ML23334A217

From kanterella
Jump to navigation Jump to search

Handouts to Applicants
ML23334A217
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/30/2023
From: Joseph Demarshall
NRC/RGN-I/DORS/OB
To:
Dominion Energy Nuclear Connecticut
References
EPID L-2023-OLL-0010
Download: ML23334A217 (1)


Text

"'

l:

N~

"'<I)

D.. S2

~8

~

<(

~

>W w

'<t I

IL

<IIBJB)...,u 8

30*

3CESN42 ESK""7VP l:17~-~

(;OO

@y' TOO 57!H 27 52R*

2B T02

~-Eq; 4 52L*

S2L*

ANN HVU19 ESK-lOGK

!iZHL*J~VU-<01 8 1,!f 11--

2 40 ANN 2.SII E5it-lO~K

~COi

.OIJ

.110 I,,

~It ct <

e; s ~

l1X*

J/1U5815 ESIWP 7

2, f

3RCP*PNL6 aRCP-PNLG, 52R-I-SZBYP*I*

4 5HIIU*FNIC..

.5HIIU*FNIG E.:>1<-r........

E~l<.-"'BAV 30 TOI 30

!!Qfil I. ~ll EO.UIPMEIIIT LOCATED AT 121'1 SWGR, 3NJ.S*u.5*&1 COMPARTMO<T J2)118 UNLESS OTHER.WISE NOTED, 2, REFERENCE LOGIC DIA. LSK-22* 27 (285921

3. PREFI X ALL SWITCHGEAR TERMINAL NUMBERS WITH E.

.ll.WJ..l...il.11.....w.l!.iL INONl 11/f'I 3'

°

~

1. m, CAD J
IIAfl.lAL Rnl SIO~S l O Tttl S DOCLM:ijr 1 L ~EN AS-llUlLT ARE f'Rl)flB!TED. _j THE IIILI.IT0NE: POINT CON,ANY IUII IOl"'"CII' NORTMLUT UTILJltliS

November 9, 2021 3/4. 7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE SAFETY VALVES LIMITING CONDITION FOR OPERATION 3.7.1.1 All main steam line Code safety valves (MSSVs) shall be OPERABLE with lift settings as specified in Table 3.7-3.

APPLICABILITY:

MODES 1, 2, and 3.

ACTION:


OOTI --------- -- ----

Separate Condition entiy is allowed for each MSSV

a.

With one or more steam generators (SGs) with one MSSV inoperable, and the Moderator Temperature Coefficient (MTC) zero or negative at all power levels, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> reduce THERMAL POWER to less than or equal to 59% RATED THERMAL P0\\1/ER (RTP); othe1w ise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.

With one or more SGs with h>vo or more MSSVs inoperable, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> reduce THERMAL POWER to less than or equal to the maximum allowable % RTP specified in Table 3.7-1 for the number of OPERABLE MSSVs, and reduce the Power Range Neutron Flux High setpoint to less than or equal to the maximum allowable % RTP specified in Table 3.7-1 for number ofOPERA.BLE MSSVs within the next 32 hour3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br />s*; othe1w ise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

c.

With one or more SGs with one MSSV inoperable and the MTC positive at any power level, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> reduce THERMAL POWER to less than or equal to the maximum allowable% RTP specified in Table 3.7-1 for the number of OPERABLE MSSVs and reduce the Power Range Neutron Flux High setpoint to less than or equal to the maximum allowable % RTP specified in Table 3.7-1 for number of OPERABLE MSSVs within the next 32 hour3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br />s*; othe1w ise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

Applicable only in MODE 1.

MILLSTONE - UNIT 3 3/4 7-1 Amendment No.~, R+, +/-4+/-, 280

August 12, 2008 3/4. 7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE SAFETY VALVES LIMITING CONDITION FOR OPERATION ACTION:

(Continued)

d.

With one or more SGs with four or more MSSVs inoperable, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.1.1 No additional Smveillance Requirements other than those required by Specification 4.0.5. The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.

MILLSTONE - UNIT 3 3/47-la Amendment No. 242

November 9, 2021 TABLE 3.7-1 OPERABLE MSSVS VERSUS MAXIiVflJM ALLOWABLE POWER NUMBER OF OPERABLE MSSVs MAXIMUM ALLOWABLE POWER PER STEAM GENERATOR (PERCENT OF RATED THERMAL POWER) 4 59 3

41 2

24 TABLE 3.7-2 DELETED MILLSTONE - UNIT 3 3/4 7-2 Amendment No. -l-fil, +/-H, +/-4+/-, 280

VALVE NUMBER LOOPl RV22A RV23A RV24A RV25A RV26A LOOP2 RV22B RV23B RV24B RV25B RV26B LOOP3 RV22C RV23C RV24C RV25C RV26C LOOP4 RV22D RV23D RV24D RV25D RV26D March 17, 1995 TABLE 3.7-3 STEAL"1 LINE SAFETY VALVES PER LOOP LIFT SETTINGa (+/-3%)b 1185 psig 1195 psig 1205 psig 1215psig 1225 psig 1185 psig 1195 psig 1205 psig 1215 psig 1225 psig 1185 psig 1195 psig 1205 psig 1215 psig 1225 psig 1185 psig 1195 psig 1205 psig 1215psig 1225 psig ORIFICE SIZE 16.0 square inches 16.0 square inches 16.0 square inches 16.0 square inches 16.0 square inches 16.0 square inches 16.0 square inches 16.0 square inches 16.0 square inches 16.0 square inches 16.0 square inches 16.0 square inches 16.0 square inches 16.0 square inches 16.0 square inches 16.0 square inches 16.0 square inches 16.0 square inches 16.0 square inches 16.0 square inches a

The lift setting pressure shall co1Tespond to ambient conditions of the valve at nominal operating temperature and pressure.

b The lift setting shall be within +/- 1 % following main steam line Code safety valve testing.

MILLSTONE - UNIT 3 3/4 7-3 Amendment No. 106

TECHNICAL REQUIREMENTS 3/4. 7 PLANT SYSTEMS 3/4.7.12 FIRE SUPPRESSION SYSTEMS SPRAY AND/OR SPRINKLER SYSTEMS TECHNICAL REQUIREMENT 3.7.12.2 The following Deluge Spray and/or Sprinkler Systems shall be FUNCTIONAL:

a. Emergency Generator A Enclosure Sprinkler**
b. Emergency Generator B Enclosure Sprinkler**
c. RSST A Deluge
d. RSST B Deluge
e. Fuel Building Filter Bank A Deluge**
f. Fuel Building Filter Bank B Deluge**
g. Auxiliary Building Filter Bank A Deluge**
h. Auxiliary Building Filter Bank B Deluge **
i.

Supplementary Leak Collection Filter Bank A Deluge**

j. Supplementary Leak Collection Filter Bank B Deluge**
k. Containment Cable Penetration Area Sprinkler
  • I.

Charging Pump Water Curtain Sprinkler System**

m. ESF Building Water Curtain Sprinkler System**
n. NSST A Deluge
o. NSST B Deluge
p. Main Transformer A Deluge
q. Main Transformer B Deluge
r.

Main Transformer C Deluge The Containment Cable Penetration Area Sprinkler System is not required to be FUNCTIONAL during the performance of Type A containment leakage rate tests.

These systems protect areas containing safety-related equipment.

APPLICABILITY:

Whenever equipment protected by the Deluge Spray/Sprinkler System is required to be FUNCTIONAL.

MILLSTONE - UNIT 3 TRM 3/4 7-21 LBDCR 07-MP3-018

TECHNICAL REQUIREMENTS 3/4.7 PLANT SYSTEMS 3/4.7.12 FIRE SUPPRESSION SYSTEMS SPRAY AND/OR SPRINKLER SYSTEMS TECHNICAL REQUIREMENTS (Continued)

ACTION:

a.

With one or more of the above required Deluge Spray and/or Sprinkler Systems nonfunctional, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a continuous fire watch for those areas in which both trains of redundant fire safe shutdown systems or components could be damaged(2l; for other areas, establish an hourly fire watch patro1(1 l_

Notes:

1.

For Completion Times stated in TECHNICAL REQUIREMENT ACTIONs which require periodic performance on a "once per.. " basis, the specified Frequency is met, after the initial performance, if the requirement is performed within 1.25 times the interval specified in the Completion Time, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

2.

For the Containment Cable Penetration Sprinkler System, if operating conditions prevent establishing a continuous fire watch, install remote cameras within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and monitor the cable penetration area continuously. Additionally, monitor area temperatures and smoke detectors.

(See Bases item 8.)

TECHNICAL SURVEILLANCE REQUIREMENTS 4.7.12.2 Each of the above required Deluge Spray and/or Sprinkler Systems shall be demonstrated FUNCTIONAL:

a.

At least once per 31 days by verifying each valve (manual, power-operated, or automatic) outside containment in the flow path is in its correct position.

b.

At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.

c.

At least once per 24 months by verifying each valve (manual, power-operated, or automatic) inside containment in the flow path is in its correct position.

d.

At least once per 18 months:

MILLSTONE - UNIT 3 TRM 3/4 7-22 LBDCR 07-MP3-018