Letter - Final Safety Evaluation for the Topical Report on the Quality Assurance Program for Holtec Internationals Small Modular Reactor (SMR) Design and Construction
ML24228A060
Person / Time
Site: 99902049
Issue date: 08/26/2024
From: Hayes M
NRC/NRR/DNRL/NLIB
To: Brenner A
Holtec
Shared Package
ML24228A054 List:
References
EPID L-2023-TOP-0049
Download: ML24228A060 (1)


Text

Mr. Andrew Brenner Director of Licensing, SMR Holtec International 1 Holtec Boulevard Camden, NJ 08104

SUBJECT:

FINAL SAFETY EVALUATION FOR THE TOPICAL REPORT ON THE QUALITY ASSURANCE PROGRAM FOR HOLTEC INTERNATIONALS SMALL MODULAR REACTOR (SMR) DESIGN AND CONSTRUCTION (EPID NO. L-2023-TOP-0049)

Dear Mr. Brenner:

By letter dated September 28, 2023, Holtec International, Small Modular Reactor (SMR), LLC (hereafter referred to as Holtec) submitted HI-2230815, Revision 0, Topical Report [(TR)] on the Quality Assurance Program [(QAP)] for Holtec Internationals Small Modular Reactor (SMR)

Design and Construction, (hereafter referred to as SMR LLC QAP TR). (Agencywide Document Access Management Systems (ADAMS) Accession Package No. ML23271A007).

By email transmittal dated October 26, 2023, the U.S. Nuclear Regulatory Commission (NRC) staff accepted the SMR LLC QAP TR (ML23297A006). The NRC staff provided information needs (ML24022A077) and held a public meeting with Holtec on January 26, 2024 (ML24039A003) to discuss the NRC staffs initial review. The NRC staff provided a revised information needs (ML24079A078) and held a second public meeting with Holtec on March 27, 2024 (ML24107B151), to further discuss the NRC staffs review. By letter dated April 19, 2024, Holtec submitted Revision 1 of the SMR LLC QAP TR for NRC staff to review (ML24110A088).

Subsequently, the NRC staff held a third public meeting with Holtec on May 31, 2024 (ML24152A002), to discuss any remaining items. By letter dated June 3, 2024, Holtec submitted Revision 2 of the SMR LLC QAP TR for NRC staff to review (ML24155A285). By email transmittal dated July 29, 2024, the NRC staff shared the draft safety evaluation (SE) with Holtec (ML24163A004).

The enclosed final SE is being provided to Holtec, because the NRC staff has found SMR LLC QAP TR, Revision 2, acceptable for referencing in licensing actions to the extent specified and under limitations and conditions delineated in the TR. The final SE defines the basis for the NRC staffs acceptance of the TR.

The NRC staff requests that Holtec publish an approved version of this TR within 3 months of receipt of this letter. The approved version should incorporate this letter and the enclosed SE after the title page. The approved version should include a -A (designating approved) following the TR identification symbol.

August 26, 2024

A. Benner 2

If you have any questions, please contact India Banks via by email at India.Banks@nrc.gov.

Sincerely, Michelle Hayes, Chief Licensing and Regulatory Infrastructure Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation Docket No. 99902049

Enclosure:

Final Safety Evaluation cc w/encl.: Holtec GovDelivery Signed by Hayes, Michelle on 08/26/24

Package: ML24228A054 Letter: ML24228A060

Enclosure:

ML24228A061

  • via eConcurrence NRR-106 OFFICE NRR/DNRL/NLIB NRR/DNRL/NLIB:LA OGC (NLO)

NAME IBanks SGreen MCarpentier DATE 08/15/2024 08/19/2024 08/20/2024 OFFICE NRR/DRO/IQVB: BC NRR/DNRL/NLIB: BC NAME KKavanagh MHayes DATE 08/22/2024