3F0524-01, Response to Request for Additional Information for the Environmental Assessment of the License Termination Plan
From kanterella
(Redirected from ML24131A075)
Jump to navigation
Jump to search
ML24131A075 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 05/09/2024 |
From: | Reid B ADP CR3 |
To: | Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk |
Shared Package | |
ML24131A074 | List: |
References | |
3F0524-01 | |
Download: ML24131A075 (209) | |
Similar Documents at Crystal River | |
---|---|
Category:Environmental Assessment
MONTHYEARML24081A0682024-07-31031 July 2024
[Table view]LTP Environmental Assessment 3F0524-01, Response to Request for Additional Information for the Environmental Assessment of the License Termination Plan2024-05-0909 May 2024 Response to Request for Additional Information for the Environmental Assessment of the License Termination Plan ML24088A2722024-03-28028 March 2024 Draft Crystal River Historic and Cultural Sections for LTP Environmental Assessment ML21060B0212021-03-31031 March 2021 Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Crystal River ISFSI 3F0717-01, Submittal of Crystal River Unit 3 - License Amendment Request 321, Revision 1, ISFSI Only Physical Security Plan2017-07-0505 July 2017 Submittal of Crystal River Unit 3 - License Amendment Request #321, Revision 1, ISFSI Only Physical Security Plan ML15013A1812015-02-23023 February 2015 Letter with Environmental Assessment and Finding of No Significant Impact Related to Request for Exemptions from Certain Emergency Planning Requirements ML15013A1732015-02-23023 February 2015 Environmental Assessment and Finding of No Significant Impact Exemptions from Certain Emergency Planning Requirements ML14246A1982015-01-14014 January 2015 Letter, Finding of No Significant Impact and Associated Environmental Assessment Related to Use of the Decommissioning Trust Fund for Irradiated Fuel Management and Site Restoration ML12314A0672013-01-0808 January 2013 Nuclear Generating Plant - Federal Register Notice - Draft Environmental Assessment and Draft Finding of No Significant Impact Related to the Proposed Extended Power Uprate ML12314A0652013-01-0808 January 2013 Nuclear Generating Plant - Letter - Draft Environmental Assessment and Draft Finding of No Significant Impact Related to the Proposed Extended Power Uprate ML0326010112003-09-17017 September 2003 Environmental Assessment & Finding of No Significant Impact Regarding Exemption from 10 CFR 50.44, 10 CFR 50.46 & Appendix K ML0312505822003-05-0505 May 2003 Environmental Assessment for Exemption from 10 CFR 55.59 ML0233802372002-12-0404 December 2002 Environmental Assessment Exemption from 10 CFR 55.59 2024-07-31 Category:Letter type: MONTHYEAR3F0824-01, Independent Spent Fuel Storage Installation Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 52024-08-21021 August 2024
[Table view]Independent Spent Fuel Storage Installation Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 5 3F0824-02, Withdrawal of License Amendment Request to Add License Condition 2.C.21, License Termination Plan, Proposed Change Number 2622024-08-12012 August 2024 Withdrawal of License Amendment Request to Add License Condition 2.C.21, License Termination Plan, Proposed Change Number 262 3F0624-02, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-06-13013 June 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0624-01, Response to Questions from the NRC Environmental Assessment Branchs Review of License Termination Plan During Virtual Meeting Dated May 20, 20242024-06-11011 June 2024 Response to Questions from the NRC Environmental Assessment Branchs Review of License Termination Plan During Virtual Meeting Dated May 20, 2024 3F0524-03, Annual Financial Report and Certified Financial Statement2024-05-30030 May 2024 Annual Financial Report and Certified Financial Statement 3F0524-01, Response to Request for Additional Information for the Environmental Assessment of the License Termination Plan2024-05-0909 May 2024 Response to Request for Additional Information for the Environmental Assessment of the License Termination Plan 3F0424-03, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report 3F0424-02, – 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 – 2023 Annual Radioactive Effluent Release Report 3F0424-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-04-12012 April 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0224-04, Independent Spent Fuel Storage Installation Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 42024-02-23023 February 2024 Independent Spent Fuel Storage Installation Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 4 3F0224-05, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-22022 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0224-03, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-0808 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0124-03, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-19019 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0124-01, Response to Request for Additional Information for the Additional Information Assessment of the License Termination Plan for Crystal River, Unit 3 Nuclear Generating Plant (Public Version)2024-01-18018 January 2024 Response to Request for Additional Information for the Additional Information Assessment of the License Termination Plan for Crystal River, Unit 3 Nuclear Generating Plant (Public Version) 3F0623-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-06-0101 June 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0423-03, 2022 Annual Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Annual Radiological Environmental Operating Report 3F0423-02, 2022 Annual Radioactive Effluent Release Report2023-04-18018 April 2023 2022 Annual Radioactive Effluent Release Report 3F0423-01, 2022 Individual Monitoring NRC Form 5 Report2023-04-0404 April 2023 2022 Individual Monitoring NRC Form 5 Report 3F0323-03, Decommissioning Funding Plan for Independent Spent Fuel Storage Installation2023-03-31031 March 2023 Decommissioning Funding Plan for Independent Spent Fuel Storage Installation 3F0323-02, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20222023-03-29029 March 2023 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2022 3F0323-01, Onsite Property Insurance Coverage2023-03-0202 March 2023 Onsite Property Insurance Coverage 3F0123-01, Proof of Financial Protection2023-01-26026 January 2023 Proof of Financial Protection 3F1222-01, Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan2022-12-12012 December 2022 Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan 3F0522-03, Notification of Revised Decommissioning Cost Estimate2022-05-26026 May 2022 Notification of Revised Decommissioning Cost Estimate 3F0522-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20222022-05-17017 May 2022 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2022 3F0422-02, 2021 Annual Radiological Environmental Operating Report2022-04-0606 April 2022 2021 Annual Radiological Environmental Operating Report 3F0322-01, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20212022-03-30030 March 2022 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2021 3F0322-03, Drug and Alcohol Testing Error at HHS-Certified Laboratory, Per 10CFR26.719(c)(1)2022-03-10010 March 2022 Drug and Alcohol Testing Error at HHS-Certified Laboratory, Per 10CFR26.719(c)(1) 3F0322-02, 2021 Individual Monitoring NRC Form 5 Report2022-03-0707 March 2022 2021 Individual Monitoring NRC Form 5 Report 3F0222-01, ADP CR3, LLC - Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb)2022-02-0909 February 2022 ADP CR3, LLC - Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb) 3F0222-02, Onsite Property Insurance Coverage2022-02-0909 February 2022 Onsite Property Insurance Coverage 3F0122-01, License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications2022-01-26026 January 2022 License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications 3F0122-02, Proof of Financial Protection2022-01-17017 January 2022 Proof of Financial Protection 3F0122-03, Complex - Environmental Protection Plan Report: 2021 Sea Turtle Rescue and Recovery Summary Report2022-01-17017 January 2022 Complex - Environmental Protection Plan Report: 2021 Sea Turtle Rescue and Recovery Summary Report 3F1021-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-10-21021 October 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0921-02, Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004 (Minor) (Rev. C)2021-09-29029 September 2021 Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004 (Minor) (Rev. C) 3F0921-01, To License Amendment Request, Revision 0, ISFSI Security Plan, Revision a2021-09-14014 September 2021 To License Amendment Request, Revision 0, ISFSI Security Plan, Revision a 3F0721-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-07-13013 July 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0621-02, Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004-001-IW1S2021-06-16016 June 2021 Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004-001-IW1S 3F0421-05, 2020 Individual Monitoring NRC Form 5 Report2021-04-27027 April 2021 2020 Individual Monitoring NRC Form 5 Report 3F0421-04, ADP CR3, LLC - Supplement to Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization2021-04-13013 April 2021 ADP CR3, LLC - Supplement to Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization 3F0421-03, Proof of Financial Protection2021-04-0707 April 2021 Proof of Financial Protection 3F0421-01, 2020 Annual Radioactive Effluent Release Report2021-04-0606 April 2021 2020 Annual Radioactive Effluent Release Report 3F0421-02, 2020 Annual Radiological Environmental Operating Report2021-04-0606 April 2021 2020 Annual Radiological Environmental Operating Report 3F0321-07, (XEG)-DOE/NRC Forms 741 742 and 743C2021-03-30030 March 2021 (XEG)-DOE/NRC Forms 741 742 and 743C 3F0321-06, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20202021-03-29029 March 2021 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2020 3F0321-01, License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Draft a, and ISFSI Only Emergency Action Level Bases Manual2021-03-17017 March 2021 License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Draft a, and ISFSI Only Emergency Action Level Bases Manual 3F0321-02, License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a2021-03-17017 March 2021 License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a 3F0321-05, Onsite Property Insurance Coverage2021-03-15015 March 2021 Onsite Property Insurance Coverage 3F0321-03, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-03-0909 March 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 2024-08-21 Category:Response to Request for Additional Information (RAI) MONTHYEAR3F0624-01, Response to Questions from the NRC Environmental Assessment Branchs Review of License Termination Plan During Virtual Meeting Dated May 20, 20242024-06-11011 June 2024
[Table view]Response to Questions from the NRC Environmental Assessment Branchs Review of License Termination Plan During Virtual Meeting Dated May 20, 2024 3F0524-01, Response to Request for Additional Information for the Environmental Assessment of the License Termination Plan2024-05-0909 May 2024 Response to Request for Additional Information for the Environmental Assessment of the License Termination Plan ML24089A0362024-03-29029 March 2024 Response to Audit Plan in Support of Accelerated Decommissioning Partners and Request to Add License Condition to Include License Termination Plan Requirements. W/Enclosures 1 to 5 ML24025A0952024-01-24024 January 2024 Clarifications Related to the NRC Staffs EA for Crystal River 3F0124-01, Response to Request for Additional Information for the Additional Information Assessment of the License Termination Plan for Crystal River, Unit 3 Nuclear Generating Plant (Public Version)2024-01-18018 January 2024 Response to Request for Additional Information for the Additional Information Assessment of the License Termination Plan for Crystal River, Unit 3 Nuclear Generating Plant (Public Version) 3F0821-01, Response to Requests for Additional Information & Supplement 1 to License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSl)-Only Emergency Plan, & ISFSI-Only Emergency Action Level Bases Manual2021-08-18018 August 2021 Response to Requests for Additional Information & Supplement 1 to License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSl)-Only Emergency Plan, & ISFSI-Only Emergency Action Level Bases Manual 3F1216-02, Revised Response to NRC Letter Providing Issuance of Order for Implementation of Additional Measures & Fingerprinting for Unescorted Access at Crystal River Nuclear Generating Plant Independent Spent Fuel Storage Installation2016-12-12012 December 2016 Revised Response to NRC Letter Providing Issuance of Order for Implementation of Additional Measures & Fingerprinting for Unescorted Access at Crystal River Nuclear Generating Plant Independent Spent Fuel Storage Installation 3F1016-02, Response to NRC Generic Letter 2016-01, Monitoring of Neutron- Absorbing Materials in Spent Fuel Pools2016-10-19019 October 2016 Response to NRC Generic Letter 2016-01, Monitoring of Neutron- Absorbing Materials in Spent Fuel Pools RA-16-0027, Response to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations2016-07-14014 July 2016 Response to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations 3F0316-03, License Amendment Request No. 318, Revision 0, Permanently Defueled Emergency Plan, Revision 2, and Emergency Action Level Scheme, Revision 1, for the ISFSI, Response to Request for Additional Information2016-03-0202 March 2016 License Amendment Request No. 318, Revision 0, Permanently Defueled Emergency Plan, Revision 2, and Emergency Action Level Scheme, Revision 1, for the ISFSI, Response to Request for Additional Information 2024-06-11 |