ML23299A036

From kanterella
Jump to navigation Jump to search

Correction of Error Incurred During Issuance of License Amendment No. 332
ML23299A036
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 10/27/2023
From: Kimberly Green
Plant Licensing Branch II
To: Jim Barstow
Tennessee Valley Authority
Green K
References
EPID L-2023-LLA-0035
Download: ML23299A036 (5)


Text

October 27, 2023 Mr. James Barstow Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 4A-C Chattanooga, TN 37402-2801

SUBJECT:

BROWNS FERRY NUCLEAR PLANT, UNIT 1 - CORRECTION OF ERROR INCURRED DURING ISSUANCE OF LICENSE AMENDMENT NO. 332 (EPID L-2023-LLA-0035)

Dear Mr. Barstow:

The purpose of this letter is to issue a correction to the Browns Ferry Nuclear Plant (Browns Ferry), Unit 1, Renewed Facility Operating License No. DPR-33.

During issuance of the subject amendment (Agencywide Documents and Management System (ADAMS) Accession No. ML23205A213) on September 8, 2023, the U.S. Nuclear Regulatory Commission (NRC) issued Browns Ferry, Unit 1, Technical Specification (TS) page 3.4-21 with the word to missing from between the words action and restore in Required Action B.1. The marked-up page in the license amendment request, dated March 10, 2023 (ML23069A100),

showed the proposed Required Action B.1 with the word to included.

The NRC concludes that this correction is entirely editorial in nature and does not change the staffs previous conclusion in the safety evaluation for issuance of Amendment No. 332, nor does it affect the no significant hazards considerations, as published in the Federal Register on May 16, 2023 (88 FR 31285).

Enclosed, please find corrected TS page 3.4-21 for Browns Ferry, Unit 1.

If you have any questions regarding this matter, please contact me at (301) 415-1627 or by email at Kimberly.Green@nrc.gov.

Sincerely,

/RA/

Kimberly J. Green, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-259

Enclosure:

Correction to Amendment No. 332 cc: Listserv

ENCLOSURE BROWNS FERRY NUCLEAR PLANT, UNIT NO. 1 DOCKET NO. 50-259 CORRECTED LICENSE AMENDMENT NO. 332 UNIT 1 TECHNICAL SPECIFICATION PAGE 3.4-21

RHR Shutdown Cooling System - Cold Shutdown 3.4.8 BFN-UNIT 1 3.4-21 Amendment No. 234, 332 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.8 Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown LCO 3.4.8 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.


NOTES---------------------------------------

1. Both required RHR shutdown cooling subsystems and recirculation pumps may not be in operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
2. One required RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for performance of Surveillances.

APPLICABILITY:

MODE 4.

ACTIONS


NOTE---------------------------------------------------

Separate Condition entry is allowed for each RHR shutdown cooling subsystem.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or two required RHR shutdown cooling subsystems inoperable.

A.1 Verify an alternate method of decay heat removal is available for each inoperable required RHR shutdown cooling subsystem.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter B. Required Action and associated Completion Time of Condition A not met.

B.1 Initiate action to restore RHR shutdown cooling subsystem(s) to OPERABLE status.

Immediately (continued)

ML23299A036 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME KGreen RButler (ABaxter for)

DWrona KGreen DATE 10/26/23 10/26/23 10/27/23 10/27/23