MONTHYEARML23072A3842023-03-15015 March 2023 Audit Plan to Support License Amendment Request to Add an Analytical Methodology to the Core Operating Limits Report for Full Spectrum Loss of Coolant Accident ML21347A8832021-12-16016 December 2021 Audit Plan for Loss of Power Diesel Generator Start and Bus Separation ML17177A4462017-07-0606 July 2017 Audit Plan for Licensee Responses Concerning Seismic Hazard Reevaluations Related to Request for Information -(50.54(F) Letter) Regarding Recommendation 2.1 of the Near-Term Task Force ML16259A1892016-12-0505 December 2016 Nuclear Regulatory Commission Plan for the Audit of Mitigation Strategies Assessment Submittals Related to Order EA-12-049, Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML16105A2112016-04-26026 April 2016 Nrc'S Plan for the Audit of First Energy Nuclear Operating Company'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1-Flooding for Beaver Valley Power Station, Units 1 and 2 (TAC Nos. MF3286 ML15152A2182015-06-0909 June 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML14356A0032015-02-10010 February 2015 Audit of Licensee Responses to the Expedited Seismic Evaluation Process to Support Implementation of Near-Term Task Force Recommendation 2.1, Seismic ML14083A6202014-03-26026 March 2014 Nuclear Regulatory Commission Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051 ML13151A0522013-06-17017 June 2013 Plan for the Regulatory Audit Regarding Seismic Walkdowns at Beaver Valley, to Support Implementation of Near-Term Task Force Recommendation 2.3, Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident 2023-03-15
[Table view] Category:Letter
MONTHYEARML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports IR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20230032023-11-0606 November 2023 Integrated Inspection Report 05000334/2023003 and 05000412/2023003 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary IR 05000334/20234022023-09-29029 September 2023 Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000334/20234012023-09-21021 September 2023 Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) ML23263A0192023-09-20020 September 2023 Operator Licensing Examination Approval ML23243A9272023-09-19019 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000334/20230052023-08-31031 August 2023 Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000334/20230022023-08-0909 August 2023 Integrated Inspection Report 05000334/2023002 and 05000412/2023002 ML23219A0592023-08-0707 August 2023 Steam Generator Inspection Reports - Spring 2023 Spring Refueling Outrage L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 ML23188A0982023-07-17017 July 2023 Correction to the Safety Evaluation Issued Related to Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23188A0672023-07-10010 July 2023 Project Manager Assignment L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report ML23157A1072023-06-0707 June 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000334/2023011 and 05000412/2023011 ML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23135A7872023-05-19019 May 2023 Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report ML23124A3882023-05-16016 May 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Technical Specification 5.6.3, Core Operating Limits Reports (COLR) and TS 4.2.1 Fuel Assemblies ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000334/20230012023-05-0808 May 2023 Integrated Inspection Report 05000334/2023001 and 05000412/2023001 L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23118A3812023-04-28028 April 2023 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23107A2502023-04-18018 April 2023 Requalification Program Inspection 2024-01-25
[Table view] |
Text
March 15, 2023 Mr. Barry N. Blair Site Vice President Energy Harbor Nuclear Corp.
Beaver Valley Power Station Mail Stop P-BV-SSB P.O. Box 4, Route 168 Shippingport, PA 15077-0004
SUBJECT:
BEAVER VALLEY POWER STATION, UNITS 1 AND 2 - AUDIT PLAN TO SUPPORT LICENSE AMENDMENT REQUEST TO ADD AN ANALYTICAL METHODOLOGY TO THE CORE OPERATING LIMITS REPORT FOR FULL SPECTRUM LOSS OF COOLANT ACCIDENT (EPID NO. L-2022-LLA-0129)
Dear Mr. Blair:
By letter dated August 31, 2022, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22249A256), Energy Harbor Nuclear Corporation (the licensee),
requested an amendment to Facility Operating License Nos. DPR-66 and NPF-73 for the Beaver Valley Power Station, Units 1 and 2. The proposed amendment would add the Westinghouse Electric Company LLC (Westinghouse) Topical Report WCAP-16996-P-A, Rev. 1, Realistic LOCA [loss of coolant] Evaluation Methodology Applied to the Full Spectrum of Break Sizes (FULL SPECTRUM LOCA Methodology), to the list of approved analytical methods used to determine the core operating limits as listed in Technical Specification 5.6.3, Core Operating Limits Report (COLR).
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the license amendment request (LAR) and determined that a regulatory audit would assist in the timely completion of the review. The NRC staff will conduct a regulatory audit to support its review in accordance with the enclosed audit plan. A regulatory audit is a planned activity that includes the examination and evaluation of primarily non-docketed information.
The audit will be conducted to increase the NRC staffs understanding of the LAR and identify information that will require docketing to support the NRC staffs regulatory findings. The audit will be conducted from March 27, 2023, to April 7, 2023, through an online portal established by the licensee.
B. Blair If you have any questions, please contact me by telephone at 301-415-8004 or email to Sujata.Goetz@nrc.gov.
Sincerely,
/RA/
Sujata Goetz, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-334 and 50-412
Enclosure:
Audit Plan cc: Listserv
REGULATORY AUDIT PLAN TO SUPPORT REVIEW OF LICENSE AMENDMENT REQUEST TO ADD AN ANALYTICAL METHODOLOGY TO THE CORE OPERATING LIMITS REPORT FOR A FULL SPECTRUM LOSS OF COOLANT ACCIDENT BEAVER VALLEY POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-334 AND 50-412
1.0 BACKGROUND
By letter dated August 31, 2022, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22249A256), Energy Harbor Nuclear Corporation (the licensee),
requested an amendment to Facility Operating License Nos. DPR-66 and NPF-73 for the Beaver Valley Power Station (Beaver Valley), Units 1 and 2. The proposed amendment would add the Westinghouse Electric Company LLC (Westinghouse) Topical Report WCAP-16996-P-A, Rev.1, Realistic LOCA [loss of coolant] Evaluation Methodology Applied to the Full Spectrum of Break Sizes (full spectrum LOCA methodology), to the list of approved analytical methods used to determine the core operating limits as listed in Technical Specification 5.6.3, Core Operating Limits Report (COLR).
The U.S. Nuclear Regulatory Commission (NRC) staff has determined the need for a regulatory audit to be conducted in accordance with the Office of Nuclear Reactor Regulation, Office Instruction LIC-111, Regulatory Audits (ML082900195), for the NRC staff to examine the licensees non-docketed information with the intent to gain a better understanding of the license amendment request (LAR), to verify information, and to identify information that would require docketing to support the basis of the NRC staffs licensing decision.
2.0 REGULATORY AUDIT BASIS The NRC staff will perform the audit to support its evaluation of whether the licensees request meets the requirements of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.90.
3.0 INFORMATION AND OTHER MATERIAL NECESSARY FOR THE REGULATORY AUDIT The NRC staff will review the licensees calculations related to its full spectrum LOCA (FSLOCA) methodology to determine if the licensee needs to submit any additional information contained in the analyses performed in support of the requested change to support or develop conclusions for the staffs safety evaluation.
Enclosure
The NRC staff requests the licensee to have the following information readily available and accessible for the staffs review via an online portal as discussed in section 6.0. Plant-specific calculations associated with the FSLOCA analysis used in support of this amendment request, specifically:
- a. The large and small break LOCA scenarios that were analyzed, peak cladding temperature versus break area and maximum local oxidation calculations,
- b. Plant-specific uncertainty analysis for Beaver Valley,
- c. YDRAG and KCOS uncertainty parameters evaluation for determination of limiting break size, and
- d. Plant-specific analysis of the most severe uncovery within Region I.
Based on the review of the documents provided, the NRC staff will determine whether it needs to request any additional documents to be made available on the portal or additional information needs to be submitted on docket for the staff to complete the review of the LAR.
4.0 TEAM ASSIGNMENTS The audit team will consist of the following NRC staff:
Fred Forsaty Nuclear Engineer Fred.Forsaty@nrc.gov Team Leader Ravinder Grover Safety and Plant Ravinder.Grover@nrc.gov System Engineer Sujata Goetz Project Manager Sujata.Goetz@nrc.gov 5.0 LOGISTICS The audit will be held from March 27 to March 31, 2023, via telephone and through an online portal established by the licensee. The online portal is discussed in section 6.0 of the audit plan.
The audit team will conduct a telephone conference with the licensee for the purposes of introducing the team, discussing the scope of the audit, and describing the information to be made available on the online portal. The audit team will also confirm with the licensee if the information made available on the online portal contains any sensitive or proprietary information. The audit team may request that representatives of the licensee answer any audit team questions during the audit related to information provided on the portal at a mutually agreeable day and time by telephone conference.
The NRC staff will not conduct formal entrance or exit meetings; however, the NRCs project manager will inform the licensee via routine communications when the staff no longer needs access to the portal information. The NRC staff does not foresee the need for an onsite visit or in-person discussions between the NRC and licensee staff at this time. However, if the need for a such a meeting is identified in the future, the audit plan will be revised, and the schedule for the audit will be adjusted accordingly. The NRC project manager will coordinate any changes to the audit schedule and location with the licensee.
6.0 ONLINE PORTAL The audit team will access the documents listed in section 3.0 above through an online portal established by the licensee that allows the audit team to access documents via the internet. The
following conditions associated with the online portal must be maintained throughout the duration that the audit team has access to the online portal:
The online portal must be password-protected, and separate passwords will be assigned to the NRC staff and contractors who are participating in the audit.
The online portal must be sufficiently secure to prevent the NRC staff and contractors from printing, saving, downloading, or collecting any information on the online portal.
Conditions of use of the online portal must be displayed on the login screen and will require acknowledgement by each user.
Username and password information should be provided directly to the NRC staff. The NRC project manager will provide the licensee the names and contact information of the NRC staff who will be participating in the audit (see section 4.0). All other communications should be coordinated through the NRC project manager.
7.0 DELIVERABLES An audit summary, which may be public, will be prepared within 60 days of the completion of the audit. If the NRC staff identifies information during the audit that is needed to support its regulatory decision, the NRC staff will issue requests for additional information to the licensee.