Form 3.2-1 Administrative Topics Outline Facility: Byron Nuclear Station Date of Examination: 10/16/23 Examination Level:
RO SRO Operating Test Number: 2023-301 Administrative Topic (Step 1)
Activity and Associated K/A (Step 2)
Type Code (Step 3)
Conduct of Operations (RA-1)
Perform 2BGP 100-7T1, RRD KA: 2.1.37 Knowledge of procedures, guidelines, or limitations associated with reactivity management (4.3)
Desc: Applicant accurately completes 2BGP 100-7T1, Reference Reactivity Data Worksheet R, D 2019 Cert Conduct of Operations (RA-2)
Perform QPTR without Process computer KA: 2.1.7 Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation (4.4)
Desc: Applicant completes 1BOSR 2.4.1-1, Unit One Quadrant Power Tilt Ratio Calculation, and determines if acceptance criteria is met.
R, M Bank Equipment Control (RA-3)
Determine Expected Plant Configuration KA: 2.2.15 Ability to determine the expected plant configuration using design and configuration control documentation, such as drawings, lineups, or tagouts (reference potential)
(3.9)
Desc: Applicant will use design and configuration control documentation to determine proper at power equipment configuration.
R, M Bank Radiation Control (RA-4)
Change Setpoints in preparation for a Containment release KA: 2.3.5 Ability to use RMSs, such as fixed radiation monitors and alarms or personnel monitoring equipment (2.9)
Desc: Applicant will enter various values into RMS to verify functionality prior to a release.
S, D 2020 NRC Emergency Plan
Instructions for completing Form 3.2-1, Administrative Topics Outline
- 1. For each license level, determine the number of administrative job performance measures (JPMs) and topic areas as follows:
- Reactor operator (RO) applicants do not need to be evaluated on every topic (i.e., Equipment Control, Radiation Control, or Emergency Plan can be omitted by doubling up on Conduct of Operations), unless the applicant is taking only the administrative topics portion of the operating test (with a waiver or excusal of the other portions).
- 2. Enter the associated knowledge and abilities (K/A) statement and summarize the administrative activities for each JPM.
- 3. For each JPM, specify the type codes for location and source as follows:
Location:
(C)ontrol room, (S)imulator, or Class(R)oom Source and Source Criteria:
(P)revious two NRC exams (no more than one JPM that is randomly selected from last two NRC exams) 0 (D)irect from bank (no more than three for ROs, no more than four for SROs and RO retakes) 2 (N)ew or Significantly (M)odified from bank (no fewer than one) 2 Topic Number of JPMs RO*
SRO and RO Retakes Conduct of Operations 1 (or 2) 2 Equipment Control 1 (or 0) 1 Radiation Control 1 (or 0) 1 Emergency Plan 1 (or 0) 1 Total 4
5
Form 3.2-1 Administrative Topics Outline Facility: Byron Nuclear Station Date of Examination: 10/16/23 Examination Level:
RO SRO Operating Test Number: 2023-301 Administrative Topic (Step 1)
Activity and Associated K/A (Step 2)
Type Code (Step 3)
Conduct of Operations (SA-1)
Evaluate a Reactivity Change KA: GEN 2.1.37 Knowledge of procedures, guidelines, or limitations associated with reactivity management (4.6)
Desc: Candidate reviews a completed reactivity change calculation, OP-AP-300-1004 Attachment 1, identifying that the calculation was performed incorrectly.
R, M 2020 Cert Conduct of Operations (SA-2)
Perform a Manual Safety Assessment (Shutdown)
KA: 2.1.23, Ability to perform general and/or normal operating procedures during any plant condition (4.4)
Desc: Candidate performs a Manual Safety Assessment per OU-AP-104 and determines the correct Overall Unit Status by evaluating each Safety Function Status.
R, M 2021 Cert Equipment Control (SA-3)
Review Offsite Power Availability Surveillance KA: 2.1.2.1.31, Ability to locate control room switches, controls, and indications and to determine whether they correctly reflect the desired plant lineup (4.2)
Desc: Candidate completes review of completed 1BOSR 8.1.1-1, identifying that acceptance criteria determination is incorrect.
R, D 2020 Cert Radiation Control (SA-4)
Review Containment release package in preparation for a Unit 1 Containment Release KA: 2.3.6 Ability to approve liquid or gaseous release permits (3.8)
Desc: Applicant completes review of the Liquid Release package identifying two errors as specified in critical steps and does not authorize release.
R, D 2021 Cert
Emergency Plan (SA-5)
Perform Follow-up PARS for a General Emergency KA: 2.4.44 Knowledge of emergency plan implementing procedures protective action recommendations (SRO Only)
(4.4)
Desc: Applicant determines the correct EAL, and Protective Action Recommendations, and completes NARS Form R, M 2019 NRC
Instructions for completing Form 3.2-1, Administrative Topics Outline
- 1. For each license level, determine the number of administrative job performance measures (JPMs) and topic areas as follows:
- Reactor operator (RO) applicants do not need to be evaluated on every topic (i.e., Equipment Control, Radiation Control, or Emergency Plan can be omitted by doubling up on Conduct of Operations), unless the applicant is taking only the administrative topics portion of the operating test (with a waiver or excusal of the other portions).
- 2. Enter the associated knowledge and abilities (K/A) statement and summarize the administrative activities for each JPM.
- 3. For each JPM, specify the type codes for location and source as follows:
Location:
(C)ontrol room, (S)imulator, or Class(R)oom Source and Source Criteria:
(P)revious two NRC exams (no more than one JPM that is randomly selected from last two NRC exams) 0 (D)irect from bank (no more than three for ROs, no more than four for SROs and RO retakes) 2 (N)ew or Significantly (M)odified from bank (no fewer than one) 3 Topic Number of JPMs RO*
SRO and RO Retakes Conduct of Operations 1 (or 2) 2 Equipment Control 1 (or 0) 1 Radiation Control 1 (or 0) 1 Emergency Plan 1 (or 0) 1 Total 4
5