ML23241A382
Text
E D
C B
50A SIA 52A 53A NOTE 2 NO TE 2 54A 55A 5917-2
~----
NOTE 2 56A 57A 58A NOTES :
I. ALL PI P ING BETWEEN ISOLATION VALVES INSTALLED PER GI REQ UIREMENTS, BUT SEISMICALLY QUALIFIED TO G REQUI REMENTS.
- 2. FOR CONTINUA TI ON OF PIPING, REFER TO SPRINKLER SYSTEM DC-693299-5, EL. 73' (CCW PUMP AND CHARGING PUMP ROOMS!
CCW & CHARGING PUMP ROOMS I\
~ 3. DE LE TED FIREWATER SPRINKLER NOTE 1----1 SYSTEM SUPP LY I
56 -A >--_________
'G'
- _I______,
>---------------~----- NOTE 2
- 4. VA LVES ON MANI FOLD LINES 5918 NEED NOT BE UL LISTED.
K-5 9 14 -3 LJ~,
G-0627 59 I 5 - I 1/4 NOTE 5 K-5918-1 G-0627 NO TE 4
_g_J V
K-59 18 -1 FE 263
- 5. HOSES TO BE INS TALL ED FOLLOW ING A SEISMIC EVENT WHEN NORMAL COO LANT WATER TO CHARGING PUMPS IS LOS T.
HOSES ARE NOT REQUIRED DURING NORMAL OPERAT ION.
V-0672 LUBE OIL COO L ERS CCW SUPPLY
)1 01 -c l 14) CHARG I NG PUMP 2-1
) 62-CI 14) CHARGING PU MP 2-2 C-0651 NOTE 5 CHARG I NG PUMPS' SEA L & LUBE OI L COO L ERS EMERG EN CY TIE-IN FROM AUX.
BLDG.
F I RE PROTECTIO N SYSTE M UNIT 2 59A DIABLO CANYON POWER PLANT - PG& E CO.
FIRE PROTECTION SYSTEMS DRAW i NG SHEET PAGE REV 1080 18 SA 0 30 E
D C
B A