MONTHYEARML24239A3632024-09-27027 September 2024 FRN Point Beach Notice of Intent to Prepare Supplement to the 2021 Dseis ML24155A0992024-07-31031 July 2024 Noi FRN ML24128A2752024-06-17017 June 2024 Notice of Acceptance and Opportunity for Hearing - Federal Register Notice ML24128A2742024-06-14014 June 2024 Notice of Acceptance and Opportunity for Hearing - Letter ML24092A3422024-05-0202 May 2024 SLRA - Receipt and Availability - FRN ML24065A4832024-04-0101 April 2024 Federal Register Notice: Issuance of Exemption for Constellations Dresden Unit 2 and Unit 3, Independent Spent Fuel Storage Installation Exemption Request ML24066A0342024-03-26026 March 2024 FRN for EA-FONSI Availability Dresden ML24044A0732024-02-28028 February 2024 Federal Register Notice - Issuance of Multiple Exemptions Regarding 10 CFR Part 73 - January 2024 ML21305A0192022-03-16016 March 2022 Exemption from the Requirements of 10 CFR Part 2, Section 2.109(b) Related to Submission of Subsequent License Renewal Application (EPID L-2021-LLE-0048) (FRN) ML21305A0182022-03-15015 March 2022 Exemption from the Requirements of 10 CFR Part 2, Section 2.109(b) Related to Submission of Subsequent License Renewal Application (EPID L-2021-LLE-0048) (Exemption) ML21294A3762021-11-16016 November 2021 Federal Register Notice for Order Approving Indirect Transfer of Licenses ML21263A0552021-09-28028 September 2021 ISFSI Withdrawal of Licensing Actions Associated with the Scheduled Permanent Shut Down and Decommissioning of the Units (Letter) ML21263A0532021-09-28028 September 2021 Notice of Withdrawal of October 29, 2020, Application Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition Defueled Technical Specifications(Frn) ML21263A0542021-09-28028 September 2021 Notice of Withdrawal of November 2, 2020, Application Revision to Emergency Plan for Permanently Shut Down and Defueled Condition (FRN) ML21263A0512021-09-28028 September 2021 Notice of Withdrawal of September 24, 2020, Application Administrative Controls for Permanently Defueled Condition (FRN) ML21204A1232021-08-25025 August 2021 FRN - Dresden Nuclear Power Station, Units 2 and 3 - Exemption from the Requirements of 10 CFR 73.55(p)(1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather ML21145A0142021-05-26026 May 2021 Fleet and the Associated Independent Spent Fuel Storage Installations - Extension of Comment Period for Notice of Consideration of Approval of Transfer of Licenses and Conforming Amendments and Opportunity to Request a Hearing EPID L-2021-L ML21145A0152021-05-26026 May 2021 FRN Exelon License Transfer - Extend Comment Period ML21102A0752021-04-28028 April 2021 Fleet - Notice of Consideration of Approval of Transfer of Licenses and Conforming Amendments and Opportunity for a Hearing (FRN) ML20271A0002020-10-13013 October 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for September 2020 ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20243A0002020-09-23023 September 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for August 2020 ML20156A4002020-06-30030 June 2020 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing ML19295F0902019-11-0505 November 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 11/05/2019 ML19085A2172019-03-29029 March 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 04/09/2019 ML19010A0902018-12-19019 December 2018 NRR E-mail Capture - Opportunity to Review and Comment on an NRC Information Collection Request for Info Pursuant to 10 CFR 50.54(f) Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima. NRC-2018-0138, Opportunity to Review and Comment on an NRC Information Collection Request for Info Pursuant to 10 CFR 50.54(f) Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima.2018-12-19019 December 2018 Opportunity to Review and Comment on an NRC Information Collection Request for Info Pursuant to 10 CFR 50.54(f) Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima. NRC-2018-0140, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/20182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 ML18180A2182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 ML18135A1882018-06-13013 June 2018 Environmental Assessment: Exelon Generation Company, LLC - Braidwood, Units 1 and 2; Byron, Unit Nos. 1 and 2; Clinton, Unit No. 1; Dresden, Units 1, 2, and 3; LaSalle, Units 1 and 2; Quad Cities, Units 1 and 2 NRC-2018-0122, Environmental Assessment: Exelon Generation Company, LLC - Braidwood, Units 1 and 2; Byron, Unit Nos. 1 and 2; Clinton, Unit No. 1; Dresden, Units 1, 2, and 3; LaSalle, Units 1 and 2; Quad Cities, Units 1 and 22018-06-13013 June 2018 Environmental Assessment: Exelon Generation Company, LLC - Braidwood, Units 1 and 2; Byron, Unit Nos. 1 and 2; Clinton, Unit No. 1; Dresden, Units 1, 2, and 3; LaSalle, Units 1 and 2; Quad Cities, Units 1 and 2 ML16131A7952016-05-13013 May 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016 NRC-2016-0100, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 20162016-05-13013 May 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016 ML16060A1922016-03-0808 March 2016 Enclosufrn: Notice of Availability of Exemption for Exelon Generation Company, LLC, Dresden Nuclear Power Station Independent Spent Fuel Storage Installation NRC-2016-0046, Enclosufrn: Notice of Availability of Exemption for Exelon Generation Company, LLC, Dresden Nuclear Power Station Independent Spent Fuel Storage Installation2016-03-0808 March 2016 Enclosufrn: Notice of Availability of Exemption for Exelon Generation Company, LLC, Dresden Nuclear Power Station Independent Spent Fuel Storage Installation NRC-2016-0047, EnclosuFRN-Notice of Availability of Environmental Assessment and Finding of No Significant Impact for Exelon Generation Company, LLC, Dresden Nuclear Power Station Independent Spent Fuel Storage Installation Exemption Request2016-02-25025 February 2016 EnclosuFRN-Notice of Availability of Environmental Assessment and Finding of No Significant Impact for Exelon Generation Company, LLC, Dresden Nuclear Power Station Independent Spent Fuel Storage Installation Exemption Request ML16056A1492016-02-25025 February 2016 Enclosuenvironmental Assessment (Letter to P. R. Simpson Dresden Nuclear Power Station Independent Spent Fuel Storage Installation Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption) ML16056A0922016-02-25025 February 2016 EnclosuFRN-Notice of Availability of Environmental Assessment and Finding of No Significant Impact for Exelon Generation Company, LLC, Dresden Nuclear Power Station Independent Spent Fuel Storage Installation Exemption Request ML15356A5992015-12-29029 December 2015 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 5, 2016 NRC-2015-0240, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: Novemb2015-10-23023 October 2015 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: November 3, ML15279A3362015-10-23023 October 2015 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: November 3, ML15058A3802015-09-25025 September 2015 Ltr., Environmental Assessment and Finding of No Significant Impact Related to Request to Dispose of Slightly Contaminated Soil in Accordance with 10 CFR 20.002 NRC-2015-0204, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - September 1, 20152015-08-21021 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - September 1, 2015 ML15231A8382015-08-21021 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - September 1, 2015 ML15218A6252015-08-14014 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 14, 2015 ML13018A2392015-04-0808 April 2015 G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 NRC-2015-0009, G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units2015-01-15015 January 2015 G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units ML14335A6482015-01-15015 January 2015 G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units ML14335A6302015-01-15015 January 2015 G20110262 - Final Response to Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units NRC-2013-0245, Confirmatory Order Modifying License2014-10-28028 October 2014 Confirmatory Order Modifying License 2024-09-27
[Table view] |
Text
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-237 and 50-249; NRC-2020-0277]
NextEra Energy Point Beach, LLC;
Point Beach Nuclear Plant, Units 1 and 2;
Notice of Intent to Prepare Supplement to the Supplemental Environmental Impact
Statement
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice.
SUMMARY
- The U.S. Nuclear Regulatory Commission (NRC) staff will prepare a
supplement to the 2021 draft Supplemental Environmental Impact Statement (SEIS) to
evaluate the environmental impacts for the subsequent license renewal (SLR) of
Renewed Facility Operating License Nos. DPR-24 and DPR-27 for Point Beach Nuclear
Plant, Units 1 and 2 (Point Beach). The NRC staff will address new information following
the issuance of the 2021 draft SEIS. The draft SEIS supplement will be issued for public
comment.
DATES: October 2, 2024
ADDRESSES: Please refer to Docket ID NRC-2020-0277 when contacting the NRC
about the availability of information for th is action. You may obtain publicly available
information related to this action by any of the following methods:
for Docket ID NRC-2020-0277.
- NRCs Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the ADAMS Public
Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select Begin Web-based ADAMS Search. For problems with ADAMS, please
contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, at
301-415-4737, or by email to PDR.Resource@nrc.gov. The ADAMS accession number
for each document referenced in this document (i f it is available in ADAMS) is provided
the first time that it is referenced.
- NRCs PDR: The PDR, where you may examine and order copies of publicly
available documents, is open by appointment. To make an appointment to visit the PDR,
please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-
4737, between 8 a.m. and 4 p.m. ET, Monday through Friday, except Federal holidays.
- Public Library: A copy of the SLR application for Point Beach, including the
applicants environmental report, will be available for public review at the following public
library location: Lester Public Library, 1001 Adams Street, Two Rivers, WI 54241.
FOR FURTHER INFORMATION CONTACT: Kevin Folk, telephone: 301-415-6944;
email: Kevin.Folk@nrc.gov; or Karen Loomis, telephone: 301-415-5142; email:
Karen.Loomis@nrc.gov. Both are staff in the Office of Nuclear Material Safety and
Safeguards at the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
SUPPLEMENTARY INFORMATION:
I. Background
By letter dated November 16, 2020 (ADAMS Package Accession No.
ML20329A292), NextEra submitted to the NRC an application for the SLR of Renewed
Facility Operating License Nos. DPR-24 and DPR-27 for Point Beach Nuclear Plant,
Units 1 and 2, respectively, for an additional 20 years of operation. This submission
initiated the NRCs proposed action of determining whether to issue the subsequent
renewed facility operating licenses. Point Beach is located in northeastern Manitowoc
County, Wisconsin, approximately 29 miles southeast of Green Bay, Wisconsin.
2 The current facility operating license for Point Beach, Unit 1, expires at midnight
on October 5, 2030, and the current facility operating license for Point Beach, Unit 2
expires at midnight on March 8, 2033.
The SLR application was submitted pursuant to part 54 of title 10 of the Code of
Federal Regulations (10 CFR), Requirements for Renewal of Operating Licenses for
Nuclear Power Plants, and included an environmental report. The applicant seeks to
extend the facility operating license for Unit 1 to midnight on October 5, 2050, and for
Unit 2 to midnight on March 8, 2053. A notice of acceptance for docketing of the
application and of an opportunity to request a hearing was published in the Federal
Register on January 22, 2021 (86 FR 6684). Thereafter, a notice of intent to prepare an
environmental impact statement and conduct a scoping process was published in the
Federal Register on February 1, 2021 (86 FR 7747) and is available on the Federal
rulemaking website (https://www.regulations.gov) by searching for Docket ID NRC-2020-
0277.
On November 9, 2021, a notice was published in the Federal Register
(86 FR 62220), stating that the NRC staff had issued its draft SEIS, documenting its
preliminary analysis and recommendation on the proposed action (subsequent license
renewal) for Point Beach. The draft SEIS is available in ADAMS under Package
Accession No. ML21306A226.
II. Discussion
On August 6, 2024, the NRC published a final rule (89 FR 64166) revising its
environmental protection regulations in 10 CFR part 51, Environmental protection
regulations for domestic licensing and related regulatory functions. The final rule
updates the potential environmental impacts associated with the renewal of an operating
license for a nuclear power plant for up to an additional 20 years, for either an initial
3 license renewal or a single SLR term. Revision 2 to NUREG-1437, Generic
Environmental Impact Statement for License Renewal of Nuclear Plants (LR GEIS)
(ADAMS Package Accession No. ML24087A133) provides the technical basis for the
final rule. The revised LR GEIS supports the updated list of environmental issues and
associated environmental impact findings contained in Table B-1 in Appendix B to
Subpart A of the revised 10 CFR part 51 for both initial license renewal and a single term
of SLR.
The final rule became effective 30 days after its publication in the Federal
Register, and the NRC staff must consider the new and modified issues, as applicable,
in its license renewal EISs after that date (i.e., on or after September 5, 2024).
Accordingly, the NRC staff will prepare a supplement to the 2021 draft SEIS for the Point
Beach SLR application in accordance with the NRC's regulations in 10 CFR 51.72, to
address new information since the draft SEIS was published. This new information
includes the new and modified environmental issues associated with the NRCs August
2024 publication of the final rule, Renewing Nuclear Power Plant Operating Licenses -
Environmental Review (89 FR 64166) and revised LR GEIS (NUREG-1437, Revision
2).
Dated: September 27, 2024.
For the Nuclear Regulatory Commission.
/RA/
Stephen Koenick, Chief, Environmental Project Management Branch 1, Division of Rulemaking, Environment, and Financial Support, Office of Nuclear Material Safety, and Safeguards.
4