ML23317A148

From kanterella
Jump to navigation Jump to search
2 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.3-1 Through 2.3-11
ML23317A148
Person / Time
Site: Seabrook  
Issue date: 11/03/2023
From:
NextEra Energy Seabrook
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23317A044 List:
References
L-2023-152
Download: ML23317A148 (1)


Text

Seabrook Site - 50 Mile Radius Regional Climatological Data Stations SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-1

Spring Wind Rose for the 30 ft. Level (March 1972 - May 1972)

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-2

Summer Wind Rose for the 30 ft. Level (June 1972 - August 1972)

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-3

Fall Wind Rose for the 30 ft. Level (November 1971 and September, October 1972)

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-4

Winter Wind Rose for the 30 ft. Level (December 1971 -

February 1972)

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-5

Annual Wind Rose for the 30 ft. Level (November 1971 -

October 1972)

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-6

Topographic Map within a Five Mile Radius of the Seabrook Site SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-7

Terrain Cross Section [2 Sheets]

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-8, Sh. 1 of 2

Terrain Cross Section [2 Sheets]

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-8, Sh. 2 of 2

Topographic Map Showing the Location of the Meteorological Tower with Respect to the Reactor Area SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-9

Meander as a Function of Wind Speed and Stability SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-10

Plume and TIBL Interaction SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-11