ML24227A958

From kanterella
Jump to navigation Jump to search
Federal Register Notice: Perry Nuclear Power Plant Unit 1 License Renewal Draft Supplemental Environmental Impact Statement
ML24227A958
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 09/03/2024
From: Melissa Ralph
NRC/NMSS/DREFS
To:
References
NRC-2023-0136
Download: ML24227A958 (5)


Text

[7590-01-P]

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-440; NRC-2023-0136]

Energy Harbor Corp.;

Energy Harbor Generation LLC.;

Energy Harbor Nuclear Corp.;

Perry Nuclear Power Plant, Unit 1;

Draft Supplemental Environmental Impact Statement

AGENCY: Nuclear Regulatory Commission

ACTION: Public meeting and request for comment.

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) is issuing for public

comment draft Supplement 61, to the Generic Environmental Impact Statement (GEIS)

for License Renewal of Nuclear Plants, NUREG-1437, regarding the proposed renewal

of Renewed Facility Operating License No. NPF-58 for an additional 20 years of

operation for Perry Nuclear Power Plant, Unit 1 (Perry Plant). Perry Plant is located in

Perry, Ohio, approximately 35 miles northeast of Cleveland, OH. Possible alternatives to

the proposed action of license renewal include no action and reasonable replacement

power alternatives.

DATES: The staff will hold two virtual public meetings through online webinar and

teleconference call on the draft supplement al environmental impact statement, including

a presentation on the preliminary findings and a transcribed public comment session.

The meetings will be held on October 1, 2024, at 1 p.m. eastern time (ET) and October 2

2024, at 6 p.m. ET. The public meeting details can be found on the NRCs Public

Meeting Schedule at https://www.nrc.gov/pmns/mtg. Members of the public are invited to submit comments by October 21, 2024. Comments received after that date will be

considered if it is practical to do so, but the NRC is able to ensure consideration only for

comments received on or before that date.

ADDRESSES: You may submit comments by any of the following methods; however,

the NRC encourages electronic comment submission through the Federal rulemaking

website:

for Docket ID NRC-2023-0136. Address questions about Docket IDs in Regulations.gov

to Stacy Schumann; telephone: 301-415-0624; email: Stacy.Schumann@nrc.gov. For

technical questions, contact the individual listed in the For Further Information Contact

section of this document.

  • Email: Comments may be submitted to the NRC electronically using the

email address PerryEnvironmental@nrc.gov.

  • Mail comments to: Office of Administration, Mail Stop: TWFN-7-A60M, U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, ATTN: Program

Management, Announcements and Editing Staff.

For additional direction on obtaining information and submitting comments, see

Obtaining Information and Submitting Comments in the SUPPLEMENTARY

INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Lance Rakovan, Senior Environmental

Project Manager, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear

Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-2589; email:

Lance.Rakovan@nrc.gov.

2 SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

Please refer to Docket ID NRC-2023-0136 when contacting the NRC about the

availability of information regarding this document. You may obtain publicly available

information related to this action using any of the following methods:

for Docket ID NRC-2023-0136.

  • NRCs Agencywide Documents Access and Management System

(ADAMS): You may obtain publicly available documents online in the ADAMS Public

Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the

search, select Begin Web-based ADAMS Search. For problems with ADAMS, please

contact the NRCs Public Document Room (P DR) reference staff at 1-800-397-4209, at

301-415-4737, or by email to PDR.Resource@nrc.gov. Draft Supplement 61, to the

GEIS for License Renewal of Nuclear Plants, NUREG-1437, is available in ADAMS

under Accession No. ML24241A256.

  • NRCs PDR: The PDR, where you may examine and order copies of publicly

available documents, is open by appointment. To make an appointment to visit the PDR,

please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-

4737, between 8 a.m. and 4 p.m. ET, Monday through Friday, except Federal holidays.

  • Public Library: A copy of the Draft Supplement 61, to the GEIS for License

Renewal of Nuclear Plants, NUREG-1437, r egarding the proposed renewal of Renewed

Facility Operating License No NPF-58, for an additional 20 years of operation for Perry

Plant, will be available for public review at the Perry Public Library, 3753 Main St, Perry,

OH 44081.

3 B. Submitting Comments

The NRC encourages electronic comment submission through the Federal

rulemaking website (https://www.regulations.gov). Please include Docket ID NRC-

2023-0136 in your comment submission.

The NRC cautions you not to include identif ying or contact information that you

do not want to be publicly disclosed in y our comment submission. The NRC will post all

comment submissions at https://www.regulat ions.gov as well as enter the comment

submissions into ADAMS. The NRC does not routinely edit comment submissions to

remove identifying or contact information.

If you are requesting or aggregating comments from other persons for

submission to the NRC, then you should inform those persons not to include identifying

or contact information that they do not w ant to be publicly disclosed in their comment

submission. Your request should state that the NRC does not routinely edit comment

submissions to remove such information before making the comment submissions

available to the public or entering the comment into ADAMS.

II. Discussion

The NRC is issuing for public comment draft Supplement 61 to the GEIS for

License Renewal of Nuclear Plants, NUREG-1437, regarding the proposed renewal of

Renewed Facility Operating License No. NPF-58, for an additional 20 years of operation

for Perry Plant. Draft site-specific Supplement 61 to the GEIS includes the preliminary

analysis that evaluates the environmental impacts of the proposed action and

alternatives to the proposed action. The NRC staff's preliminary recommendation is that

the adverse environmental impacts of license renewal for Perry Plant are not so great

4 that preserving the option of license renew al for energy-planning decisionmakers would

be unreasonable.

Dated: September 3, 2024.

For the Nuclear Regulatory Commission.

/RA/

Melissa Ralph, Deputy Director, Division of Rulemaking, Environmental, and Financial Support, Office of Nuclear Material Safety and Safeguards.

5