Federal Respondents' Separate Addendum of Statutes and Regulations
ML23313A180
Person / Time
Site: Consolidated Interim Storage Facility
Issue date: 11/09/2023
From: Andrew Averbach, Brooke Clark, Heminger J, Kim T
NRC/OGC, US Dept of Justice, Environment & Natural Resources Div
To:
US Federal Judiciary, Court of Appeals, for the District of Columbia Circuit
References
USCA Case #20-1187, Document #2026176
Download: ML23313A180 (1)


Text

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 1 of 76 ORAL ARGUMENT NOT YET SCHEDULED No. 20-1187 (consolidated with Nos. 20-1225, 21-1104, and 21-1147)

UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT BEYOND NUCLEAR, et al.,

Petitioners, v.

NUCLEAR REGULATORY COMMISSION and UNITED STATES OF AMERICA, Respondents, HOLTEC INTERNATIONAL, Respondent-Intervenor.

On Petition for Review of Orders of the Nuclear Regulatory Commission FEDERAL RESPONDENTS SEPARATE ADDENDUM OF STATUTES AND REGULATIONS TODD KIM BROOKE P. CLARK Assistant Attorney General General Counsel JUSTIN D. HEMINGER ANDREW P. AVERBACH Attorney Solicitor Environment and Natural Office of the General Counsel Resources Division U.S. Nuclear Regulatory Commission U.S. Department of Justice 11555 Rockville Pike Post Office Box 7415 Rockville, MD 20852 Washington, D.C. 20044 (301) 415-1956 (202) 514-5442 andrew.averbach@nrc.gov justin.heminger@usdoj.gov

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 2 of 76 TABLE OF CONTENTS 5 U.S.C. § 704 .......................................................................................... 1a 5 U.S.C. § 706 .......................................................................................... 1a 28 U.S.C. § 2342 ...................................................................................... 2a 28 U.S.C. § 2343 ...................................................................................... 3a 42 U.S.C. § 2013 ...................................................................................... 4a 42 U.S.C. § 2014 ...................................................................................... 6a 42 U.S.C. § 2073 ...................................................................................... 8a 42 U.S.C. § 2093 ...................................................................................... 9a 42 U.S.C. § 2111 .................................................................................... 11a 42 U.S.C. § 2201 .................................................................................... 12a 42 U.S.C. § 2236 .................................................................................... 13a 42 U.S.C. § 2239 .................................................................................... 14a 42 U.S.C. § 2241 .................................................................................... 18a 42 U.S.C. § 5841 .................................................................................... 19a 42 U.S.C. § 10134 .................................................................................. 23a 42 U.S.C. § 10139 .................................................................................. 25a 42 U.S.C. § 10141 .................................................................................. 26a 42 U.S.C. § 10143 .................................................................................. 28a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 3 of 76 42 U.S.C. § 10155 .................................................................................. 28a 42 U.S.C. § 10161 .................................................................................. 39a 42 U.S.C. § 10172 .................................................................................. 40a 42 U.S.C. § 10222 .................................................................................. 41a 10 C.F.R. § 2.309.................................................................................... 44a 10 C.F.R. § 2.326 ................................................................................... 55a 10 C.F.R. § 2.335.................................................................................... 56a 10 C.F.R. § 2.1212.................................................................................. 58a 10 C.F.R. § 51.23.................................................................................... 58a 10 C.F.R. § 51.45.................................................................................... 59a 10 C.F.R. § 51.61.................................................................................... 62a 10 C.F.R. § 51.97.................................................................................... 63a 10 C.F.R. § 71.47.................................................................................... 64a 10 C.F.R. § 72.42.................................................................................... 66a 10 C.F.R. § 72.54.................................................................................... 67a 10 C.F.R. § 72.214.................................................................................. 73a ii

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 4 of 76 5 U.S.C. § 704 Actions reviewable Agency action made reviewable by statute and final agency action for which there is no other adequate remedy in a court are subject to judicial review. A preliminary, procedural, or intermediate agency action or ruling not directly reviewable is subject to review on the review of the final agency action. Except as otherwise expressly required by statute, agency action otherwise final is final for the purposes of this section whether or not there has been presented or determined an application for a declaratory order, for any form of reconsideration, or, unless the agency otherwise requires by rule and provides that the action meanwhile is inoperative, for an appeal to superior agency authority.

5 U.S.C. § 706 Scope of review To the extent necessary to decision and when presented, the reviewing court shall decide all relevant questions of law, interpret constitutional and statutory provisions, and determine the meaning or applicability of the terms of an agency action. The reviewing court shall--

(1) compel agency action unlawfully withheld or unreasonably delayed; and (2) hold unlawful and set aside agency action, findings, and conclusions found to be--

(A) arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law; (B) contrary to constitutional right, power, privilege, or immunity;

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 5 of 76 (C) in excess of statutory jurisdiction, authority, or limitations, or short of statutory right; (D) without observance of procedure required by law; (E) unsupported by substantial evidence in a case subject to sections 556 and 557 of this title or otherwise reviewed on the record of an agency hearing provided by statute; or (F) unwarranted by the facts to the extent that the facts are subject to trial de novo by the reviewing court.

In making the foregoing determinations, the court shall review the whole record or those parts of it cited by a party, and due account shall be taken of the rule of prejudicial error.

28 U.S.C. § 2342 Jurisdiction of court of appeals The court of appeals (other than the United States Court of Appeals for the Federal Circuit) has exclusive jurisdiction to enjoin, set aside, suspend (in whole or in part), or to determine the validity of--

(1) all final orders of the Federal Communications Commission made reviewable by section 402(a) of title 47; (2) all final orders of the Secretary of Agriculture made under chapters 9 and 20A of title 7, except orders issued under sections 210(e), 217a, and 499g(a) of title 7; (3) all rules, regulations, or final orders of--

(A) the Secretary of Transportation issued pursuant to section 50501, 50502, 56101-56104, or 57109 of title 46 or pursuant to part B or C of subtitle IV, subchapter III of chapter 311, chapter 313, or chapter 315 of title 49; and 2a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 6 of 76 (B) the Federal Maritime Commission issued pursuant to section 305, 41304, 41308, or 41309 or chapter 421 or 441 of title 46; (4) all final orders of the Atomic Energy Commission made reviewable by section 2239 of title 42; (5) all rules, regulations, or final orders of the Surface Transportation Board made reviewable by section 2321 of this title; (6) all final orders under section 812 of the Fair Housing Act; and (7) all final agency actions described in section 20114(c) of title 49.

Jurisdiction is invoked by filing a petition as provided by section 2344 of this title.

28 U.S.C. § 2343 Venue The venue of a proceeding under this chapter is in the judicial circuit in which the petitioner resides or has its principal office, or in the United States Court of Appeals for the District of Columbia Circuit.

3a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 7 of 76 42 U.S.C. § 2013 Purpose of chapter It is the purpose of this chapter to effectuate the policies set forth above by providing for (a) a program of conducting, assisting, and fostering research and development in order to encourage maximum scientific and industrial progress; (b) a program for the dissemination of unclassified scientific and technical information and for the control, dissemination, and declassification of Restricted Data, subject to appropriate safeguards, so as to encourage scientific and industrial progress; (c) a program for Government control of the possession, use, and production of atomic energy and special nuclear material, whether owned by the Government or others, so directed as to make the maximum contribution to the common defense and security and the national welfare, and to provide continued assurance of the Governments ability to enter into and enforce agreements with nations or groups of nations for the control of special nuclear materials and atomic weapons; (d) a program to encourage widespread participation in the development and utilization of atomic energy for peaceful purposes to the maximum extent consistent with the common defense and security and with the health and safety of the public; (e) a program of international cooperation to promote the common defense and security and to make available to cooperating nations the benefits of peaceful applications of atomic energy as widely as expanding technology and considerations of the common defense and security will permit; and 4a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 8 of 76 (f) a program of administration which will be consistent with the foregoing policies and programs, with international arrangements, and with agreements for cooperation, which will enable the Congress to be currently informed so as to take further legislative action as may be appropriate.

5a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 9 of 76 42 U.S.C. § 2014 Definitions The intent of Congress in the definitions as given in this section should be construed from the words or phrases used in the definitions. As used in this chapter:

(e) The term byproduct material means--

(1) any radioactive material (except special nuclear material) yielded in or made radioactive by exposure to the radiation incident to the process of producing or utilizing special nuclear material; (2) the tailings or wastes produced by the extraction or concentration of uranium or thorium from any ore processed primarily for its source material content; (3)(A) any discrete source of radium-226 that is produced, extracted, or converted after extraction, before, on, or after August 8, 2005, for use for a commercial, medical, or research activity; or (B) any material that--

(i) has been made radioactive by use of a particle accelerator; and (ii) is produced, extracted, or converted after extraction, before, on, or after August 8, 2005, for use for a commercial, medical, or research activity; and (4) any discrete source of naturally occurring radioactive material, other than source material, that (A) the Commission, in consultation with the Administrator of the 6a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 10 of 76 Environmental Protection Agency, the Secretary of Energy, the Secretary of Homeland Security, and the head of any other appropriate Federal agency, determines would pose a threat similar to the threat posed by a discrete source of radium-226 to the public health and safety or the common defense and security; and (B) before, on, or after August 8, 2005, is extracted or converted after extraction for use in a commercial, medical, or research activity.

(z) The term source material means (1) uranium, thorium, or any other material which is determined by the Commission pursuant to the provisions of section 2091 of this title to be source material; or (2) ores containing one or more of the foregoing materials, in such concentration as the Commission may by regulation determine from time to time.

(aa) The term special nuclear material means (1) plutonium, uranium enriched in the isotope 233 or in the isotope 235, and any other material which the Commission, pursuant to the provisions of section 2071 of this title, determines to be special nuclear material, but does not include source material; or (2) any material artificially enriched by any of the foregoing, but does not include source material.

7a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 11 of 76 42 U.S.C. § 2073 Domestic distribution of special nuclear material The Commission is authorized (i) to issue licenses to transfer or receive in interstate commerce, transfer, deliver, acquire, possess, own, receive possession of or title to, import, or export under the terms of an agreement for cooperation arranged pursuant to section 2153 of this title, special nuclear material, (ii) to make special nuclear material available for the period of the license, and, (iii) to distribute special nuclear material within the United States to qualified applicants requesting such material--

(1) for the conduct of research and development activities of the types specified in section 2051 of this title; (2) for use in the conduct of research and development activities or in medical therapy under a license issued pursuant to section 2134 of this title; (3) for use under a license issued pursuant to section 2133 of this title; (4) for such other uses as the Commission determines to be appropriate to carry out the purposes of this chapter.

8a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 12 of 76 42 U.S.C. § 2093 Domestic distribution of source material (a) License The Commission is authorized to issue licenses for and to distribute source material within the United States to qualified applicants requesting such material (1) for the conduct of research and development activities of the types specified in section 2051 of this title; (2) for use in the conduct of research and development activities or in medical therapy under a license issued pursuant to section 2134 of this title; (3) for use under a license issued pursuant to section 2133 of this title; or (4) for any other use approved by the Commission as an aid to science or industry.

(b) Minimum criteria for licenses The Commission shall establish, by rule, minimum criteria for the issuance of specific or general licenses for the distribution of source material depending upon the degree of importance to the common defense and security or to the health and safety of the public of (1) the physical characteristics of the source material to be distributed; (2) the quantities of source material to be distributed; and (3) the intended use of the source material to be distributed.

9a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 13 of 76 (c) Determination of charges The Commission may make a reasonable charge determined pursuant to section 2201(m) of this title for the source material licensed and distributed under subsection (a)(1), (a)(2), or (a)(4) and shall make a reasonable charge determined pursuant to section 2201(m) of this title, for the source material licensed and distributed under subsection (a)(3).

The Commission shall establish criteria in writing for the determination of whether a charge will be made for the source material licensed and distributed under subsection (a)(1), (a)(2), or (a)(4),

considering, among other things, whether the licensee is a nonprofit or eleemosynary institution and the purposes for which the source material will be used.

10a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 14 of 76 42 U.S.C. § 2111 Domestic Distribution (a) In general No person may transfer or receive in interstate commerce, manufacture, produce, transfer, acquire, own, possess, import, or export any byproduct material, except to the extent authorized by this section, section 2112 or section 2114 of this title. The Commission is authorized to issue general or specific licenses to applicants seeking to use byproduct material for research or development purposes, for medical therapy, industrial uses, agricultural uses, or such other useful applications as may be developed. The Commission may distribute, sell, loan, or lease such byproduct material as it owns to qualified applicants with or without charge: Provided, however, That, for byproduct material to be distributed by the Commission for a charge, the Commission shall establish prices on such equitable basis as, in the opinion of the Commission, (a) will provide reasonable compensation to the Government for such material, (b) will not discourage the use of such material or the development of sources of supply of such material independent of the Commission, and (c) will encourage research and development. In distributing such material, the Commission shall give preference to applicants proposing to use such material either in the conduct of research and development or in medical therapy. The Commission shall not permit the distribution of any byproduct material to any licensee, and shall recall or order the recall of any distributed material from any licensee, who is not equipped to observe or who fails to observe such safety standards to protect health as may be established by the Commission or who uses such material in violation of law or regulation of the Commission or in a manner other than as disclosed in the application therefor or approved by the Commission. The Commission is authorized to establish classes of byproduct material and to exempt certain classes or quantities of material or kinds of uses or users from the requirements for a license set forth in this section when 11a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 15 of 76 it makes a finding that the exemption of such classes or quantities of such material or such kinds of uses or users will not constitute an unreasonable risk to the common defense and security and to the health and safety of the public.

42 U.S.C. § 2201 General duties of Commission In the performance of its functions the Commission is authorized to

(b) Standards governing use and possession of material establish by rule, regulation, or order, such standards and instructions to govern the possession and use of special nuclear material, source material, and byproduct material as the Commission may deem necessary or desirable to promote the common defense and security or to protect health or to minimize danger to life or property; in addition, the Commission shall prescribe such regulations or orders as may be necessary or desirable to promote the Nations common defense and security with regard to control, ownership, or possession of any equipment or device, or important component part especially designed for such equipment or device, capable of separating the isotopes of uranium or enriching uranium in the isotope 235;

12a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 16 of 76 42 U.S.C. § 2236 Revocation of licenses (a) False applications; failure of performance Any license may be revoked for any material false statement in the application or any statement of fact required under section 2232 of this title, or because of conditions revealed by such application or statement of fact or any report, record, or inspection or other means which would warrant the Commission to refuse to grant a license on an original application, or for failure to construct or operate a facility in accordance with the terms of the construction permit or license or the technical specifications in the application, or for violation of, or failure to observe any of the terms and provisions of this chapter or of any regulation of the Commission.

(b) Procedure The Commission shall follow the provisions of section 558(c) of title 5 in revoking any license.

(c) Repossession of material Upon revocation of the license, the Commission may immediately retake possession of all special nuclear material held by the licensee. In cases found by the Commission to be of extreme importance to the national defense and security or to the health and safety of the public, the Commission may recapture any special nuclear material held by the licensee or may enter upon and operate the facility prior to any of the procedures provided under subchapter II of chapter 5 and chapter 7 of title 5. Just compensation shall be paid for the use of the facility.

13a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 17 of 76 42 U.S.C. § 2239 Hearings and judicial review (a)(1)(A) In any proceeding under this chapter, for the granting, suspending, revoking, or amending of any license or construction permit, or application to transfer control, and in any proceeding for the issuance or modification of rules and regulations dealing with the activities of licensees, and in any proceeding for the payment of compensation, an award or royalties under sections1 2183, 2187, 2236(c) or 2238 of this title, the Commission shall grant a hearing upon the request of any person whose interest may be affected by the proceeding, and shall admit any such person as a party to such proceeding. The Commission shall hold a hearing after thirty days' notice and publication once in the Federal Register, on each application under section 2133 or 2134(b) of this title for a construction permit for a facility, and on any application under section 2134(c) of this title for a construction permit for a testing facility. In cases where such a construction permit has been issued following the holding of such a hearing, the Commission may, in the absence of a request therefor by any person whose interest may be affected, issue an operating license or an amendment to a construction permit or an amendment to an operating license without a hearing, but upon thirty days' notice and publication once in the Federal Register of its intent to do so. The Commission may dispense with such thirty days' notice and publication with respect to any application for an amendment to a construction permit or an amendment to an operating license upon a determination by the Commission that the amendment involves no significant hazards consideration.

(B)(i) Not less than 180 days before the date scheduled for initial loading of fuel into a plant by a licensee that has been issued a combined construction permit and operating license under section 2235(b) of this title, the Commission shall publish in the Federal Register notice of intended operation. That notice shall provide that any 14a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 18 of 76 person whose interest may be affected by operation of the plant, may within 60 days request the Commission to hold a hearing on whether the facility as constructed complies, or on completion will comply, with the acceptance criteria of the license.

(ii) A request for hearing under clause (i) shall show, prima facie, that one or more of the acceptance criteria in the combined license have not been, or will not be met, and the specific operational consequences of nonconformance that would be contrary to providing reasonable assurance of adequate protection of the public health and safety.

(iii) After receiving a request for a hearing under clause (i), the Commission expeditiously shall either deny or grant the request. If the request is granted, the Commission shall determine, after considering petitioners' prima facie showing and any answers thereto, whether during a period of interim operation, there will be reasonable assurance of adequate protection of the public health and safety. If the Commission determines that there is such reasonable assurance, it shall allow operation during an interim period under the combined license.

(iv) The Commission, in its discretion, shall determine appropriate hearing procedures, whether informal or formal adjudicatory, for any hearing under clause (i), and shall state its reasons therefor.

(v) The Commission shall, to the maximum possible extent, render a decision on issues raised by the hearing request within 180 days of the publication of the notice provided by clause (i) or the anticipated date for initial loading of fuel into the reactor, whichever is later.

Commencement of operation under a combined license is not subject to subparagraph (A).

(2)(A) The Commission may issue and make immediately effective any amendment to an operating license or any amendment to a combined construction and operating license, upon a determination by the Commission that such amendment involves no significant hazards 15a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 19 of 76 consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. Such amendment may be issued and made immediately effective in advance of the holding and completion of any required hearing. In determining under this section whether such amendment involves no significant hazards consideration, the Commission shall consult with the State in which the facility involved is located. In all other respects such amendment shall meet the requirements of this chapter.

(B) The Commission shall periodically (but not less frequently than once every thirty days) publish notice of any amendments issued, or proposed to be issued, as provided in subparagraph (A). Each such notice shall include all amendments issued, or proposed to be issued, since the date of publication of the last such periodic notice. Such notice shall, with respect to each amendment or proposed amendment (i) identify the facility involved; and (ii) provide a brief description of such amendment. Nothing in this subsection shall be construed to delay the effective date of any amendment.

(C) The Commission shall, during the ninety-day period following the effective date of this paragraph, promulgate regulations establishing (i) standards for determining whether any amendment to an operating license or any amendment to a combined construction and operating license involves no significant hazards consideration; (ii) criteria for providing or, in emergency situations, dispensing with prior notice and reasonable opportunity for public comment on any such determination, which criteria shall take into account the exigency of the need for the amendment involved; and (iii) procedures for consultation on any such determination with the State in which the facility involved is located.

(b) The following Commission actions shall be subject to judicial review in the manner prescribed in chapter 158 of Title 28 and chapter 7 of Title 5:

(1) Any final order entered in any proceeding of the kind specified in subsection (a).

16a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 20 of 76 (2) Any final order allowing or prohibiting a facility to begin operating under a combined construction and operating license.

(3) Any final order establishing by regulation standards to govern the Department of Energy's gaseous diffusion uranium enrichment plants, including any such facilities leased to a corporation established under the USEC Privatization Act.

(4) Any final determination under section 2297f(c) of this title relating to whether the gaseous diffusion plants, including any such facilities leased to a corporation established under the USEC Privatization Act, are in compliance with the Commission's standards governing the gaseous diffusion plants and all applicable laws.

17a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 21 of 76 42 U.S.C. § 2241 Atomic safety and licensing boards; establishment; membership; functions; compensation (a) Notwithstanding the provisions of sections 556(b) and 557(b) of Title 5, the Commission is authorized to establish one or more atomic safety and licensing boards, each comprised of three members, one of whom shall be qualified in the conduct of administrative proceedings and two of whom shall have such technical or other qualifications as the Commission deems appropriate to the issues to be decided, to conduct such hearings as the Commission may direct and make such intermediate or final decisions as the Commission may authorize with respect to the granting, suspending, revoking or amending of any license or authorization under the provisions of this chapter, any other provision of law, or any regulation of the Commission issued thereunder. The Commission may delegate to a board such other regulatory functions as the Commission deems appropriate. The Commission may appoint a panel of qualified persons from which board members may be selected.

(b) Board members may be appointed by the Commission from private life, or designated from the staff of the Commission or other Federal agency. Board members appointed from private life shall receive a per diem compensation for each day spent in meetings or conferences, and all members shall receive their necessary traveling or other expenses while engaged in the work of a board. The provisions of section 2203 of this title shall be applicable to board members appointed from private life.

18a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 22 of 76 42 U.S.C. § 5841 Establishment and transfers (a) Composition; Chairman; Acting Chairman; quorum; official spokesman; seal; functions of Chairman and Commission (1) There is established an independent regulatory commission to be known as the Nuclear Regulatory Commission which shall be composed of five members, each of whom shall be a citizen of the United States. The 20President shall designate one member of the Commission as Chairman thereof to serve as such during the pleasure of the President. The Chairman may from time to time designate any other member of the Commission as Acting Chairman to act in the place and stead of the Chairman during his absence. The Chairman (or the Acting Chairman in the absence of the Chairman) shall preside at all meetings of the Commission and a quorum for the transaction of business shall consist of at least three members present. Each member of the Commission, including the Chairman, shall have equal responsibility and authority in all decisions and actions of the Commission, shall have full access to all information relating to the performance of his duties or responsibilities, and shall have one vote. Action of the Commission shall be determined by a majority vote of the members present. The Chairman (or Acting Chairman in the absence of the Chairman) shall be the official spokesman of the Commission in its relations with the Congress, Government agencies, persons, or the public, and, on behalf of the Commission, shall see to the faithful execution of the policies and decisions of the Commission, and shall report thereon to the Commission from time to time or as the Commission may direct.

The Commission shall have an official seal which shall be judicially noticed.

19a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 23 of 76 (2) The Chairman of the Commission shall be the principal executive officer of the Commission, and he shall exercise all of the executive and administrative functions of the Commission, including functions of the Commission with respect to (a) the appointment and supervision of personnel employed under the Commission (other than personnel employed regularly and full time in the immediate offices of commissioners other than the Chairman, and except as otherwise provided in this chapter), (b) the distribution of business among such personnel and among administrative units of the Commission, and (c) the use and expenditure of funds.

(3) In carrying out any of his functions under the provisions of this section the Chairman shall be governed by general policies of the Commission and by such regulatory decisions, findings, and determinations as the Commission may by law be authorized to make.

(4) The appointment by the Chairman of the heads of major administrative units under the Commission shall be subject to the approval of the Commission.

(5) There are hereby reserved to the Commission its functions with respect to revising budget estimates and with respect to determining upon the distribution of appropriated funds according to major programs and purposes.

(b) Appointment of members (1) Members of the Commission shall be appointed by the President, by and with the advice and consent of the Senate.

20a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 24 of 76 (2) Appointments of members pursuant to this subsection shall be made in such a manner that not more than three members of the Commission shall be members of the same political party.

(c) Term of office Each member shall serve for a term of five years, each such term to commence on July 1, except that of the five members first appointed to the Commission, one shall serve for one year, one for two years, one for three years, one for four years, and one for five years, to be designated by the President at the time of appointment; and except that any member appointed to fill a vacancy occurring prior to the expiration of the term for which his predecessor was appointed, shall be appointed for the remainder of such term. For the purpose of determining the expiration date of the terms of office of the five members first appointed to the Nuclear Regulatory Commission, each such term shall be deemed to have begun July 1, 1975.

(d) Submission of appointments to Senate Such initial appointments shall be submitted to the Senate within sixty days of October 11, 1974. Any individual who is serving as a member of the Atomic Energy Commission on October 11, 1974, and who may be appointed by the President to the Commission, shall be appointed for a term designated by the President, but which term shall terminate not later than the end of his present term as a member of the Atomic Energy Commission, without regard to the requirements of subsection (b)(2) of this section.

Any subsequent appointment of such individuals shall be subject to the provisions of this section.

21a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 25 of 76 (e) Removal of members; prohibition against engagement in business or other employment Any member of the Commission may be removed by the President for inefficiency, neglect of duty, or malfeasance in office. No member of the Commission shall engage in any business, vocation, or employment other than that of serving as a member of the Commission.

(f) Transfer of licensing and regulatory functions of Atomic Energy Commission There are hereby transferred to the Commission all the licensing and related regulatory functions of the Atomic Energy Commission, the Chairman and members of the Commission, the General Counsel, and other officers and components of the Commission--which functions officers, components, and personnel are excepted from the transfer to the Administrator by section 5814(c) of this title.

(g) Additional transfers In addition to other functions and personnel transferred to the Commission, there are also transferred to the Commission--

(1) the functions of the Atomic Safety and Licensing Board Panel and the Atomic Safety and Licensing Appeal Board; (2) such personnel as the Director of the Office of Management and Budget determines are necessary for exercising responsibilities under section 5845 of this title, relating to, research, for the purpose of confirmatory assessment relating to licensing and other regulation under the provisions of the Atomic Energy Act of 1954, as amended, and of this chapter.

22a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 26 of 76 42 U.S.C. § 10134 Site approval and construction authorization (b) Submission of application If the President recommends to the Congress the Yucca Mountain site under subsection (a) and the site designation is permitted to take effect under section 10135 of this title, the Secretary shall submit to the Commission an application for a construction authorization for a repository at such site not later than 90 days after the date on which the recommendation of the site designation is effective under such section and shall provide to the Governor and legislature of the State of Nevada a copy of such application.

(c) Status report on application Not later than 1 year after the date on which an application for a construction authorization is submitted under subsection (b), and annually thereafter until the date on which such authorization is granted, the Commission shall submit a report to the Congress describing the proceedings undertaken through the date of such report with regard to such application, including a description of--

(1) any major unresolved safety issues, and the explanation of the Secretary with respect to design and operation plans for resolving such issues; (2) any matters of contention regarding such application; and (3) any Commission actions regarding the granting or denial of such authorization.

(d) Commission action The Commission shall consider an application for a construction authorization for all or part of a repository in accordance with the laws 23a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 27 of 76 applicable to such applications, except that the Commission shall issue a final decision approving or disapproving the issuance of a construction authorization not later than the expiration of 3 years after the date of the submission of such application, except that the Commission may extend such deadline by not more than 12 months if, not less than 30 days before such deadline, the Commission complies with the reporting requirements established in subsection (e)(2). The Commission decision approving the first such application shall prohibit the emplacement in the first repository of a quantity of spent fuel containing in excess of 70,000 metric tons of heavy metal or a quantity of solidified high-level radioactive waste resulting from the reprocessing of such a quantity of spent fuel until such time as a second repository is in operation. In the event that a monitored retrievable storage facility, approved pursuant to part C of this subchapter, shall be located, or is planned to be located, within 50 miles of the first repository, then the Commission decision approving the first such application shall prohibit the emplacement of a quantity of spent fuel containing in excess of 70,000 metric tons of heavy metal or a quantity of solidified high-level radioactive waste resulting from the reprocessing of spent fuel in both the repository and monitored retrievable storage facility until such time as a second repository is in operation.

24a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 28 of 76 42 U.S.C. § 10139 Judicial review of agency actions (a) Jurisdiction of United States courts of appeals (1) Except for review in the Supreme Court of the United States, the United States courts of appeals shall have original and exclusive jurisdiction over any civil action (A) for review of any final decision or action of the Secretary, the President, or the Commission under this part; (B) alleging the failure of the Secretary, the President, or the Commission to make any decision, or take any action, required under this part; (C) challenging the constitutionality of any decision made, or action taken, under any provision of this part; (D) for review of any environmental impact statement prepared pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to any action under this part, or as required under section 10155(c)(1) of this title, or alleging a failure to prepare such statement with respect to any such action; (E) for review of any environmental assessment prepared under section 10132(b)(1) or 10155(c)(2) of this title; or (F) for review of any research and development activity under subchapter II.

(2) The venue of any proceeding under this section shall be in the judicial circuit in which the petitioner involved resides or has its principal office, or in the United States Court of Appeals for the District of Columbia.

25a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 29 of 76 (c) Deadline for commencing action A civil action for judicial review described under subsection (a)(1) may be brought not later than the 180th day after the date of the decision or action or failure to act involved, as the case may be, except that if a party shows that he did not know of the decision or action complained of (or of the failure to act), and that a reasonable person acting under the circumstances would not have known, such party may bring a civil action not later than the 180th day after the date such party acquired actual or constructive knowledge of such decision, action, or failure to act.

42 U.S.C. § 10141 Certain Standards and Criteria (a) Environmental Protection Agency standards Not later than 1 year after January 7, 1983, the Administrator, pursuant to authority under other provisions of law, shall, by rule, promulgate generally applicable standards for protection of the general environment from offsite releases from radioactive material in repositories.

(b) Commission requirements and criteria (1)(A) Not later than January 1, 1984, the Commission, pursuant to authority under other provisions of law, shall, by rule, promulgate technical requirements and criteria that it will apply, under the Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.) and the Energy Reorganization Act of 1974 (42 U.S.C. 5801 et seq.), in approving or disapproving--

(i) applications for authorization to construct repositories; (ii) applications for licenses to receive and possess spent nuclear fuel and high-level radioactive waste in such repositories; and 26a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 30 of 76 (iii) applications for authorization for closure and decommissioning of such repositories.

(B) Such criteria shall provide for the use of a system of multiple barriers in the design of the repository and shall include such restrictions on the retrievability of the solidified high-level radioactive waste and spent fuel emplaced in the repository as the Commission deems appropriate.

(C) Such requirements and criteria shall not be inconsistent with any comparable standards promulgated by the Administrator under subsection (a).

(2) For purposes of this chapter, nothing in this section shall be construed to prohibit the Commission from promulgating requirements and criteria under paragraph (1) before the Administrator promulgates standards under subsection (a). If the Administrator promulgates standards under subsection (a) after requirements and criteria are promulgated by the Commission under paragraph (1), such requirements and criteria shall be revised by the Commission if necessary to comply with paragraph (1)(C).

(c) Environmental impact statement The promulgation of standards or criteria in accordance with the provisions of this section shall not require the preparation of an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)), or to require any environmental review under subparagraph (E) or (F) of section 102(2) of such Act.

27a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 31 of 76 42 U.S.C. § 10143 Title to material Delivery, and acceptance by the Secretary, of any high-level radioactive waste or spent nuclear fuel for a repository constructed under this part shall constitute a transfer to the Secretary of title to such waste or spent fuel.

42 U.S.C. § 10155 Storage of spent nuclear fuel (a) Storage capacity (1) Subject to section 10107 of this title, the Secretary shall provide, in accordance with paragraph (5), not more than 1,900 metric tons of capacity for the storage of spent nuclear fuel from civilian nuclear power reactors. Such storage capacity shall be provided through any one or more of the following methods, used in any combination determined by the Secretary to be appropriate:

(A) use of available capacity at one or more facilities owned by the Federal Government on January 7, 1983, including the modification and expansion of any such facilities, if the Commission determines that such use will adequately protect the public health and safety, except that such use shall not (i) render such facilities subject to licensing under the Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.)

or the Energy Reorganization Act of 1974 (42 U.S.C.

5801 et seq.); or (ii) except as provided in subsection (c) require the preparation of an environmental impact statement 28a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 32 of 76 under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)), such [1]

facility is already being used, or has previously been used, for such storage or for any similar purpose.[2]

(B) acquisition of any modular or mobile spent nuclear fuel storage equipment, including spent nuclear fuel storage casks, and provision of such equipment, to any person generating or holding title to spent nuclear fuel, at the site of any civilian nuclear power reactor operated by such person or at any site owned by the Federal Government on January 7, 1983; (C) construction of storage capacity at any site of a civilian nuclear power reactor.

(2) Storage capacity authorized by paragraph (1) shall not be provided at any Federal or non-Federal site within which there is a candidate site for a repository. The restriction in the preceding sentence shall only apply until such time as the Secretary decides that such candidate site is no longer a candidate site under consideration for development as a repository.

(3) In selecting methods of providing storage capacity under paragraph (1), the Secretary shall consider the timeliness of the availability of each such method and shall seek to minimize the transportation of spent nuclear fuel, the public health and safety impacts, and the costs of providing such storage capacity.

(4) In providing storage capacity through any method described in paragraph (1), the Secretary shall comply with any applicable requirements for licensing or authorization of such method, except as provided in paragraph (1)(A)(i).

(5) The Secretary shall ensure that storage capacity is made available under paragraph (1) when needed, as determined on the basis 29a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 33 of 76 of the storage needs specified in contracts entered into under section 10156(a) of this title, and shall accept upon request any spent nuclear fuel as covered under such contracts.

(6) For purposes of paragraph (1)(A), the term facility means any building or structure.

(b) Contracts (1) Subject to the capacity limitation established in subsections (a)(1) and (d), the Secretary shall offer to enter into, and may enter into, contracts under section 10156(a) of this title with any person generating or owning spent nuclear fuel for purposes of providing storage capacity for such spent fuel under this section only if the Commission determines that (A) adequate storage capacity to ensure the continued orderly operation of the civilian nuclear power reactor at which such spent nuclear fuel is generated cannot reasonably be provided by the person owning and operating such reactor at such site, or at the site of any other civilian nuclear power reactor operated by such person, and such capacity cannot be made available in a timely manner through any method described in subparagraph (B); and (B) such person is diligently pursuing licensed alternatives to the use of Federal storage capacity for the storage of spent nuclear fuel expected to be generated by such person in the future, including (i) expansion of storage facilities at the site of any civilian nuclear power reactor operated by such person; (ii) construction of new or additional storage facilities at the site of any civilian nuclear power reactor operated by such person; 30a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 34 of 76 (iii) acquisition of modular or mobile spent nuclear fuel storage equipment, including spent nuclear fuel storage casks, for use at the site of any civilian nuclear power reactor operated by such person; and (iv) transshipment to another civilian nuclear power reactor owned by such person.

(2) In making the determination described in paragraph (1)(A),

the Commission shall ensure maintenance of a full core reserve storage capability at the site of the civilian nuclear power reactor involved unless the Commission determines that maintenance of such capability is not necessary for the continued orderly operation of such reactor.

(3) The Commission shall complete the determinations required in paragraph (1) with respect to any request for storage capacity not later than 6 months after receipt of such request by the Commission.

(c) Environmental review (1) The provision of 300 or more metric tons of storage capacity at any one Federal site under subsection (a)(1)(A) shall be considered to be a major Federal action requiring preparation of an environmental impact statement under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)).

(2)(A) The Secretary shall prepare, and make available to the public, an environmental assessment of the probable impacts of any provision of less than 300 metric tons of storage capacity at any one Federal site under subsection (a)(1)(A) that requires the modification or expansion of any facility at the site, and a discussion of alternative activities that may be undertaken to avoid such impacts. Such environmental assessment shall include 31a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 35 of 76 (i) an estimate of the amount of storage capacity to be made available at such site; (ii) an evaluation as to whether the facilities to be used at such site are suitable for the provision of such storage capacity; (iii) a description of activities planned by the Secretary with respect to the modification or expansion of the facilities to be used at such site; (iv) an evaluation of the effects of the provision of such storage capacity at such site on the public health and safety, and the environment; (v) a reasonable comparative evaluation of current information with respect to such site and facilities and other sites and facilities available for the provision of such storage capacity; (vi) a description of any other sites and facilities that have been considered by the Secretary for the provision of such storage capacity; and (vii) an assessment of the regional and local impacts of providing such storage capacity at such site, including the impacts on transportation.

(B) The issuance of any environmental assessment under this paragraph shall be considered to be a final agency action subject to judicial review in accordance with the provisions of chapter 7 of title 5. Such judicial review shall be limited to the sufficiency of such assessment with respect to the items described in clauses (i) through (vii) of subparagraph (A).

(3) Judicial review of any environmental impact statement or environmental assessment prepared pursuant to this subsection 32a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 36 of 76 shall be conducted in accordance with the provisions of section 10139 of this title.

(d) Review of sites and State participation (1) In carrying out the provisions of this part with regard to any interim storage of spent fuel from civilian nuclear power reactors which the Secretary is authorized by this section to provide, the Secretary shall, as soon as practicable, notify, in writing, the Governor and the State legislature of any State and the Tribal Council of any affected Indian tribe in such State in which is located a potentially acceptable site or facility for such interim storage of spent fuel of his intention to investigate that site or facility.

(2) During the course of investigation of such site or facility, the Secretary shall keep the Governor, State legislature, and affected Tribal Council currently informed of the progress of the work, and results of the investigation. At the time of selection by the Secretary of any site or existing facility, but prior to undertaking any site-specific work or alterations, the Secretary shall promptly notify the Governor, the legislature, and any affected Tribal Council in writing of such selection, and subject to the provisions of paragraph (6) of this subsection, shall promptly enter into negotiations with such State and affected Tribal Council to establish a cooperative agreement under which such State and Council shall have the right to participate in a process of consultation and cooperation, based on public health and safety and environmental concerns, in all stages of the planning, development, modification, expansion, operation, and closure of storage capacity at a site or facility within such State for the interim storage of spent fuel from civilian nuclear power reactors.

Public participation in the negotiation of such an agreement shall be provided for and encouraged by the Secretary, the State, and the affected Tribal Council. The Secretary, in cooperation with the 33a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 37 of 76 States and Indian tribes, shall develop and publish minimum guidelines for public participation in such negotiations, but the adequacy of such guidelines or any failure to comply with such guidelines shall not be a basis for judicial review.

(3) The cooperative agreement shall include, but need not be limited to, the sharing in accordance with applicable law of all technical and licensing information, the utilization of available expertise, the facilitating of permitting procedures, joint project review, and the formulation of joint surveillance and monitoring arrangements to carry out applicable Federal and State laws. The cooperative agreement also shall include a detailed plan or schedule of milestones, decision points and opportunities for State or eligible Tribal Council review and objection. Such cooperative agreement shall provide procedures for negotiating and resolving objections of the State and affected Tribal Council in any stage of planning, development, modification, expansion, operation, or closure of storage capacity at a site or facility within such State.

The terms of any cooperative agreement shall not affect the authority of the Nuclear Regulatory Commission under existing law.

(4) For the purpose of this subsection, process of consultation and cooperation means a methodology by which the Secretary (A) keeps the State and eligible Tribal Council fully and currently informed about the aspects of the project related to any potential impact on the public health and safety and environment; (B) solicits, receives, and evaluates concerns and objections of such State and Council with regard to such aspects of the project on an ongoing basis; and (C) works diligently and cooperatively to resolve, through arbitration or other appropriate mechanisms, such concerns and objections. The process of consultation and cooperation shall not include the grant of a right to any State or Tribal Council to exercise an absolute veto of any aspect of the 34a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 38 of 76 planning, development, modification, expansion, or operation of the project.

(5) The Secretary and the State and affected Tribal Council shall seek to conclude the agreement required by paragraph (2) as soon as practicable, but not later than 180 days following the date of notification of the selection under paragraph (2). The Secretary shall periodically report to the Congress thereafter on the status of the agreements approved under paragraph (3). Any report to the Congress on the status of negotiations of such agreement by the Secretary shall be accompanied by comments solicited by the Secretary from the State and eligible Tribal Council.

(6)(A)Upon deciding to provide an aggregate of 300 or more metric tons of storage capacity under subsection (a)(1) at any one site, the Secretary shall notify the Governor and legislature of the State where such site is located, or the governing body of the Indian tribe in whose reservation such site is located, as the case may be, of such decision. During the 60-day period following receipt of notification by the Secretary of his decision to provide an aggregate of 300 or more metric tons of storage capacity at any one site, the Governor or legislature of the State in which such site is located, or the governing body of the affected Indian tribe where such site is located, as the case may be, may disapprove the provision of 300 or more metric tons of storage capacity at the site involved and submit to the Congress a notice of such disapproval.

A notice of disapproval shall be considered to be submitted to the Congress on the date of the transmittal of such notice of disapproval to the Speaker of the House and the President pro tempore of the Senate. Such notice of disapproval shall be accompanied by a statement of reasons explaining why the provision of such storage capacity at such site was disapproved by such Governor or legislature or the governing body of such Indian tribe.

35a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 39 of 76 (B) Unless otherwise provided by State law, the Governor or legislature of each State shall have authority to submit a notice of disapproval to the Congress under subparagraph (A). In any case in which State law provides for submission of any such notice of disapproval by any other person or entity, any reference in this part to the Governor or legislature of such State shall be considered to refer instead to such other person or entity.

(C) The authority of the Governor and legislature of each State under this paragraph shall not be applicable with respect to any site located on a reservation.

(D) If any notice of disapproval is submitted to the Congress under subparagraph (A), the proposed provision of 300 or more metric tons of storage capacity at the site involved shall be disapproved unless, during the first period of 90 calendar days of continuous session of the Congress following the date of the receipt by the Congress of such notice of disapproval, the Congress passes a resolution approving such proposed provision of storage capacity in accordance with the procedures established in this paragraph and subsections (d) through (f) of section 10135 of this title and such resolution thereafter becomes law. For purposes of this paragraph, the term resolution means a joint resolution of either House of the Congress, the matter after the resolving clause of which is as follows: That there hereby is approved the provision of 300 or more metric tons of spent nuclear fuel storage capacity at the site located at _______, with respect to which a notice of disapproval was submitted by _______ on _______.. The first blank space in such resolution shall be filled with the geographic location of the site involved; the second blank space in such resolution shall be filled with the designation of the State Governor and legislature or affected Indian tribe governing body submitting the notice of disapproval involved; and the last blank space in such resolution shall be filled with the date of submission of such notice of disapproval.

36a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 40 of 76 (E) For purposes of the consideration of any resolution described in subparagraph (D), each reference in subsections (d) and (e) of section 10135 of this title to a resolution of repository siting approval shall be considered to refer to the resolution described in such subparagraph.

(7) As used in this section, the term affected Tribal Council means the governing body of any Indian tribe within whose reservation boundaries there is located a potentially acceptable site for interim storage capacity of spent nuclear fuel from civilian nuclear power reactors, or within whose boundaries a site for such capacity is selected by the Secretary, or whose federally defined possessory or usage rights to other lands outside of the reservations boundaries arising out of congressionally ratified treaties, as determined by the Secretary of the Interior pursuant to a petition filed with him by the appropriate governmental officials of such tribe, may be substantially and adversely affected by the establishment of any such storage capacity.

(e) Limitations Any spent nuclear fuel stored under this section shall be removed from the storage site or facility involved as soon as practicable, but in any event not later than 3 years following the date on which a repository or monitored retrievable storage facility developed under this chapter is available for disposal of such spent nuclear fuel.

(f) Report The Secretary shall annually prepare and submit to the Congress a report on any plans of the Secretary for providing storage capacity under this section. Such report shall include a description of the specific manner of providing such storage selected by the Secretary, if any. The Secretary shall prepare and submit the first such report not later than 1 year after January 7, 1983.

37a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 41 of 76 (g) Criteria for determining adequacy of available storage capacity Not later than 90 days after January 7, 1983, the Commission pursuant to section 553 of the Administrative Procedures Act [5 U.S.C.

553], shall propose, by rule, procedures and criteria for making the determination required by subsection (b) that a person owning and operating a civilian nuclear power reactor cannot reasonably provide adequate spent nuclear fuel storage capacity at the civilian nuclear power reactor site when needed to ensure the continued orderly operation of such reactor. Such criteria shall ensure the maintenance of a full core reserve storage capability at the site of such reactor unless the Commission determines that maintenance of such capability is not necessary for the continued orderly operation of such reactor. Such criteria shall identify the feasibility of reasonably providing such adequate spent nuclear fuel storage capacity, taking into account economic, technical, regulatory, and public health and safety factors, through the use of high-density fuel storage racks, fuel rod compaction, transshipment of spent nuclear fuel to another civilian nuclear power reactor within the same utility system, construction of additional spent nuclear fuel pool capacity, or such other technologies as may be approved by the Commission.

(h) Application Notwithstanding any other provision of law, nothing in this chapter shall be construed to encourage, authorize, or require the private or Federal use, purchase, lease, or other acquisition of any storage facility located away from the site of any civilian nuclear power reactor and not owned by the Federal Government on January 7, 1983.

(i) Coordination with research and development program To the extent available, and consistent with the provisions of this section, the Secretary shall provide spent nuclear fuel for the research and development program authorized in section 10198 [3] of this title from spent nuclear fuel received by the Secretary for storage under this 38a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 42 of 76 section. Such spent nuclear fuel shall not be subject to the provisions of subsection (e).

42 U.S.C. § 10161 Monitored retrievable storage (a) Findings The Congress finds that--

(1) long-term storage of high-level radioactive waste or spent nuclear fuel in monitored retrievable storage facilities is an option for providing safe and reliable management of such waste or spent fuel; (2) the executive branch and the Congress should proceed as expeditiously as possible to consider fully a proposal for construction of one or more monitored retrievable storage facilities to provide such long-term storage; (3) the Federal Government has the responsibility to ensure that site-specific designs for such facilities are available as provided in this section; (4) the generators and owners of the high-level radioactive waste and spent nuclear fuel to be stored in such facilities have the responsibility to pay the costs of the long-term storage of such waste and spent fuel; and (5) disposal of high-level radioactive waste and spent nuclear fuel in a repository developed under this chapter should proceed regardless of any construction of a monitored retrievable storage facility pursuant to this section.

39a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 43 of 76 42 U.S.C. § 10172 Selection of Yucca Mountain Site (a) In general (1) The Secretary shall provide for an orderly phase-out of site specific activities at all candidate sites other than the Yucca Mountain site.

(2) The Secretary shall terminate all site specific activities (other than reclamation activities) at all candidate sites, other than the Yucca Mountain site, within 90 days after December 22, 1987.

(b) Eligibility to enter into benefits agreement Effective on December 22, 1987, the State of Nevada shall be eligible to enter into a benefits agreement with the Secretary under section 10173 of this title.

40a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 44 of 76 42 U.S.C. § 10222 Nuclear Waste Fund (a) Contracts (1) In the performance of his functions under this chapter, the Secretary is authorized to enter into contracts with any person who generates or holds title to high-level radioactive waste, or spent nuclear fuel, of domestic origin for the acceptance of title, subsequent transportation, and disposal of such waste or spent fuel. Such contracts shall provide for payment to the Secretary of fees pursuant to paragraphs (2) and (3) sufficient to offset expenditures described in subsection (d).

(2) For electricity generated by a civilian nuclear power reactor and sold on or after the date 90 days after January 7, 1983, the fee under paragraph (1) shall be equal to 1.0 mil per kilowatt-hour.

(3) For spent nuclear fuel, or solidified high-level radioactive waste derived from spent nuclear fuel, which fuel was used to generate electricity in a civilian nuclear power reactor prior to the application of the fee under paragraph (2) to such reactor, the Secretary shall, not later than 90 days after January 7, 1983, establish a 1 time fee per kilogram of heavy metal in spent nuclear fuel, or in solidified highlevel radioactive waste. Such fee shall be in an amount equivalent to an average charge of 1.0 mil per kilowatt-hour for electricity generated by such spent nuclear fuel, or such solidified high-level waste derived therefrom, to be collected from any person delivering such spent nuclear fuel or high-level waste, pursuant to section 10143 of this title, to the Federal Government. Such fee shall be paid to the Treasury of the United States and shall be deposited in the separate fund established by subsection (c). In paying such a fee, the person delivering spent fuel, or solidified high-level radioactive wastes derived therefrom, to the Federal Government shall have no further financial obligation to the Federal Government 41a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 45 of 76 for the long-term storage and permanent disposal of such spent fuel, or the solidified high-level radioactive waste derived therefrom.

(4) Not later than 180 days after January 7, 1983, the Secretary shall establish procedures for the collection and payment of the fees established by paragraph (2) and paragraph (3). The Secretary shall annually review the amount of the fees established by paragraphs (2) and (3) above to evaluate whether collection of the fee will provide sufficient revenues to offset the costs as defined in subsection (d) herein. In the event the Secretary determines that either insufficient or excess revenues are being collected, in order to recover the costs incurred by the Federal Government that are specified in subsection (d), the Secretary shall propose an adjustment to the fee to insure full cost recovery. The Secretary shall immediately transmit this proposal for such an adjustment to Congress. The adjusted fee proposed by the Secretary shall be effective after a period of 90 days of continuous session have elapsed following the receipt of such transmittal unless during such 90-day period either House of Congress adopts a resolution disapproving the Secretary's proposed adjustment in accordance with the procedures set forth for congressional review of an energy action under section 6421 of this title.

(5) Contracts entered into under this section shall provide that--

(A) following commencement of operation of a repository, the Secretary shall take title to the high-level radioactive waste or spent nuclear fuel involved as expeditiously as practicable upon the request of the generator or owner of such waste or spent fuel; and (B) in return for the payment of fees established by this section, the Secretary, beginning not later than January 31, 1998, will dispose of the high-level radioactive waste or spent nuclear fuel involved as provided in this subchapter.

42a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 46 of 76 (6) The Secretary shall establish in writing criteria setting forth the terms and conditions under which such disposal services shall be made available.

43a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 47 of 76 10 C.F.R. § 2.309 Hearing requests, petitions to intervene, requirements for standing, and contentions.

(a) General requirements. Any person whose interest may be affected by a proceeding and who desires to participate as a party must file a written request for hearing and a specification of the contentions which the person seeks to have litigated in the hearing. In a proceeding under 10 CFR 52.103, the Commission, acting as the presiding officer, will grant the request if it determines that the requestor has standing under the provisions of paragraph (d) of this section and has proposed at least one admissible contention that meets the requirements of paragraph (f) of this section. For all other proceedings, except as provided in paragraph (e) of this section, the Commission, presiding officer, or the Atomic Safety and Licensing Board designated to rule on the request for hearing and/or petition for leave to intervene, will grant the request/petition if it determines that the requestor/petitioner has standing under the provisions of paragraph (d) of this section and has proposed at least one admissible contention that meets the requirements of paragraph (f) of this section. In ruling on the request for hearing/petition to intervene submitted by petitioners seeking to intervene in the proceeding on the HLW repository, the Commission, the presiding officer, or the Atomic Safety and Licensing Board shall also consider any failure of the petitioner to participate as a potential party in the pre-license application phase under subpart J of this part in addition to the factors in paragraph (d) of this section. If a request for hearing or petition to intervene is filed in response to any notice of hearing or opportunity for hearing, the applicant/licensee shall be deemed to be a party.

(b) Timing. Unless specified elsewhere in this chapter or otherwise provided by the Commission, the request or petition and the list of contentions must be filed as follows:

44a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 48 of 76 (1) In proceedings for the direct or indirect transfer of control of an NRC license when the transfer requires prior approval of the NRC under the Commission's regulations, governing statute, or pursuant to a license condition, twenty (20) days from the date of publication of the notice in the Federal Register.

(2) In proceedings for the initial authorization to construct a high-level radioactive waste geologic repository, and the initial licensee to receive and process high level radioactive waste at a geological repository operations area, thirty (30) days from the date of publication of the notice in the Federal Register.

(3) In proceedings for which a Federal Register notice of agency action is published (other than a proceeding covered by paragraphs (b)(1) or (b)(2) of this section), not later than:

(i) The time specified in any notice of hearing or notice of proposed action or as provided by the presiding officer or the Atomic Safety and Licensing Board designated to rule on the request and/or petition, which may not be less than sixty (60) days from the date of publication of the notice in the Federal Register; or (ii) If no period is specified, sixty (60) days from the date of publication of the notice.

(iii) [Reserved by 73 FR 44620]

(4) In proceedings for which a Federal Register notice of agency action is not published, not later than the latest of:

(i) Sixty (60) days after publication of notice on the NRC Web site at http://www.nrc.gov/public-involve/major-actions.html, or 45a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 49 of 76 (ii) Sixty (60) days after the requestor receives actual notice of a pending application, but not more than sixty (60) days after agency action on the application.

(c) Filings after the deadline; submission of hearing request, intervention petition, or motion for leave to file new or amended contentions (1) Determination by presiding officer. Hearing requests, intervention petitions, and motions for leave to file new or amended contentions filed after the deadline in paragraph (b) of this section will not be entertained absent a determination by the presiding officer that a participant has demonstrated good cause by showing that:

(i) The information upon which the filing is based was not previously available; (ii) The information upon which the filing is based is materially different from information previously available; and (iii) The filing has been submitted in a timely fashion based on the availability of the subsequent information.

(2) Applicability of §§ 2.307 and 2.323.

(i) Section 2.307 applies to requests to change a filing deadline (requested before or after that deadline has passed) based on reasons not related to the substance of the filing.

(ii) Section 2.323 does not apply to hearing requests, intervention petitions, or motions for leave to file new or amended contentions filed after the deadline in paragraph (b) of this section.

(3) New petitioner. A hearing request or intervention petition filed after the deadline in paragraph (b) of this section must 46a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 50 of 76 include a specification of contentions if the petitioner seeks admission as a party, and must also demonstrate that the petitioner meets the applicable standing and contention admissibility requirements in paragraphs (d) and (f) of this section.

(4) Party or participant. A new or amended contention filed by a party or participant to the proceeding must also meet the applicable contention admissibility requirements in paragraph (f) of this section. If the party or participant has already satisfied the requirements for standing under paragraph (d) of this section in the same proceeding in which the new or amended contentions are filed, it does not need to do so again.

(d) Standing.

(1) General requirements. A request for hearing or petition for leave to intervene must state:

(i) The name, address and telephone number of the requestor or petitioner; (ii) The nature of the requestor's/petitioner's right under the Act to be made a party to the proceeding; (iii) The nature and extent of the requestor's/petitioner's property, financial or other interest in the proceeding; and (iv) The possible effect of any decision or order that may be issued in the proceeding on the requestor's/petitioner's interest.

(2) Rulings. In ruling on a request for hearing or petition for leave to intervene, the Commission, the presiding officer, or the Atomic Safety and Licensing Board designated to rule on such requests must determine, among other things, whether the 47a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 51 of 76 petitioner has an interest affected by the proceeding considering the factors enumerated in paragraph (d)(1) of this section.

(3) Standing in enforcement proceedings. In enforcement proceedings, the licensee or other person against whom the action is taken shall have standing.

(e) Discretionary Intervention. The presiding officer may consider a request for discretionary intervention when at least one requestor/petitioner has established standing and at least one admissible contention has been admitted so that a hearing will be held. A requestor/petitioner may request that his or her petition be granted as a matter of discretion in the event that the petitioner is determined to lack standing to intervene as a matter of right under paragraph (d)(1) of this section. Accordingly, in addition to addressing the factors in paragraph (d)(1) of this section, a petitioner who wishes to seek intervention as a matter of discretion in the event it is determined that standing as a matter of right is not demonstrated shall address the following factors in his/her initial petition, which the Commission, the presiding officer or the Atomic Safety and Licensing Board will consider and balance:

(1) Factors weighing in favor of allowing intervention (i) The extent to which the requestor's/petitioner's participation may reasonably be expected to assist in developing a sound record; (ii) The nature and extent of the requestor's/petitioner's property, financial or other interests in the proceeding; and (iii) The possible effect of any decision or order that may be issued in the proceeding on the requestor's/petitioner's interest; (2) Factors weighing against allowing intervention 48a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 52 of 76 (i) The availability of other means whereby the requestor's/petitioner's interest will be protected; (ii) The extent to which the requestor's/petitioner's interest will be represented by existing parties; and (iii) The extent to which the requestor's/petitioner's participation will inappropriately broaden the issues or delay the proceeding.

(f) Contentions.

(1) A request for hearing or petition for leave to intervene must set forth with particularity the contentions sought to be raised. For each contention, the request or petition must:

(i) Provide a specific statement of the issue of law or fact to be raised or controverted, provided further, that the issue of law or fact to be raised in a request for hearing under 10 CFR 52.103(b) must be directed at demonstrating that one or more of the acceptance criteria in the combined license have not been, or will not be met, and that the specific operational consequences of nonconformance would be contrary to providing reasonable assurance of adequate protection of the public health and safety; (ii) Provide a brief explanation of the basis for the contention; (iii) Demonstrate that the issue raised in the contention is within the scope of the proceeding; (iv) Demonstrate that the issue raised in the contention is material to the findings the NRC must make to support the action that is involved in the proceeding; (v) Provide a concise statement of the alleged facts or expert opinions which support the requestor's/petitioner's position on the issue and on which the petitioner intends 49a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 53 of 76 to rely at hearing, together with references to the specific sources and documents on which the requestor/petitioner intends to rely to support its position on the issue; (vi) In a proceeding other than one under 10 CFR 52.103, provide sufficient information to show that a genuine dispute exists with the applicant/licensee on a material issue of law or fact. This information must include references to specific portions of the application (including the applicant's environmental report and safety report) that the petitioner disputes and the supporting reasons for each dispute, or, if the petitioner believes that the application fails to contain information on a relevant matter as required by law, the identification of each failure and the supporting reasons for the petitioner's belief; and (vii) In a proceeding under 10 CFR 52.103(b), the information must be sufficient, and include supporting information showing, prima facie, that one or more of the acceptance criteria in the combined license have not been, or will not be met, and that the specific operational consequences of nonconformance would be contrary to providing reasonable assurance of adequate protection of the public health and safety. This information must include the specific portion of the report required by 10 CFR 52.99(c) which the requestor believes is inaccurate, incorrect, and/or incomplete (i.e., fails to contain the necessary information required by § 52.99(c)). If the requestor identifies a specific portion of the § 52.99(c) report as incomplete and the requestor contends that the incomplete portion prevents the requestor from making the necessary prima facie showing, then the requestor must explain why this deficiency prevents the requestor from making the prima facie showing.

50a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 54 of 76 (2) Contentions must be based on documents or other information available at the time the petition is to be filed, such as the application, supporting safety analysis report, environmental report or other supporting document filed by an applicant or licensee, or otherwise available to a petitioner. On issues arising under the National Environmental Policy Act, participants shall file contentions based on the applicant's environmental report. Participants may file new or amended environmental contentions after the deadline in paragraph (b) of this section (e.g., based on a draft or final NRC environmental impact statement, environmental assessment, or any supplements to these documents) if the contention complies with the requirements in paragraph (c) of this section.

(3) If two or more requestors/petitioners seek to co-sponsor a contention, the requestors/petitioners shall jointly designate a representative who shall have the authority to act for the requestors/petitioners with respect to that contention. If a requestor/petitioner seeks to adopt the contention of another sponsoring requestor/petitioner, the requestor/petitioner who seeks to adopt the contention must either agree that the sponsoring requestor/petitioner shall act as the representative with respect to that contention, or jointly designate with the sponsoring requestor/petitioner a representative who shall have the authority to act for the requestors/petitioners with respect to that contention.

(g) Selection of hearing procedures. A request for hearing and/or petition for leave to intervene may, except in a proceeding under 10 CFR 52.103, also address the selection of hearing procedures, taking into account the provisions of § 2.310. If a request/petition relies upon § 2.310(d), the request/petition must demonstrate, by reference to the contention and the bases provided and the specific procedures in subpart G of this part, that resolution of the contention 51a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 55 of 76 necessitates resolution of material issues of fact which may be best determined through the use of the identified procedures.

(h) Requirements applicable to States, local governmental bodies, and Federally recognized Indian Tribes seeking party status.

(1) If a State, local governmental body (county, municipality or other subdivision), or Federally-recognized Indian Tribe seeks to participate as a party in a proceeding, it must submit a request for hearing or a petition to intervene containing at least one admissible contention, and must designate a single representative for the hearing. If a request for hearing or petition to intervene is granted, the Commission, the presiding officer or the Atomic Safety and Licensing Board ruling on the request will admit as a party to the proceeding a single designated representative of the State, a single designated representative for each local governmental body (county, municipality or other subdivision),

and a single designated representative for each Federally-recognized Indian Tribe. Where a State's constitution provides that both the Governor and another State official or State governmental body may represent the interests of the State in a proceeding, the Governor and the other State official/government body will be considered separate participants.

(2) If the proceeding pertains to a production or utilization facility (as defined in § 50.2 of this chapter) located within the boundaries of the State, local governmental body, or Federally-recognized Indian Tribe seeking to participate as a party, no further demonstration of standing is required. If the production or utilization facility is not located within the boundaries of the State, local governmental body, or Federally-recognized Indian Tribe seeking to participate as a party, the State, local governmental body, or Federally-recognized Indian Tribe also must demonstrate standing.

52a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 56 of 76 (3) In any proceeding on an application for a construction authorization for a high-level radioactive waste repository at a geologic repository operations area under parts 60 or 63 of this chapter, or an application for a license to receive and possess high-level radioactive waste at a geologic repository operations area under parts 60 or 63 of this chapter, the Commission shall permit intervention by the State and local governmental body (county, municipality or other subdivision) in which such an area is located and by any affected Federally-recognized Indian Tribe as defined in parts 60 or 63 of this chapter if the requirements of paragraph (f) of this section are satisfied with respect to at least one contention. All other petitions for intervention in any such proceeding must be reviewed under the provisions of paragraphs (a) through (f) of this section.

(i) Answers to hearing requests, intervention petitions, and motions for leave to file new or amended contentions filed after the deadline.

Unless otherwise specified by the Commission, the presiding officer, or the Atomic Safety and Licensing Board designated to rule on the request, petition, or motion (1) The applicant/licensee, the NRC staff, and other parties to a proceeding may file an answer to a hearing request, intervention petition, or motion for leave to file amended or new contentions filed after the deadline in § 2.309(b) within 25 days after service of the request, petition, or motion.

Answers should address, at a minimum, the factors set forth in paragraphs (a) through (h) of this section insofar as these sections apply to the filing that is the subject of the answer.

(2) Except in a proceeding under § 52.103 of this chapter, the participant who filed the hearing request, intervention petition, or motion for leave to file new or amended contentions after the deadline may file a reply to any answer. The reply must be filed within 7 days after service of that answer.

53a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 57 of 76 (3) No other written answers or replies will be entertained.

(j) Decision on request/petition.

(1) In all proceedings other than a proceeding under § 52.103 of this chapter, the presiding officer shall issue a decision on each request for hearing or petition to intervene within 45 days of the conclusion of the initial prehearing conference or, if no pre-hearing conference is conducted, within 45 days after the filing of answers and replies under paragraph (i) of this section. With respect to a request to admit amended or new contentions, the presiding officer shall issue a decision on each such request within 45 days of the conclusion of any pre-hearing conference that may be conducted regarding the proposed amended or new contentions or, if no pre-hearing conference is conducted, within 45 days after the filing of answers and replies, if any. In the event the presiding officer cannot issue a decision within 45 days, the presiding officer shall issue a notice advising the Commission and the parties, and the notice shall include the expected date of when the decision will issue.

(2) The Commission, acting as the presiding officer, shall expeditiously grant or deny the request for hearing in a proceeding under § 52.103 of this chapter. The Commissions decision may not be the subject of any appeal under § 2.311.

54a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 58 of 76 10 C.F.R. § 2.326 Motions to reopen.

(a) A motion to reopen a closed record to consider additional evidence will not be granted unless the following criteria are satisfied:

(1) The motion must be timely. However, an exceptionally grave issue may be considered in the discretion of the presiding officer even if untimely presented; (2) The motion must address a significant safety or environmental issue; and (3) The motion must demonstrate that a materially different result would be or would have been likely had the newly proffered evidence been considered initially.

(b) The motion must be accompanied by affidavits that set forth the factual and/or technical bases for the movant's claim that the criteria of paragraph (a) of this section have been satisfied. Affidavits must be given by competent individuals with knowledge of the facts alleged, or by experts in the disciplines appropriate to the issues raised. Evidence contained in affidavits must meet the admissibility standards of this subpart. Each of the criteria must be separately addressed, with a specific explanation of why it has been met. When multiple allegations are involved, the movant must identify with particularity each issue it seeks to litigate and specify the factual and/or technical bases which it believes support the claim that this issue meets the criteria in paragraph (a) of this section.

(c) A motion predicated in whole or in part on the allegations of a confidential informant must identify to the presiding officer the source of the allegations and must request the issuance of an appropriate protective order.

(d) A motion to reopen that relates to a contention not previously in controversy among the parties must also satisfy the § 2.309(c) 55a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 59 of 76 requirements for new or amended contentions filed after the deadline in

§ 2.309(b).

10 C.F.R. § 2.335 Consideration of Commission rules and regulations in adjudicatory proceedings.

(a) Except as provided in paragraphs (b), (c), and (d) of this section, no rule or regulation of the Commission, or any provision thereof, concerning the licensing of production and utilization facilities, source material, special nuclear material, or byproduct material, is subject to attack by way of discovery, proof, argument, or other means in any adjudicatory proceeding subject to this part.

(b) A participant to an adjudicatory proceeding subject to this part may petition that the application of a specified Commission rule or regulation or any provision thereof, of the type described in paragraph (a) of this section, be waived or an exception be made for the particular proceeding. The sole ground for petition of waiver or exception is that special circumstances with respect to the subject matter of the particular proceeding are such that the application of the rule or regulation (or a provision of it) would not serve the purposes for which the rule or regulation was adopted. The petition must be accompanied by an affidavit that identifies the specific aspect or aspects of the subject matter of the proceeding as to which the application of the rule or regulation (or provision of it) would not serve the purposes for which the rule or regulation was adopted. The affidavit must state with particularity the special circumstances alleged to justify the waiver or exception requested. Any other participant may file a response by counter-affidavit or otherwise.

(c) If, on the basis of the petition, affidavit, and any response permitted under paragraph (b) of this section, the presiding officer determines that the petitioning participant has not made a prima facie 56a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 60 of 76 showing that the application of the specific Commission rule or regulation (or provision thereof) to a particular aspect or aspects of the subject matter of the proceeding would not serve the purposes for which the rule or regulation was adopted and that application of the rule or regulation should be waived or an exception granted, no evidence may be received on that matter and no discovery, cross examination, or argument directed to the matter will be permitted, and the presiding officer may not further consider the matter.

(d) If, on the basis of the petition, affidavit and any response provided for in paragraph (b) of this section, the presiding officer determines that the prima facie showing required by paragraph (b) of this section has been made, the presiding officer shall, before ruling on the petition, certify the matter directly to the Commission (the matter will be certified to the Commission notwithstanding other provisions on certification in this part) for a determination in the matter of whether the application of the Commission rule or regulation or provision thereof to a particular aspect or aspects of the subject matter of the proceeding, in the context of this section, should be waived or an exception made. The Commission may, among other things, on the basis of the petition, affidavits, and any response, determine whether the application of the specified rule or regulation (or provision thereof) should be waived or an exception be made. The Commission may direct further proceedings as it considers appropriate to aid its determination.

(e) Whether or not the procedure in paragraph (b) of this section is available, a participant to an initial or renewal licensing proceeding may file a petition for rulemaking under § 2.802.

57a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 61 of 76 10 C.F.R. § 2.1212 Petitions for Commission review of initial decisions.

Parties may file petitions for review of an initial decision under this subpart in accordance with the procedures set out in § 2.341. Unless otherwise authorized by law, a party to an NRC proceeding must file a petition for Commission review before seeking judicial review of an agency action.

10 C.F.R. § 51.23 Environmental impacts of continued storage of spent nuclear fuel beyond the licensed life for operation of a reactor.

(a) The Commission has generically determined that the environmental impacts of continued storage of spent nuclear fuel beyond the licensed life for operation of a reactor are those impacts identified in NUREG-2157, Generic Environmental Impact Statement for Continued Storage of Spent Nuclear Fuel.

(b) The environmental reports described in §§ 51.50, 51.53, and 51.61 are not required to discuss the environmental impacts of spent nuclear fuel storage in a reactor facility storage pool or an ISFSI for the period following the term of the reactor operating license, reactor combined license, or ISFSI license. The impact determinations in NUREG-2157 regarding continued storage shall be deemed incorporated into the environmental impact statements described in §§ 51.75, 51.80(b), 51.95, and 51.97(a). The impact determinations in NUREG-2157 regarding continued storage shall be considered in the environmental assessments described in §§ 51.30(b) and 51.95(d), if the impacts of continued storage of spent fuel are relevant to the proposed action.

(c) This section does not alter any requirements to consider the environmental impacts of spent fuel storage during the term of a reactor operating license or combined license, or a license for an ISFSI in a licensing proceeding.

58a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 62 of 76 10 C.F.R. § 51.45 Environmental Report.

(a) General. As required by §§ 51.50, 51.53, 51.54, 51.55, 51.60, 51.61, 51.62, or 51.68, as appropriate, each applicant or petitioner for rulemaking shall submit with its application or petition for rulemaking one signed original of a separate document entitled Applicant's or Petitioner's Environmental Report, as appropriate. An applicant or petitioner for rulemaking may submit a supplement to an environmental report at any time.

(b) Environmental considerations. The environmental report shall contain a description of the proposed action, a statement of its purposes, a description of the environment affected, and discuss the following considerations:

(1) The impact of the proposed action on the environment. Impacts shall be discussed in proportion to their significance; (2) Any adverse environmental effects which cannot be avoided should the proposal be implemented; (3) Alternatives to the proposed action. The discussion of alternatives shall be sufficiently complete to aid the Commission in developing and exploring, pursuant to section 102(2)(E) of NEPA, appropriate alternatives to recommended courses of action in any proposal which involves unresolved conflicts concerning alternative uses of available resources. To the extent practicable, the environmental impacts of the proposal and the alternatives should be presented in comparative form; (4) The relationship between local short-term uses of man's environment and the maintenance and enhancement of long-term productivity; and 59a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 63 of 76 (5) Any irreversible and irretrievable commitments of resources which would be involved in the proposed action should it be implemented.

(c) Analysis. The environmental report must include an analysis that considers and balances the environmental effects of the proposed action, the environmental impacts of alternatives to the proposed action, and alternatives available for reducing or avoiding adverse environmental effects. An environmental report required for materials licenses under § 51.60 must also include a description of those site preparation activities excluded from the definition of construction under § 51.4 which have been or will be undertaken at the proposed site (i.e., those activities listed in paragraphs (2)(i) and (2)(ii) in the definition of construction contained in § 51.4); a description of the impacts of such excluded site preparation activities; and an analysis of the cumulative impacts of the proposed action when added to the impacts of such excluded site preparation activities on the human environment. An environmental report prepared at the early site permit stage under § 51.50(b), limited work authorization stage under § 51.49, construction permit stage under § 51.50(a), or combined license stage under § 51.50(c) must include a description of impacts of the preconstruction activities performed by the applicant at the proposed site (i.e., those activities listed in paragraph (1)(ii) in the definition of construction contained in

§ 51.4), necessary to support the construction and operation of the facility which is the subject of the early site permit, limited work authorization, construction permit, or combined license application. The environmental report must also contain an analysis of the cumulative impacts of the activities to be authorized by the limited work authorization, construction permit, or combined license in light of the preconstruction impacts described in the environmental report. Except for an environmental report prepared at the early site permit stage, or an environmental report prepared at the license renewal stage under § 51.53(c), the analysis in the environmental report should also include consideration of the economic, technical, and other benefits and costs of 60a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 64 of 76 the proposed action and its alternatives. Environmental reports prepared at the license renewal stage under § 51.53(c) need not discuss the economic or technical benefits and costs of either the proposed action or alternatives except if these benefits and costs are either essential for a determination regarding the inclusion of an alternative in the range of alternatives considered or relevant to mitigation. In addition, environmental reports prepared under § 51.53(c) need not discuss issues not related to the environmental effects of the proposed action and its alternatives. The analyses for environmental reports shall, to the fullest extent practicable, quantify the various factors considered. To the extent that there are important qualitative considerations or factors that cannot be quantified, those considerations or factors shall be discussed in qualitative terms. The environmental report should contain sufficient data to aid the Commission in its development of an independent analysis.

(d) Status of compliance. The environmental report shall list all Federal permits, licenses, approvals and other entitlements which must be obtained in connection with the proposed action and shall describe the status of compliance with these requirements. The environmental report shall also include a discussion of the status of compliance with applicable environmental quality standards and requirements including, but not limited to, applicable zoning and land-use regulations, and thermal and other water pollution limitations or requirements which have been imposed by Federal, State, regional, and local agencies having responsibility for environmental protection. The discussion of alternatives in the report shall include a discussion of whether the alternatives will comply with such applicable environmental quality standards and requirements.

(e) Adverse information. The information submitted pursuant to paragraphs (b) through (d) of this section should not be confined to information supporting the proposed action but should also include adverse information.

61a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 65 of 76 10 C.F.R. § 51.61 Environmental reportindependent spent fuel storage installation (ISFSI) or monitored retrievable storage installation (MRS) license.

Each applicant for issuance of a license for storage of spent fuel in an independent spent fuel storage installation (ISFSI) or for the storage of spent fuel and high-level radioactive waste in a monitored retrievable storage installation (MRS) pursuant to part 72 of this chapter shall submit with its application to: ATTN: Document Control Desk, Director, Office of Nuclear Material Safety and Safeguards, a separate document entitled Applicant's Environmental ReportISFSI License or Applicant's Environmental ReportMRS License, as appropriate. If the applicant is the U.S. Department of Energy, the environmental report may be in the form of either an environmental impact statement or an environmental assessment, as appropriate. The environmental report shall contain the information specified in § 51.45 and shall address the siting evaluation factors contained in subpart E of part 72 of this chapter. As stated in § 51.23, no discussion of the environmental impacts of the continued storage of spent fuel in an ISFSI is required in this report. 10 C.F.R. § 51.102 Requirement to provide a record of decision; preparation.

(a) A Commission decision on any action for which a final environmental impact statement has been prepared shall be accompanied by or include a concise public record of decision.

(b) Except as provided in paragraph (c) of this section, the record of decision will be prepared by the NRC staff director authorized to take the action.

(c) When a hearing is held on the proposed action under the regulations in subpart G of part 2 of this chapter or when the action can only be taken by the Commissioners acting as a collegial body, the initial decision of the presiding officer or the final decision of the 62a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 66 of 76 Commissioners acting as a collegial body will constitute the record of decision. An initial or final decision constituting the record of decision will be distributed as provided in § 51.93.

10 C.F.R. § 51.97 Final environmental impact statementmaterials license.

(a) Independent spent fuel storage installation (ISFSI). As stated in § 51.23, the generic impact determinations regarding the continued storage of spent fuel in NUREG-2157 shall be deemed incorporated into the environmental impact statement.

(b) Monitored retrievable storage facility (MRS). As provided in sections 141 (c), (d), and (e) and 148 (a) and (c) of the Nuclear Waste Policy Act of 1982, as amended (NWPA) (96 Stat. 2242, 2243, 42 U.S.C. 10161 (c),

(d), (e); 101 Stat. 1330-235, 1330-236, 42 U.S.C. 10168 (a), (c)) a final environmental impact statement for the construction of a monitored retrievable storage installation (MRS) will not address the need for the MRS or any alternative to the design criteria for an MRS set forth in section 141(b)(1) of the NWPA (96 Stat. 2242, 42 U.S.C. 10161(b)(1)) but may consider alternative facility designs which are consistent with these design criteria.

(c) Uranium enrichment facility. As provided in section 5(e) of the Solar, Wind, Waste, and Geothermal Power Production Incentives Act of 1990 (104 Stat. 2834 at 2835, 42 U.S.C. 2243), a final environmental impact statement must be prepared before the hearing on the issuance of a license for a uranium enrichment facility is completed.

63a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 67 of 76 10 C.F.R. § 71.47 External radiation standards for all packages.

(a) Except as provided in paragraph (b) of this section, each package of radioactive materials offered for transportation must be designed and prepared for shipment so that under conditions normally incident to transportation the radiation level does not exceed 2 mSv/h (200 mrem/h) at any point on the external surface of the package, and the transport index does not exceed 10.

(b) A package that exceeds the radiation level limits specified in paragraph (a) of this section must be transported by exclusive use shipment only, and the radiation levels for such shipment must not exceed the following during transportation:

(1) 2 mSv/h (200 mrem/h) on the external surface of the package, unless the following conditions are met, in which case the limit is 10 mSv/h (1000 mrem/h):

(i) The shipment is made in a closed transport vehicle; (ii) The package is secured within the vehicle so that its position remains fixed during transportation; and (iii) There are no loading or unloading operations between the beginning and end of the transportation; (2) 2 mSv/h (200 mrem/h) at any point on the outer surface of the vehicle, including the top and underside of the vehicle; or in the case of a flat-bed style vehicle, at any point on the vertical planes projected from the outer edges of the vehicle, on the upper surface of the load or enclosure, if used, and on the lower external surface of the vehicle; and (3) 0.1 mSv/h (10 mrem/h) at any point 2 meters (80 in) from the outer lateral surfaces of the vehicle (excluding the top and underside of the vehicle); or in the case of a flat-bed style vehicle, at any point 2 meters 64a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 68 of 76 (6.6 feet) from the vertical planes projected by the outer edges of the vehicle (excluding the top and underside of the vehicle); and (4) 0.02 mSv/h (2 mrem/h) in any normally occupied space, except that this provision does not apply to private carriers, if exposed personnel under their control wear radiation dosimetry devices in conformance with 10 CFR 20.1502.

(c) For shipments made under the provisions of paragraph (b) of this section, the shipper shall provide specific written instructions to the carrier for maintenance of the exclusive use shipment controls. The instructions must be included with the shipping paper information.

(d) The written instructions required for exclusive use shipments must be sufficient so that, when followed, they will cause the carrier to avoid actions that will unnecessarily delay delivery or unnecessarily result in increased radiation levels or radiation exposures to transport workers or members of the general public.

65a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 69 of 76 10 C.F.R. § 72.42 Duration of license; renewal.

(a) Each license issued under this part must be for a fixed period of time to be specified in the license. The license term for an ISFSI must not exceed 40 years from the date of issuance. The license term for an MRS must not exceed 40 years from the date of issuance. Licenses for either type of installation may be renewed by the Commission at the expiration of the license term upon application by the licensee for a period not to exceed 40 years and under the requirements of this rule.

Application for ISFSI license renewals must include the following:

(1) TLAAs that demonstrate that structures, systems, and components important to safety will continue to perform their intended function for the requested period of extended operation; and (2) A description of the AMP for management of issues associated with aging that could adversely affect structures, systems, and components important to safety.

(b) Applications for renewal of a license should be filed in accordance with the applicable provisions of subpart B of this part at least 2 years before the expiration of the existing license. The application must also include design bases information as documented in the most recently updated FSAR as required by § 72.70. Information contained in previous applications, statements, or reports filed with the Commission under the license may be incorporated by reference provided that these references are clear and specific.

(c) In any case in which a licensee, not less than two years prior to expiration of its existing license, has filed an application in proper form for renewal of a license, the existing license shall not expire until a final decision concerning the application for renewal has been made by the Commission.

66a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 70 of 76 10 C.F.R. 72.54 Expiration and termination of licenses and decommissioning of sites and separate buildings or outdoor areas.

(a) Each specific license expires at the end of the day on the expiration date stated in the license except when a licensee has filed an application for renewal pursuant to § 72.42 not less than 24 months before the expiration of the existing license. If an application for renewal has been filed at least 24 months prior to the expiration date stated in the existing license, the existing license expires at the end of the day on which the Commission makes a final determination to deny the renewal application or, if the determination states an expiration date, the expiration date stated in the determination.

(b) Each specific license revoked by the Commission expires at the end of the day on the date of the Commission's final determination to revoke the license or on the expiration date stated in the determination or as otherwise provided by Commission Order.

(c) Each specific license continues in effect, beyond the expiration date if necessary, with respect to possession of licensed material until the Commission notifies the licensee in writing that the license is terminated. During this time, the licensee shall (1) Limit actions involving spent fuel, reactor-related GTCC waste, or other licensed material to those related to decommissioning; and (2) Continue to control entry to restricted areas until they are suitable for release in accordance with NRC requirements.

(d) As required by § 72.42(b), or within 60 days of the occurrence of any of the following, consistent with the administrative directions in § 72.4, each licensee shall notify the NRC in writing, and submit within 12 months of this notification, a final decommissioning plan and begin decommissioning upon approval of the plan if 67a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 71 of 76 (1) The licensee has decided to permanently cease principal activities, as defined in this part, at the entire site or any separate building or outdoor area that contains residual radioactivity such that the building or outdoor area is unsuitable for release in accordance with NRC requirements; or (2) No principal activities under the license have been conducted for a period of 24 months; or (3) No principal activities have been conducted for a period of 24 months in any separate building or outdoor area that contains residual radioactivity such that the building or outdoor area is unsuitable for release in accordance with NRC requirements.

(e) Coincident with the notification required by paragraph (d) of this section, the licensee shall maintain in effect all decommissioning financial assurances established by the licensee pursuant to § 72.30 in conjunction with a license issuance or renewal or as required by this section. The amount of the financial assurance must be increased, or may be decreased, as appropriate, to cover the detailed cost estimate for decommissioning established pursuant to paragraph (g)(5) of this section.

(1) Any licensee who has not provided financial assurance to cover the detailed cost estimate submitted with the decommissioning plan shall do so when this rule becomes effective November 24, 1995.

(2) Following approval of the decommissioning plan, a licensee may reduce the amount of the financial assurance as decommissioning proceeds and radiological contamination is reduced at the site with the approval of the Commission.

(f)(1) The Commission may grant a request to delay or postpone initiation of the decommissioning process if the Commission determines that this relief is not detrimental to the public health and safety and is otherwise in the public interest. The request must be submitted no later than 30 days before notification pursuant to paragraph (d) of this section. The schedule for decommissioning set forth in paragraph (d) of 68a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 72 of 76 this section may not commence until the Commission has made a determination on the request.

(2) The Commission may approve an alternate schedule for submittal of the final decommissioning plan required pursuant to paragraph (d) of this section if the Commission determines that the alternate schedule is necessary to the effective conduct of decommissioning operations and presents no undue risk from radiation to the public health and safety, and is otherwise to the public interest.

(g) The proposed final decommissioning plan must include (1) A description of the current conditions of the site or separate building or outdoor area sufficient to evaluate the acceptability of the plan; (2) The choice of the alternative for decommissioning with a description of the activities involved; (3) A description of controls and limits on procedures and equipment to protect occupational and public health and safety; (4) A description of the planned final radiation survey; and (5) An updated detailed cost estimate for the chosen alternative for decommissioning, comparison of that estimate with present funds set aside for decommissioning, and plan for assuring the availability of adequate funds for completion of decommissioning including means for adjusting cost estimates and associated funding levels over any storage or surveillance period; and (6) A description of technical specifications and quality assurance provisions in place during decommissioning.

(h) For final decommissioning plans in which the major dismantlement activities are delayed by first placing the ISFSI or MRS in storage, planning for these delayed activities may be less detailed. Updated detailed plans must be submitted and approved prior to the start of these activities.

69a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 73 of 76 (i) If the final decommissioning plan demonstrates that the decommissioning will be completed as soon as practicable, performed in accordance with the regulations in this chapter, and will not be inimical to the common defense and security or to the health and safety of the public, and after notice to interested persons, the Commission will approve the plan subject to any appropriate conditions and limitations and issue an order authorizing decommissioning.

(j)(1) Except as provided in paragraph (k) of this section, each licensee shall complete decommissioning of the site or separate building or outdoor area as soon as practicable but no later than 24 months following approval of the final decommissioning plan by the Commission.

(2) Except as provided in paragraph (k) of this section, when decommissioning involves the entire site, each licensee shall request license termination as soon as practicable but no later than 24 months following approval of the final decommissioning plan by the Commission.

(k) The Commission may approve a request for an alternate schedule for completion of decommissioning of the site or separate building or outdoor area, and license termination if appropriate, if the Commission determines that the alternate schedule is warranted by consideration of the following:

(1) Whether it is technically feasible to complete decommissioning within the allotted 24-month period; (2) Whether sufficient waste disposal capacity is available to allow completion of decommissioning within the allotted 24-month period; (3) Whether a significant volume reduction in wastes requiring disposal will be achieved by allowing short-lived radionuclides to decay; (4) Whether a significant reduction in radiation exposure to workers can be achieved by allowing short-lived radionuclides to decay; and 70a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 74 of 76 (5) Other site-specific factors that the Commission may consider appropriate on a case-by-case basis, such as regulatory requirements of other government agencies, lawsuits, groundwater treatment activities, monitored natural groundwater restoration, actions that could result in more environmental harm than deferred cleanup, and other factors beyond the control of the licensee.

(l) As the final step in decommissioning, the licensee shall (1) Certify the disposition of all licensed material, including accumulated wastes, by submitting a completed NRC Form 314 or equivalent information; and (2) Conduct a radiation survey of the premises where the licensed activities were conducted and submit a report of the results of this survey, unless the licensee demonstrates in some other manner that the premises are suitable for release in accordance with the criteria for decommissioning in 10 CFR part 20, subpart E. The licensee shall, as appropriate (i) Report levels of gamma radiation in units of millisieverts (microroentgen) per hour at one meter from surfaces, and report levels of radioactivity, including alpha and beta, in units of megabecquerels (disintegrations per minute or microcuries) per 100 square centimeters removable and fixed for surfaces, megabecquerels (microcuries) per milliliter for water, and becquerels (picocuries) per gram for solids such as soils or concrete; and (ii) Specify the survey instrument(s) used and certify that each instrument is properly calibrated and tested.

(m) Specific licenses, including expired licenses, will be terminated by written notice to the licensee when the Commission determines that (1) The decommissioning has been performed in accordance with the approved final decommissioning plan and the order authorizing decommissioning; and 71a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 75 of 76 (2)(i) A radiation survey has been performed which demonstrates that the premises are suitable for release in accordance with the criteria for decommissioning in 10 CFR part 20, subpart E; or (ii) Other information submitted by the licensee is sufficient to demonstrate that the premises are suitable for release in accordance with the criteria for decommissioning in 10 CFR part 20, subpart E.

(3) Records required by § 72.80(e) have been received.

72a

USCA Case #20-1187 Document #2026176 Filed: 11/09/2023 Page 76 of 76 10 C.F.R. § 72.214 List of approved spent fuel storage casks.

The following casks are approved for storage of spent fuel under the conditions specified in their Certificates of Compliance.

Certificate Number: 1040.

Initial Certificate Effective Date: April 6, 2015.

Amendment Number 1 Effective Date: September 8, 2015.

Amendment Number 2 Effective Date: January 9, 2017.

Amendment Number 3 [RESERVED]

Amendment Number 4 Effective Date: January 25, 2021.

SAR Submitted by: Holtec International, Inc.

SAR

Title:

Final Safety Analysis Report for the Holtec International HI-STORM UMAX Canister Storage System.

Docket Number: 72-1040.

Certificate Expiration Date: April 6, 2035.

Model Number: MPC-37, MPC-89.