghouse Electric Company Criterion VII, Control of Purchased Material, Equipment, and Services Failed to provide sufficient objective evidence to demonstrate the requirements in a purchase order for calibration services and recording of inspection, measurement, and test equipment used were satisfied.
Criterion XVI, Corrective Action Failed to adequately correct the conditions adverse to quality identified in two corrective action reports before closing them.
NRC Inspections Findings 4
Doosan Enerbility, Ltd.
10 CFR Part 21 Failed to invoke the requirements of 10 CFR Part 21 in the procurement documents for safety-related machining services and important to safety materials for a vertical concrete cask.
ASCO L.P.
Criterion II, Quality Assurance Program Failed to establish adequate training requirements for personnel performing manufacturing activities and special processes, and adequately document training for those personnel. No objective evidence that personnel performing soldering and laser welding activities were adequately qualified.
NRC Inspections Findings 5
ASCO L.P. (cont.)
Criterion IX, Control of Special Processes Failed to perform the required weekly in-process audits of the laser welding process and the required dimensional measurements, as well as the axial load and leakage testing on the laser welded joints for a safety-related valve to ensure they met the required engineering specifications.
Criterion XII, Control of Measuring and Test Equipment Failed to calibrate a load cell used to verify the strength of laser welds as well as to provide objective evidence that the weight used to test the mechanical joints on solder cup terminals was properly controlled.
NRC Inspections Findings 6
Energy Steel & Supply Company (ESSC)
Criterion VIII, Identification and Control of Materials, Parts, and Components Failed to properly control and identify/mark with a heat number or other appropriate means filler metal rods used in the welding of safety-related letdown coolers.
Criterion XII, Control of Measuring and Test Equipment Failed to perform an evaluation to determine the effect of an out of calibration condition identified on items that had been inspected and shipped since the last valid calibration date of a hexagon absolute arm measuring gage consistent with ESSCs Quality Assurance manual.
NRC Inspections Findings 7
Energy Steel & Supply Company (cont.)
Criterion XV, Nonconforming Materials, Parts, and Components, and Criterion XVI, Corrective Action Failed to implement corrective actions to address Nonconformance 99902104/2022-201-01 as documented in corrective action report No. 1459 and in the response to the nonconformance. Because ESSC failed to adequately implement the corrective actions to address Nonconformance 99902104/2022-201-01, the NRC inspection team identified 22 nonconformance and 25 corrective action reports that were past the 30 business days due date as required in ESSCs nonconformance and corrective action procedures. Three of the 22 nonconformance reports and five of the 25 corrective action reports have been opened for more than a year.
Revision to RG 1.164 8
Revision 1 to Regulatory Guide (RG) 1.164, Dedication of Commercial-Grade Items for Use in Nuclear Power Plant, was issued in April 2024.
2 updates related to Counterfeit, Fraudulent, or Suspect Items (CFSI):
Definition of CFSI.
Reference to EPRI 3002002276, Plant Support Engineering: Counterfeit and Fraudulent Items Mitigating the Increasing Risk.
Actual Revisions to RG 1.164 9
Regulatory Issue Summary 2024-02 10 The Department of Energy (DOE) maintains the National Laboratories as GOCOs -
Government Owned, Contractor Operated.
Contractors may be individual universities, university consortia, private companies, or nonprofits.
DOE National laboratories are commercial entities for which an assessment must be performed.
National Energy Technology Laboratory (NETL) is the only DOE national laboratory owned and operated by the U.S.
Federal Government.
Regulatory Issue Summary 2024-02 11 When procuring items or services for use in a safety-related applications; licensees, applicants, and suppliers are responsible for:
verifying the effective implementation of the laboratories programmatic quality controls, and maintaining 10 CFR Part 21 responsibility.
Advance Reactors Licensing Status:
Quality Assurance Program Descriptions 12 Approved:
BWXT - BANR Kairos Power (Hermes 1 & 2)
NuScale SDA TerraPower Holtec SMR-300 TVA New Reactor Under Review:
X-energy General Atomics Expected:
ARC-100 Dow Long Mott Deep Fission Unannounced SMR
Advance Reactors Licensing Status:
Construction Permit Applications 13 Approved:
Hermes Test Reactor Unit 1 (Kairos)
Hermes Test Reactor Unit 2 (soon to be approved)
Under Review:
USO Kemmerer Unit 1 (TerraPower)
Abilene Christian University (Molten Salt Research Reactor)
Expected:
Dow Long Mott (X-energy)
QAPD Reviews 14 Palisades Operating QAPD - Under review TVA Operating Fleet QAPD (conversion to NQA-1 2015) - Under review Sargent & Lundy QAPD - Under review Framatome TXS Compact Platform QA -
2024 Workshop on Vendor Oversight 15 THANK YOU for making the 9th NRC Workshop on Vendor Oversight a success!!
Your contribution to the content and the food is TRULY appreciated!!
Yamir Diaz-Castillo Reactor Operations Engineer (301) 415-2228 Yamir.Diaz-Castillo@nrc.gov Deanna Zhang Senior Reactor Operations Engineer (301) 415-1946 Deanna.Zhang@nrc.gov