Copyright © 2023 Kairos Power LLC. All Rights Reserved.
No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.
MICHAEL LAUFER, CHIEF EXECUTIVE OFFICER PER PETERSON, CHIEF NUCLEAR OFFICER OCTOBER 19, 2023 Hermes Mandatory Hearing - Overview Panel 1
Exhibit KRS-002
Copyright © 2023 Kairos Power LLC. All Rights Reserved.
No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.
Kairos Powers mission is to enable the worlds transition to clean energy, with the ultimate goal of dramatically improving peoples quality of life while protecting the environment.
2
Copyright © 2023 Kairos Power LLC. All Rights Reserved.
No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.
Overview of Kairos Power
- Kairos Power is a privately owned nuclear energy engineering, design, and manufacturing company singularly focused on the commercialization of the fluoride salt-cooled high-temperature reactor (FHR)
Founded in 2016 and headquartered in Alameda California 360+ Employees with a majority engineering and manufacturing
- Kairos Power is pursuing a novel approach to nuclear development, highly informed by the success of SpaceX, that includes iterative hardware demonstrations and in-house manufacturing to achieve disruptive cost reduction and provide true cost certainty for commercialization
- Our cost target objectives are set to be competitive with natural gas in the US electricity market
- We are targeting a US commercial demonstration by 2030 (or earlier) and rapid deployment ramp in 2030s Kairos Power Headquarters Kairos Power Team
Copyright © 2023 Kairos Power LLC. All Rights Reserved.
No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.
Kairos Power Locations HQ / R-Lab / S-Lab Alameda, CA Kairos Power Facilities Molten Salt Purification Plant Elmore, OH T-Facility / Engineering Test Unit Production Development Facility Albuquerque, NM Hermes Reactor Oak Ridge, TN Licensing Office Charlotte, NC Instrumentation Labs Rexford, NY
Copyright © 2023 Kairos Power LLC. All Rights Reserved.
No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.
Kairos Power Business Model Focuses on Reducing Risk and Improving Build Cost Certainty Test Program Licensing Technology Certainty Licensing Certainty Cost Certainty Supply Chain Certainty Fuel Development Salt Development KP-FHR Design Build Certainty
Copyright © 2023 Kairos Power LLC. All Rights Reserved.
No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.
Kairos Power Nuclear Development Paradigm Shift:
Rapid Hardware Iterations Enable Innovation and Build True Cost Certainty 6
Conventional Nuclear Development Cycle is Slow and Capital Intensive PLAN DESIGN BUILD TEST Kairos Power Iterative Test Cycles Accelerate Technology and Manufacturing Development Test Experience TEST EXPERIENCE PLAN BUILD DESIGN TEST PLAN BUILD DESIGN TEST PLAN BUILD DESIGN TEST Test Experience TEST EXPERIENCE Inner Loop of Plan-Design is Common for Conventional Nuclear
Copyright © 2023 Kairos Power LLC. All Rights Reserved.
No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.
Path to Commercialization PLAN BUILD DESIGN TEST PLAN BUILD DESIGN TEST PLAN BUILD DESIGN TEST PLAN BUILD DESIGN TEST Produces electricity and connected to grid U-Facility User Facility Reactor Demonstration Unit (Non-Nuclear)
Hermes Hermes 2 Hermes Demo Reactor Series KP-X KP-X Commercial Plant Nuclear Engineering Test Units (Non-Nuclear)
ETU 1.0 ETU 2.0 ETU 3.0
Copyright © 2023 Kairos Power LLC. All Rights Reserved.
No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.
- What?
A low power demonstration reactor that will prove Kairos Powers capability to deliver low-cost nuclear heat
- Why?
Cost: Establish competitive cost through iterative learning cycles Supply Chain: Advance the supply chain for KP-FHR specialized components and materials while vertical integrating critical systems Design / Test: Deliberate and incremental risk reduction Licensing Approach: NRC will license Hermes as a non-power reactor and facilitate licensing certainty for KP-FHR Operations: Provide a complete demonstration of nuclear functions including reactor physics, fuel and structural materials irradiation, and radiological controls Operations Hermes will ultimately demonstrate the U.S. aptitude to license an advanced reactor in a timely manner Hermes Reactor ETU / Hermes KP-X / U-Facility
Copyright © 2023 Kairos Power LLC. All Rights Reserved.
No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.
Hermes Overview 9
- Fluoride-salt cooled, high temperature reactor (FHR)
- Pebble bed core with Tri-structural, isotropic (TRISO) fuel particles, graphite moderator/reflector
- Reactor Thermal Power: 35 MWth
- Coolant Operating Temperature:550°C - 650°C
- 316H stainless steel reactor vessel
- Passive safety systems Shutdown elements insert via gravity Decay heat removal system removes heat during postulated events without active components
Copyright © 2023 Kairos Power LLC. All Rights Reserved.
No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.
Hermes Site
- The site is located in Oak Ridge, Tennessee in Roane County within the East Tennessee Technology Park (ETTP)
- The Hermes test reactor will be located on former Department of Energy gaseous diffusion plant (K-33) building site
- The site boundary encompasses approximately 185 acres About 30 acres would be permanently disturbed for operations of the facility
Copyright © 2023 Kairos Power LLC. All Rights Reserved.
No Reproduction or Distribution Without Express Written Permission of Kairos Power LLC.
11 Hermes Construction Permit Application (CPA)
Hermes CPA developed using guidance in NUREG 1537 Hermes PSAR submitted September 2021 Hermes ER submitted October 2021 NRC accepted Kairos Powers CPA for review in November 2021 Hermes ER Rev 1 submitted March 2023 FEIS issued August 2023 Hermes PSAR Rev 3 submitted May 2023 FSER issued June 2023 Artists rendering of the Hermes facility Artists rendering of the Hermes facility