ML23229A159

From kanterella
Jump to navigation Jump to search
July 12, 2023, Summary of Meeting with Framatome
ML23229A159
Person / Time
Site: 07007036
Issue date: 09/15/2023
From: Stephen Poy
NRC/NMSS/DFM/FFLB
To: Lav S
NRC/NMSS/DFM/FFLB
Shared Package
ML23229A155 List:
References
Download: ML23229A159 (2)


Text

OFFICIAL USE ONLY - PROPRIETARY INFORMATION S. Lav OFFICIAL USE ONLY - PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 15, 2023 MEMORANDUM TO:

Samantha C. Lav, Chief Fuel Facility Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards FROM:

Stephen Poy, Project Manager Fuel Facility Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards

SUBJECT:

SUMMARY

OF JULY 12, 2023, MEETING WITH FRAMATOME On July 12, 2023, the U.S. Nuclear Regulatory Commission (NRC) staff held a hybrid meeting with Framatome. Framatome had requested this Observation Meeting to discuss their upcoming submittal of two licensing actions: a facility-wide enrichment change to support accident tolerant fuel and a single building enrichment change to support advanced reactor fuel fabrication. The first session of the meeting was open to the public while the second session was closed to the public for discussion of proprietary information. The meeting notice and agenda, dated July 12, 2023, is available in the NRCs Agencywide Documents Access and Management System (ADAMS) at Accession No. ML23156A666.

Framatomes presentations (slides) for the open session (ML23248A270) (public) and closed session (ML23202A070) (non-public) are also in ADAMS. The list of attendees and summaries of the open and closed sessions are enclosed.

CONTACT: Stephen Poy, NMSS/DFM 301-415-7135 Docket No. 70-7036

Enclosures:

1.

List of Attendees 2.

Meeting Summary Session 1 (Public) 3.

Meeting Summary Session 2 (Non-Public) cc: Timothy Tate, Framatome transmitted herewith contains proprietary information. When separated from Enclosure 3, this document and Enclosures 1 and 2 are decontrolled.

Signed by Poy, Stephen on 09/15/23

ML23229A155(pkg), ML23229A159(memo),

ML23229A156(Encl 1), ML23229A157(Encl 2), ML23229A158(Encl 3) *via email OFFICE NMSS/DFM/

FFLB/PM NMSS/DFM/

STLB/LA NMSS/DFM/

FFLB/BC NAME SPoy JGoodridge SLav DATE 8/17/2023 8/21/2023 9/15/2023