Public Workshop on Development of Risk Metrics to Support Implementation of Risk-Informed Programs for Advanced Reactors July 18, 2024
Workshop Overview
- NRC Opening Remarks
- Review Workshop Purpose
- Review Meeting Agenda
- External stakeholder presentations
- NRC staff presentations
- Open Discussion
- Public Comments 2
Public Workshop on Development of Risk Metrics to Support Implementation of Risk-Informed Programs for Advanced Reactors Opening Remarks Division of Advanced Reactors and Non-Power Production and Utilization Facilities (DANU) of NRCs Office of Nuclear Reactor Regulation (NRR)
Workshop Purpose 4
Gather input on strategy for establishing risk metrics for Non-LWRs (NLWRs).
Focus on technical aspects of risk metric development and use.
Identify the many risk metric connections to regulatory programs.
Focus staff ideas for further work on risk metrics for NLWRs.
Discuss NLWR operating experience data, methods, and tools to support risk estimation.
Project Drivers SRM-SECY-23-0021 provides motivation and direction to staff related NLWR risk metrics, but this workshop is not part of the Part 53 rulemaking.
5 Understanding that LWR risk metrics may not be suitable for NLWR designs.
Commission direction to staff on Part 53 rule SRM-SECY-23-0021 (ADAMS ML24064A039)
Prepare to assess applicant-proposed comprehensive plant risk metric (or set of metrics) and associated methodology.
Development of metrics for different plant designs (e.g., LWRs, gas-cooled reactors, molten salt reactors).
The risk metric(s) and methodology should inform NRCs risk-informed decision making (including applications after initial licensing).
NRC Tasks on Evaluating Risk of Advanced Reactors 6
- Development of technology-inclusive risk metrics that can be applied to NLWRs.
- Output: White paper outlining vision and strategies for risk metrics and tools to support risk-informed licensing and oversight for NLWRs.
- Includes topics to be discussed at this workshop Task 1
- Developing methods, tools, and processes to collect, analyze, and use data to support RIDM for advanced reactors.
- Includes topics to be discussed at this workshop Task 2
NRC Tasks on Evaluating Risk of Advanced Reactors (continued) 7
- Scoping study to evaluate the risk and modeling approaches for a selected advanced reactor design.
- Effort expected to be focused in fiscal years 2026 - 2028.
Task 3
- Enhancing RIDM guidance and framework for advanced reactors.
- Effort expected to be focused in fiscal years 2026 - 2029.
Task 4
Focus of NRC Working Group 8
Risk metric(s) should be comprehensive in covering all radiological sources, all operating states, and all internal and external hazards.
The Working Groups initial focus:
- Risk metrics that express plant risk so they can provide indications of meeting desired ultimate risk objectives, such as the Quantitative Health Objectives (QHOs).
- Initial focus on NLWRs
- For example, molten salt reactors, high-temperature gas-cooled reactors.
- Initial focus on radiological sources from reactors primary system.
Public Workshop Agenda (part 1 of 4)
Time Topic Speaker 8:30 am - 8:40 am NRC Opening Remarks NRC 8:40 am - 8:50 am Purpose of Public Workshop Jeffery Wood, NRC 8:50 am - 9:20 am Review of Applicant-Proposed Risk Metrics for Commercial Nuclear Power Plants Licensed Under Proposed 10 CFR Part 53 -
Development of Interim Staff Guidance Marty Stutzke, NRC 9:20 am - 10:05 am NIA Perspectives on Comprehensive Risk Metrics Patrick White, Nuclear Innovation Alliance (NIA) 10:05 am - 10:35 am EPRIs Risk Metric Work Eric Thornsbury, Electric Power Research Institute (EPRI) 10:35 am - 10:45 am Break 9
Public Workshop Agenda (part 2 of 4)
Time Topic Speaker 10:45 am - 11:15 am Breakthrough Institute Perspectives on Risk Metrics Adam Stein, The Breakthrough Institute 11:15 am - 11:45 am Challenges and Lessons Learned in Applying NEI 18-04 During Active Design: The eVinci Microreactor Kyle Hope, Westinghouse Electric Company 11:45 am - 12:15 pm Hazard Level Selection for LMP Jessica Maddocks, X-Energy 12:15 pm - 1:15 pm Lunch Break 10
Public Workshop Agenda (part 3 of 4)
Time Topic Speaker 1:15 pm - 1:45 pm UCS Views on Advanced Reactor Risk Metrics Ed Lyman, Union of Concerned Scientists (UCS) 1:45 pm - 2:15 pm USNIC Perspectives on Risk Metrics Cyril Draffin, U.S. Nuclear Industry Council (USNIC) 2:15 pm - 2:30 pm NRC Plans for Work on Operating Experience, Methods, and Tools to Support Advanced Reactor Risk John Lane, NRC 2:30 pm - 3:00 pm NLWR Data Insights and Experience Dave Grabaskas, Argonne National Laboratory (ANL) 3:00 pm - 3:30 pm Advanced Reactor Operating Experience Data Analysis to Support Risk Estimation and the Intertwining of Data, Decisions, and Reliability Sai Zhang and Diego Mandelli, Idaho National Lab. (INL) 3:30 pm - 3:40 pm Break 11
Public Workshop Agenda (part 4 of 4)
Time Topic Speaker 3:40 pm - 4:10 pm NRC Preliminary Thoughts on Risk Metrics for NLWRs Matthew Humberstone and Gerardo Martinez-Guridi, NRC 4:10 pm - 4:50 pm Open Discussion All 4:50 pm - 5:00 pm Public Comments NRC 5:00 pm Adjourn 12
NRC Working Group on Advanced Reactor Risk Metrics
- 2 NRC Office of Nuclear Reactor Regulation (NRR) / Division of Advanced Reactors and Non-power Production Utilization Facilities (DANU) 13 Matt Humberstone 1 Gerardo Martinez-Guridi 1 Hanh Phan 2 Marty Stutzke 2 Jeffery Wood 1
Questions?
14 Comments or questions on workshop purpose?
Acronyms and Abbreviations
- ANL - Argonne National Laboratory
- CFR - Code of Federal Regulations
- EPRI - Electric Power Research Institute
- LMP - Licensing Modernization Project
- NEI - Nuclear Energy Institute
- NIA - Nuclear Innovation Alliance
- NRC - U.S. Nuclear Regulatory Commission
- NLWR - Non-Light-Water Reactor
- QHO - Quantitative Health Objective
- RIDM - Risk-Informed Decision Making
- USNIC - U.S. Nuclear Industry Council 15
Review of Applicant-Proposed Risk Metrics for Commercial Nuclear Plants Licensed Under Proposed 10 CFR Part 53
- Development of Interim Staff Guidance -
Marty Stutzke Senior Technical Advisor for Probabilistic Risk Assessment Division of Advanced Reactors and Non-Power Production and Utilization Facilities (DANU)
Office of Nuclear Reactor Regulation (NRR)
July 18, 2024 1
Agenda
- Review of SRM-SECY-23-0021, Item 2
- Development of interim staff guidance (ISG):
- ISG applicability
- Terminology related to risk metrics
- Review flowchart
- Change provisions
- Intellectual property
- Next steps 2
SRM-SECY-23-0021, Item 2
- Disapproved codification of the QHOs
- Revise draft § 53.220 to specify that applicants must propose a comprehensive plant risk metric (or set of metrics) and a description of the associated methodology:
Explain initial and boundary conditions Explain assumptions
- Cumulative and comprehensive mean that the risk metric(s) should approximate the total overall risk from the facility:
Screening tools and bounding or simplified methods may be used for any mode or hazard with an acceptable technical basis Address uncertainties
- NRCs approval of the metric or set of metrics is not, by itself, an indicator of adequate protection
- Ensure that approved metric(s) and methodology cannot be changed without prior NRC approval
- The metric(s) and associated methodology will not constitute a real-time requirement
- Conduct tabletop exercises and widespread public engagement with interested external stakeholders
- Seek comment on whether and how comprehensive plant risk metrics should be codified or otherwise memorialized 3
Tentative ISG Scope
- Addresses the NRC staff review of applicant-proposed risk metrics for commercial nuclear plants under proposed 10 CFR Part 53:
- Light-water reactor (LWR) and non-LWR technologies
- Radiological risks (separate guidance is being developed for the assessment of the risk of permanent injury to the public due to the health effects of the chemical hazards of licensed material)
- Initial applications for:
- Standard design approvals (SDAs)
- Standard design certifications (DCs)
- Manufacturing licenses (MLs)
- Construction permits (CPs)
- Operating licenses (OLs)
- Combined licenses (COLs)
- Changes to risk metrics or risk performance objectives after initial licensing
- Topical reports submitted by:
- Individual applicants, permit holders, or license holders
- Third parties, e.g., designers, industry groups
- Industry consensus standards
- White papers 4
How the proposed risk metric is presented to the staff determines what NRC internal process applies.
NRC Management Directives NRR Office Instructions
Tentative Terminology 5
Possible terms to be defined in the ISG:
1.
Risk metric (RM) 2.
Comprehensive risk metric 3.
Risk performance objective (RPO) 4.
Risk surrogate For all plants, IEFR 5 x 10-7/plant-year Statement of Applicability Technology-inclusive or reactor specific?
What source(s)?
What POSs?
What hazards(s)?
Risk Performance Objective (RPO)
A risk performance objective is a preestablished, indicative value of the risk metric that is used during risk-informed decision making to gauge plant safety.
Risk Metric (RM)
Calculated by the PRA Example for Discussion
Tentative Terminology (Continued) 6 For LWRs, if CDF 10-4/r-y, then ILCFR 2 x 10-6/r-y If [risk surrogate is met], then [risk metric is met]
Risk Surrogate - general form Example Question For LWRs, if HCLPF 1.67 SSE, then seismic risk is acceptable (SRM-SECY-93-087)
- Is the HCLPF (high confidence of low probability of failure) developed by a PRA-based seismic margins analysis (SMA) a risk metric or a risk surrogate?
- Note: The 1.67 multiplier has not yet been accepted for non-LWRs
7 Individual members of the public should be provided a level of protection from the consequences of nuclear power plant operation such that individuals bear no significant additional risk to life and health.
Societal risks to life and health from nuclear power plant operation should be comparable to or less than the risks of generating electricity by viable competing technologies and should not be a significant addition to other societal risks.
The risk to an average individual in the vicinity of a nuclear power plant of prompt fatalities that might result from reactor accidents should not exceed one-tenth of one percent (0.1 percent) of the sum of prompt fatality risks resulting from other accidents to which members of the U.S. population are generally exposed.
The risk to the population in the area near a nuclear power plant of cancer fatalities that might results from nuclear power plant operation should not exceed one-tenth of one percent (0.1 percent) of the sum of cancer fatality risks resulting from all other causes.
IEFR 5x10-7/reactor-year*
- RPO basis: NUREG-0880, Rev. 1 ILCFR 2x10-6/reactor-year*
- RPO basis: NUREG-0880, Rev. 1 LERF 10-5/reactor-year
- RPO basis: NUREG-1860, App. D CDF 10-4/reactor-year
- RPO basis: NUREG-1860, App. D LRF 10-6/reactor-year
- Applicant-defined
- History: SECY-13-0029 The safety goals broadly define an acceptable level of radiological risk technology-inclusive LWR-specific
- LMP (NEI 18-04, Rev. 1, as endorsed in RG 1.233), uses the QHOs on a per plant basis QHOs practical values for RIDM SGPS risk surrogates Example: Deriving Risk Surrogates from the QHOs
Tentative ISG Overarching Principles
- The ISG provides guidance to NRC staff reviewers
- Review should ensure that the proposed risk metrics and associated risk performance objectives are fit-for-purpose:
- Form follows function - Louis Sullivan
- Start with the end in mind - Stephen Covey
- Review should ensure consistency with Commission policies and previously accepted risk metrics and risk performance objectives to help achieve an equivalent level of safety
- Applicants may use previously accepted risk metrics and risk performance objectives, when applicable, which improves review efficiency 8
Tentative ISG High-Level Concept 9
Uses of the PRA Meet regulations Demonstrate that Commission expectations in policy statements have been achieved Support voluntary risk-informed applications Risk Metric Risk Performance Objective Methodology Risk Metric Risk Performance Objective Methodology Risk Metric Risk Performance Objective Propose a risk metric (or set of metrics) and associated risk performance target(s) that collectively:
Approximates the total overall risk o
All radiological sources o
All plant operating states o
All internal and external hazards Supports the intended uses of the PRA A given methodology may be used to determine multiple risk metrics Qualitative and quantitative screening analyses PRA logic models Quantitative risk-informed supplemental evaluations o
Bounding methods o
Simplified methods
Regulations Related to Risk Metrics
- Proposed § 53.220 - Safety criteria for licensing-basis events other than design-basis accidents
- Numerous references to proposed § 53.220 throughout proposed Part 53
- Remember that under Part 53, a commercial nuclear plant means a facility consisting of one or more commercial nuclear reactors and associated co-located support facilities, including the collection of buildings, radionuclide sources, and SSCs. Accordingly, comprehensive risk metrics must include the risks from:
- Multi-reactor event sequences
- Non-reactor event sequences
- Proposed § 53.440(k) - Chemical hazards
- Relation of methods for analyzing the risk of permanent injury to the public due to the health effects of the chemical hazards of licensed material to methods used to calculate radiological risk metrics?
- 10 CFR Part 51 - Severe accident mitigation design alternatives (SAMDAs)
- Not required for SDAs
- Relation to risk metrics, methods to calculate risk metrics, and risk performance objectives used in the safety analysis?
10
Risk Metrics and SAMDA Analysis 11 NPV = (APE + AOC + AOE + AOSC) - COE NPV
=
Net present value of current risk ($)
APE
=
Present value of averted public exposure ($)
AOC
=
Present value of averted offsite property damage costs ($)
AOE
=
Present value of averted occupational exposure ($)
AOSC =
Present value of averted onsite costs ($)
=
Cost of any enhancement implemented to reduce risk ($)
Proportional to population dose risk (person-rem/y)
Proportional to offsite economic cost risk ($/y)
For LWRs, proportional to CDF What about non-LWRs?
12 Stage 2 Stage 1 Same reactor technology, uses, risk metrics, and risk performance objectives as previously reviewed?
Risk metrics and risk performance objectives same as the QHOs?
Risk metrics and risk performance objectives derived from the QHOs?
Inform management Acceptable no yes no no yes Consistency with Commission policy expectations Leverage previous reviews (e.g., COL based on DC, SDA, or ML)
Review processes, coordination, and scheduling
- Revised or new risk metric or risk performance objective after initial licensing
- Topical report - applicant, vendor, industry
- Industry consensus standard
- White paper Start Is each risk metric concisely and unambiguously defined?
Does each risk performance objective have an acceptable technical basis?
Has the applicant described the methodology to be used to compute each risk metric?
- Treatment of uncertainties?
Acceptable yes yes yes Is the set of risk metrics and risk performance objectives comprehensive?
yes Has the applicant identified its intended uses of the risk metrics and risk performance objectives?
yes Unacceptable no no no no no A
B C
D E
F G
H I
J Tentative ISG Review Process yes
Other Topics
- Change Provisions
- Type of licensing process:
- CPs - attach as a permit condition
- DCs:
Not certification information (analogy: not Tier 1 information under Part 52)
Include in the DCD
- Subject to relevant change provisions in proposed Part 53
- Intellectual Property
- The NRC staff recognizes that applicants, licensees, and industry organization may invest considerable resources in proposing risk metrics.
- NRR Office Instruction LIC-204, Handling Requests to Withhold Proprietary Information from Public Disclosure.
- The Commissions PRA Policy Statement (60 FR 42622; August 16, 1995): PRA evaluations in support of regulatory decisions should be as realistic as practicable and appropriate supporting data should be publicly available for review.
13
Next Steps
- The ISG on staff review of applicant proposed risk metrics is a separate effort (i.e., the ISG will not be not included in the Part 53 rulemaking package).
- Goal is to issue the ISG when Part 53 is finalized.
- Part 53 rulemaking schedule:
- September 4, 2024: Send revised proposed Part 53 to the Commission
- Early October: Publish proposed Part 53 in the Federal Register; start of public comment period
- The ISG will be informed by:
- Comments and discussion during this workshop
- Public comments on the proposed Part 53 (late 2024 - early 2025)
- Future workshops (to be determined) 14
Acronyms and Initialisms 15 BC boundary condition CDF core damage frequency CFR Code of Federal Regulations COL combined license CP construction permit DANU Division of Advanced Reactors and Non-power Production and Utilization Facilities DC standard design certification FR Federal Register HCLPF high confidence of low probability of failure IC initial condition IEFR individual early fatality risk ILCFR individual latent cancer fatality risk ISG interim staff guidance LERF large early release frequency LRF large release frequency LWR light-water reactor ML manufacturing license Non-LWR non-light-water reactor NRC Nuclear Regulatory Commission NRR Office of Nuclear Reactor Regulation POS plant operating state PRA probabilistic risk assessment OL operating license QHOs quantitative health objectives RM risk metric RG regulatory guide RIDM risk-informed decision make RPO risk performance objective SAMDA severe accident mitigation design alternatives SDA standard design approval SMA seismic margins analysis SRM staff requirements memorandum SSCs structures, systems, and components SSE safe shutdown earthquake
References
- SRM-SECY-23-0021, Staff Requirements - SECY-23-0021 - Proposed Rule: Risk-Informed, Technology-Inclusive Regulatory Framework For Advanced Reactors (RIN 3150-AK31), March 4, 2024, public website.
- SRM-SECY-93-087, SECY-89-102 - Implementation of the Safety Goals, June 15, 1990, ADAMS Accession No. ML051660712.
- RG 1.200, Rev. 1, Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities, December 2020, public website.
- RG 1.247, TRIAL - Acceptability of Probabilistic Risk Assessment Results for Non-Light Water Reactor Risk-Informed Activities, March 2022, public website.
- NUREG-0880, Rev. 1, Safety Goals for Nuclear Power Plant Operation, May 1983, ADAMS Accession No. ML071770230.
- NUREG-1860, Feasibility Study for a Risk-Informed and Performance-Based Regulatory Structure for Future Plant Licensing, December 2007, public website.
- SECY-13-0029, History of the Use and Consideration of the Large Release Frequency Metric by the U.S. Nuclear Regulatory Commission, March 22, 2013, public website.
16
John C Lane PE Division of Risk Analysis Office of Nuclear Regulatory Research Workshop on Advanced Reactors Risk Metrics & Data July 18 2024 Reliability & Operational Data Needs For Advanced Reactors
2 Advanced Reactor Operational Exp Relevance of Research & Operational Data a Needs
- Data will inform:
- Reactor design
- Reliability assessment
- Risk modeling
- NRC licensing
- Licensing basis event selection
- Classification of structures, systems and components
- Conformance with ASME/ANS NLWR PRA Standard data requirements
- NaSCoRD-SNL-Sodium System & Component Reliability Database (developed from CREDO data)
- MOSARD-ORNL-Molten Salt Reactor Component Reliability Database (w/ EPRI)
- NDMAS-INL-Nuclear Data Management & Analysis System
- FFTF-PPNL-Passive Safety Testing & Metal Fuel Irradiation Database
- TREXR-ANL-Treat Experimental Relational Database & EBR-II Transient
& Fuels DBs Component reliability raw data databases 3
Gateway for Accelerated Innovation in Nuclear 4
Data Sources & Challenges in Modeling Risk 5
Early initiatives will likely combine
- Commercial power plant data (INPO-IRIS database)
- Advanced reactor component engineering & operational failure event data
- Expert/engineering judgement
- Simulations Data challenges for passive system reliability
- Physical failure of components (e.g.,
pipe breaks, spurious actuation)
- Functional failure (e.g., unexpected, unanalyzed situations)
- Uncertainties in new system design, time-dependent boundary conditions
- Limited testing of operating condition
Planned Data Activities 6
Workshop (July 18 2024)
Examine available existing advanced reactor OpE databases Establish database templates, reporting criteria, and data methods/procedures to support risk modeling and regulatory oversight Populate the new database with operational data from prominent advanced reactor designs
NRC Preliminary Thoughts on Risk Metrics for Non-LWRs NRC Working Group on Technology-Inclusive Risk Metrics
- Matt Humberstone (RES/DRA)
- Gerardo Martinez-Guridi (RES/DRA)
- Hanh Phan (NRR/DANU)
- Marty Stutzke (NRR/DANU Sr. Level Advisor)
- Jeffery Wood (RES/DRA)
Outline
- Structure for Discussing Risk Metrics for NLWRs
- Applicability of Existing Risk Metrics
- Desirable Characteristics for Risk Metrics
- Desirable Characteristics for Using Risk Metrics
- Some Considerations on Other Potential Approaches to Risk Metrics
- Basic Considerations on Risk Metrics Proposed by Industry
- Summary of Initial Thoughts: Proposed Approach to Risk Metrics 2
Structure for Discussing Risk Metrics for NLWRs
- The current regulatory structure and the three levels of PRA commonly applied to LWRs are used herein as the bases for discussing risk metrics for NLWRs
- Other approaches to developing these metrics are possible and are also briefly addressed 3
Initiating event Prevention capabilities Core damage event Containment systems, Severe accident progression, Radiological release Offsite radiological consequences Modeling approach:
Probabilistic analysis (e.g.,
SAPHIRE, CAFTA) with probability and frequency-based outputs Level 2 PRA Level 3 PRA Level 1 PRA Reliability and core damage metrics:
CDF Importance measures Performance indicators Reliability targets Radioactive release metrics:
LERF, LRF Characteristics of release, such as timing and magnitude Consequence metrics:
Early fatalities Latent cancer fatalities Dose Economic impacts Modeling approach:
Mechanistic analysis (MELCOR, MAAP) for accident progression and source terms Frequency-based output Modeling approach:
Mechanistic analysis of radionuclide transport and health effects Incorporates probabilistic evaluation (e.g., weather)
MACCS commonly used
Applications of Risk Metrics Applications Where Regulatory Decision Making is Informed by Applicant/Licensee-Defined Risk Metrics and Models Initial licensing (CP, OL, DC, SDA, ML, COL) applications 10 CFR 50.69 - Risk-Informed Categorization of SSCs 10 CFR 50.65 - Maintenance Rule RG 1.178 - Risk-Informed Inservice Inspection RG 1.175 - Risk-Informed Inservice Testing 10 CFR 50 App J, NEI 94-01, and EPRI TR-1009325 - Risk-Informed Integrated Leak Review Testing RG 1.205 - Risk-Informed Fire Protection RG 1.177 - Risk-Informed Technical-Specification JLD-ISG-2012-01 and NEI 12 Flex Strategies Risk-Informing Emergency Planning Risk-informing Security Mitigating System Performance Indicators (MSPIs)
RG 1.174 - An Approach for Using PRA in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis LR-ISG-2006-03 and NEI 05 SAMDA analysis Reliability and Integrity Management Programs Etc.
Applications Where Regulatory Decision Making is Informed by Staff-Defined Risk Metrics and Models Incidence Investigation Program (MD 8.3)
Notice of Enforcement Discretion (NOED) (IMC-0410)
Integrated Risk Informed Decision Making of Emergent Issues (LIC-504)
Integrated Risk Informed Decision Making for Licensing Reviews (LIC-206)
Reactor Oversight Process - Significance Determination Process (SDP) (IMC-0609)
Generic Issues Program - GI screening is heavily informed by the RG 1.174 approach Accident Sequence Precursor (ASP) Program Etc.
5 PRA Risk Metrics
Applicability of LWR Risk Metrics to NLWRs CDF LERF/LRF Consequence Metrics LWR Applicable Technology inclusive Technology inclusive NLWR Applicable to NLWRs w/CD Not Applicable to Other NLWRs 6
For LWRs:
Challenges with Consequence (Radiological Health-Effects) Metrics
- Technical
- Health effects metrics are obtained by combining the characteristics of a plant with the conditions of the plants location, such as the number of people surrounding the plant, the peoples spatial distribution, and the weather
- It is difficult to relate health effects metrics to the elements (e.g., hardware components and human errors) of a Level-1 PRA and a Level-2 PRA to evaluate the importance measures of each element
- Large uncertainties 7
Challenges with Consequence (Radiological Health-Effects) Metrics (contd)
- Perception
- Possible perception of additional burden on NLWR applicants compared to LWRs
- Possible negative perceptions (e.g., results reported in terms of number of fatalities)
- Increased review times 8
Desirable Characteristics for Risk Metrics
- A risk metric is a measure that is used to express the risk quantity of interest
- A risk metric can be used to illustrate compliance with safety goals
- A risk metric can be used in performing risk characterization
- Risk characterization combines the major components of risk (hazards, consequences, frequency, and probability), along with quantitative estimates of risk, to give a combined and integrated risk perspective (i.e., a risk profile)
- A risk metric can be used to derive risk indicators
- An example of a risk indicator is conditional core damage probability (CCDP)
- Importance measures is an important example because:
- They provide relative and absolute measures of the importance of PRA elements to plants risk
- They are used in many regulatory programs involving RIDM
- Characterization of the uncertainty of risk metric is possible 9
Desirable Characteristics for Using Risk Metrics
- The process for calculating a risk metric is transparent
- Risk metrics for accident prevention and accident mitigation would be useful (as described on SECY-89-102)
- Risk metrics that minimize changes to the current regulatory structure
- It allows to maximize consistency with current risk metrics (CDF and LERF/LRF)
- Risk metrics that minimize challenges to relate them to safety objectives, such as the QHOs 10
Desirable Characteristics for Using Risk Metrics (contd)
- Risk metrics that can be applied to the lifetime of an NLWR
- Risk metrics that avoid challenges associated with health-effect metrics
- Risk metrics that can be applied to all sizes (i.e., power generation) of reactors 11
Risk Metrics for Accident Prevention for NLWRs
- When core damage is applicable (e.g., for fast reactors cooled by liquid metals):
- CDF is applicable to these NLWRs
- Definition of core damage may be specific to each reactor technology
- When core damage is not applicable:
- Core damage for LWRs implies the failure of the LWR fuel cladding, which is the initial confinement of radioactive material
- Accordingly, our initial tendency is to define a frequency of failure of initial confinement of radioactive material
- Defining failure of initial confinement is specific to each reactor technology
- It may be somewhat challenging to define this failure for each reactor technology 12
Some Considerations on Other Potential Approaches to Risk Metrics for NLWRs
- Technology-inclusive risk metrics
- LERF could be a possibility
- Risk metrics for accident prevention could be missing since they are technology-specific
- It would require major modifications to current regulatory structure or developing a new regulatory structure for NLWRs
- It may be difficult to calculate quantitative risk metrics that can be used to compare with the safety objectives, such as the QHOs
- It may be difficult to generate derived risk indicators, such as importance measures, which are used in many regulatory programs involving RIDM 13
Basic Considerations on Risk Metrics Proposed by Industry
- NRC is open to consider the proposed risk metrics
- It also seems desirable to establish:
- Set of unified metrics between industry and NRC (as much as possible)
- Set of unified metrics that would be appropriate for use throughout plant lifetime 14
Summary of Initial Thoughts:
Proposed Approach to Risk Metrics for NLWRs
- For accident prevention:
- Use CDF whenever core damage is applicable
- Use new metrics when core damage is not applicable (e.g., frequency of failure of initial confinement of radioactive material)
- For accident mitigation, LERF is technology inclusive
- Consequence metrics are technology inclusive, but there are challenges associated with them
- Desirable attributes for risk metrics and for using the metrics are proposed 15
Acronyms and Abbreviations 16 Adv.
Advanced ASP Accident Sequence Precursor CCDP Conditional Core Damage Probability CDF Core Damage Frequency CFR Code of Federal Regulations COL CP Combined License Construction Permit DANU (NRC) Division of Advanced Reactors and Non-Power Production and Utilization Facilities DC Design Certification EPRI Electric Power Research Institute IMC Inspector Manual Chapter ISG Interim Staff Guidance LERF Large Early Release Frequency LRF Large Release Frequency LWR MACCS Light-Water Reactor MELCOR Accident Consequence Code System
Acronyms and Abbreviations (contd) 17 MAAP MD ML Modular Accident Analysis Program Management Directive Manufacturing License NEI Nuclear Energy Institute NLWR NOED Non-Light-Water Reactor Notice of Enforcement Discretion NRC Nuclear Regulatory Commission RIDM Risk-Informed Decision Making NRR (NRC) Office of Nuclear Reactor Regulation OL Operating License OpE Operating Experience PRA QHO Probabilistic Risk Assessment Qualitative Health Objective RES (NRC) Office of Nuclear Regulatory Research RG Regulatory Guide
Acronyms and Abbreviations (contd) 18 Rx SAMDA SDA SSC Reactor Severe Accident Mitigation and Design Alternatives Standard Design Approval Structures, Systems, and Components
Backup Slides 19
Early Studies, Events, and Policies related to Risk 20 1975 1985 1995 Reactor Safety Study (WASH-1400)
Severe Accident Risks (NUREG-1150)
Individual Plant Examinations (IPE) for Severe Accident Vulnerabilities (GL 88-20, NUREG-1560)
IPE of External Events (GL 88-20 supp. 4, NUREG-1742)
Station Blackout (NUREG-1032)
Indian Point
& Zion Probabilistic Safety Studies 1980 1990 PRA Policy Statement Severe Accident Policy Statement Safety Goal Policy Statement TMI Accident Shutdown /
Low Power (NUREG-1449)
1986 Policy Statement: Safety Goals for the Operations of Nuclear Power Plants 21 Qualitative Safety Goals:
Individual members of the public should be provided a level of protection from the consequences of nuclear power plant operation such that individuals bear no significant additional risk to life and health.
Societal risks to life and health from nuclear power plant operation should be comparable to or less than the risks of generating electricity by viable competing technologies and should not be a significant addition to other societal risks.
Quantitative Health Objectives (QHOs):
The risk to an average individual in the vicinity1 of a nuclear power plant of prompt fatalities that might result from reactor accidents should not exceed one-tenth of one percent (0.1 percent) of the sum of prompt fatality risks resulting from other accidents to which members of the U.S. population are generally exposed.
The risk to the population in the area2 near a nuclear power plant of cancer fatalities that might result from nuclear power plant operation should not exceed one-tenth of one percent (0.1 percent) of the sum of cancer fatality risks resulting from all other causes.
1Within 1 mile of the nuclear power plant site boundary; 2Within 10 miles of the plant site
Background on Risk Metrics Policy and History
- NRC has a long history of integrating risk into our decision-making
- Suggested reading:
22
Risk Objective References
- SRM on SECY-89-102, Implementation of Safety Goals (ML003707881)
- Establishes objectives for CDF, LRF, and CCFP
- SECY-93-138, Recommendation on Large Release Definition (ML003761015)
- Recommend terminating further work to develop large release definition
- SECY-10-0121, Modifying the Risk-Informed Regulatory Guidance for New Reactors (ML102230076)
- SRM on SECY-10-0121 (ML110610166) disapproved staffs recommendation, reaffirms existing subsidiary risk goals
- NUREG-1860, Feasibility Study for a RIPB Regulatory Structure for Future Plant Licensing
- See Appendix D - Derivation of Risk Surrogates for LWRs 23
Risk vs Risk Metrics
- Risk Triplet:
- 1. What can go wrong?
- 2. How likely is it?
- 3. What are the consequences?
- Risk Metric - a measure that is used to express the risk quantity of interest (from NUREG-2122 - Glossary of Risk-Related Terms)
- For example, for LWRs:
- Core damage frequency (CDF)
- Risk metrics could be used to address all parts of the risk triplet.
24
Risk Metric Terms
- Subsidiary Risk Metric or Surrogate Risk Metric - an alternative risk metric that can provide indication of meeting a desired ultimate risk objective, e.g., QHOs
- A surrogate is typically developed at a lower modeling level and provides a measure of margin to the desired risk goal
- Risk Performance Objective - a preestablished, indicative value that is used during RIDM to gauge plant safety
- Provides a reference point for risk metric results.
- Typically, not a strict acceptance limit.
- Sometimes also referred to as risk goal or risk criterion.
25
- Level 1: Core damage frequency analysis
- It calculates the core damage frequency given the design and operation of the plant.
- Level 2: Radionuclide release frequency analysis
- It takes the results of the Level-1 PRA (accident sequences resulting in core damage) as input and produces frequencies of radioactivity releases as output.
- Level 3: Consequence analysis
- It takes the results of the Level 2 PRA as input and produces offsite consequences (health effects, economic consequences) as output.
Source of text: NUREG-2122 26
Structure of Level 1, Level 2, Level 3 PRA (for LWRs)
Figure from System Modeling Techniques for PRA (P-200) by INL.
Subsidiary Risk Objectives In NRCs risk-informed decision-making for operating reactors (LWRs):
- A core damage frequency (CDF) of < 10-4/Rx-year is used as a surrogate for the latent cancer fatality QHO.
- A large early release frequency (LERF) of < 10-5/Rx-year is used as a surrogate for the individual prompt fatality QHO.
28
Subsidiary Risk Objectives (contd)
In 1990, the Commission established three risk metrics for new reactors (Advanced LWRs (ALWRs)) and associated quantitative goals:
- Core Damage Frequency (CDF) < 1x10-4/year - A measure of overall safety performance in prevention of severe accidents
- Large Release Frequency (LRF) < 1x10-6/year - A measure of prevention of significant offsite consequences
- Conditional Containment Failure Probability (CCFP) < 0.1 - A measure of the capability of design to mitigate a severe accident 29
Examples of Previously Used Risk Metrics and Associated Performance Objectives.
Risk Metric and Performance Objective Applicability Definition Notes IEFR: individual early fatality risk mean* IEFR 5x10-7 /plant-year Technology Inclusive RG 1.247 First quantitative health objective (QHO) in the Commissions safety goal policy statement; NUREG-0880 provides the technical rationale.
ILCFR: individual latent cancer fatality risk mean* ILCFR 2x10-6 /plant-year Technology Inclusive RG 1.247 Second QHO in the Commissions safety goal policy statement; NUREG-0880 provides the technical rationale.
LRF: large release frequency mean* LRF 10-6 /reactor-year Technology inclusive Staff has not defined LRF; practice has been to allow Part 52 applicants to define LRF.
SRM on SECY-90-016 established this performance objective.
LRF applies to all current and future designs (SRM-SECY-98-102).
LWRs transition from LRF to LERF at initial fuel load (SRM-SECY-12-0081)
SECY-13-0029 provides a history of LRF.
CDF: core-damage frequency mean* CDF 10-4 /reactor-year LWRs and NLWRs susceptible to core damage RG 1.200 Surrogate for the ILCFR QHO; NUREG-1860, Vol. 2, App. D provides the technical rationale for LWRs.
Measure of plants accident prevention capability.
Does not address non-core sources or multi-reactor accidents.
LERF: large early release frequency mean* LERF 10-5 /reactor-year Technology inclusive RG 1.200 Surrogate for the IEFR QHO and LRF; NUREG-1860, Vol.
2, App. D provides the technical rationale for LWRs.
Measure of plants accident mitigation capability.
Does not address non-core sources or multi-reactor accidents.
LERF sequences have been identified qualitatively for LWRs (e.g., Table 2-2.8-9 in ASME/ANS RA-Sa-2009, as endorsed in RG 1.200).
- The term mean refers to the mean of the parametric uncertainty distribution of the risk metric. Modeling uncertainties and completeness uncertainties also should be considered in risk-informed decision making (NUREG-1855).
30
Impressions of LMP Approach Strengths:
- Technology-inclusive
- Useful for initial licensing
- It is being used by applicants and potential applicants Challenges:
- How will the approach be leveraged for other RI programs?
- Maintenance rule
- Interface of LMP with industry consensus standards
- Seismic design process, reliability integrity management, RI fire protection 31