ML24254A248

From kanterella
Jump to navigation Jump to search
Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010
ML24254A248
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/10/2024
From: Mel Gray
Division of Operating Reactors
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2025010
Download: ML24254A248 (1)


See also: IR 05000352/2025010

Text

September 10, 2024

David P. Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Officer (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

LIMERICK GENERATING STATION, UNITS 1 AND 2 - INFORMATION

REQUEST FOR QUADRENNIAL BASELINE COMPREHENSIVE

ENGINEERING TEAM INSPECTION; NOTIFICATION TO PERFORM

INSPECTION 05000352/2025010 AND 05000353/2025010

Dear David Rhoades:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region I staff will conduct a Comprehensive Engineering Team Inspection (CETI) at your

Limerick Generating Station, Units 1 and 2. Jeffrey Kulp, a Senior Reactor Inspector from the

NRCs Region I office, will lead the inspection team. The inspection will be conducted in

accordance with Inspection Procedure (IP) 71111.21M, Comprehensive Engineering Team

Inspection (CETI), dated January 1, 2023 (ADAMS Accession No. ML19084A030). This

inspection combines elements of the Design Basis Assurance Inspection (Teams), the Heat

Exchanger/Sink Performance inspection (IP 71111.07T), and the Evaluations of Changes, Tests

and Experiments inspection (IP 71111.17).

The inspection will evaluate the capability of risk-significant/low-margin components to function

as designed to support proper system operation. The inspection will also include a review of

selected modifications, operating experience, and as applicable, operator actions.

On August 28, 2024, the NRC team leader confirmed arrangements for an information-gathering

site visit and the two-week onsite inspection with Charles Wheeler, Limerick Regulatory

Assurance. The schedule is as follows:

Information-gathering visit: November 12-15, 2024

Onsite weeks: Weeks of January 13, 2025 and January 27, 2025

The purpose of the information-gathering visit is to meet with members of your staff to identify

risk-significant components, modifications, operator actions, and operating experience items.

Information and documentation needed to support the inspection will also be identified.

Carey Bickett, a Region I Senior Risk Analyst, will support Jeff during the information-gathering

visit to review probabilistic risk assessment data and identify components to be examined during

the inspection.

D. Rhoades

2

Experience with previous baseline design/modification inspections of similar depth and length

has shown this type of inspection is resource intensive, both for the NRC inspectors and the

licensee staff. In order to minimize the inspection impact on the site and to ensure a productive

inspection for both parties, we have enclosed a request for information needed for the

inspection.

Ensuring these documents are up-to-date and complete will support the more efficient conduct

of the inspection. Insofar as possible, this information should be provided electronically to the

lead inspector. The information request has been divided into two groups:

The first group lists information necessary for our initial inspection scoping activities.

This information should be provided to the lead inspector by November 11, 2024. By

November 29, 2024, the lead inspector will communicate the selected set of

components, modifications, 50.59 screenings, and operating experience samples.

The second group of documents requested is those items needed to support our in-

office preparation activities. This set of documents, specific to the selected components

and modifications, should be provided to the lead inspector at the Regional Office no

later than January 6, 2025. During the in-office preparation activities, the team may

identify additional information needed to support the inspection, and those items will be

communicated directly to Charles Wheeler.

If there are any questions about the inspection or the material requested in the enclosure,

please contact the lead inspector at (610) 547-2603 or via email at jak2@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget Control Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

Mel Gray, Chief

Engineering Branch 1

Division of Operating Reactor Safety

Docket Nos. 05000352 and 05000353

License Nos. NPF-39 and NPF-85

Enclosure:

Document Request for Comprehensive

Engineering Team Inspection

cc w/encl: Distribution via ListServ

Melvin K.

Gray

Digitally signed by Melvin

K. Gray

Date: 2024.09.10

09:44:11 -04'00'

ML24254A248

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE

RI/DORS

RI/DORS

NAME

JKulp

MGray

DATE

9/09/2024

9/05/2024

DOCUMENT REQUEST FOR COMPEHENSIVE ENGINEERING TEAM INSPECTION

Enclosure

Onsite Inspection Dates:

January 13, 2025 through January 17, 2025; and

January 27, 2025 through January 31, 2025

Inspection Procedure:

Inspection Procedure 71111.21M, Comprehensive Engineering

Team Inspection (CETI)

Lead Inspector:

Jeffrey Kulp, Senior Reactor Inspector

(610) 547-2603

jak2@nrc.gov

Inspection Report: 05000352/2025010 and 05000353/2025010

I.

Information Requested for Sample Selection Process

The following information is requested by November 11, 2024, to facilitate inspection

preparation. Feel free to contact the lead inspector as soon as possible if you have any

questions regarding this information request. Please provide the information electronically in

pdf files, Word, Excel, or other searchable format. The files should contain descriptive

names, and be indexed and hyperlinked to facilitate ease of use. Information in lists should

contain enough information to be easily understood by someone who has knowledge of light

water reactor technology.

1.

The site probabilistic risk analysis (PRA) System Notebook and latest PRA Summary

Document.

2.

Risk-ranking of top 250 basic events sorted by Risk Achievement Worth (>/= 1.3).

Include values for Risk Reduction Worth, Birnbaum Importance, and Fussell-Vesely (as

applicable). Please provide in an excel spreadsheet or other sortable format, and

include an understandable definition of the coded basic events.

3.

Risk-ranking of top 100 components from site specific PRA sorted by Large Early

Release Frequency. Provide any basic event mapping used to develop the ranking of

components.

4.

List of the top 200 cut-sets from your PRA. Provide the descriptions of the basic events

in the list of cut-sets.

5.

List of the top 200 cut-sets for each initiator modeled in the PRA that contributes more

than 5 percent to the baseline plant core damage frequency.

6.

If you have an External Events or Fire PRA Model, provide the information requested in

Items 1 and 2 for external events and fire. Provide narrative description of each coded

event, including fire and flood zone description.

7.

List of time-critical and/or risk-significant operator actions.

8.

List of emergency and abnormal operating procedures.

DOCUMENT REQUEST FOR COMPREHENSIVE ENGINEERING TEAM INSPECTION

2

9.

If available, any pre-existing evaluation or list of components and associated

calculations with low design margins (e.g., pumps closest to the design limit for flow or

pressure, diesel generator close to design required output, heat exchangers close to

rated design heat removal).

10. If applicable, copy of any self-assessments and/or Quality Assurance assessments of

low-margin structures, systems, and components (SSC), completed in the last 3 years.

11. List of available design margins in both the open and closed direction for valves in the

motor-operated valve and air-operated valve programs. Identify the safety-related

direction and the basis for how the margin was determined.

12. The age and capacity of the safety-related DC batteries.

13. The In-Service Testing Program (IST) Basis document identifying the in-scope valves

and pumps, and the associated IST Program requirements for each component (e.g.,

IST valve table identifying category, active/passive function).

14. SSCs in the Maintenance Rule (a)(1) category in the last 3 years.

15. List of Root Cause Evaluations associated with SSCs failures or design issues

initiated/completed in the last 4 years.

16. List of formal operability evaluations in the last 4 years.

17. List of current operator work arounds/burdens.

18. List of permanent plant modifications to SSCs that are field work complete in the last 3

years. For the purpose of this inspection, permanent plant modifications include

permanent: plant changes, design changes, set point changes, equivalency

evaluations, suitability analyses, and commercial grade dedications. The list should

contain the number of each document, title (sufficient to understand the purpose of the

modification), revision/date, and the affected system.

19. List of calculation changes that have been issued for use in the last 3 years.

20. Programmatic Procedures.

Corrective Action Program Procedure.

Permanent Plant Modifications and Design Changes

In-service Testing

Setpoint Changes

Commercial Grade Dedication

Post-Maintenance Testing

50.69 Screening/Program

Maintenance Rule

21. List of corrective action documents (open and closed) in the last 3 years associated with

permanent plant modifications issues, concerns, or processes.

DOCUMENT REQUEST FOR COMPREHENSIVE ENGINEERING TEAM INSPECTION

3

22. Any internal/external self-assessments and associated corrective action documents

generated in preparation for this inspection.

23. Corrective Action Program documents (e.g., condition reports) associated with

inspection findings from the last performance of NRC Inspection Procedure 71111.21M

(CETI/DBAI).

24. Updated Final Safety Analysis Report, Technical Specifications, Technical

Specifications Bases, and Technical Requirements Manual.

25. One line safety-related electrical drawings (AC and DC), and Piping and

Instrumentation Drawings of emergency core cooling systems, ultimate heat sink, and

auxiliary feedwater system.

26. List of 50.59 Evaluations and Screenings performed since January 2022.

27. Equipment Listings (Preferably in Excel Spreadsheet format, if available)

If implemented, listing of 50.69 RISC 1, 2 and 3 components.

Listing of equipment classified under the Conduct of Equipment Reliability Manual

showing the Tier level.

Listing of equipment classified under the Maintenance Rule showing HSS/LSS

classifications.

II. Information Requested to Be Available by January 6, 2025, following sample

selection.

This information should be separated for each selected component and modification,

especially if provided electronically (e.g., a folder for each component and modification

named after the component or modification that includes the information requested below).

Items 1 through 11 are associated with the selected components and Item 12 is for the

selected modifications.

1.

List of corrective action documents associated with each selected component for the

last 4 years.

2.

Maintenance history (e.g., corrective, preventive, and elective) associated with each

selected component for the last 6 years. Identify frequency of preventive maintenance

activities.

3.

Aging Management Program documents applicable to each selected component.

4.

List of calculations associated with each selected component, excluding data files. Pipe

stress calculations are excluded from this request.

5.

System Health Report (last completed) and Design Basis Document associated with

each selected component.

6.

Access to or copy of vendor manual(s) for each selected component.

DOCUMENT REQUEST FOR COMPREHENSIVE ENGINEERING TEAM INSPECTION

4

7.

List of open temporary modifications associated with each selected component, if

applicable.

8.

Trend data/graphs on the selected components performance for the last 3 years (e.g.,

pump performance including IST, other vibration monitoring, oil sample results).

9.

List of normal operating and alarm response procedures associated with each selected

component.

10. Last completed tests and surveillances for each selected component performed during

the last 3 years. For those tests and surveillances performed at a periodicity of greater

than three years, provide the latest test performed.

11. Schedule of surveillance testing of selected components that occur during the onsite

inspection weeks.

12. For each selected modification, copies of associated documents such as modification

package, engineering changes, 50.59 screening or evaluation, relevant calculations,

post-modification test packages, associated corrective action documents, design

drawings, and new/revised preventive maintenance requirements.

13. A copy of the evaluation or screening document for each of the selected 50.59

evaluation/screens. A copy of the modification package if the evaluation/screen pertains

to a modification.