ML23058A012
| ML23058A012 | |
| Person / Time | |
|---|---|
| Site: | 05200050 |
| Issue date: | 03/17/2023 |
| From: | Getachew Tesfaye NRC/NRR/DNRL/NRLB |
| To: | |
| References | |
| EPID L-2022-TOP-0018 TR-124587 | |
| Download: ML23058A012 (1) | |
Text
NRC FORM 898 (01-2021)
Topical Report Completeness Determination U.S. NUCLEAR REGULATORY COMMISSION NRC FORM 898 (01-2021)
Page 1 of 1 Topical Report Information Report Number:
TR-124587
Title:
Extended Passive Cooling and Reactivity Control Methodology, Revision 0 ADAMS Accession Number:
ML23005A308 EPID:
L-2022-TOP-0018 Docket Number:
05200050 Review Information Office/Division/
Branch:
NRR/DSS/SNRB NRR/DSS/SNRB NRR/DSS/SFNB NRR/DNRL/NRLB Project Manager:
Getachew Tesfaye Bruce Bavol Stacy Joseph Reviewers:
Antonio Barrett, Ryan Nolan, Zhian Li Rosie Sugrue, John Lehning III, Dong Zheng Syed Haider Review Type:
Standard
Compressed ADAMS Accession Numbers (Top row is for transmittal of this form)
Package: ML23058A003 E-mail: ML23058A013 This Form: ML23058A012 Withholding Determination: ML23069A010 Fee Waiver: ML N/A Topical Reports for Review The NRC staff has performed an acceptance review of the subject topical report. We have found that the material presented is sufficient to begin our review. The dates below are based on current resources, if they change the NRC staff will contact you.
Information for Topical Reports That Are Found Acceptable for Review Issue Dates For Requests for Additional Information:
Issue Dates For Draft Safety Evaluation:
Review hours total includes project management and contractor time:
Topical Reports Not Acceptable for Review
Based on its review of the information provided, the NRC staff cannot find sufficient details in the submittal to allow the staff to evaluate the proposed topical report.
[Only for Use with Topical Reports in Standard Review Process] Although the NRC staff has found the current topical report is not sufficiently detailed to begin our review, the sponsor can supplement the submittal with additional information. The additional information should be submitted within 60 days the date of this form.
Basis for Nonacceptance:
The basis for nonacceptance is provided in NRC letter dated March 17, 2023 (ML23058A160).
Additional Information Needed:
The additional information needed is provided in NRC letter dated March 17, 2023 (ML23058A160).
Approvals Technical Branch Chief Projects Branch Chief Rebecca L. Patton Digitally signed by Rebecca L. Patton Date: 2023.03.15 08:32:51 -04'00' Michael I. Dudek Digitally signed by Michael I. Dudek Date: 2023.03.15 08:36:10 -04'00'