ML23215A163

From kanterella
Jump to navigation Jump to search
Bf 2023-301 File 2B - Exam Administrative Items (Normal Release)
ML23215A163
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/01/2023
From: Schulte M
NRC/RGN-II
To:
Tennessee Valley Authority
References
50-259/23-301, 50-260/23-301, 50-296/23-301 50-259/OL-23, 50-260/OL-23, 50-296/OL-23
Download: ML23215A163 (31)


Text

ML23215A163 O

O

O

Digitally signed by Bruno L. Caballero Bruno L. Caballero Date: 2023.06.02 11:34:28 -04'00' Digitally signed by Bruno L. Caballero Bruno L. Caballero Date: 2023.06.02 11:33:54 -04'00' Digitally signed by Thomas A. Stephen Date: 2023.06.02 12:20:41 -04'00' O8SJUUFOFYBNPVUMJOFQSFWJPVTMZJOEFQFOEFOUMZSFWJFXFECZ,FWJO,JSDICBVNPO

Digitally signed by Bruno L. Caballero Bruno L. Caballero Date: 2023.06.02 11:37:51 -04'00' Digitally signed by Bruno L. Caballero Bruno L. Caballero Date: 2023.06.02 11:38:24 -04'00' Digitally signed by Thomas A. Stephen Date: 2023.06.02 12:31:03 -04'00'

       

>Z^hni. 9}us>bHLL ;Zbud=Zq/ %CUH%%& =ZqFbbo0 OJ $ QOJp

                                                                                                                                    VbHu
                                                  @bq ;b^}ixhus Z    \      ^

%

MbhusZs`Zsb}Z}bb^gsh^ZnnZ^^}ZbZs`Zxxoi^Z\obugbdZ^hnh=Z^g{bius is^n`bZb^gsh^Zn}bdb}bs^b Z 5on{bius}bdb}bs^bHO?msuob`fbZs`Z\inhhbE5}b{i}bqbs

                                                                                                                                             
       \ >Z^iniobZ}sisfu\lb^hbZ}b}bdb}bs^b`ZZZinZ\nb
       ^ 5onlbiushs^n`bZsbynZsZhusudgb^u}}b^Zsb}byoZsZhusZs`Z`i}Z^u}ZsZoi                                  
&
'

Qbsiu}}bZ^u}uxb}Zu}QOJ{biusbZgbQOJoh^bsbobbn RgbZqxnisfx}u^bZ}Zs`uqZs`bqZi^ Adqu}bgZsdu}}bZ^u}uxb}Zu}OJu}u

                                                                                                                                             

( QOJ{biusb}b}bxbZb`d}uqgbnZuHO?ni^bshsfbZq js^n`hsfdon<K{bius

      }bZmbbZqhsZhus ^usngbHO?Jei^budH^nbZ}ObZ^u}ObfnZiusuxb}Zu}ni^bshsf z}uN}Zqueh^b

Mbius`xoh^Ziusd}uqgbnh^bsbb^}bbshsfZ`hbZqZ^us}unnb`Zhs`h^Zb`\bnu

                                                                                                                                               
       ^gb^mgbhbqgZZxxnhbZs`ZxxbZ}Zxx}ux}iZb0 YRgbZ`ibZqZbqZi^ZooZs`}Zs`uqo`bbnuxb`

WSgbZ`ibZqZ^uqxnbb`\bdu}bgbni^bsbbZqZZ}b` SgbbZqisZiusb}b`bbouxb`hs`bxbs`bso XSgbnh^bsbb^bidibgZgb}bi u`xni^Zius

                                                     

Jgb}bynZis 1~c !#6 8D  v?

                                                                                                                                              
 )   9Zsmbqbbniqhsuqu}bgZs*(d}uqgb\Zsm  Z nbZ                   9Zsm            Gu`hdib`     Hb
        "sbZgb^uqx}bgbshusZsZoinbboZs`gb}bsbu}

qu`hdib`2bsb}gbZ^ZoOJQOJusn{bius`i}i\ius4       

                                                                                                                                                
 
 

9bbbs&+Zs`'({bhusudgb{biususgbOJbZqZs` ZnbZ&udgb{bhususgbQOJusoxuiusudgbbZq Z}b}ibsZgb^uqx}bgbsiusZsZnhobbn2bsb}gbZ^Zo PJQOJuso{bhus`h}h\hus4 Gbqu}

                                                                                                       

Pbdb}bs^bgZs`ux}ui`b``usufibZZZsb}u}Zi`isgbbnhqhsZhusud`h}Z^u}

B5
                                                                                                                           
                                                                                                                                   
                                                                                                                                    
                                                                                                                                        
                                                                                                                                                  
                                                                                                                                                   
 ,     Mbius^usbs^usdu}quxb^hdh^E5Zbqbsisgbx}bhunZxx}ub`bZqhsZhus uoisbZs`iZxx}ux}iZbdu}gbE5ZbqbsZhfsb`ib}3`biZiusZ}blidhb`                                             
   Mbhusx^guqb}i^{ZnhZs`du}qZqbbgbis}^husZs`fh`bohsbhs =Q'%
                                                                                                                                               
   RgbbZq^usZhsgb}b{i}b`sq\b}udusbxuis  qnhxnb^guh^bhbq3gbuZoi^u}}b^Zs`

Zf}bbiggbZnbusgb^ub}gbb L}isb`HZqbQifsZ}b

                                                                                                                                               

[ 5gu} Gh^gZboRgZrb  ;Zb

                                                                                                                    )-%%&
  ] >Z^inhObhbb}            Gi^gZbnGinnZw                                                 )-%%&

_ HO?Obibb} Bruno L. Caballero  Digitally signed by Bruno L. Caballero Date: 2023.06.09 12:28:46 -04'00' Digitally signed by Bruno L. Caballero IO?:gibd =Zqhsb} Bruno L. Caballero Date: 2023.06.09 12:29:19 -04'00' Digitally signed by Thomas A. Stephen IO:Qxb}hu} Date: 2023.06.12 14:36:54 -04'00' TgbdZ^inioh^bsbbhfsZ}bhsuZxxni^Z\obdu}HO?`bbnuxb`b

   7ths`bxbs`bsHO?}bibb}xbu}qbxhs^uoqs^RgiqZ\bgbHO?:gibd=Zqhsb}hdgbgb ak`su`bbnuxgb}hbsbZqhsZhuss`b}}bib

Form 5.1-1 Postexamination Check Sheet Postexamination Check Sheet 2 Facility: %URZQV)HUU\ Dates of Examination:



Date Activity Description Complete

1. *Received postexamination package from facility licensee and 

verified complete. (ES-4.4)

2. *Reviewed and incorporated any necessary facility and applicant
                                                                                 

written examination comments. NRC grading of written examination completed. (ES-4.4)

3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed. 

(ES-3.6)

4. *Completed NRC chief examiner review of operating test and written 

examination grading. (ES-3.6 and ES-4.4)

5. Completed licensing official review. 
6. Mailed licenses, preliminary results, and pass letters. 
7. Notified facility licensee of results. 
8. Issued the examination report (refer to Operator Licensing Manual 

Chapter (OLMC) 510, Operator Licensing Examination Reports).

9. Returned reference material after final resolution of any informal 

NRC staff reviews, hearing demands, or both.

10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and 

Management Directive 3.53, NRC Records and Document Management Program).

  • Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.

ES-5.1, Page 8 of 20

Withhold the Enclosure from Public Disclosure in Accordance with NUREG-1021 Post Office Box 2000, Decatur, Alabama 35609-2000 March 28, 2023 10 CFR 40(b)(3) 10 CFR 55.5 10 CFR 55.49 Ms. Laura A. Dudes Regional Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Attn: Mr. Tom Stephen Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, 50-296, and 72-052

Subject:

Submittal of Initial Operator Licensing Examination

Reference:

Letter from the Nuclear Regulatory Commission to the Tennessee Valley Authority, Browns Ferry Nuclear Plant - Notification of Licensed Operator Initial Examination 05000259/2023301, 05000260/2023301, 05000296/2023301, dated October 17, 2022. In accordance with the referenced letter and NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," the Tennessee Valley Authority is providing the written test and supporting reference materials for the upcoming license examination. The Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3 Initial Operator Licensing Examination is scheduled for the weeks of June 12 and 19, 2023. In order to meet the examination schedule, BFN submitted the written examination to the NRC on February 1, 2023. The NRC requested that BFN furnish the operating examination by March 29, 2023. See the attached enclosure for the Reactor Operators and Senior Reactor Operators examinations.

Withhold the Enclosure from Public Disclosure in Accordance with NUREG-1021 Ms. Laura A. Dudes Page 2 March 28, 2023 In accordance with Title 10 of the Federal Code of Regulations (10 CFR) 55.49 and NUREG-1021, appropriate measures have been taken to ensure examination integrity and security. Accordingly, it is requested that this letter and the enclosed documents be withheld from public disclosure until the examinations are completed. There are no commitments contained in this submittal. Should you have any questions regarding this matter, please contact Mr. Michael Schulte at (256) 729-2783. Respectfully, Manu Sivaraman Site Vice President

Enclosure:

Operating Examination and Supporting Reference Materials - Operator License Examination Scheduled for the Weeks of June 12 and 19, 2023. cc (w/ Enclosure): NRC Division of Reactor Safety, Operator Licensing Assistant - Operations Branch II NRC Division of Reactor Safety, Senior Operations Engineer, Region II

Withhold the Enclosure from Public Disclosure in Accordance with NUREG-1021 Ms. Laura A. Dudes Page 3 March 28, 2023 CLV:RWC Enclosure bcc: (w/o Enclosure) R. D. Busick D. Green J. J. Heugel K. D. Hulvey R. J. Krigelman E. Q. Leonard M. W. Oliver J. L. Paul M. M. Rasmussen T. S. Rausch D. K. Riggs C. L. Vaughn ECM

Withhold the Enclosure from Public Disclosure in Accordance with NUREG-1021 ENCLOSURE BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 OPERATING EXAMINATIONS AND SUPPORTING REFERENCE MATERIALS - OPERATOR LICENSE EXAMINATION SCHEDULED FOR THE WEEKS OF JUNE 12 AND 19, 2023.

Post Office Box 2000, Decatur, Alabama 35609-2000 May 12, 2023 10 CFR 55.5 Ms. Laura A. Dudes Regional Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Attn: Mr. Tom Stephen Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296

Subject:

Submittal of Preliminary Operator Applications

Reference:

Letter from the Nuclear Regulatory Commission to the Tennessee Valley Authority, Browns Ferry Nuclear Plant - Notification of Licensed Operator Initial Examination 05000259/2023301, 05000260/2023301, and 05000296/2023301, dated October 17, 2022. In accordance with the above referenced letter, and with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 12, the Tennessee Valley Authority is providing the Preliminary Operator Applications associated with the upcoming Initial Operator License Examination for Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3. The BFN Units 1, 2, and 3 Initial Operator Licensing Examination is scheduled for the weeks of June 12 and 19, 2023. To meet the examination schedule, the NRC requested that BFN furnish preliminary reactor operator and senior reactor operator license applications and medical certifications by May 12, 2023.}}