ML23290A019

From kanterella
Jump to navigation Jump to search

Transmittal of NEI-03-08 Needed Interim Guidance Regarding PWR Core Barrel Inspections as Defined in EPRI Guidance MRP-227
ML23290A019
Person / Time
Site: Electric Power Research Institute
Issue date: 10/16/2023
From: Efsing P, Mcgill R
Electric Power Research Institute, Vattenfall
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML23290A018 List:
References
MRP-227, MRP 2023-014, NEI-03-08
Download: ML23290A019 (1)