Completeness Determination for NuScale Topical Report TR-124587, Extended Passive Cooling and Reactivity Control Methodology, Revision 0
ML23205A005
Person / Time
Site: 05200050
Issue date: 07/28/2023
From: Getachew Tesfaye
NRC/NRR/DNRL/NRLB
To:
References
Download: ML23205A005 (1)


Text

NRC FORM 898 U.S. NUCLEAR REGULATORY COMMISSION (01-2021)

Topical Report Completeness Determination Topical Report Information Review Information Report Number: TR-124587 NRR/DSS/SNRB Office/Division/ NRR/DSS/SFNB Branch: NRR/DNRL/NRLB Extended Passive Cooling and Reactivity

Title:

Control Methodology, Revision 0 Getachew Tesfaye Project Manager:

ADAMS Accession Stacy Joseph Number:

ML23005A308, RSI Resp. ML23195A092 EPID: L-2022-TOP-0018 A. Barrett, R. Nolan, Z. Li, D. Zheng Reviewers: R. Sugrue, J. Lehning III, S. Marshall, Docket Number: 05200050 J. Thompson, A. Bielen, C. Boyd, J. Coury Review Type: Standard Compressed ADAMS Accession Numbers (Top row is for transmittal of this form)

Package: ML 23205A003 E-mail: ML 23205A004 This Form: ML 23205A005 Withholding Determination: ML 23069A010 Fee Waiver: ML N/A Topical Reports for Review The NRC staff has performed an acceptance review of the subject topical report. We have found that the material presented is sufficient to begin our review. The dates below are based on current resources, if they change the NRC staff will contact you.

Information for Topical Reports That Are Found Acceptable for Review Issue Dates For Issue Dates For Requests for Additional Information: June 27, 2024 Draft Safety Evaluation: November 27, 2024 Review hours total includes project management and contractor time: TBD Topical Reports Not Acceptable for Review Based on its review of the information provided, the NRC staff cannot find sufficient details in the submittal to allow the staff to evaluate the proposed topical report.

[Only for Use with Topical Reports in Standard Review Process] Although the NRC staff has found the current topical report is not sufficiently detailed to begin our review, the sponsor can supplement the submittal with additional information. The additional information should be submitted within 60 days the date of this form.

Basis for Nonacceptance:

Additional Information Needed:

The factors impacting the LTR review schedule is provided in NRC letter dated July 31, 2023 (ML23198A163). The estimate for review hours will be provided with the SDAA review hours within 60 days of the issuance of this form.

NRC FORM 898 (01-2021) Page 1 of 2

NRC FORM 898 U.S. NUCLEAR REGULATORY COMMISSION (01-2021)

Topical Report Completeness Determination Approvals Technical Branch Chief Rebecca L. Patton Digitally signed by Rebecca L. Patton Date: 2023.07.28 14:51:30 -04'00' Projects Branch Chief Michael I. Dudek Digitally signed by Michael I. Dudek Date: 2023.07.28 15:08:29 -04'00' NRC FORM 898 (01-2021) Page 2 of 2