Letter Sequence Response to RAI |
---|
EPID:L-2023-LLR-0036, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Inspection (ISI) Interval, RR-002 (L-MT-23-024) (Open) |
|
|
|
---|
Category:Letter type:L
MONTHYEARL-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI2024-09-13013 September 2024 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report L-MT-24-016, 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2024-05-0808 May 2024 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) L-MT-24-002, Submittal of Revision 41 to the Updated Safety Analysis Report2024-04-17017 April 2024 Submittal of Revision 41 to the Updated Safety Analysis Report L-MT-24-004, Submittal of 10 CFR 72.48 Report for Monticello Nuclear Generating Plant (MNGP)2024-04-17017 April 2024 Submittal of 10 CFR 72.48 Report for Monticello Nuclear Generating Plant (MNGP) L-MT-24-006, Subsequent License Renewal Application Annual Update 1 and Supplement 92024-02-29029 February 2024 Subsequent License Renewal Application Annual Update 1 and Supplement 9 L-MT-24-007, Response to NRC Request for Additional Information on Proposed Inservice Inspection Alternative RR-002 for the Sixth Ten-Year ISI Interval2024-02-15015 February 2024 Response to NRC Request for Additional Information on Proposed Inservice Inspection Alternative RR-002 for the Sixth Ten-Year ISI Interval L-MT-24-001, 10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval2024-01-30030 January 2024 10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval L-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462023-12-11011 December 2023 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-23-053, Condition Prohibited by Technical Specifications Due to Inoperable Main Steam Line Low Pressure Isolation Switch2023-12-0404 December 2023 Condition Prohibited by Technical Specifications Due to Inoperable Main Steam Line Low Pressure Isolation Switch L-MT-23-052, Subsequent License Renewal Application Supplement 72023-11-30030 November 2023 Subsequent License Renewal Application Supplement 7 L-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-092023-11-13013 November 2023 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 22023-10-0303 October 2023 Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 62023-09-0505 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 12023-08-15015 August 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 1 L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-112023-07-31031 July 2023 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report2023-07-31031 July 2023 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 L-MT-23-030, Subsequent License Renewal Application Supplement 32023-07-0404 July 2023 Subsequent License Renewal Application Supplement 3 L-MT-23-025, Subsequent License Renewal Application Supplement 22023-06-26026 June 2023 Subsequent License Renewal Application Supplement 2 L-MT-23-019, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report L-MT-23-020, Submittal of 2022 Annual Radioactive Effluent Release Report2023-05-10010 May 2023 Submittal of 2022 Annual Radioactive Effluent Release Report L-MT-23-021, Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 322023-05-0202 May 2023 Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 32 L-MT-23-017, 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2023-04-18018 April 2023 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) L-MT-23-010, Subsequent License Renewal Application Supplement 12023-04-0303 April 2023 Subsequent License Renewal Application Supplement 1 L-MT-23-013, Core Operating Limits Report (COLR) for Cycle 31, Revision 32023-03-28028 March 2023 Core Operating Limits Report (COLR) for Cycle 31, Revision 3 L-MT-23-012, Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 22023-03-17017 March 2023 Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 2 L-MT-23-008, 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003)2023-02-0707 February 2023 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003) L-MT-23-004, CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program2023-01-23023 January 2023 CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program L-MT-23-005, Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088)2023-01-0606 January 2023 Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088) L-MT-22-049, Industry Groundwater Protection Initiative Special Report2022-12-15015 December 2022 Industry Groundwater Protection Initiative Special Report L-MT-22-052, L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative2022-12-15015 December 2022 L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative L-MT-22-046, 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462022-12-13013 December 2022 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-22-048, Update to the Monticello Technical Specification Bases2022-11-28028 November 2022 Update to the Monticello Technical Specification Bases 2024-09-26
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARL-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI2024-09-13013 September 2024 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 ML24092A2152024-03-27027 March 2024 Email: Requests for Information to Support Deis ML24088A2152024-02-20020 February 2024 Feb. 20, 2024 Xcel Energy Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information for Monticello Nuclear Generating Plant L-MT-24-007, Response to NRC Request for Additional Information on Proposed Inservice Inspection Alternative RR-002 for the Sixth Ten-Year ISI Interval2024-02-15015 February 2024 Response to NRC Request for Additional Information on Proposed Inservice Inspection Alternative RR-002 for the Sixth Ten-Year ISI Interval L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 ML23262B0372023-09-19019 September 2023 Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 62023-09-0505 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 12023-08-15015 August 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 1 L-MT-23-005, Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088)2023-01-0606 January 2023 Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088) ML22220A2722022-08-0808 August 2022 Response to a Request for Additional Informational Regarding the Monticello Fuel Oil Storage Tank Inspection L-MT-22-007, Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007)2022-07-22022 July 2022 Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007) ML22161A9152022-06-10010 June 2022 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Response to a Request for Additional Information Xcel Energy Amendment Request to Create a Common Emergency Plan and Emergency Operations. L-MT-22-024, Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies2022-06-0606 June 2022 Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies L-MT-22-022, Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency2022-05-25025 May 2022 Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency L-MT-21-017, Response to Request for Additional Information (RAI) Related to License Amendment Request to Implement Technical Specifications Task Force Traveler TSTF-505, Revision 22021-04-20020 April 2021 Response to Request for Additional Information (RAI) Related to License Amendment Request to Implement Technical Specifications Task Force Traveler TSTF-505, Revision 2 L-MT-20-036, Response to Request for Additional Information Related to License Amendment Request to Implement Technical Specification Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times2020-12-21021 December 2020 Response to Request for Additional Information Related to License Amendment Request to Implement Technical Specification Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times L-MT-20-024, Response to Request for Additional Information (RAI) Monticello 10 CFR 50.55a Request: Request RR-016 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval2020-07-20020 July 2020 Response to Request for Additional Information (RAI) Monticello 10 CFR 50.55a Request: Request RR-016 Associated with the Fifth Ten-Year Inservice Inspection (ISI) Interval L-MT-20-015, Response to Request for Additional Information (RAI) Long-Term Replacement Steam Dryer Inspection Plan2020-06-0808 June 2020 Response to Request for Additional Information (RAI) Long-Term Replacement Steam Dryer Inspection Plan ML20045E8942020-02-14014 February 2020 Response to a Request for Additional Information for Proposed 10 CFR 50.55a(z)(2) Alternatives to Utilize ASME Code Case N-786-3, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, and AS L-MT-19-030, Supplement to a Response for a Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors.2019-05-15015 May 2019 Supplement to a Response for a Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. L-MT-19-024, Response to a Request for Additional Information for Removal of a Note Associated with Technical Specification 3.5.12019-04-18018 April 2019 Response to a Request for Additional Information for Removal of a Note Associated with Technical Specification 3.5.1 L-MT-19-018, Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk- Informed Categorization & Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-03-13013 March 2019 Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk- Informed Categorization & Treatment of Structures, Systems and Components for Nuclear Power Reactors L-MT-18-058, Response to Request for Additional Information: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to ...2018-10-23023 October 2018 Response to Request for Additional Information: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to ... L-MT-18-041, Response to Request for Additional Information Re Request for Permanent Exemption from 10CFR50, App R, III.G.2.a Requirements for Exposed Structural Steel2018-07-20020 July 2018 Response to Request for Additional Information Re Request for Permanent Exemption from 10CFR50, App R, III.G.2.a Requirements for Exposed Structural Steel L-MT-18-032, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, and Supplement (EPID: L-2017-LLA-03602018-06-0101 June 2018 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, and Supplement (EPID: L-2017-LLA-0360 ML18131A2232018-05-11011 May 2018 Prairie and Monticello - Response to Request for Additional Information Regarding Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Di L-MT-18-013, Response to Request for Additional Information Regarding Exemption Request for Nonconforming Dye Penetrant Examinations of Dry Shielded Canisters (Dscs) 11 Through 152018-04-0505 April 2018 Response to Request for Additional Information Regarding Exemption Request for Nonconforming Dye Penetrant Examinations of Dry Shielded Canisters (Dscs) 11 Through 15 L-MT-17-071, Response to Request for Additional Information Regarding Risk-Informed Request for Exemption from 10CFR50, Appendix R, III.G.2 Requirements for Multiple Spurious Operations of Drywell Spray Motor-Operated Valves2017-11-20020 November 2017 Response to Request for Additional Information Regarding Risk-Informed Request for Exemption from 10CFR50, Appendix R, III.G.2 Requirements for Multiple Spurious Operations of Drywell Spray Motor-Operated Valves L-MT-17-066, Supplemental Information for the Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events2017-09-28028 September 2017 Supplemental Information for the Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events L-MT-17-065, License Amendment Request to Revise the Emergency Action Level Scheme - Supplement and Response to Requests for Additional Information2017-09-25025 September 2017 License Amendment Request to Revise the Emergency Action Level Scheme - Supplement and Response to Requests for Additional Information L-MT-17-063, Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Response Times2017-09-20020 September 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Response Times L-MT-17-025, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accid2017-04-11011 April 2017 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident L-MT-17-022, Response to Second Round PRA Related RAIs for the License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval2017-03-29029 March 2017 Response to Second Round PRA Related RAIs for the License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval L-MT-17-007, Part 3 Response to Probabilistic Risk Assessment (PRA) Related Requests for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval2017-02-0707 February 2017 Part 3 Response to Probabilistic Risk Assessment (PRA) Related Requests for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval L-MT-17-002, Part 2 Response to Probabilistic Risk Assessment (PRA) Related Requests for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50Appendix J Containment Type a Test Interval2017-01-31031 January 2017 Part 2 Response to Probabilistic Risk Assessment (PRA) Related Requests for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50Appendix J Containment Type a Test Interval L-MT-16-062, Part 1 Response to Probabilistic Risk Assessment Related Requests for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval2016-12-16016 December 2016 Part 1 Response to Probabilistic Risk Assessment Related Requests for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval L-MT-16-058, Supplement to License Amendment Request to Revise Battery Charger Surveillance Requirement 3.8.4.22016-11-22022 November 2016 Supplement to License Amendment Request to Revise Battery Charger Surveillance Requirement 3.8.4.2 ML16288A0972016-10-14014 October 2016 and Monticello - Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools L-MT-16-044, Response to Request for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval2016-10-10010 October 2016 Response to Request for Additional Information: License Amendment Request for a Permanent Extension of the 10 CFR 50 Appendix J Containment Type a Test Interval L-MT-16-045, Response to Request for Additional Information: License Amendment Request to Revise Battery Charger Surveillance Requirement 3.8.4.22016-10-0303 October 2016 Response to Request for Additional Information: License Amendment Request to Revise Battery Charger Surveillance Requirement 3.8.4.2 L-MT-16-041, License Amendment Request for Areva Extended Flow Window Supplement to Address Power Distribution Uncertainties2016-09-14014 September 2016 License Amendment Request for Areva Extended Flow Window Supplement to Address Power Distribution Uncertainties L-MT-16-038, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)2016-08-19019 August 2016 Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) L-MT-16-039, Response to Nuclear Security and Incident Response Requests for Additional Information Regarding Changes to the Monticello Nuclear Generation Plant Physical Security Plan (Revision 16) Pursuant to 10 CFR 50.54(p)(2)2016-08-15015 August 2016 Response to Nuclear Security and Incident Response Requests for Additional Information Regarding Changes to the Monticello Nuclear Generation Plant Physical Security Plan (Revision 16) Pursuant to 10 CFR 50.54(p)(2) ML16221A2742016-07-31031 July 2016 ANP-3435NP, Revision 2, Areva Responses to RAI-8 and RAI-32 from Srxb and Snpb on MNGP EFW Lar. 2024-09-13
[Table view] |
Text
2807 West County Road 75 fl Xcel Energy Monticello, MN 55362
February 15, 2024 L-MT-24-007 10 CFR 50.55a(z)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22
Response to NRC Request for Additional Information on Proposed Inservice Inspection Alternative RR-002 for the Sixth Ten-Year ISI Interval (EPID L-2023-LLR-0036)
References:
- 1) NSPM letter to NRC, "10 CFR 50.55a(z)(1) Request Associated with the Monticello Sixth Inservice Inspection (ISI) Interval, RR-002,"
(L-MT-23-024) dated July 11, 2023 (ADAMS Accession No. ML23193A799)
- 2) NRC email to NSPM, "Monticello - Request for Additional Information re:
ISI RR-002 Alternative to Use IWB-2500(f) (EPID L-2023-LLR-0036),"
dated January 20, 2024
Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM") submitted a 10 CFR 50.55a(z)(1) request associated with the Monticello Nuclear Generating Plant (MNGP) 6th 10-Year Inservice Inspection (ISI) Interval on July 11, 2023 (Reference 1). In that request, NSPM proposed an alternative to the American Society of Mechanical Engineers (ASME) Bo iler and Pressure Vessel Code Section XI, 2019 Edition, IWB-2500(f)(8) and IWB-2500(f)(9) that would allow reducing the number of volumetric inspections planned for MNGP reac tor pressure vessel (RPV) nozzle-to-vessel welds and nozzle inner blend radius locations. This alternative would be in use during the 6th 10-Year ISI interval through September 8, 2030, the end of the current renewed license for MNGP.
On January 20, 2024, the NRC identified the need for additional inform ation (Reference 2).
The enclosure to this letter provides NSPM's response to Reference 2.
Please contact Mr. Ron Jacobson at 612-330- 6542 or ronald.g.jacobson@xcelenergy.com if there are any questions or if further additional information is needed.
Document Control Desk L-MT-24-007 Page 2
Summary of Commitments
This letter makes no new commitments and no revisions to existing commitments.
/'
Gregory D. Brown Plant Manager, Monticello Nuclear Generating Plant Northern States Power Company - Minnesota
Enclosure
cc: Administrator, Region Ill, USNRC Project Manager, Monticello, USN RC Resident Inspector, Monticello, USNRC L-MT-24-007 NSPM
RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION (RAI)
ON PROPOSED INSERVICE INSPECTION ALTERNATIVE RR-002 FOR THE SIXTH TEN-YEAR ISI INTERVAL
1.0 BACKGROUND
Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM") submitted a 10 CFR 50.55a(z)(1) request associated with the Monticello Nuclear Generating Plant (MNGP) 6th 10-Year Inservice Inspection (ISI) Interval on July 11, 2023 (Reference 1). In that request, NSPM proposed an alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI, 2019 Edition, IWB-2500(f)(8) and IWB-2500(f)(9) that would allow reducing the number of volumetric inspections planned for MNGP reactor pressure vessel (RPV) nozzle-to-vessel (NV) welds and nozzle inner blend radius (IR) locations. This alternative would be in use during the 6th 10-Year ISI interval through September 8, 2030, the end of the current renewed license for MNGP.
On January 20, 2024, the NRC identified the need for additional information (Reference 2).
This enclosure provides NSPM's response to Reference 2.
2.0 RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION
The NRC request information is repeated below in italics.
RAI #RR-002-1
Basis for Request: The incoming web-based RR-002 request (for 6th 10-Year ISI interval) does not provide any information regarding the inspection results of past volumetric inspections that were performed on the nozzle-to-vessel welds and nozzle inner blend radius sections of the RPV N2 recirculation inlet nozzles, N3 main steam line nozzles, N5 core spray nozzles, N6 upper closure head spare nozzles, and N8 jet pump instrumentation nozzles during the 5th 10-Year ISI interval.
Request, Part 1:
(a) Provide a summary of the past inspection results of all volumetric inspections performed on the nozzle-to-vessel welds and nozzle inner blend radius sections of the RPV N2 recirculation inlet nozzles, N3 main steam line nozzles, N5 core spray nozzles, N6 upper closure head spare nozzles, and N8 jet pump instrumentation nozzles during the 5th 10-Year ISI interval.
RESPONSE
provides the component identification, system, examination year, and the result of those 5th 10-Year ISI interval examinations. There were no relevant indications or flaws identified in the B3.100 examinations performed during the 5th 10-Year ISI interval. One B3.90
Page 1 of 7 L-MT-24-007 NSPM
relevant indication (RI) was evaluated for the N3C NV weld that was accepted per IWB-3512-1 of the 2007 Edition with 2008 Addenda ASME Section XI for the 5th ISI Interval.
(b) Provide quantitative data (as applicable) regarding detected flaw sizes (e.g., individual flaw length and depth data and, for probabilistic fracture mechanics (PFM) analysis objectives, number of flaws of specified flaw sizes falling within a particular PFM analysis flaw size range for the applicable PFM flaw distribution analysis).
RESPONSE
PFM flaw analysis of the N3C NV relevant indication is not required due to no relevant flaw conditions.
(c) Provide ASME-defined allowable flaw sizes for any relevant flaw conditions that were detected and recorded as part of the past volumetric inspections performed during the 5th 10-Year ISI interval.
RESPONSE
No relevant flaw conditions were detected and recorded.
Request, Part 2: The NRC staff notes that RPV N1 recirculation outlet nozzles are not part of the RR-002, as the N1 recirculation outlet nozzles should be volumetrically inspected at a 100% accessible population basis. However, the inspection results of 5th interval inspections performed on both the N1 recirculation outlet nozzles and the N2 recirculation inlet nozzles would provide relevant information for the probabilistic flaw distribution integrity assessment of RPV nozzles covered in RR-002. As such, the NRC staff requests the following information regarding the past 5th interval inspections performed on N1 and N2 nozzle-to-vessel welds and nozzle inner blend radii locations.
(a) If flaws were detected in any of the specified N1 or N2 nozzle locations during the 5th interval inspections, demonstrate that the number of flaws and flaw sizes associated with the recordable indications in the applicable nozzle-to-vessel welds or nozzle inner blend radius locations are consistent with or bounded by the flaw distribution assumptions of the past PFM flaw distribution analysis that was performed as part of the Structural Integrity Associates (SIA)
Calculation No. 1101463.301 basis.
RESPONSE
No flaws were detected in any of the N1 or N2 nozzles during the 5th 10-Year ISI interval inspections.
(b) As part of this request, provide the flaw distribution data (i.e., size range data for analyzed flaw size ranges and maximum allowable number of flaws of particular sizes falling within the specified flaw size ranges) of the VIPERNOZ PFM flaw distribution analysis that was performed as part of the analysis bases for SIA Calculation No. 1101463.301.
Page 2 of 7 L-MT-24-007 NSPM
The staff emphasizes that a response to Part 2 will only be necessary if relevant flaw indications were detected and recorded in any of the nozzle-to-vessel welds or nozzle inner blend radius sections of the set (i.e., reduced population) of the N1 recirculation outlet nozzles or the N2 recirculation inlet nozzles that were inspected during the past 5th 10-Year ISI interval.
RESPONSE
No relevant flaw indications were detected during the 5th 10-Year ISI interval.
Request, Part 3 (a) Identify which PFM flaw distribution analysis is being applied to the flaws detected in the nozzle-to-vessel welds or nozzle inner blend radius sections of the specified RPV N3 main steam line nozzle, N5 core spray nozzle, N6 upper closure head spare nozzle, or N8 jet pump instrumentation nozzle type (i.e., if relevant flaw indications were detected in the weld or inner blend radius locations of the specified nozzle type during the inspections performed in the 5th 10-Year ISI interval).
RESPONSE
No relevant flaw indications were detected during the 5th 10-Year ISI interval.
(b) As part of the response, include considerations on whether a new, component-specific PFM flaw distribution analysis will need to be performed and docketed as part of RR-002 for a specified RPV N3, N5, N6, or N8 nozzle type if relevant flaw indications were detected in the nozzle-to-vessel welds or inner blend radius sections of the specified N3, N5, N6, or N8 nozzle type.
RESPONSE
No relevant flaw indications were detected during the 5th 10-Year ISI interval. No additional PFM flaw distribution analysis is required since calculation 1101463.301 bounds the N3, N5, N6, and N8 nozzles for the period of extended operation.
(c) For detected flaw indications in the nozzle-to-vessel welds or nozzle inner blend radius locations of the RPV N3, N5, N6, or N8 nozzles, demonstrate that the number of flaws and flaw sizes associated with the recordable flaw indications are consistent with or bounded by the flaw distribution assumptions (i.e., data for analyzed flaw size ranges and allowable number of flaws of particular sizes falling within the specified flaw size ranges) of the PFM flaw distribution analysis used for the nozzle-to-vessel welds or nozzle inner blend radius sections of the specified nozzle type(s).
The staff emphasizes that a response to this RAI part will only be necessary if relevant flaw indications were detected and recorded in any of the nozzle-to-vessel welds or nozzle inner blend radius sections of the set (i.e., reduced population) of RPV N3, N5, N6, or N8 nozzles that were inspected during the past 5th 10-Year ISI interval.
Page 3 of 7 L-MT-24-007 NSPM
RESPONSE
No relevant flaw indications were detected during the 5th 10-Year ISI interval.
RAI #RR-002-2
Basis for Request: The RR-002 request (for 6th 10-Year ISI interval) does not clearly define whether additional information docketed with the prior RR-002 alternative for the 5th 10-Year ISI interval is applicable to, part of, and valid for the new RR-002 ISI alternative request for the 6th 10-Year ISI interval (i.e., references to the prior submittal records does not achieve this objective).
Request Part 1. In Section 17, Applicable ASME Code Components and/or System Description, of RR-002, the licensee identifies that the scope of RR-002 for the MNGP 6th 10-Year ISI interval applies to the ASME Code Class 1 N2, N3, N5, N6, and N8 Nozzle-to-shell welds and associated inner radius sections. However, the RR-002 alternative does not specify which types of RPV nozzles correlate to the N2, N3, N5, N6 and N8 nozzle designations. Attachment 1 of the previous RR-002 request for the 5th 10-Year ISI interval (i.e.,
in Attachment 1 of Xcel Energy Letter dated September 23, 2011; ML112720147) provided more detailed component scoping information by identifying that the applicable Class 1 nozzle-to-vessel welds and associated inner blend radius sections are those associated with the following RPV nozzle types:
The ten (10) RPV N2 recirculation inlet nozzles - Component IDs N2A, N2B, N2C, N2D, N2E, N2F, N2G, N2H, N2J, and N2K The four RPV N3 main steam line nozzles - Component IDs N3A, N3B, N3C, and N3D The two RPV N5 core spray nozzles - Component IDs N5A and N5B The two RPV N6 closure head spare nozzles - Component IDs N6A and N6B The two RPV jet pump instrumentation nozzles - Component IDs N8A and N8B
Confirm whether the information regarding the prior nozzle descriptions, nozzle ID numbers, and nozzle populations provided in Attachment 1 of Xcel Energy Serial Letter No. L-MT-11-056 (ML112720147) is applicable to, part of, and valid for the new RR-002 alternative request for the 6th 10-Year ISI interval.
RESPONSE
The data set provided in Enclosure 1, Attachment 1 of the 5th 10-Year ISI interval request L-MT-11-056 (Reference 3) is applicable, part of, and valid for the 6th 10-Year ISI interval.
Request Part 2. The information in incoming web-based RR-002 does not specify how many (by number of nozzle locations) of the nozzle-to-shell welds and associated inner blend radius sections in the RPV N2, N3, N5, N6, and N8 nozzle types will be inspected during the portion of the 6th 10-Year ISI interval. The licensee provided this information in Table 5-1 of Enclosure 1 in the prior Xcel Energy L-MT-11-056 transmittal letter for the 5th 10-Year ISI interval (letter dated September 28, 2011; ML112720147). Confirm whether the total number of nozzle
Page 4 of 7 L-MT-24-007 NSPM
inspections, as provided and identified in Table 5-1 of Enclosure 1 in the Xcel Energy Serial Letter No. L-MT-11-056 is still being applied to (i.e., applicable to, part of, and valid for) the new RR-002 alternative request for the 6th 10-Year ISI interval.
RESPONSE
The total number of nozzle inspections, as provided and identified in Table 5-1 of Enclosure 1 of Reference 3 will still be applied to the 6th 10-Year ISI interval RR-002.
Request, Part 3: The criteria in BWRVIP-108-A, BWR Vessel and Internals Project, Technical Basis for Reduction of Inspection Requirements for Boiling Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Blend Radii (ML19297F808 [non-public, proprietary version];
ML19297F806 [redacted, publicly available version]), specify that the risk-informed alternatives for reducing BWR RPV nozzle inspections be accompanied with a plant-specific PFM analysis that includes a probability of failure analysis for the applicable RPV nozzle types (covering the applicable nozzle-to-vessel welds and associate nozzle inner blend radius locations). For the prior RR-002 request that applied to the 5th 10-Year ISI interval, the licensee submitted the applicable PFM analysis as shown in SIA Calculation No. 1101463.301, Monticello N2 Nozzle Code Case N-702 Relief Request, (ML12230A098) which was supplemented and included as an enclosure in the Xcel Energy email dated August 10, 2012 (ML12230A091).
(a) Confirm whether the PFM analysis in the docketed SIA No. 1101463.301 calculation is applicable to, part of, and valid for the new RR-002 ISI alternative request that applies to the 6th 10-Year ISI interval of the unit. If the SIA calculation is applicable, discuss the reason (with sufficient technical details) why the PFM analysis basis in the SIA No. 1101463.301 calculation is considered to be valid for the nozzle population in the current RR-002.
RESPONSE
Yes, the PFM analysis in the docketed SIA No. 1101463.301 (Reference 4) is applicable to and valid for the 6th 10-Year ISI interval timeframe requested in Reference 1. The PFM analysis provided a justification of the reduction of in-service inspection of the nozzle-to-shell weld and the nozzle blend radii through the period of the MNGP renewed license, which ends on September 8, 2030 (through 54 Effective Full-Power Years [EFPY]/60 years). Design inputs for this justification provided in PFM Section 3.0, and the Assumptions of Section 4.0, remain valid. Additionally, verified in the 5th 10-Year ISI interval:
No flaws found in the conduct of ISI program examinations on applicable B3.90 and B3.100 ASME code components.
The End of Life Fluence input in the PFM Section 3 is more conservative than the updated 72EFPY/80 years estimate of 7.08x1017 n/cm2 that has been determined in support of the ongoing MNGP Subsequent License Renewal As of June 2023, MNGP has done 156 start/shutdown cycles and is projected to do 176 by the end of the current renewed license, below the assumed 288 heat/shutdown cycles in the PFM Section 7.0
Page 5 of 7 L-MT-24-007 NSPM
(b) Discuss why the selected lower bound KIc fracture toughness value of 200 ksiinch, as shown in Section 4 of the SIA calculation, is considered to be a valid lower bound value for the PFM analysis, as this is based on the unirradiated material assumption in BWRVIP-108-A that the assessed BWR RPV nozzles will not have neutron fluence exposures in excess of 1.0 x 1017 n/cm2 (E > 1.0 MeV) at the end of the period of interest. Confirm that use of the unirradiated KIc value of 200 ksiinch is valid and can applied as the KIc value for the nozzles in the current RR-002 in the licensees PFM analysis. However, in contrast to this BWRVIP-108-A assumption, the N2 inlet nozzles are projected to have a limiting inside surface fluence exposure high enough as shown in Section 3 of the SIA calculation (i.e., 1.01 x 1018 n/cm2 at 54 effective full power years) that could potentially challenge the selection, validity, and use of the 200 ksiin KIc value specified in SIA Calculation.
RESPONSE
Adjusted Reference Temperature is an input to KIC and the Adjusted Reference Temperature equations are taken from Regulatory Guide 1.99, "Radiation Embrittlement of Reactor Vessel Materials," Revision 2, which has fluence as an input. Therefore, the fracture toughness values used in the PFM are adjusted based on fluence levels. KIC values less than 200 ksiinch are used for calculation runs with higher fluence values in the PFM.
Request, Part 4: The criteria in BWRVIP-108-A include five criteria that, if met, would provide proper demonstration that PFM analyses of RPV recirculation inlet and outlet nozzle locations are bounding for the PFM analyses of other nozzles adjoined to the RPV such that PFM analysis considerations of the other RPV nozzle locations would not be necessary. For the prior RR-002 request that applied to the 5th 10-Year ISI interval, the licensee included the five appropriate criterion assessments in Attachment 2 of the Xcel Energy L-MT-11-056 letter dated September 28, 2011 (ML112720147). Additionally, the prior RR-002 request for the 5th 10-Year ISI interval did not include the N1 RPV recirculation outlet nozzles because the prior BWRVIP-108-A deterministic screening criteria assessments applied to the RPV recirculation outlet nozzles in the licensees Letter No. L-MT-11-056 did not pass Screening Criterion 4 for the RPV recirculation outlet nozzles which required the calculated (p*r/t)/CRPV parameter value < 1.15. For the 5th 10-Year ISI interval, the RPV recirculation outlet nozzle-to-vessel welds and inner blend radius sections were required to be inspected in accordance with the volumetric inspection requirements including 100% population and 10-year frequency criteria specified in ASME Section XI, Table IWB-2500-1, Examination Category B-D, Inspection Items B3.90 and B3.100.
(a) In relation to these Criteria assessments, confirm whether the previous five Criteria assessments in Attachment 2 of the licensees L-MT-11-056 letter are still applicable to, part of, and valid for the new RR-002 that applies to the 6th 10-Year ISI interval.
RESPONSE
The five criteria identified in Attachment 2 of the Reference 3 Enclosure 1 are valid for this relief request as required by IWB-2500(f). The 5th 10-Year ISI interval request L-MT-11-056 (Reference 3) and the SIA PFM analysis as shown in SIA Calculation No. 1101463.301 were
Page 6 of 7 L-MT-24-007 NSPM
for the application of ASME Code Case N-702. That code case is now incorporated in the ASME BPV Section XI code, 2019 edition as IWB-2500(f):
Criteria 1 [IWB-2500(f)(3)]: the Monticello Pressure and Temperature Limits Report (PTLR) specifies RPV heatup/cooldown rate less than or equal to 100°F per hour Criteria 2 [IWB-2500(f)(4)]: remains applicable and met for the recirculation inlet nozzles (N2)
Criteria 3 [IWB-2500(f)(5)]: remains applicable and met for the recirculation inlet nozzles (N2)
Criteria 4 [IWB-2500(f)(6)]: is not met for the recirculation outlet nozzles (N1) and these nozzles will remain subject to inspection of 100% of the population Criteria 5 [IWB-2500(f)(7)]: is met but will not be needed since IWB-2500(f)(6) is not met for the recirculation outlet nozzles
Specifically, the requirements of IWB-2500(f), using an approved alternative for IWB-2500(f)(8) and IWB-2500(f)(9) as requested in Reference 1, will still be met before applying the 25%
minimum examination requirement to the Reference 1 specified population in the 6th 10-Year ISI interval.
(b) Additionally, since the RPV N1 recirculation outlet nozzles did not pass the calculation basis for Criterion 4, confirm that the licensee will perform volumetric inspections of 100 % of the N1 RPV recirculation outlet nozzle-to-vessel welds and nozzle inner blend radii sections for essentially 100% of the accessible nozzle location surface areas or volumes (i.e., achieving a minimum 90% coverage of the surface areas or volumes) during the 6th 10-Year ISI interval in accordance with the applicable requirements in ASME Section XI, Table IWB-2500-1, Examination Category B-D, Inspection Items B3.90 and B3.100.
RESPONSE
100% of the RPV N1 recirculation outlet nozzle population will be completed during the 6th 10-Year ISI interval.
3.0 REFERENCES
- 1. NSPM letter to NRC, "10 CFR 50.55a(z)(1) Request Associated with the Monticello Sixth Inservice Inspection (ISI) Interval, RR-002," (L-MT-23-024) dated July 11, 2023 (ADAMS Accession No. ML23193A799)
- 2. NRC email to NSPM, "Monticello - Request for Additional Information re: ISI RR-002 Alternative to Use IWB-2500(f) (EPID L-2023-LLR-0036)," dated January 20, 2024
- 3. NSPM letter to NRC "10CFR50.55a Requests Associated with the 5th Inservice Inspection Ten-Year Interval," dated September 28, 2011 (ADAMS Accession No. ML112720147)
- 4. SIA No. 1101463.301, " Monticello N2 Nozzle Code Case N-702 Relief Request,"
Revision 2, dated August 7, 2012 (ML12230A098)
Page 7 of 7 L-MT-24-007 NSPM
ATTACHMENT 1
Fifth Ten-Year Interval Examinations
Nozzle ID1 System Exam Year Result2
N2D (NV) Recirculation 2013 NRI (Inlet)
N2D (IR) Recirculation 2013 NRI (Inlet)
N2E (NV) Recirculation 2017 NRI (Inlet)
N2E (IR) Recirculation 2017 NRI (Inlet)
N2G (NV) Recirculation 2021 NRI (Inlet)
N2G (IR) Recirculation 2021 NRI (Inlet)
N3C (NV) Main Steam 2019 RI N3C (IR) Main Steam 2019 NRI N5B (NV) Core Spray 2013 NRI N5B (IR) Core Spray 2013 NRI N6A (NV) Closure Head 2021 NRI Spare N6A (IR) Closure Head 2021 NRI Spare N8A (NV) Jet Pump 2013 NRI Instrumentation N8A (IR) Jet Pump 2013 NRI Instrumentation
1 Nozzle ID: Nozzle-to-Vessel (NV), Item B3.90 or Inner Radius (IR), Item B3.100
2 Results: No Relevant Indication (NRI), Relevant Indication (RI)
Page 1 of 1