ML22244A236
ML22244A236 | |
Person / Time | |
---|---|
Site: | Hermes File:Kairos Power icon.png |
Issue date: | 09/01/2022 |
From: | Hastings P Kairos Power |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML22244A235 | List: |
References | |
KP-NRC-2209-003 | |
Download: ML22244A236 (6) | |
Text
KPNRC2209003
September1,2022 DocketNo.507513
USNuclearRegulatoryCommission ATTN:DocumentControlDesk Washington,DC205550001
Subject:
KairosPowerLLC TransmittalofResponsetoNRCQuestiononDHRSTestingfromPSARSection6.3Audit onHermesPreliminarySafetyAnalysisReport
References:
- 1. Letter,KairosPowerLLCtoDocumentControlDesk,SubmittalofthePreliminary SafetyAnalysisReportfortheKairosPowerFluorideSaltCooled,HighTemperature NonPowerReactor(Hermes),September29,2021(ML21272A376)
- 2. AuditPlan,NuclearRegulatoryCommission,KairosPowerLLC-Hermes ConstructionPermitPreliminarySafetyAnalysisReportChapter6,Section6.3Audit Plan,February12,2022(ML22039A226)
InSeptember2021,KairosPowersubmittedaPreliminarySafetyAnalysisReport(PSAR)(Reference1)as partoftheConstructionPermitApplication(CPA)fortheHermesnonpowerreactor.Thisletter transmitsaresponsetoNRCquestiononDHRStestingprovidedaspartoftheSection6.3auditonthe KairosPowerHermesTestReactorPreliminarySafetyAnalysisReport(Reference2).KairosPower requestsNRCreviewoftheresponseinsupportofcontinuedreviewoftheHermesnonpowertest reactorconstructionpermitapplication.
Portionsoftheattachedresponseareconsideredproprietary,andKairosPowerrequeststhoseportions tobewithheldfrompublicdisclosureinaccordancewiththeprovisionsof10CFR2.390.Enclosure1 providestheproprietaryversionoftheresponse.Enclosure2providesthenonproprietaryversionof theresponse.AnaffidavitsupportingthewithholdingrequestisprovidedinEnclosure3.
Additionally,theinformationindicatedasproprietaryhasalsobeendeterminedtocontainExport ControlledInformation.Thisinformationmustbeprotectedfromdisclosurepursuanttothe requirementsof10CFR810.
Ifyouhaveanyquestionsorneedanyadditionalinformation,pleasecontactDelaneySimmonsat simmons@kairospower.comorat(605)8385132,orDarrellGardneratgardner@kairospower.comor (704)7691226.
PeterHastings,PE VicePresident,RegulatoryAffairsandQuality KairosPowerLLC www.kairospower.com 707WTowerAve,SuiteA 5201HawkingDrSE,UnitA 2115RexfordRd,Suite325 Alameda,CA94501 Albuquerque,NM87106 Charlotte,NC28211
KPNRC2209003 Page2
Enclosures:
- 1) KairosPowerResponsetoNRCQuestiononDHRSTesting(Proprietary)
- 2) KairosPowerResponsetoNRCQuestiononDHRSTesting(NonProprietary)
- 3) KairosPowerLLCAffidavitandRequestforWithholdingfromPublicDisclosure(10CFR2.390)
xc(w/enclosure):
WilliamKennedy,ActingChief,NRRAdvancedReactorLicensingBranch BenjaminBeasley,ProjectManager,NRRAdvancedReactorLicensingBranch EdwardHelvenston,ProjectManager,NRRAdvancedReactorLicensingBranch SamuelCuadradodeJesus,ProjectManager,NRRAdvancedReactorLicensingBranch
KPNRC2209003
KairosProprietaryInformation WithholdfromPublicDisclosureunder10CFR2.390(a)(4)
Enclosure1 KairosPowerResponsetoNRCQuestiononDHRSTesting (Proprietary)
KPNRC2209003
Enclosure2 KairosPowerResponsetoNRCQuestiononDHRSTesting (NonProprietary)
KPNRC2209003
Enclosure3
KairosPowerLLCAffidavitandRequestfor WithholdingfromPublicDisclosure(10CFR2.390)
I,DarrellGardner,herebystate:
- 1. IamSeniorDirector,Licensing,atKairosPowerLLC(Kairos),andassuchIhavebeenauthorized byKairostoreviewinformationsoughttobewithheldfrompublicdisclosureinconnectionwith thedevelopment,testing,licensing,anddeploymentoftheKairosreactoranditsassociated structures,systems,andcomponents,andtoapplyforitswithholdingfrompublicdisclosureon behalfofKairos.
- 2. Theinformationsoughttobewithheld,initsentirety,iscontainedinKairosEnclosure1tothis letter.
- 3. Iammakingthisrequestforwithholding,andexecutingthisaffidavitinsupportthereof,pursuant totheprovisionsof10CFR2.390(b)(1).
- 4. IhavepersonalknowledgeofthecriteriaandproceduresutilizedbyKairosindesignating informationasatradesecret,privileged,orasconfidentialcommercialorfinancialinformation.
SomeexamplesofinformationKairosconsidersproprietaryandeligibleforwithholdingunder
§2.390(a)(4)include:
- a. Informationwhichdisclosesprocess,method,orapparatus,includingsupportingdataand analyses,wherepreventionofitsusebyKairoscompetitorswithoutlicenseorcontractfrom Kairosconstitutesacompetitiveeconomicadvantageoverothercompaniesintheindustry;
- b. Information,whichifusedbyacompetitor,wouldreducehisexpenditureofresourcesor improvehiscompetitivepositionindesign,manufacture,shipment,installation,assuranceof quality;
- c. Informationwhichrevealscostorpriceinformation,productioncapacities,budgetlevels,or commercialstrategiesofKairos,itscustomers,itspartners,oritssuppliers;
- d. Informationwhichrevealsaspectsofpast,present,orfutureKairosorcustomerfunded developmentplansorprograms,ofpotentialcommercialvaluetoKairos;
- e. Informationwhichdisclosespatentablesubjectmatterforwhichitmaybedesirableto obtainpatentprotection;and/or
- f. InformationobtainedthroughKairosactionswhichcouldrevealadditionalinsightsinto reactorsystemdevelopment,testing,qualificationprocesses,and/orregulatoryproceedings, andwhicharenototherwisereadilyobtainablebyacompetitor.
- 5. KairosinformationcontainedinEnclosure1tothislettercontainsdetailsofKairosDHRStesting foraKairosPowerfluoridesaltcooledhightemperaturereactor.Thesedetailscouldprovidea competitorwithacommercialadvantageiftheinformationweretoberevealedpublicly.
- 6. Pursuanttotheprovisionsof§2.390(b)(4),thefollowingisfurnishedforconsiderationbythe Commissionindeterminingwhethertheinformationsoughttobewithheldfrompublicdisclosure shouldbewithheld:
- a. Theinformationsoughttobewithheldfrompublicdisclosureisownedandhasbeenheldin confidencebyKairos.
KPNRC2209003
- b. TheinformationisofatypecustomarilyheldinconfidencebyKairosandnotcustomarily disclosedtothepublic.Kairoshasarationalbasisfordeterminingthetypesofinformation customarilyheldinconfidencebyitand,inthatconnection,utilizesasystemtodetermine whenandwhethertoholdcertaintypesofinformationinconfidence.Theapplicationofthat systemandthesubstanceofthatsystemconstituteKairospolicyandprovidetherational basisrequired.
- c. TheinformationisbeingtransmittedtotheCommissioninconfidenceand,underthe provisionsof10CFR2.390,itistobereceivedinconfidencebytheCommission.
- d. Thisinformationisnotreadilyavailableinpublicsources.
- e. Publicdisclosureofthisproprietaryinformationislikelytocausesubstantialharmtothe competitivepositionofKairos,becauseitwouldenhancetheabilityofcompetitorsto providesimilarproductsandservicesbyreducingtheirexpenditureofresourcesusingsimilar projectmethods,equipment,testingapproach,contractors,orlicensingapproaches.This informationistheresultofconsiderableexpensetoKairosandhasgreatvalueinthatitwill assistKairosinprovidingproductsandservicestonew,expandingmarketsnotcurrently servedbythecompany.
- f. Theinformationcouldrevealorcouldbeusedtoinferpriceinformation,costinformation, budgetlevels,orcommercialstrategiesofKairos.
- g. Eachcomponentofproprietaryinformationpertinenttoaparticularcompetitiveadvantage ispotentiallyasvaluableasthetotalcompetitiveadvantage.Ifcompetitorsacquire componentsofproprietaryinformation,anyonecomponentmaybethekeytotheentire puzzle,therebydeprivingKairosofacompetitiveadvantage.
- h. UnrestricteddisclosurewouldjeopardizethepositionofKairosintheworldmarket,and therebygiveamarketadvantagetothecompetitioninthosecountries.
Ideclareunderpenaltyofperjurythattheforegoingistrueandcorrect.
Executedon:September1,2022
DarrellGardner SeniorDirector,Licensing