CY-23-014, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI

From kanterella
(Redirected from ML23361A148)
Jump to navigation Jump to search
Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI
ML23361A148
Person / Time
Site: Haddam Neck, 07100904  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 12/04/2023
From: Norton W
Connecticut Yankee Atomic Power Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
CY-23-014
Download: ML23361A148 (1)


Text

CONNECTICUT YANKEE ATOMIC POWER COMPANY

HADDAM NECK PLANT 362 INJUN HOLLOW ROAD

  • EAST HAMPTON, CT 06424-3099

December 4, 2023 CY-23-014 10 CFR 50.7l(e)(4) and 10 CFR 71.106 10 CFR 50.4 and 10 CFR 71.1

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-001

Connecticut Ya nkee Atomic Power Company Haddam Neck Plant Indepe ndent Spent Fuel Storage Installation NRC License No. DPR-61 (NRC Docket Nos. 50-213. 71-0904. and 72-39)

Subject:

Biennial Update of the CYAPCO Qu ali ty Assurance Program for the Haddam Neck ISFSI

Pursuant to the requirements of 10 CFR 50.71(e)(4), 10 CFR 71.106, 10 CFR 50.4, and 10 CFR 71.1, Connecticut Yankee Atomic Power Company (CYAPCO) submits the biennial update to the CY APCO Quality Assurance Program (QAP) for the Haddam Neck Indepen de nt Spent Fuel Storage Installation (ISF SI). There have been no revisions to the CYAPCO QAP for the Haddam Neck ISFSI, since Revision 14 was submitted to the NRC on December 5, 2019 (Reference 1 ). Revision 14 of the CY APCO QAP for the Haddam Neck ISFSI remains the revision of record.

There are no commitments in this letter.

Should you require additional information, please contact Mr. Rob Desmarais at 86 0-267- / J h O / J 6426, Extension 306. l/l V 't

I state under penalty of perjury that the foregoing is true and correct. Executed on fl(J53 December 4, 2023. / / j

JAfSS Zip

Wayne Norton CYAPCO President and Chief Executive Officer Connecticut Yankee Atomic Power Company CY-23-014/December 4, 2023/Page 2

Reference:

I. Letter from W. Norton (CYAPC O) to Document Control Desk (NRC), Biennial Update of the CY APCO Quality Assurance Program for the Haddam Neck ISFSI, dated December 5, 2019 (C Y-1 9-018).

cc : R. Lorson, NRC Region I Administrator A. Dimitriadis, Chief, Decommis si oning Branch, NRC, Region I Y. Diaz-Sanabria, Chief, Divi sio n of Fuel Management, Storage and Transportation Licensing Bra nch S. Helton, Director, Division of F uel Management, Office of Nuclear Material Safety and Safeguard J. Semancik, Director, CT DEEP, Radiation Division M. Firsick, CT DEEP, Radiation Division