ML23241A382

From kanterella
Jump to navigation Jump to search
7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 108018, Rev. 30, Sheet 5A, Fire Protection Systems
ML23241A382
Person / Time
Site: Diablo Canyon  
Issue date: 05/25/2023
From:
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23241A052 List: ... further results
References
DCL-23-044
Download: ML23241A382 (1)


Text

E D

C B

50A SIA 52A 53A NOTE 2 NO TE 2 54A 55A 5917-2


~----

NOTE 2 56A 57A 58A NOTES :

I. ALL PI P ING BETWEEN ISOLATION VALVES INSTALLED PER GI REQ UIREMENTS, BUT SEISMICALLY QUALIFIED TO G REQUI REMENTS.

2. FOR CONTINUA TI ON OF PIPING, REFER TO SPRINKLER SYSTEM DC-693299-5, EL. 73' (CCW PUMP AND CHARGING PUMP ROOMS!

CCW & CHARGING PUMP ROOMS I\

~ 3. DE LE TED FIREWATER SPRINKLER NOTE 1----1 SYSTEM SUPP LY I

56 -A >--_________

'G'

_I______,

>---------------~----- NOTE 2

4. VA LVES ON MANI FOLD LINES 5918 NEED NOT BE UL LISTED.

K-5 9 14 -3 LJ~,

G-0627 59 I 5 - I 1/4 NOTE 5 K-5918-1 G-0627 NO TE 4

_g_J V

K-59 18 -1 FE 263

5. HOSES TO BE INS TALL ED FOLLOW ING A SEISMIC EVENT WHEN NORMAL COO LANT WATER TO CHARGING PUMPS IS LOS T.

HOSES ARE NOT REQUIRED DURING NORMAL OPERAT ION.

V-0672 LUBE OIL COO L ERS CCW SUPPLY

)1 01 -c l 14) CHARG I NG PUMP 2-1

) 62-CI 14) CHARGING PU MP 2-2 C-0651 NOTE 5 CHARG I NG PUMPS' SEA L & LUBE OI L COO L ERS EMERG EN CY TIE-IN FROM AUX.

BLDG.

F I RE PROTECTIO N SYSTE M UNIT 2 59A DIABLO CANYON POWER PLANT - PG& E CO.

FIRE PROTECTION SYSTEMS DRAW i NG SHEET PAGE REV 1080 18 SA 0 30 E

D C

B A