Mr. Peter Hastings Vice President, Regulatory Affairs and Quality Kairos Power LLC 707 W Tower Ave Alameda, CA 94501
SUBJECT:
ACCEPTANCE FOR DOCKETING OF THE HERMES 2 TEST REACTOR FACILITY CONSTRUCTION PERMIT APPLICATION SUBMITTED BY KAIROS POWER LLC
Dear Mr. Hastings:
By letter dated July 14, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23195A121), Kairos Power LLC (Kairos) submitted a construction permit (CP) application for a two-unit test reactor facility pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Domestic Licensing of Production and Utilization Facilities, and Section 104c of the Atomic Energy Act of 1954, as amended. The two-unit facility, referred to as Hermes 2, would be built in Oak Ridge, Tennessee. The purpose of this letter is to inform you of the results of the NRC staffs acceptance review of this application.
The NRC staff performed an acceptance review and determined that Kairos submitted sufficient information in accordance with 10 CFR 2.101, Filing of Application, 10 CFR 50.33, Contents of applications; general information, 10 CFR 50.34, Contents of application; technical information, and 10 CFR 51.50, Environmental report-construction permit, early site permit, or combined license stage. The acceptance review confirmed that the NRC staff will be able to conduct its detailed safety and environmental technical reviews and to complete the reviews on a predictable schedule.
The NRC staff performed the acceptance review of the CP application in accordance with 10 CFR Part 2, Agency Rules of Practice and Procedure, 10 CFR Part 50, and the agencys procedures. The review assessed the various criteria and considerations specified in the agencys procedures associated with accepting an application. The NRC staff concluded that the application is acceptable for docketing. However, the NRC staffs determination does not preclude audits or requests for additional information as the review proceeds. The docket numbers established for the Hermes 2, Units 1 and 2, test reactors are 50-611 and 50-612, respectively.
The NRC staff will provide a schedule for completion of the safety and environmental reviews of the application, to include key milestones and resource estimates, within 30 days of the date of this letter.
September 11, 2023
P. Hastings A notice of acceptance for docketing will be published by the Office of the Federal Register.
If you have any questions regarding this matter, please contact me at (301) 415-3229, or via email at Michael.Orenak@nrc.gov.
Sincerely, Michael Orenak, Project Manager Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket Nos.: 50-611 50-612 cc: Distribution via Gov Delivery ListServ Signed by Orenak, Michael on 09/11/23
ML23233A167 NRR-106 OFFICE NRR/DANU/UAL1:PM NMSS/REFS/ERNRB:PM NRR/DANU/UAL1:LA NAME MOrenak PDoub DGreene DATE 8/21/2023 8/21/2023 8/24/2023 OFFICE NMSS/REFS/ERNRB:BC NRR/DANU/UTB2:BC NRR/DANU/UAL1:BC NAME KErwin CDeMessieres WJessup DATE 8/24/2023 8/24/2023 8/24/2023 OFFICE NRR/DANU/UAL1:PM NAME MOrenak DATE 9/11/2023