ML24117A138
| ML24117A138 | |
| Person / Time | |
|---|---|
| Site: | 99902049 |
| Issue date: | 04/26/2024 |
| From: | Banks I NRC/NRR/DNRL/NLIB |
| To: | Brenner A SMR |
| Banks, I., NRR/DNRL | |
| Shared Package | |
| ML24117A103 | List: |
| References | |
| EPID L-2023-TOP-0049 | |
| Download: ML24117A138 (1) | |
Text
From:
India Banks To:
Andrew Brenner Cc:
Carolyn Lauron; Manny Sayoc; C.Shurtleff@holtec.com; Sarah Horacek; Michelle Hayes
Subject:
Rev. 1, Updated NRC Form 898 - Completeness Determination for the SMR (Holtec) Quality Assurance Program Topical Report Date:
Friday, April 26, 2024 4:31:00 PM Attachments:
Rev.1 Updated NRC Form 898 - Completeness Determination for the SMR (Holtec) Quality Assurance Program Topical Report.pdf Mr. Andrew Brenner Director of Licensing, SMR, LLC
Mr. Brenner,
By email transmittal (ML23297A007) dated October 26, 2023, the U.S. Nuclear Regulatory Commission (USNRC) staff accepted the SMR (Holtec) Quality Assurance Program (QAPD) topical report and estimated 170 hours0.00197 days <br />0.0472 hours <br />2.810847e-4 weeks <br />6.4685e-5 months <br /> of effort to complete the review. However, during the detailed review it was determined an additional 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> of effort would be needed to identify the information needs and resolve them through two public meetings. This updated form reflects the new estimated level of effort. At this time, no changes have been made to the schedule.
A revision to the SMR (Holtec) QAPD TR (ML24110A090) was received. However, since this is a replacement to the original Form 898, the original submittal (ML23271A009) is referenced.
If you have any questions, please let me know.
Docket No.: 99902049