Form 3.2-1 Administrative Topics Outline Facility: _______Point Beach_____________

Date of Examination: __Feb 2023___

Examination Level: RO SRO Operating Test Number: __________

Administrative Topic (Step 1)

Activity and Associated K/A (Step 2)

Type Code (Step 3)

Conduct of Operations

a. PBN JPM P004.005a.COT - Perform Boron Concentration Change Calculation 2.1.43 / 4.1, Ability to use an online power distribution monitoring system and/or procedures to determine the effects on reactivity of plant changes, such as RCS temperature, secondary plant, or fuel depletion D, R Conduct of Operations
b. PBN JPM P157.002.AOT - Receive Fuel Oil 2.1.25 / 3.9, Ability to interpret reference materials, such as graphs, curves, and tables D, R Equipment Control
c. PBN JPM P000.015.COT - Respond to a CCW Malfunction 2.2.15 / 3.9, Ability to determine the expected plant configuration using design and configuration control documentation, such as drawings, lineups, or tagouts N, R Radiation Control
d. PBN JPM P162.006b.AOT - Determine a Stay Time for a High Radiation Area 2.3.12 / 3.2, Knowledge of radiological safety principles and procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, or alignment of filters D, R Emergency Plan
e. N/A for RO N/A

Form 3.2-1 Administrative Topics Outline Facility: _______Point Beach_____________

Date of Examination: __Feb 2023___

Examination Level: RO SRO Operating Test Number: __________

Administrative Topic (Step 1)

Activity and Associated K/A (Step 2)

Type Code (Step 3)

Conduct of Operations

a. PBN JPM P001.003f.SRO - Review OP 3B Appendix A, Shutdown Margin Calculation 2.1.43 / 4.3, Ability to use an online power distribution monitoring system and/or procedures to determine the effects on reactivity of plant changes, such as RCS temperature, secondary plant, or fuel depletion D, R Conduct of Operations
b. PBN JPM P001.025a.COT - Respond to Rod Insertion Limit Alarm 2.1.25 / 4.2, Ability to interpret reference materials, such as graphs, curves, and tables N, R Equipment Control
c. PBN JPM NUCTAG104a.SRO - Review a Clearance Order for Accuracy 2.2.15 / 4.3, Ability to determine the expected plant configuration using design and configuration control documentation, such as drawings, lineups, or tagouts D, P, R Radiation Control
d. PBN JPM P028.012.EMR - Dispatch Re-Entry Teams 2.3.14 / 3.8 Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities, such as analysis and interpretation of radiation and activity readings as they pertain to administrative, normal, abnormal, and emergency procedures or to analysis and interpretation of coolant activity, including comparison to emergency plan or regulatory limits (SRO Only)

D, R Emergency Plan

e. PBN JPM P028.001e.EMR - Classify an Emergency Event in Accordance with EPIP 1.2 2.4.41 / 4.6, Knowledge of the emergency action level thresholds and classifications.

D, R