ML23317A169
From kanterella
Jump to navigation
Jump to search
ML23317A169 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 11/03/2023 |
From: | NextEra Energy Seabrook |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML23317A044 | List:
|
References | |
L-2023-152 | |
Download: ML23317A169 (1) | |
Similar Documents at Seabrook | |
---|---|
Category:Graphics incl Charts and Tables
MONTHYEARL-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024
[Table view]And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML23317A1302023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 2 ML23317A1462023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML23317A1562023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems ML23317A1662023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 3, Appendices 3A - 3C ML23317A1692023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22131A1302022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix G, Part 2 and Appendix H ML20323A1522020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems SBK-L-20127, Generator Tube Inspection Report2020-10-20020 October 2020 Generator Tube Inspection Report L-2018-067, Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table L-2016-109, Official Service List Changes and Distribution for Safeguards Information and Official Use Only-Security-Related Information2016-05-11011 May 2016 Official Service List Changes and Distribution for Safeguards Information and Official Use Only-Security-Related Information ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T ML13004A3402012-12-11011 December 2012 Nuclear Meeting Letter from Don Tilbury Dated December 11, 2012 SBK-L-11209, Correction to 2010 Annual Radioactive Effluent Release Report2011-10-14014 October 2011 Correction to 2010 Annual Radioactive Effluent Release Report SBK-L-09216, Nextera Seabrook Station, Response to Regulatory Conference Questions, Dated 10/09/092009-10-0909 October 2009 Nextera Seabrook Station, Response to Regulatory Conference Questions, Dated 10/09/09 ML16195A3882008-11-0303 November 2008 Updated Final Safety Analysis Report, Revision 12, Chapter 2, Figures 2.-4-1 Through 2.4-32 - Redacted L-2008-002, Corporate Merger of Decommissioning Trustee2008-01-0303 January 2008 Corporate Merger of Decommissioning Trustee ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0626502572006-10-15015 October 2006 Receipt of Draft Response to NRC Staff Clarifying Questions Related to a Request for Additional Information ML0529902932005-10-19019 October 2005 FAQ Log 10/19/2005 SBK-L-05172, Response to Request for Additional Information Regarding Seabrook Station Unit No. 1, Steam Generator Tube Inspection Summary for the Fall 2003 Outage2005-08-0404 August 2005 Response to Request for Additional Information Regarding Seabrook Station Unit No. 1, Steam Generator Tube Inspection Summary for the Fall 2003 Outage ML0318401882003-06-0505 June 2003 Draft - Outlines 2024-03-13 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML23317A1422023-11-0303 November 2023
[Table view]2 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2G, Static Dynamic Rock Properties ML23317A1642023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 3, Appendices 3D - 3F ML23317A1322023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML23317A1462023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML23317A1352023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23317A1472023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML23317A1412023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Onsite Meteorological Data Summaries November 1971 - March 1973 ML23317A1362023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23317A1482023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.3-1 Through 2.3-11 ML23317A1332023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, List of Effective Pages and Chapter 1, Introduction and General Description of Plant ML23317A1382023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2F, Geotechnical Report - Reactor Borings - July 1974 ML23317A1602023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2D, Geologic Bedrock Logs of Boring in the Site Area ML23317A1552023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23317A1652023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML23317A1622023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Onsite Meteorological Data Summaries April 1979 - March 1980 ML23317A1662023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 3, Appendices 3A - 3C ML23317A1592023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML23317A1612023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Chapter 17, Quality Assurance ML23317A1402023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3G, Part 1 ML23317A1692023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23317A1342023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs L-2023-152, 2 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 32023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 3 ML23317A1392023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML23317A1312023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23317A1432023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2E, Historical Earthquakes in the Site Vicinity ML23317A1372023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 1 ML23317A1502023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2J, Sample Descriptions for Borings Made in November-December 1972 ML23317A1702023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 3, Appendix Appendix G, Part 2 and Appendix H ML23317A1562023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems ML23317A1492023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2C, Geologic Investigations of the Scotland Road Fault (Clinton - Newbury Fault), Newbury, Massachusetts, and Portsmouth Fault Investigations 2023-11-03 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML23317A169&oldid=3692892"