ML23068A158
| ML23068A158 | |
| Person / Time | |
|---|---|
| Site: | 05200050 |
| Issue date: | 03/17/2023 |
| From: | David Drucker, Patton R NRC/NRR/DNRL/NRLB |
| To: | |
| References | |
| EPID L-2022-TOP-0019, TR-131981 | |
| Download: ML23068A158 (1) | |
Text
NRC FORM 898 (01-2021)
Topical Report Completeness Determination U.S. NUCLEAR REGULATORY COMMISSION NRC FORM 898 (01-2021)
Page 1 of 1 Topical Report Information Report Number:
TR-131981
Title:
Methodology for the Determination of the Onset of Density Wave Oscillations (DWO),
Revision 0 ADAMS Accession Number:
ML22364A331 EPID:
L-2022-TOP-0019 Docket Number:
05200050 Review Information Office/Division/
Branch:
RES/DSA/CRAB II NRR/DSS/SNRB NRR/DNRL/NCSG NRR/DNRL/NRLB Project Manager:
David Drucker Getachew Tesfaye Reviewers:
Greg Makar, Joshua Kaizer, Leslie Terry, Rosie Sugrue, Peter Yarsky, Yuken Wong, Shanlai Lu Review Type:
Standard
Compressed ADAMS Accession Numbers (Top row is for transmittal of this form)
Package: ML23068A126 E-mail: ML23068A159 This Form: ML23068A158 Withholding Determination: ML23068A192 Fee Waiver: ML Topical Reports for Review The NRC staff has performed an acceptance review of the subject topical report. We have found that the material presented is sufficient to begin our review. The dates below are based on current resources, if they change the NRC staff will contact you.
Information for Topical Reports That Are Found Acceptable for Review Issue Dates For Requests for Additional Information:
Issue Dates For Draft Safety Evaluation:
Review hours total includes project management and contractor time:
Topical Reports Not Acceptable for Review
Based on its review of the information provided, the NRC staff cannot find sufficient details in the submittal to allow the staff to evaluate the proposed topical report.
[Only for Use with Topical Reports in Standard Review Process] Although the NRC staff has found the current topical report is not sufficiently detailed to begin our review, the sponsor can supplement the submittal with additional information. The additional information should be submitted within 60 days the date of this form.
Basis for Nonacceptance:
The basis for nonacceptance is provided in NRC letter dated March 17, 2023 (ML23058A160).
Additional Information Needed:
The additional information needed is provided in NRC letter dated March 17, 2023 (ML23058A160).
Approvals Technical Branch Chief Projects Branch Chief Rebecca L. Patton Digitally signed by Rebecca L. Patton Date: 2023.03.16 12:53:51 -04'00' Michael I. Dudek Digitally signed by Michael I. Dudek Date: 2023.03.16 13:14:53 -04'00'