ML23241A382

From kanterella
Jump to navigation Jump to search
7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 108018, Rev. 30, Sheet 5A, Fire Protection Systems
ML23241A382
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/25/2023
From:
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23241A052 List: ... further results
References
DCL-23-044
Download: ML23241A382 (1)


Text

50A SIA 52A 53A 54A 55A 56A 57A 58A 59A NO TES :

5917-2 NOTE 2 --- - ~ - - -- NOTE 2 I. ALL PI P ING BETWEEN ISOLATION VALVES E INSTALLED PER GI REQ UIREM ENTS, BUT E SEISMICALLY QUALIFIED TO G REQ UI REMENTS.

NO TE 2 2. FOR CONTINUA TI ON OF PIPING, REFER TO SPRINKLER SYSTEM DC-693299-5, EL. 73' (CCW PUMP AND CHARGING PU MP ROOMS!

CCW & CHARGING PUMP ROOMS I\

FIREWATER SPRINKLER NO TE 1----1 ~ 3. DE LE TED SYSTEM SUPP L Y I 4. VA LVES ON MANI FO LD LINE S 5918 56 -A >--_ _ _ _ _ _ _ _ _ 'G'

_I______, NOTE 2 LJ~,

>--- - - - - - - - - - - - - ~ - - - - - NEED NO T BE UL LISTED.

D K-5 9 14 -3 D

5. HOSES TO BE I NS TALL ED FOLLOW I NG A SEISMIC EVENT WHEN NORMAL COO LANT WATER TO CHARGING PUMPS IS LOS T.

HOSES ARE NO T REQUIRED DURING NORMAL OPERAT ION.

V C LUBE OIL COO L ERS CCW SUPPLY C G-0627 V-0672 )1 01 -c l 14) CHARG I NG PUMP 2-1 FE K- 59 18 -1 263 ) 62-CI 14) CHARGING PU MP 2-2 59 I 5 - I 1/4 C-0651 NO TE 5 NOTE 5 K-5918- 1 G-0627 B NO TE 4 B

_g_J CHARG I NG PUMPS' SEA L & LUBE O I L COO L ERS EMERG EN CY TIE-IN FROM AUX. BLDG. F I RE PROTECTIO N SYSTE M UNIT 2 A DIABLO CANYON POWER PLANT - PG& E CO .

FIRE PROTECTION SYSTEMS DRAW i NG SHEET PAGE REV 1080 18 SA 0 30