NRC Staff Exhibit List and Notice of Revisions
ML23285A122
Person / Time
Site: Hermes
Issue date: 10/12/2023
From: Naber A, Vaisey B, Megan Wright
NRC/OGC
To:
NRC/OCM
SECY RAS
References
Construction Permit Mndtry Hrg, RAS 56820, 50-7513-CP
Download: ML23285A122 (0)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of KAIROS POWER LLC Docket No. 50-7513-CP (Hermes Test Reactor)

NRC STAFF EXHIBIT LIST AND NOTICE OF REVISIONS The U.S. Nuclear Regulatory Commission (NRC) staff (Staff) hereby files its exhibit list for the mandatory hearing on the construction permit application for Kairos Power LLC (Kairos).

Each exhibit has been listed and marked according to the instructions in the Commissions Scheduling Order, dated October 5, 2023.

The sections below describe changes to the draft Construction Permit (CP) and draft Record of Decision (ROD). The draft CP and draft ROD have previously been made publicly available in the Agencywide Documents Access and Management System (ADAMS).

A. Change to Draft CP as Identified in Response to Commission Question As indicated in its response to the Commissions Pre-hearing Question 21, the Staff no longer proposes to include a provision in the CP requiring Kairos to request a license amendment to incorporate Terms and Conditions set forth in the Incidental Take Statement of Biological Opinions issued subsequent to the effective date of the Environmental Protection Plan (EPP).

  • In Appendix A to the draft CP, the following text in Section 4.4 Changes in Environmental Protection Plan, is deleted:

o The permit holder shall request a license amendment to incorporate the requirements of any Terms and Conditions set forth in the Incidental Take

Statement of Biological Opinions issued subsequent to the effective date of this EPP.

The change described above is reflected in the exhibit marked NRC-002.

B. Change to Draft ROD as Identified in Response to Commission Question As stated in its response to the Commissions Pre-hearing Question 22, prior to issuing the final environmental impact statement (FEIS), the Staff reviewed the Fiscal Responsibility Act (FRA) and the amendments to NEPA and found that the FEIS was consistent with the requirements of the FRA. The staff made the following change to the draft ROD consistent with its response to Question 22.

  • The footnote at the bottom of page 4 in the draft ROD has been revised to read:

o NEPA was amended in June 2023 by the Fiscal Responsibility Act of 2023 (FRA).

The Staff determined that the FEIS is consistent with the requirements of the FRA.

The change described above is reflected in the exhibit marked NRC-003.

Respectfully submitted,

/Signed (electronically) by/

Megan Wright Counsel for NRC Staff Mail Stop: O-14-A44 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Telephone: (516) 765-6523 E-mail: megan.wright@nrc.gov Executed in accord with 10 CFR 2.304(d)

Anita Ghosh Naber Counsel for NRC Staff Mail Stop: O-14-A44 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Telephone: (301) 415-0764 E-mail: anita.ghoshnaber@nrc.gov 2

Blake Vaisey Counsel for NRC Staff Mail Stop: O-14-A44 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Telephone: (301) 415-0995 E-mail: blake.vaisey@nrc.gov Dated at Lewes, DE this 12th day of October, 2023 3

Staff Exhibits for Kairos Hermes Mandatory Hearing Exhibit Panel Number / Exhibit Title ADAMS Accession Number Number Sponsoring Witness(es)

NRC- Mohamed SECY-23-0074, Staff ML23123A064 001 Shams & Statement in Support of the Christopher Uncontested Hearing for Regan Issuance of a Construction Permit for the Kairos Hermes Test Reactor (August 23, 2023).

NRC- Mohamed Draft Construction Permit for ML23209A659 002 Shams Kairos Power LLC (October 6, 2023).

NRC- Christopher Draft Summary Record of ML23192A766 003 Regan Decision for Kairos Hermes Test Reactor Construction Permit (October 10, 2023).

NRC- Mohamed NRC Staff Responses to ML23271A250 004 Shams & Commission Pre-Hearing Christopher Questions (September 28, Regan 2023).

NRC- Mohamed Kairos Power LLC, ML21272A376 005A Shams Construction Permit ML21272A377 Application - Cover Letter and General Information (September 29, 2021).

NRC- Mohamed Kairos Power LLC, ML23151A743 005B Shams Construction Permit Application - Preliminary Safety Analysis Report (PSAR), Revision 3 (May 31, 2023).

NRC- Mohamed Kairos Power LLC, ML22272A598 005C Shams Construction Permit Application, Enclosure 4 - KP-TR-017-NP, KP-FRN Core Design and Analysis Methodology, Revision 1 (September 29, 2022).

NRC- Mohamed Kairos Power LLC, ML23055A676 005D Shams Construction Permit Application, Enclosure 3 - KP-TR-018, Postulated Event Analysis Methodology, Revision 2 (February 24, 2023).

1

NRC- Christopher Kairos Power LLC, ML23089A386 005E Regan Construction Permit Application - Environmental Report, Revision 1 (March 30, 2023).

NRC- Mohamed NON-PUBLIC - Kairos Power ML21272A380 006A Shams LLC, Construction Permit Application, Enclosure 4 -

Financial Information (September 29, 2021).

NRC- Mohamed NON-PUBLIC - Kairos Power ML22272A596 006B Shams LLC, Construction Permit Application, Enclosure 2 -

KP-TR-017-P, KP-FRN Core Design and Analysis Methodology, Revision 1 (September 29, 2022).

NRC- Mohamed NON-PUBLIC - Kairos Power ML23055A675 006C Shams LLC, Construction Permit Application, Enclosure 2 -

KP-TR-018, Postulated Event Analysis Methodology, Revision 2 (February 24, 2023).

NRC- Mohamed Safety Evaluation Related to ML23158A268 007 Shams the Kairos Power LLC Construction Permit Application for the Hermes Test Reactor (June 13, 2023).

NRC- Christopher NUREG-2263, Environmental ML23214A269 008 Regan Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor (August 17, 2023).

NRC- Mohamed Staff Presentation Slides - N/A 009 Shams & Overview Panel (October 12, Christopher 2023).

Regan NRC- Mohamed Staff Presentation Slides - N/A 010 Shams Safety Panel (October 12, 2023).

NRC-011 Christopher Staff Presentation Slides - N/A Regan Environmental Panel (October 12, 2023).

2

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of KAIROS POWER LLC Docket No. 50-7513-CP (Hermes Test Reactor)

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing NRC STAFF EXHIBIT LIST AND NOTICE OF REVISIONS, dated October 12, 2023, have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 12th day of October, 2023.

/Signed (electronically) by/

Megan Wright Counsel for NRC Staff Mail Stop: O-14-A44 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Telephone: (516) 765-6523 E-mail: megan.wright@nrc.gov Dated at Lewes, DE this 12th day of October, 2023