{{#Wiki_filter::;::::=- ENERGYSOLVTIONS Survey Package Worksheet for ARRRC-001 Package Identification No.: ARRR-C00l Prepared by: Paul C. Ely Location: Reactor Building: Inside Bioshield, Floors, Date Prepared: 5/17/2011 Walls and Wood Cover Material Area Classification: Preliminary Class 1 Reviewed By: Area Description This characterization survey includes the area inside the Bioshield. Surfaces include wood & metal flooring (cover) on top on reactor, metal floor inside Bioshield, concrete Bioshield interior walls and top of wood cover material. Historical Information The Bioshield is built over the reactor pool. There is no history of contamination in the area but this area has a higher probability for contamination due to the proximity of the reactor pool and reactor maintenance activities conducted poolside. There is a possibility of activation products due to neutron beams passing into this area during operation. This room is a Class 1 survey unit based on the increased possibility of contaminated and activated materials. Rev. O Page I of4
General Survey Instructions
- 1. Perform alpha scans at a speed not to exceed 1 detector width per second on 50% of floors on top of reactor (metal and wood cover material) using a 43-37 detector and 20% of wall surfaces using a 43-68 detector.
- 2. Choose a minimum of 10 measurement locations on floors (on top of Rx and on metal floor inside Bioshield),_§ locations on walls ( on top of Rx and inside Bioshield), and 4 locations on wood cover material (including elevated locations). If elevated areas were identified based on scan measurements, select the location of the highest activity for direct survey measurements. Perform direct alpha surface activity measurements independently at each of the 20 measurement locations for 1 minute each. Note: Due to high gamma background in general area (100 µR/hr and above) beta scans and beta direct measurements do not need to be performed.
- 3. Note any wall locations that exceed 40 cpm/100 cm2 total alpha activity and determine the extent of the elevated area. Note any floor locations that exceed 50 cpm/100 cm2 total alpha activity and determine the extent of the elevated area.
- 4. Collect a removable surface activity sample over an area of 100 cm2 in size at 100% of the locations chosen above, plus at judgmental locations at the discretion of the surveyor. A minimum of 20 removable activity measurement locations are required.
- 5. Perform at least 8 gamma direct survey measurements at 1 cm and at 1 m from the surface or source at locations chosen above. Record readings in µ.R/hr.
- 6. Prepare survey diagrams of walls, floors and wood cover material, with approximate dimensions and any unique features.
- 7. Note the locations of direct alpha, smears, and gamma fixed measurements and any samples. A sample of the wood cover material should be taken on the underside. Mark measurement and sample locations in the field using round adhesive backed circular stickers, markers, etc.
- 8. Record the maximum and average scan results, in cpm, on each wall and floor survey diagram.
- 9. Record the scan percentages completed for scans on each wall and floor diagram.
Rev. 0 Page 2 of 4
Survey Package Worksheet ARRR-C00l (cont'd) I Special Instructions I
- Source check instrumentation to Th-230 for alpha, SrN-90 for alpha +
- Notify the ES Project Manager of locations that were flagged due to beta, and Cs-137 for gamma measurements.
elevated readings on surfaces. Use gas proportional detector model 43-68 ( or equivalent) for total surface
- Notify the ES Project Manager of smear samples that were flagged due to activity surveys on walls and floors.
elevated removable results. Perform 3 one-minute field background alpha and beta counts, using an Notify the ES Project Manager of any exposure rate measurements that empty source holder prior to surveys. If needed, perform 3 one-minute exceed 25 µR/hr or 2 X background. background counts on a reference surface similar to the surface to be
- Attach photographic records if available and provide descriptive surveyed.
comments for each image under Survey Comments. Ensure that the
- Use a model 44-10 (or equivalent) for gamma scan surveys and exposure Package ID No. and a page number (e.g., Page Al) are included on each rate measurements.
attachment.
- The MDC for removable alpha activity shall be less than 20 dpm/100 cm2 Complete Survey Cover page with required location, date and instrument (preferable < 10 dpm/100 cm2) and for removable beta activity information. Complete remainder of Survey Form as applicable.
measurements shall be less than 150 dpm/100 cm2 (preferably < 100 dom/100 cm2). Survey performance (Initial and date each survey task after completion) Gamma 1cm lm General Description Beta Scan Direct Beta Direct Alpha Smear Gross Scan Exposure Exposure Rate Samples Rate Top of Reactor South Wall Al/A ti/A 5.1fi,f( ~ -S,-lg,{1~ f;,,.1i1( 97/.t;., i.-1 I ~----- h---1r,.a ~ rul-1r I Top of Reactor West Wall ( r c__ ( ~ C ~ Top of Reactor Floor Covering ~ \\ \\ ) \\ ) Inside Bioshield North Wall J \\ I I J I I I Inside Bioshield West WaU I J ( ( I I Inside Bioshield-Metal Floor ( I '\\I 'W ~ V/ \\V \\v Sample of wood cover (from \\Y w 1'1/A- ,5,;J.,j(~ underside) Rev. 0 Page3 of4
Survey Package Worksheet ARRR-C00l (cont'd) Survey Comments 3 fMx~ ~ /Af/)OJ_ 'hf<< 1-tm /)//_f,t/ /JlUl ~ IJA--t,i~ /_c,(l),t/ 1 'Ji*-/v /!11' }f t:Jl -fh ti -~~ tJt ~ frffltM J/Jlf:,.-lf;, fl I Package Review I Surveyor(s) Signatures: ~}#~ Date Package Completed:
- ,1$ /(
Package Reviewed by and Date: '4i1/ a~, 5)~ Rev. 0 Page4 of4
Page# /d-//icl-Survey Diagram Room/Area: Reactor Enclosure Area Date: ----- 25.5 ft 28.5 ft l 22.5 ft l l ~ @) c~J git;/4t'dl ~~ ft 25.5 ft 28.5 ft l 22.5 ft I j ( l 28.5 ft l I ~ft l ~ ... loot-J:jJf. e --Piii.?WI
Ii -,-, I t ,-::.i....... ~.,~ ~.:
- l'r,it
~* ,..... l l
- 2-
.,. !' 3 i,; .. _ 5 i-!......"-:, \\ I 'I -~ 5 l: , t, I,* I ~l,4 ..J,,a '-1. "'-- J. J I A. ;;2 7ft/4d ,I' - \\ r 1 5~;J/ ';v ~
- I r,
I
- I*
..... r
~ ENERGY SOLUTIONS Survey Package Worksheet for ARRRC-002 Package Identification No.: ARRR-C002 Prepared by: Paul C. Ely Location: Reactor Building: Radioactive Material Date Prepared: 5/10/2011 Storage Room Floors, Walls and Ceiling Area Classification: Preliminary Class l Reviewed By: Area Description This characterization survey includes the surfaces inside the Radioactive Material Storage Room. All surfaces including floor, interior walls and ceiling, plus inventory/surveys of waste stored inside the room. Note: Waste will need to be removed from room before surveys. Historical Information The Radioactive Waste Storage Room (Rm. 45) did not exist in the original building plan but was created at a later time by installing walls and a locked door. There is no history of contamination in the room but it has a higher probability for contamination due to activities in the room. This room is a Class 1 survey unit based on the increased possibility of contaminated and activated materials. General Survey Instructions
- 1. Perform alpha + beta scans at a speed not to exceed 1 detector width per second on 50% of floors using a 43-37 detector and 20% of wall surfaces using a 43-68 detector. Listen to audible output using headphones, if available.
- 2. Choose a minimum of 10 measurement locations on floors, 7 locations on walls, and 3 locations on ceilings (including elevated locations). If elevated areas were identified based on scan measurements, select the location of the highest activity for direct survey measurements. Perform direct alpha and direct beta surface activity measurements independently at each of the 20 measurement locations for 1 minute each.
- 3. Note any wall locations that exceed 40 cpm/100 cm2 total alpha or 450 cpm/100 cm2 total beta activity and determine the extent of the elevated area. Note any floor locations that exceed 50 cpm/100 cm2 total alpha or 1,500 cpm/100 cm2 total beta activity and determine the extent of the elevated area. (The elevated area limits are based on estimated backgrounds of 4 cpm/100 cm2 alpha and 250 cpm/100 cm2 beta on a 43-68 and estimated backgrounds of 15 cpm/100 cm2 alpha and 1,000 cpm/100 cm2 beta on a 43-37.)
- 4. Collect a removable surface activity sample over an area of 100 cm2 in size at 100% of the locations chosen in step #2, plus at judgmental locations at the discretion of the surveyor. A minimum of 20 removable activity measurement locations are required. Note removable results that exceed 10 dpm/100 cm2 alpha or 200 dpm/100 cm2 beta.
- 5. Perform a gamma scan survey of surfaces at a speed not to exceed 0.5 meters per second, on 20% of floor and 20% of the wall areas. Perform at least 10 gamma direct survey measurements at 1 cm and at 1 m from surfaces at locations chosen in step #2. Record readings in µR/hr.
- 6. Prepare survey diagrams of walls, floor and ceiling, with approximate dimensions and any unique features.
- 7. Inventory all waste items and obtain maximum exposure rate measurements at a distance of 10-cm and I-meter from each waste item for higher exposure rate items. For low exposure rates, obtain 1-cm and l 0-cm readings.
- 8. Note the location of all waste items on a survey diagram.
- 9. Note the locations of direct alpha, direct beta, smears, and gamma fixed measurements. Also mark measurement and sample locations in the field using round adhesive backed circular stickers, markers, or equivalent.
- 10. Record the maximum and average scan results, in cpm, on each wall and floor survey diagram.
- 11. Record the scan percentages completed for alpha/beta and gamma scans on each wall and floor diagram.
Rev. 0 Page I of3
Survey Package Worksheet ARRR-C002 (cont'd) I Special Instructions I
- Source check instrumentation to Th-230 for alpha, Sr/Y-90 for alpha+
- Notify the ES Project Manager of locations that were flagged in Step #2 beta, and Cs-137 for gamma measurements.
due to elevated readings on surfaces.
- Use gas proportional detector model 43-68 ( or equivalent) for total surface
- Notify the ES Project Manager of smear samples that were flagged in Step activity surveys on walls and ceilings. Use gas proportional detector
- 4 due to elevated removable results.
model 43-37 (or equivalent) for total surface activity surveys on floors. Notify the ES Project Manager of any exposure rate measurements that
- Perform 3 one-minute field background alpha and beta counts, using an exceed 25 µR/hr or 2 X background (with waste removed).
empty source holder prior to surveys. If needed, perform 3 one-minute
- Attach photographic records if available and provide descriptive background counts on a reference surface similar to the surface to be comments for each image under Survey Comments. Ensure that the surveyed.
Package ID No. and a page number (e.g., Page Al) are included on each
- Use a model 44-10 (or equivalent) for gamma scan surveys and exposure attachment.
rate measurements. Complete Survey Cover page with required location, date and instrument The MDC for removable alpha activity shall be less than 20 dpm/100 cm2 information. Complete remainder of Survey Form as applicable. (preferable < 10 dpm/100 cm2) and for removable beta activity measurements shall be less than 150 dpm/100 cm2 (preferably < 100 dpm/100 cm2). Survey performance (Initial and date each survey task after completion) Aµtl-11\\ Gamma 1cm lm General Description p?~an Direct Beta Direct Alpha Smear Gross Scan Exposure Exposure Rate Samples Rate North Wall t:j,,-f{o--1 ~ - ~ 6-Jt,,r 1);,,,,f (6--lf ~ b,J(:rlr'\\o/' t;,,-//a.,I{ ~ ~--fb-f.~ c; 1 fu (( g__ II/Ir East Wall ( c....__ ( South Wall ) \\ \\ ) ) \\ \\ West Wall I I I I ) ) Floor ,v I I ( I I Ceiling /ir \\V "V ~ ~ V ~ I Waste Items 1NIA NIA NIA I ~tt!,-!il, /1 J,,L, --..i, <J;q.J~AV:. * ~J, , --r;:z;;:. -. Rev. 0 Page 2of3
Survey Package Worksheet ARRR-C002 (cont'd) Survey Comments it 7) t<G" 10 /-J1 Gff 'i314c;c:G/)._01A/\\I D &;:-1.,¥; 5CA/l/g WG~£" /\\!OT rA~N. '3t3t;() C?IY7 fle:rA <5m £ f}R.., M LoCkitotJ /6/ - r-/A:)()f<_ JI-JvD /IJL C <:>Af77Jr-m u.J /f Te::t> Lil--7> 51-/C>T.. J),;:c o;J7ArM 1t-f ltTJ> I JMoP / C t-a'Tlf - w r n+ 1-A PE A-A(l> 5 {;(JI FFetL 6aJO CPn? [)£:TEcT~b cAI ~w,F~ef2-- Ct.orH-.. f(E ~ 5'm.511RB,]), ,Alo 7)~ cl71-!5Lc;- 11 m v 1T1/ 1tl5oVG l,1n?1-r5. Package Review Surveyor(s) Signatures: b--$~ Date Package Completed: £-./6-!( Package Reviewed by and Date: J(}M)/4~ 47/11 Rev. 0
Page #, 1 */(!fN/,_ Survey Diagram Room/Area: Radioactive Waste Storage i 'SCANS Date: 5-J /,- f ( (+flii> ~
- 5CAfJS 8.6 ft l
1-/0C/l/5!5 12.0 ft l 7 (5) ~ ( - 7 / l '-- ___.--'- t;{A~,- Wall 8.6 ft I 'j/;JJ/ 590~/fa 12.0 j ~q_ ~ Zi ~-C Wall +---- 8.6 ft l
- ~
8.2ft @) l <n ~N-Floor --- 8.6ft I 0:) 8.2 ft l 1 I 1 l I ( '1 l I \\..., Ceiling l 12.0 ft l I 12.0 ft l 8.2 ft ~ ~ 0 (~75~ 'Gvl rl- // 'Q~ L ~ 0_ : Wall 8.2 ft Z,.W / ?,~d/.14-'v-J T\\ t, L I .§Pl.Xf <Ja> ~ I ( l t ) I ~ clotvi+ Wall Au 7ZEIFDw65 1~12-/AR.. lA.NL~5S N~D Au.~ l<0FD1N6-S lukl<.e SAcJtlJ~a~ /I l-1}-(0{l 6M ;;xJ /Y)G- ('.?ott ~ tv~R.~ ll1772_rp_~f:E ~~" <!Ao5$-()VBl<. [~-,w~ "f!En;ttA.JTEt> W 177-1 A-p~ '5111 ra/:) - S"(}/)1(£ tf t3Y~
I i__.--:-
- 1.
... J t '* I~ I
- 'lo I
.,..J..- ,_ l I*-*- L ~ I I
- I I I T
I w.. I - - I I I I' J I 1.,.
- r.
i - l
- I.r AJ -.
I - '-_
- r T
.r I* f I ' J.. I I ,., I -- 3
- ..r I
- I -
. 1 J
~ ENERGY SOLUTIONS Survey Package Worksheet for ARRRC-003 Package Identification No.: ARRR-C003 Prepared by: Paul C. Ely Location: Maintenance Office, Demineralizer Bldg & Date Prepared: 5/17/2011 Heat Exchanger Bldg: Floors, Walls and Ceiling. Area Classification: Preliminary Class 1 Reviewed By: Area Description This characterization survey includes the areas inside the Demineralizer Building, the Maintenance Office and the Heat Exchanger Building. Due to high gamma background, only alpha scans, direct alpha surveys,and gamma surveys will be performed. Surveys of all interior surfaces including floors, interior walls and ceilings, plus smears on surfaces. Also do gamma surveys on Demineralizer Column (bottom) and spent resin cartridge (1 feet and 3 feet), Historical Information The Demineralizer Building (24) and the Heat Exchanger Building (26) were part of the original site construction. The Maintenance Office (25) was a small building that was added later and it currently holds a large backup demineralizer system. There are high radiation levels associated with spent resin inside the Demineralizer Building. There is no history of contamination in the buildings but these buildings have a higher probability for contamination due to maintenance activities and spent resin handling activities in the buildings. These buildings are Class I areas based on the increased possibility of contaminated surfaces and materials. General Survey Instructions
- 1. Perform alpha only scans at a speed not to exceed 1 detector width per second on 20% of accessible floors and 20 % of accessible wall surfaces using a 43-68 detector in Maintenance Office & Heat Exchanger Bldg only.
- 2. Choose a minimum of 6 measurement locations on floors, 4 locations on walls, and 2 locations on ceilings (including elevated locations) in Maintenance Office & Heat Exchanger Bldg only. Distribute locations proportionately based on relative sizes of areas. If elevated areas were identified based on scan measurements, select the location of the highest activity for direct survey measurements. Perform direct alpha surface activity measurements independently at each of the 12 measurement locations for 1 minute each.
- 3. Note any wall locations that exceed 40 cpm/100 cm2 total alpha activity and determine the extent of the elevated area. Note any floor locations that exceed 50 cpm/100 cm2 total alpha activity and determine the extent of the elevated area.
- 4. Collect a removable surface activity sample over an area of 100 cm2 in size at the locations chosen in step #2 for the Maintenance Office & Heat Exchanger Bldg, plus 3 locations on floor and 2 on walls in Demineralizer Bldg.
A total of 17 removable activity measurement locations are required.
- 5. Perform a gamma scan survey of surfaces and penetrations (if applicable) at a speed not to exceed 0.5 meters per second, on 20% of floor and 20% of the wall areas. Perform 12 gamma direct survey measurements at 1 cm from the surface at locations chosen in Maintenance Office & Heat Exchanger Bldg, plus at the 5 locations in the Demineralizer Bldg. Record readings in µR/hr.
- 6. Prepare survey diagrams of walls, floor and ceiling for each area or room, with approximate dimensions.
- 7. Note the locations of direct alpha, smears, and gamma fixed measurements. Mark measurement and sample locations in the field using round adhesive backed circular stickers, markers, etc.
- 8. Record the maximum and average scan results, in cpm, on survey diagram.
- 9. Record the scan percentages completed for alpha and gamma scans on diagram.
Rev. 0 Page I of 3
Survey Package Worksheet ARRR-C003 (cont'd) I Special Instructions I
- Source check instrumentation to Th-230 for alpha, Sr/Y-90 for alpha+
- Notify the ES Project Manager of locations that were flagged due to beta, and Cs-137 for gamma measurements.
elevated readings on surfaces.
- Use gas proportional detector model 43-68 (or equivalent) for total surface
- Notify the ES Project Manager of smear samples that were flagged due to activity surveys on walls and ceilings.
elevated removable results. Perform 3 one-minute field background alpha and beta counts, using an Notify the ES Project Manager of any exposure rate measurements that empty source holder prior to surveys. If needed, perform 3 one-minute exceed 25 µR/hr or 2 X background. background counts on a reference surface similar to the surface to be Attach photographic records if available and provide descriptive surveyed. comments for each image under Survey Comments. Ensure that the Use a model 44-10 (or equivalent) for gamma scan surveys and exposure Package ID No. and a page number (e.g., Page Al) are included on each rate measurements. attachment.
- The MDC for removable alpha activity shall be less than 20 dpm/100 cm2 Complete Survey Cover page with required location, date and instrument (preferable< 10 dpm/100 cm2) and for removable beta activity information. Complete remainder of Survey Form as applicable.
measurements shall be less than 150 dpm/100 cm2 (preferably< 100 dom/100 cm2)
- Survey performance (Initial and date each survey task after completion)
~It Gamma 1cm lm General Description 71:. SWlj Direct Beta Direct Alpha Smear Gross Scan Exposure Exposure Rate Samples Rate Floors 6-i'1,fl ~ tiJ/4 t:;,11;11 ~ v&:-fl-//~ 6~{'1-1/ Q_ 6-t'l-!/Dv-tJ I A AJ/.tf Walls ~ ~ ) \\ )/ ) J Ceilings fl/11 ~ J,
- I/A-
{/ w J I V I Jj1J..t,d}y. ii& I.~. J~'" 71 hi<j~~M ita; ~..L- ~ P'714./- -~~ / ! 1 A In,,.i,...,!;~ ~, Rev.0 Page 2 of3
Survey Package Worksheet ARRR-C003 (cont'd) Survey Comments Package Review Date Package Completed: 5.-11-1 Package Reviewed by and Date: Rev. 0 Page 3 of3
Page # / oF3 /H:&Id,,_ Survey Diagram Room/Area: Maintenance Office Date: 5 l \\ 12.4 ft 9.3 ft l b,,f-1 my_l,tt ~ l Oo~ ~ 7.0 ft 7.0 ft ~ 12-. l 1 l VlV[1 Wall Wall 12.4 ft 9.3 ft I 2.8 lo/:;~ i )/ /i. 7.0 ft l~ 7.0 ft j @) '1.5m~ l ~ -{~ /tJb'>L Wall --- 12.4ft - ---- Floor 12.4 ft ------- I 9.3 ft l Ceiling l ,-J 1
,agram Page # :Z.. CF 3 ~ Survey n* Room/Area: De. mmerabzer Bldg Date: 5-1 7--/ / l 7.0 ft l I 7.0 ft l 7.5 ft Nft~~ f1\\H ~ Wall 7.5 ft W$Twall l 3.6 ft l I 3.6 ft l 7.5 ft Floor 7.5 ft Ceiling 3.6 ft l 7.0 ft ' l Wall 3.6 ft I 7.0 ft l
Page # ~ 61'.= 3,jf#4f:i Survey Diagram Room/Area: Heat Exchange Bldg 11.3 ft l 7 7.0 ft l I t=f6t Wall 11.3ft I '1/2o/,;10 7.0 ft j ft-.J8zf Wall ( i 11.3ft l
- 4. 1 ft l
I 4.1 ft l ~ N-Floor 11.3 ft Ceiling Date: ----- 4.1 ft I 7.0 ft l A(0/2:rl.f-Wall 4.1 ft I 7.0 ft l / 7
J
- II:
1-rlT-.. - ~ i
- . ?
t ,ii...L. '*t T - I *.,. <f I -,r . I it l I ~ I -fAe12-A0-0 3 l> j (:tEC..7':::> -~
- I e>t- -~erri)
.. "_i I.,--
- r.. ~-*
~~ [* ..J i-""i X) J.._ - -11; .,.; I l I
- ~.
r~ "52- _L:-1
- -. r' I
r-,_ L -~.. - ~ _11 :w,-. I I I & )," ...:. -:---:;:-7 ~ L ~ J L
- T -f.
-I' I I 11.---r I I~ _f I L'.,,,,
- I --,,-
I *. -. r* r:.,.T ~ I
- I =-"
l * \\.-:* I r I I .J ..:-t I-1 7i:'. _I r-r' - ~ i {cm, At,f!-._ -,- f f-~
- r-.. -
a/lltdnJt!
- *; r,*
?..... ~ I u:* l
- I
- I I
I I, ~ I 1
- I f" _I =-- _1_1
- r ~
- -W- -,-
~~-* ~l*l't - - I -f1 (" 7"'\\, 1 *- ~ I L._ l(" J"f ~ I 1 7I ** ~ *? I r/.:._, I 173 30S orz 53(')() 6tf5 Zooo ~C/00 zsco I I' r
- ~I*
-,-t .. _.- I I I I J t,..4 ~ J .Li" ~ -.... C. ---r---. I..l_! -_J. I,/.-.;..,- 1.!.l,. r - ...... J I' , 1 l "I
- .ifj I I
I, - 'I t .,_ J J d II --._ ll
- l:
LI ' . f. ~,* ~ IL Ill
- i.
_I 11 .IT 11 11
- I d
- ~
..._ s. *--. ........, \\, -- L I_ J'" ~ J_. -"--t I ~ 1 I I -, I I 1 J,.. .. [ ,::. I ., *.,-r--* -; 1 I r- ~ "I' I *_ J * *. L~ -, I. - I
- I *
. ~ ENERGY SOLUTIONS Survey Package Worksheet for ARRRC-004 Package Identification No.: ARRR-C004 Prepared by: Paul C. Ely Location: Waste Storage Tanlc Area: Sump Walls and Date Prepared: 5/10/2011 Cover, pad and soil in the area Area Classification: Preliminary Class 1 Reviewed By: Area Description This characterization survey includes the areas inside the waste sump pit that are dry, the Waste Storage Tanlc pads and the ground (soil) surface inside the shielded area beside the Waste Storage Tanks. [The Waste Storage Tanks are covered by another survey package.) Note: The sump pit may be a confined space. Do not place bead or other body parts in the sump pit. Use extensions to lower instrument for readings and to obtain smears. Historical Information The waste sump is used to collect potentially contaminated waste water from operations at ARRR. The waste water is collected in the sump and is pumped into the waste storage tanks for sampling and disposal. There bas been detectible activity in the waste water, but it was below approved release limits for the site. This is a Class 1 survey unit because activity has been detected in the waste water. General Survey Instructions I. Perform alpha + beta scans at a speed not to exceed 1 detector width per second on 50% of pads using a 43-37 detector and 50% of sump wall dry surfaces, if accessible, using a 43-68 detector. See Note above. Use extensions as necessary to reach into sump pit.
- 2. Choose a minimum of 7 measurement locations on pads and soil, and 3 locations on sump interior walls, if accessible. If elevated areas were identified based on scan measurements, select the location of the highest activity for direct survey measurements. Perform direct alpha and direct beta surface activity measurements independently at each of the 10 measurement locations for 1 minute each.
- 3. Note any wall locations that exceed 40 cpm/100 cm2 total alpha or 450 cpm/100 cm2 total beta activity and determine the extent of the elevated area. Note any pad or soil locations that exceed 50 cpm/100 cm2 total alpha or 1,500 cpm/ 100 cm2 total beta activity and determine the extent of the elevated area. (The elevated area limits are based on estimated backgrounds of 4 cpm/100 cm2 alpha and 250 cpm/100 cm2 beta on a 43-68 and estimated backgrounds of 15 cpm/100 cm2 alpha and 1,000 cpm/100 cm2 beta on a 43-37.)
- 4. Collect a removable surface activity sample over an area of 100 cm2 in size at 100% of the locations chosen in step #2 (except soil locations), plus at judgmental locations at the discretion of the surveyor. A minimum of 10 removable activity measurement locations are required. Note removable results that exceed 10 dpm/100 cm2 alpha or 200 dpm/100 cm2 beta.
- 5. Perform a gamma scan survey of surfaces at a speed not to exceed 0.5 meters per second, on 50% of pad and 50 % of the sump wall dry areas that are accessible. Perform at least 10 gamma direct survey measurements at 1 cm and at 1 m from the surface or equipment at locations chosen in step #2. Record readings in µ.R/hr.
- 6. Prepare survey diagrams of walls and pads for each area, with approximate dimensions and any unique features.
- 7. Note the locations of direct alpha, direct beta, smears, and gamma fixed measurements. Also mark measurement and sample locations in the field using round adhesive backed circular stickers, markers, or equivalent.
- 8. Record the maximum and average scan results, in cpm, on each wall and pad survey diagram.
- 9. Record the scan percentages completed for alpha/beta and gamma scans on each wall and pad diairram.
Rev. 0 Page I ofj),,CI
I Rev.0 Survey Package Worksheet ARRR-C004 (cont'd) Special Instructions Source check instrumentation to Th-230 for alpha, Sr/Y-90 for alpha + Notify the ES Project Manager of locations that were flagged due to beta, and Cs-137 for gamma measurements. elevated readings on surfaces. Use gas proportional detector model 43-68 (or equivalent) for total surface
- Notify the ES Project Manager of smear samples that were flagged due to activity surveys on walls and ceilings. Use gas proportional detector elevated removable results.
model 43-37 (or equivalent) for total surface activity surveys on floors.
- Notify the ES Project Manager of any exposure rate measurements that Perform 3 one-minute field background alpha and beta counts, using an exceed 25 µR/hr or 2 X background.
empty source holder prior to surveys. If needed, perform 3 one-minute Attach photographic records if available and provide descriptive background counts on a reference surface similar to the surface to be comments for each image under Survey Comments. Ensure that the surveyed. Package ID No. and a page number (e.g., Page Al) are included on each Use a model 44-10 (or equivalent) for gamma scan surveys and exposure attachment. rate measurements.
- Complete Survey Cover page with required location, date and instrument The MDC for removable alpha activity shall be less than 20 dpm/100 cm2 information. Complete remainder of Survey Fonn as applicable.
(preferable < 10 dpm/100 cm2) and for removable beta activity measurements shall be less than 150 dpm/100 cm2 (preferably< 100 dpm/100 cm2). Survey performance General Description Beta Scan Sump Walls Waste Tank Pad (Initial and date each survey task after completion) Direct Beta I Direct Alpha I Smear Gross Gamma Scan 1cm Exposure Rate lm Exposure Rate 5/ IYll/,,4;c Samples Page 2 of)# ~c I
Survey Package Worksheet ARRR-C004 (cont'd) Survey Comments Package Review Date Package Completed: ,S-- / 3-/ / Package Reviewed by and Date: ~ e ~ ..Jiillf/;/ Rev. 0
Survey Diagram Room/Ar. S ea. ump and Pad s ~ '1 Cfm rJ.}l!j:.'~ 1¥/ ,t Large Waste T_ank-Top I view Small tank-Top View Page # q ~?/:
- ?-
ENERGYSOLUTIONS Survey Package Worksheet for ARRRC-005 Package Identification No.: ARRR-C00S Prepared by: Paul C. Ely Location: Bldgl Addition: Counting Roomjand Reactor Bldg: Conf Rm, Control Rm, Employee Locker Rm, GM Date Prepared: 5/10/2011 Office, Machine Shop, Office Supply Rm & South End Radiography Area Classification: Prelimina1y Class 2 Reviewed By: Area Description This characterization survey includes the Counting Room inside the Building 1 Addition, and the Conference/Lunch Room, the Control Room, the Employee Locker Room, the General Managers Office, the Machine Shop, the Office Supply Room and the South End Radiography Area inside the Reactor Building. All surfaces including floor, interior walls and ceilings, and equipment inside the room. Historical Information The Counting Room (9) is used to handle potentially radioactive samples, the Conference/Lunch Room was originally the Chemical Lab, the Control Room is in its original location, the Employee Locker Room was not shown on the original construction drawings but was added soon after construction, the General Managers Office was used as a film processing area before it was moved to its current location. The Machine Shop and the Office Supply Room were created after the Hot Cell was removed and the Machine Shop may at one time have been used to machine activated or contaminated items. The South End Radiography Area was not shown on the original construction drawings but was added after the N-Ray work started. There is no history of contamination in these areas but these areas have a possibility for contamination due to work activities in the area and are therefore Class 2 survey units. Rev. 0 Page I of5
General Survey Instructions
- 1. Perform alpha + beta scans at a speed not to exceed 1 detector width per second on 50% of floors using a 43-37 detector and 20% of wall surfaces using a 43-68 detector. Listen to audible output using headphones, if available.
- 2. Note any wall locations that exceed 40 cpm/100 cm2 total alpha or 450 cpm/100 cm2 total beta activity and detennine the extent of the elevated area. Note any floor locations that exceed 50 cpm/100 cm2 total alpha or 1,500 cpm/l 00 cm2 total beta activity and determine the extent of the elevated area. (The elevated area limits are based on estimated backgrounds of 4 cpm/100 cm2 alpha and 250 cpm/100 cm2 beta on a 43-68 and estimated backgrounds of 15 cpm/100 cm2 alpha and 1,000 cpm/100 cm2 beta on a 43-37.)
- 3. Choose a minimum of 20 measurement locations on floors, 5 locations on walls, and 5 locations on ceilings (including elevated locations). Distribute locations proportionately based on relative sizes of rooms or areas. If elevated areas were identified based on scan measurements, select the location of the highest activity for direct survey measurements. Perform direct alpha and direct beta surface activity measurements independently at each of the 30 measurement locations for 1 minute each.
- 4. Collect a removable surface activity sample over an area of 100 cm2 in size at 100% of the locations chosen in step #3, plus at judgmental locations at the discretion of the surveyor. A minimum of 30 removable activity measurement locations are required. Note removable results that exceed 10 dpm/100 cm2 alpha or 200 dpm/100 cm2 beta.
- 5. Perform a gamma scan survey of surfaces and penetrations (if applicable) at a speed not to exceed 0.5 meters per second, on 20% of floor and 20% of the wall areas. Perform at least 10 gamma direct survey measurements at I cm and at I m from the surface or source at locations chosen in step #3. Record readings in µ,R/hr.
- 6. Prepare survey diagrams of walls, floor and ceiling for each area or room, with approximate dimensions.
- 7. Note the locations of direct alpha, direct beta, smears, and gamma fixed measurements and all samples. Also mark measurement and sample locations in the field using round adhesive backed circular stickers, markers, etc.
- 8. Record the maximum and average scan results, in cpm, on each wall and floor survey diagram.
- 9. Record the scan percentages completed for alpha/beta and gamma scans on each wall and floor diagram.
Rcv. O Page 2 of 5
Survey Package Worksheet ARRR-C00S (cont'd) I Special Instructions I Source check instrumentation to Th-230 for alpha, SrN-90 for alpha + Notify the ES Project Manager of locations that were flagged in Step #2 beta, and Cs-137 for gamma measurements. due to elevated readings on surfaces.
- Use gas proportional detector model 43-68 ( or equivalent) for total surface
- Notify the ES Project Manager of smear samples that were flagged in Step activity surveys on walls and ceilings. Use gas proportional detector
- 4 due to elevated removable results.
model 43-37 (or equivalent) for total surface activity surveys on floors. Notify the ES Project Manager of any exposure rate measurements that Perform 3 one-minute field background alpha and beta counts, using an exceed 25 µR/hr or 2 X background. empty source holder prior to surveys. If needed, perform 3 one-minute Attach photographic records if available and provide descriptive background counts on a reference surface similar to the surface to be comments for each image under Survey Comments. Ensure that the surveyed. Package ID No. and a page number (e.g., Page Al) are included on each
- Use a model 44-10 (or equivalent) for gamma scan surveys and exposure attachment.
rate measurements.
- Complete Survey Cover page with required location, date and instrument
- The MDC for removable alpha activity shall be less than 20 dpm/100 cm2 information. Complete remainder of Survey Form as applicable.
(preferable < 10 dpm/100 cm2) and for removable beta activity measurements shall be less than 150 dpm/100 cm2 (preferably < 100 dpm/100 cm2). Survey performance (Initial and date each survey task after completion) Gamma 1cm Im General Description BetaS~ Direct Beta Direct Alpha Smear Gross Scan Exposure Exposure Rate Samples Al-PuA S4 ',../ Rate Counting Room Walls 1¥c S-/1-IJ ~\\>ft-/{ JLc s-:,11-1, y/:Z.-1/ iy-4-1~~11 w ~,U,.,11 0v 5--ft.,1, ~.MA ~ ~ Counting Room Floor 5-tf,/I ~ ?~---A (J_. ~--r;-111n--- £,12.-11 g,,_. ij-/(p-// \\d'),- Counting Room Equipment S-13..tl'J:y *, 15:,13~11~ /Ill A-NIA-t-1/1-1 ) I Conference/Lunch Room Walls .t;-1;~ ii Dr' ,f,,12--11.Dr- -':i---f~,f(vz, ~ .... 1,-t( Q,,.,.,. ~-f(p-1( ~ Conference/Lunch Room Floor 5-11-111)y-I ~~ £..ft,-1I~ Jfj.--//rll 9'-- ~ ~ I Conference/Lunch Room Equipment ti/A-JJ/ ~1
- J/~
1!/.J /\\I/A-Al I,4-N/A Control Room Walls 5,/},l('Dy-- ~
- rL.N,,
i"'T "(-r"qJ / ~,~,tt:>v G1z,../l1).,- 5,1/r;,,, ~ ':),/fe.-if1n~ ?--/~-,/( ~ Control Room Floor 5--11-11 ~ 6-l~Vy--' 6--r;--f/~ 51Z--lf~ 5..-f~-tl Q..- ~ ~ \\ V I Rev. 0 Page 3 ofS
.._.,u.a.....,.J A ""'n."6,"",.,. VI. n..:,1.n... ~1. r1.l.'-..l.'-A'--'--VV.J \\\\..UJ.ll U J Survey performance (Initial and date each survey task after completion) Gamma I cm lm General Description Beta Scan/ Direct Beta Direct Alpha Smear Gross Scan Exposure Exposure Rate Samples Ai.PIM 9-A,J Rate Control Room Equipment /11 I I.II IV I r1 ,§,,-/'$-j/ A-, '5-12-1I P>-- V Employee Locker Room Walls ~6--/(Ji_ §-It, -1r vv- -1{;,,1( W 546-1(1);___.- t:;1'7-!/f),_ \\. Employee Locker Room Floor 5-tl-11 ~ \\
- 5--lt-ll ~
L.. r \\ Employee Locker Room Equipment
- /4
\\ .NIA- \\ "\\ I \\ 1 I \\ \\ \\ l I General Managers Office Walls ?-i3-I/ f}4Z-II ~ General Managers Office Floor 5,ff-11 'Pv-. \\ 5-12,110-- ) I ~VM'A-I .II/A-I I General Managers Office Equipment I I I I I Machine Shop Walls 5,..1'5-J(~ I j 5:1z-11Pz.,, I I \\ I I I Machine Shop Floor '5-//-{/ ~ 5,;z1! R>-- I Machine Shop Equipment c;,11>-11 'j.}_ \\ I \\ Office Supply Room Walls/wu1vt. '5-t3 -II P-I ti,1z111)y-- \\ \\ \\ Office Supply Room Floor 6-11-11 ~ I 5-ll-ll 'P,- I \\ Office Supply Room Equipment tl/,4 I
- .//1+
I \\ I I I I South End Radiography Walls/t.Guw
- 5,/g,J('Vvc-
) \\ '5-tJ.... /I~ I I I South End Radiography Floor '5-1/-!I W- ~ / ~ ~,121112:- \\kr ~ ,i 0 South End Radiography Equipment fl!A- ~- tv/A-Rev. 0 Page4 of5
Survey Package Worksheet ARRR-C00S (cont'd) Survey Comments ,1. /IJ1 IJ $-T ;A-L--L-It !<15fl.'5-OF 77-/-15 $a1<_0a{ WE~ $-t18J'ect -~r6 f!1G+f ~R.ourlb t)uE TC> (!ElMS IN vY}ez..vt-N 1/\\IG /1-AJt> /CJR. l,t)/t?-re: $ 70R.l+6.. C/?{(:I;: Wl/-5 T1/-KEN -ro~ i1'-5~' ; 8 ~ / AS ~e-rA5 rl$~1tl Cot/771-rM,Al ATJ oA[ tutf-s Al~T 111 I :5$ e ])f I e~A R:Elt-oiN6S W Si<£ R~K:£11 lvl r'lf p tlJ-S7? C..J :;J) G ? l-A c_ E: D _& T 1=::N Pf2of3&AJJ'J:> 5,u ~ Cb. f;;;,(_ K~')1tJr;-s Wttf PA-P~R.. 73-ctWf=E"N }1<()Bt;;_: //-/VO :Su I<__ FM-~ - No d. i ff-u{ en c G, Package Review II Surveyor(s) Signatures: P fott4-Date Package Completed: 6--1&-!t Package Reviewed by and Date: Rev. 0
&oJ'TvntA.. 1/J Survey Diagram Room/Area: Counting & Computer Rm 10.8ft i I 13.7 ft 13.7 ft l l 10.8 ft i 13.7 ft j AvgCpm!- 28 MR..., Mr:~?}J '~ ~'~IL 1 13.7 ft l 10.8 ft Avg-epll! 21,.1111, J Max..cpm: ~ ~1,Z-_,µ<.: i,,_ "'3-z_ ~ ~.j(..,l \\ 7.3 ft l Floor 10.8 ft Avgcpm: i Maxcpm: }J (-!t 7.3 ft l Ceiling Date: --- 7.3ft W'l2Q Wall 7.3 ft Avg~ l./-1-. Max_g)lR: ~ ~T Wall
Survey Diagram Room/Area: Lunch Room/ CON F_ Date: 5.,,../0,,/ ( 20.3 ft t Avg s;pfW, "8i!-5./4_ d IJ,, I~ I Maxc.pm,: rJKJ ,y-1 TIJ 9.5 ft l
- G46r:: Wall 20.3 ft t
Avg cpm: t'-'?3 ()/ 1 Max Gf>8r. 2o (.,Uf )11_ 9.5 ft j wr$°CWall <O .2D\\ - -- 20.3ft Avg-Gfl11): (q0 t Max ~ '2-t../a I 12.8 ft l Avgcpm: Maxcpm: I 12.8 ft l ,<:--* ~- Floor 20.3ft Ceiling 12.8 ft I 9.5 ft l NO~~ Wall 12.8 ft l 9.5 ft l '$,lr11-I W a II Z~4-Jl 1ro / z~ /2_ /j!.
Survey Diagram Room/Area: Control Room Date: 26.0 ft 12.8 ft r Avg '-f)ffl: 4,0 .A,{ ~µ I Avg cpm: f 'i;O µ-,jft_ ~ ,_ 4:,- /b - /( Max~ 39-0 VL Max~ ~75'
- !:l!/-"VJ,
- ~IL
?::,15 9.5 ft 9.5 ft l ~ l 1o o I to 2--M ~ ~,Wall f.JOll.J;ti Wall 26.0 ft 12.8 ft I Avg~ % 0 r Avgepnr. ZD Max -GpfJr.- I z_.? \\'l,~ Max~ "3-Z ?31,;&112-/ J1, 9.5 ft 9.5 ft j l W~Wall ~ Wall 26.0 ft Avg~ 5C r ~ Ma~ \\~ eo3/qt) 12.8 ft l e 1~1_µ1<-,/)A, ~1-J-Floor 26.0 ft Avgcpm: I Max cpm: 12.8 ft l (D ?f-5 6'.3 )AR. Ceiling
Survey Diagram Room/Area: Employee Lockers 9.5ft 8.7 ft r Avg~ S6 11'i Max.cpm;. 0 ( )I., I Avg~ /15 /4t,~ Max r,pm;- ZZ(J '1. 9.5 ft 9.5 ft l l ~ Wall ,a~1Wall 9.5 ft 8.7 ft I Avgff!i¥. % /'-- l Avg~ ~ M;t/11 Max~ l-Z..'r /4/t Max.cpm: 'f?) ~ 9.5 ft \\1.~t_ 9.5 ft j l 9~ Wall ~,- Wall 9.5 ft Avg- '24/J.1.j,r Max~.32. c& 8.7ft -J.-i/ 5o.lt 3/-/tt, l 1 Floor t 9.5 ft Avgcpm: I Maxcpm: AJ/4 8.7 ft l Ceiling
Survey Diagram Room/Area: General Mgr Office Date: ----- 13.2 ft 10.3 ft l Avg~ 54', 11' l Avg~ '-f:S ~ Max-'lpIU:- q I )A l Max ~pm;... /07 * ~ ~ 9.5 ft 1' ~,J~ 9.5 ft l 1 ~'[ Wall Wall 13.2 ft 10.3 ft I Avg~ Z..S ~ l Avgcpm;. 35 ~ Max~ ~7 A 1 0 Maxcpm.:.. 't?'? /4t,_ 'Jr. '+J<<IZ/Ai t 9.5 ft 9.5 ft ~~/4 j l ~ Wall >aLL-f'H, Wall 13.2 ft Avgcpm: l Maxcpm: 10.3 ft ~ /-y:51ut/1, l ~/J-Floor 13.2 ft Avgcpm: I Maxcpm: N /Ir 10.3 ft l Ceiling
Room/Area: Machine Shop 12.7 ft r Avg et'ffl: ~ µ Max~ G,.){ /- 9.5 ft l No~Wall 12.7 ft r Avg si,m: l ~ M
- Max~ "2..'Z-9.5 ft j
tq* /2 ~ttr:rt Wall Avg-2.l) fj/ r Max spm;. 3 1M ~n 11.7 ft l Avg cpm: r Max cpm: 11.7 ft l Survey Diagram r 9.5 ft l I 9.5 ft l 12.7 ft Floor 12.7 ft Al /-Ir Ceiling Date: 11.7ft Avg~ '3o 1J J/ Max~ 'f<t./i,t,,*~l eAJ:r:: Wall 11.7 ft Avg @tfflT. {>] ,/, JJ J ~ Max,epw.: '22-, flt-~ ~ Wall
Survey Diagram Room/Area: Office Supply Room l 8.0 ft l i 8.0 ft j 13.8 ft Avg~ Uo l!!/J. Max~ "535 /4 "fM-fJ {lty\\t: Wall I 3.8 ft Avg~ lf(J./nl Max cpm: 7~~.n,. 11.4 ft l 13.8 ft Floor 13.8 ft Avgcpm: Max cpm: i 11.4ft l Ceiling Date: 11.4 ft I 8.0 ft l 11.4ft I Avg <;,pm: 5'0 /4t f!! J ~.n / Max~ 76 f""1-- c_.l"Yo/'--41 8.0 ft 1 WeS,- Wall /
Survey Diagram Room/ Area: South End Radiography 17.4 ft r Avg~ Cj'O
- 14.
Maxspm: 115 }vit r 7.0 ft 7.0 ft l ,tf3 6 l ~ Wall 17.4 ft I Avg~ Ito ~ I Ma~ l'Gi o M i, . /b)v-R/~ 7.0 ft 7.0 ft j l W1;$'.CWall 17.4ft I I 0.3 ft ~ µ1/t l .I::-- r,t-Floor 17.4 ft I 10.3 ft JJ (tr l Ceiling Avg cpm: -:).(oo L.,, 11. Max Gpmt-3q O 111/f'~ N Ofl~ Wall 10.3 ft ?41,1.~ Wall Avg~ Max~: Avgcpm: Max cpm: I
Survey Diagram Room/Area: Counting & Computer Rm o<;)., /3 10.8 ft r Avg cpm: Maxcpm: /J,4 ~ 7,S-i )r<c_ 1> r0e ~ t ~.r 10.8 ft }~e""IJ Avg cpm: 3Sb 3 Max cpm: 'I- /1,f:,3 7$' ~ I µ~! ~fhWall tf/ f.. Zk Avg cpm: :/4'C j Maxcpm:~ I '-!/ IA?>/<... 7.3 ft l -- Avgcpm: j Max cpm: }J f( I 7.3 ft l CAV£ {,I
- 6. (
Floor l 0.8 ft Ceiling I ...... J.~*fMl ~c_ 7.11 I /15=B.'Ht l .;,,"e.. Page#~~ Date: S-/(-1 / 7.3 ft Avgcpm: Max cpm: tt1A C.Ve£ 7.3 ft Avg cpm: 35b i Max cpm: 'f;)ojll, c (gJ f c::t.f ~ Wall \\J ~, e~---t S @ ?> 3 L/-0 Cfw-d-. };;" II @~ -~~--16---11
~-I-Survey Diagram Room/Area:(LunchRoom er//? Date: 5--//-// /2-4112/0&f>?t7 I 9.5 ft l I 9.5 ft j Avgcpm: Maxcpm: Avgcpm: Maxcpm: 20.3 ft 12.8 ft Avgcpm: f/Z~ Max cpm: 1/ / bk:._ 8A$-t Wall -- 20.3 ft ------+ l,vESIWall --- 20.3ft r~~ /al \\./ --\\. 12.8 ft,i~! I l ~) ~-' Floor 20.3 ft I 12.8 ft l 0 Ceiling I 9.5 ft l I 9.5 ft l ~ --, : 12.8 ft Avg cpm: / / b"?l'0/1 1 A Max cpm: 2/ f1/k.. \\./ V V: ~( \\, \\ \\ S::rt&r~ Wall r;,l-. :=:: 7 CPM A,of?-.- rv ~ 1----'- ~ 'fr /s, 5 k c p f'I\\ t {-f l6H Bf1/2 OrA'G rtJ j1lf((/;'/<JA-L-iN ~-z,AIJtN[:
- GSfJCt/Jt(. rt SJ; CbRN~!2!
m--A~-16 NOT'5't4'f/'JF)! --JJ~
Survey Diagram Page#~ //ftlheA_ Room/Area: Control Room l 9.5 ft l I 9.5 ft j Avgcpm: Maxcpm: Avg cpm: Max cpm: 26.0 ft Avg cpm:I 10 Max cpm: 2--/:i.. IO ~"\\....-. ~s-r wan 26.0 ft ) \\ ( Avg cpm: t /. ~~D,.,___~, ---..- '-,, Max cpm: '£./ ~00 1i:216rWall +---- 26.0 ft ~ ~tl. 6)~- 12.8 ft l I 12.8 ft l 11 - Floor C:CCrL +---- 26.0 ft Ceiling I 9.5 ft l I 9.5 ft l Date: 73-//~ If 12.8 ft \\~ Wall 12.8 ft ~ ( ~ ~ =s: { c)lttjf-Wall ~ 7 cPn1
- ).. / tf. lo {L. (Pm
-N--'7 /'1 c,£: f/ t G f{ B f!L:. Du P '70 r ~/Y) S'7olc£J> 1tJ mc-z-z.A-NtNe.
Page#~ /:2.trlhtr/ Survey Diagram ( 1.,,6172/ If&? I 7 Room/Area: Employee Lockers 9.5ft l 9.5 ft l \\ 9.5 ft I 9.5 ft j 9.5 ft Avg cpm: l Max cpm: 8.7ft ( ~ --~ Floor 9.5 ft Avg cpm: I Max cpm: !J/lt 8.7 ft l Ceiling l 8.7 ft Avg cpm: / I OCQ Max cpm:i/ J./Zc() 95[ ) .___.r-----:-.---=::-=-c-:--~ ey,GT Wall 8.7 ft I 9.5 ft ) l Wi?;5T Wall ,-:)(_ I_ "7 CP W\\ 0 _<f /. <a/ z. 0 ¥-- ---~ c_p,~ l +-1-101--/ 'IYA C~a/2.ct<,J 'D "Twc; -rei PRax, m,T~ r('d,J-&AU?e° ~ = A~f-AS: N<ff '5{ftA11JW
Survey Diagram Page # ~ {3/rl/-tJ..d, , u 11z/ oSgt?, 7 Room/Area: General Mgr Office o{ f f. Date: _5_ ---l_l-_l _I_ l 9.5 ft l i 9.5 ft j Avgcpm: Max cpm: 13.2 ft -----. Avg cpm: f iiOC) / 't, ~ Max cpm: ' / f9'fo0 V 1 I 9.5 ft l 13.2 ft -----~ I 9.5 ft l 10.3ft r--- Avgcpm:/ ~ Max cpm: i/ LfScO 10.3 ft Avg cpm: ( }/'f '-1() Max cpm:-JL<'flk/'t} r /I~~ i - -./ '--"""" ~ -~ Sll~[H Wall 13.2ft ------.. l 10.3 ft l):o\\?__ c:~ L 7 CPn-, ~N--1 /fl 3.sjt r,1<. epl'Y\\ /JCJT,E: If IGR f kG-17/.R.ll...
- 3(
l::.,(1-:;;r W A L-<- Avgcpm: Max cpm: i 10.3 ft l Floor 13.2 ft ------. N(ft-Ceiling l-f t 6ft 'j3Ae,r::.Sf2<JUAJP ])tc E
- 7J PR..d'X.I,,,,, Ty
-rD Rill> Jl}111-7£i<JII-L S T<J M G~ f< (l:J Jr\\
Room/Area: Machine Shop I 9.5 ft l Avg cpm: i Max cpm: 12.7 ft §cWall 12.7 ft j Avg cpm: // $-7k., 1 Max cpm: Z/ l2;3K, 9.5 ft j 'GAS/Wall Avgcpm: Max cpm: I 11.7 ft l t')l1 lit,;rJG-W) tlCH I tJG Sfht;,/+{l.5 -t;'S-Lf/ Avgcpm: Max cpm: l 11.7 ft l Survey Diagram Page #,-D v. /lf fli/-ar) r 2-~r-1fo&r 17 I 9.5 ft l I 9.5 ft l Date: '=>*-/ )- 11 11.7ft --- Avg cpm: I 2."2..0b ~ e2__- @) 11.7ft Avg cpm: / !<&CO , Max cpm: i/ "3be>O tJ~ Wall Oi--.. ~ 7 C.Pf'r\\ f2'>. 4 / /2/5 f<_ tPfY\\ ~~ ~\\ i ~ f{-tGlf. ~ACf!-~(JUtJ]) \\ Vue rd ~t~IJJ111y t Y'- RAJ /11'1-Te'/).,Jl.ll-I 12.7 ft ----- c:;3m!cA~ /2(Jar>1. Ceiling ~ m ,:; Al<al-5 N6f.YNVNE]) i
Survey Diagram N' { j) Room/Area: Office Supply Room V\\. ,Y Date: 5-11-/ / I 8.0 ft l l 8.0 ft j Avgcpm: Maxcpm: Avg cpm: Max cpm: l 3.8 ft 13.8 ft I Avg cpm: / ~ t.f.61< ~ Max cem:Z _'1.K --_r:::ooR., 1 7 I l l-G7 l 13.8 ft r 8.0 ft l I 8.0 ft 11.4 ft Avg cpm: I,g._s k_ ,-Max cpm: Z,/ / 91<-.. 11.4 ft l ~ ~if-;T Wall I ~==- IC.PM I 3/ / fo k C.PJ'Y\\ l ri"~- 11.4ft rJ ~<' l~ ,J 1Ht; ~ f+/ <;..rl. /311& I,,r I 11J/2..U JJ ol?..171 WA t. l-t-J Floor 1~ t 13.8 ft l Jf/!f 11.4 ft \\ l N t Ceiling
Survey Diagram Room/Area: South End Radiography o( ff Date: 5-1 I -J \\ 17.4ft 10.3 ft I I Avg cpm: r S,t K Max cpmlfo/1<. 7.0 ft @) 7.0 ft -*1 C)l2_ l ~ <; : (-0,) l \\.o \\,~\\.~ ~ £ ~j, *; ~ / ( 7 L ~ CA5-t Wall. 0~ Wall 17.4 ft 10.3 ft l Maxc 11 t ~ I Avg cpm: { Maxcpm:
- 7.0ft 7.0 ft j
/ ') 7 l ~ I ~ { v v tu;:"'~ Wall S:>t,(ffl Wall 17.4ft l 10.3 ft l Avg cpm: 2.J> k C.ftr\\ Max cpm: /-.fao /<... cPl'Y"\\ l 10.3 ft l Floor 17.4ft N /If Ceiling Avgcpm: Maxcpm:
I I
- j......__
I
- °7,*
I /. I I?) 1 2-f g Z..0 2..'"L
- ......
- ----=
- ~=-~-=--'....:....
1 --=
- ~-
i~+-,---=---------1--1--...;.=:..._-J..;.___Z-=-lf-----'-\\-~ __ 2-,cg { q__ =-:,-.:.. -. r *. ~ . ~.. ~ _, ~ -J- ~ 5' \\ 2-i/52 ~ L lo5~ l I \\ *1 t.f 30 ..r II I . 1-Y; L lf ,.."' rr.* ** -, fD r.: - J I ~-,* * *
- l -
I i ~ ? '?::>01 ~ 6 l.f --:i \\. f I I
- C*
I L I .{ r... l
I I 1, ~ J - L L ltJad-,-~N ~ &t/4- = - I'. I C~dJ,JjA_ (rn I LI I I I 3 ~-z_ I i 2..7 l ~ t 3 V?t 0 Zoo 'I C
- I I :
iO ~ Co2-I. I (Q() - r* I
- 1)
_fg_s 1-0 ,/' -I 59 12-q I ~ r I q 3,~ 53 I t-1 <2,C) "55 J' \\ "Z-."'2- ~~ t G\\ L ff 76 61 . 1 J. ~ I I ,/' yt..1.:/. \\ 3~ 2..$0 I
- I 1
I r.. r ( -. * . ~ ~..
- r. _.
L r r I-. ,I I I I. I'. ..'r. ~ I. .. ~ I, L L ~ *,. I f , I L r I I J I I I I I 11 I ~ L ~
- '*= - --
I I L -l I l
~ ENERGYSOLUTIONS Survey Package Worksheet for ARRRC-006 Package Identification No.: ARRR-C006 Prepared by: Paul C. Ely Location: Tagging Building: Safe Date Prepar*ed: 5/l 7/2011 Area Classification: Preliminary Class 2 Reviewed By: Area Description This characterization survey includes the Safe inside the Tagging Building. All surfaces including floor, interior walls and ceiling. Historical Information The Tagging Building was added to the site in 1980/1981. There is no history of contamma 1011 m contamination due to fuel transfer activities and is therefore Class 2. General S urvey Instructions
- 1.
Prepare survey diagrams of walls, floor and ceiling for the safe, with approximate dimensions and note the locations of direct measurements and scans (as applicable, alpha, beta & gamma) and smears. Mark measurement and sample locations in the field using round adhesive backed circular stickers, markers, etc.
- 2. Perform alpha+ beta scans at a speed not to exceed I detector width per second on 20% of floors using a 43-37 or 43-68 detector and 20% of wall surfaces using a 43-68 detector. Record maximum and average scan results in cpm.
- 3. Choose a minimum of 2 measurement locations on floors, 2 locations on walls, and 2 locations on ceilings (including elevated locations identified based on scans). For elevated areas, select the location of the highest activity for direct survey measurements.
- 4. Perfonn direct alpha and direct beta surface activity measurements independently at each of the 6 measurement locations for 1 minute each. For any wall locations that exceed 40 cpm/100 cm2 total alpha or 450 cpm/l 00 cm2 total beta activity, dete1mine the extent of the elevated area. For any floor locations that exceed 50 cpm/100 cm2 total alpha or 1,500 cpm/100 cm 2 total beta activity, determine the extent of the elevated area.
- 5. Perform a gamma scan survey of surfaces and penetrations (if applicable) at a speed not to exceed 0.5 meters per second, on 20% of floor and 20% of wall areas. Perform 6 gamma direct survey measurements at l cm and at l m from the surface at locations chosen above. Record readings in µR/hr.
- 6. Record the scan percentages completed for alpha/beta and gamma scans on each wall and floor diagram.
- 7. Collect a removable surface activity sample from 100 cm2 at each of the 6 locations chosen above, plus at judgmental locations, if needed. A minimum of 6 removable activity measurement locations are required.
Summary a/~ Surveys-perform a.IP scans on 20% of floors and walls; perform direct 1-min a.IP at 2 locations on floors, 2 on walls & 2 on ceilin!!. Record scan areas and fixed locations on diagram. Record readings in cpm. Summary Smears-Collect 6 smears on locations chosen above and label with locations number. Summary Gamma Surveys-perform gamma scans on 20% of floors and walls; perform gamma direct surveys at I cm and I m at locations above. Record the scan areas and fixed locations on diagram. Record in µR/hr. O,.,..,.. I,..f' ')
Survey Package Worksheet ARRR-C006 (cont'd) I Special Instructions I
- Source check instrumentation to Th-230 for alpha, Sr/Y-90 for alpha+
- Notify the ES Project Manager of locations that were flagged due to beta, and Cs-137 for gamma measurements.
elevated readings on surfaces.
- Use gas proportional detector model 43-68 (or equivalent) for total surface
- Notify the ES Project Manager of smear samples that were flagged due to activity surveys on walls and ceilings. Use gas proportional detector elevated removable results.
model 43-37 (or equivalent) for total surface activity surveys on floors.
- Notify the ES Project Manager of any exposure rate measurements that
- Perform 3 one-minute field background alpha and beta counts, using an exceed 25 µR/hr or 2 X background.
empty source holder prior to surveys. If needed, perform 3 one-minute
- Attach photographic records if available and provide descriptive background counts on a reference surface similar to the surface to be comments for each image under Survey Comments. Ensure that the surveyed.
Package ID No. and a page number (e.g., Page Al) are included on each
- Use a model 44-10 ( or equivalent) for gamma scan surveys and exposure attachment.
rate measurements.
- Complete Survey Cover page with required location, date and instrument
- The MDC for removable alpha activity shall be less than 20 dpm/100 cm2 information. Complete remainder of Survey Form as applicable.
(preferable < l 0 dpm/100 cm2) and for removable beta activity measurements shall be less than 150 dpm/100 cm2 (preferably< 100 dpm/100 cm2). Survey performance /'SG£N~5 (Initial and date each survey task after completion) .;)'"-'-' ;'-' *- 1cm /, Gamma lm General Description Beta Scan Direct Beta Direct Alpha Smear Gross Exposure Samples Scan Rate* Exposure Rate Walls .ti-,t~-lf ~ 5'--tt-/( VL i;---,g_,.,, ~ 5-11*-'/( Q,,,- t;,,-)'7-11 '"Q _ _ t;;:11'/,HQ.--
- 0/14 Floor r
I r Ceiling ~ \\I/ ,v V' ~I ,v Rev. 0 Page2 of3
Survey Package Worksheet ARRR-C006 (cont'd) Survey Comments /1 - ***.....-......r.')~ A ~f 4-\\*.A V A~)> ~-A '"°D I R_F-G~ '1 ~ IJ.-.6, T C £,Jf.£'{AT£1:>~K-&P..OtA..N() Dtt'G: '"\\O 1=-~~L ~St\\JIS \\tJ r_L()S r=;- \\>RO~\\ m \\T'-{ _ K ~ tJ~i v. ~ ,Tl'---1'l-U-f -// \\)\\~,~ A~D -S-CArJS bS°512".rn 41..-i-l/ lAN I r::-01<..m "°DUE TC 'fficJ:'.:.G-/2.C)IA.rJ D * .J1 W>t\\ A ~ cA /.JS l<AJ/H"R.rv/ ~ lJ ,W IT+/- 1?AC~&icol-lN 1) / Cl2.055a~t<J ~ ~13-rRA:CTT=b. g.yyJi\\ 1-L- -AR&A-fDt m£";;~1 o J () ~ 45/J FG" T~--, IAtYE./:> 1 Wl 011-mrh-lf-72ef}-'1>1tvfi-5 k Package Review Surveyor(s) Signatures: )dtitwl-Date Package Completed: ~ lg-I( Package Reviewed by and Date: AW~ 5/;1J11 Rev. 0 Page 3 of3
Room/Area: Fuel Storage Safe I 2.0ft l l 2.0 ft l I 2.0 ft Survey Diagram £.o,#v ---~ft - -- ~(\\R-t~ Wall~~ View ,5,0 ::Jwe +--- M ft ---- -~ 5.0 ft deep v:;,Ju{Z_ " ) ( ~ / l I 1-fvR. '2t:IX) R Top View Floor 5.0 ft deep i.. ) r 2.0 ft -4o~ (p Top View Ceiling Page # / lfdf:a4!, Date: 5/J1)!1 ---,}~~--
~--- .' I J I { ~f* ;:2 llfbd ?,(8'--1 / ,..,"4" I I I L* J - /.>CA&:5-I I ~G =fe ~ ~ "(* I, .C:>P"Y!L . ~ I I .~ ---++--' *L;----------............. ----:-;----____;=---_.1.,.._--
- . -!..--1--.:::,________:,__
~....2 ~ -~- .* *.J, .r .*i ---r.-..... '"i r-. 10-so .. L. 1, 2/2, / rJE6/t6?6 L - _),. 3 ~ ~ Ir
- :.:I I j
I,-, ,I. _. '-ii t.l, '31 ____. ____ \\ L LJ 5
- ' ;;z.....3 7
( . 7 .JI I I I ,~
- I
~ -,,..... r .J *
- r I,",.
... I "r I I .J I J..-1 * - I r k ti r.J ~I I ~/
- r'.
L ~ I . ?- 1-I I I. I. I I I L '"=*-
- 1::
"ii--.. - I I r I I I
- 1
. I I ~ "'l I _,.\\_...,,., 1i I; -.=-- ~ ~ f I I, I.. i.
- r.
I I I ' I-I J\\,--L --- I .J; I-* .. v-t l r I I .J f I I JI J ,_r I. I i" ~ \\ ~ - I L I -
- -Y.,.
..... l_;. r~ ~ - r i l -f. ._. l -- 'II ~ f-'
- ~
I I r, - - * . I _. ** ~.,L I"' I...! .... : __ I I 1._. ~* I f, r J..IWL -" --~< ~ ;,r*-,- ~3/4"\\: -.1-* 1 -fl_,, I ~ I ~ ~ I I *.r. I I ~ I ~= I I-I l 1~ J I .J I t I I,_ J =-. ? .L - -- - f r I I I .,._ r I I I. 1 I I I L
- -1. -
I I. "'!=" I. !
- I I
- I I
r"' I: I \\.,. I * ~ .(' I I ,: I I. - -~ \\i 1 ~ ~-i I r I ~: .4-... I - 'rl
- 1,.
f. -~ I I.- J L r i l -
- i-
.... 1. I "-. 1,- ., *._1 ~ I I
- I J
J I *. - I.
- i,.
-T - _r-,i- -;::r.. l
- L..
-,.- I~ *"' J.'* ~ 7 l I I I 1L, I
- +:"'
I . - I. ., ~ I 1,- l"'I.. -_ I I -,. - .I I I I ~-- r L. ~ ', . :J* I -, J t I l ~.. -1 r' J I ~ - I ,- I I... i' - .. i-. I 1 i I I I ~ I r-I I l I. ,1 .I ., r .J -~ I ti T, 1 I I J I ' I I I [. 1.. .1. I 7 I ~ I ~ -I I f ~ r L ~ - ~~ J I I 't'* I I I - I , J r
- r
- I I
I I 1* . r L r I . I I I I I
-:~ ENERGY SOLUTIONS Survey Package Worksheet for ARRRC-0O7 Package Identification No.: ARRR-C007 Prepared by: Steve Croslin Location: Reactor Building Mezzanine: Prep Lab, Chemistry Lab, Inst Cal Room, Electronics Lab, Stairway, Date Prepared: 5/10/2011 N-Ray Gauge Off., Sheet Metal Fabrication Area, Storage Area Area Classification: Preliminary Class 2 Reviewed By: Area Description This characterization survey includes the Prep Lab, Chem Lab, Inst Cal Rm, Electronics Lab, Stairway, N-Ray Gauge Off., Sheet Metal Fabrication Area, and the Storage Area on th in the Reactor Bldg. All surfaces including floor, interior walls and ceiling. Historical Information The Preparation Lab is a small room on the that contains a worktable, marble weighing table and non-radioactive waste disposal drum. The Chemistry Lab is a small room on the hat contains two workbench cabinets, a fume hood and two sinks, the "Cold Sink" which drains to the sewer and the "Hot Sink" which drains to an outdoor waste holdup and sampling tank. The Electronics Lab is a small room on the that contains spare electrical parts.. The N-Ray Gauge Office is a small room that was used for preparing the N-Ray gauges prior to use. The Instrument Calibration Room is used for instrument calibrations and coating of Exposure Trays. The Sheet Metal Fabrication Area is an open topped portion of the *** currently used for storage of spare mechanical parts. The ***IStorage Area contains the control room HVAC system, a storage area for irradiated items, and wall mounted cabinets just off the mezzanine and over the bioshield that are used to store reactor pool tools. There is no history of contamination in these areas but there is a possibility for contamination due to historical activities, and is therefore a Class 2 survey unit. Rev.0 Page I of4
General Survey Instructions
- 1. Perform alpha + beta scans at a speed not to exceed 1 detector width per second on 50% of floors using a 43-37 detector and 20% of wall surfaces using a 43-68 detector. Listen to audible output using headphones, if available.
- 2. Choose a minimum of 20 measurement locations on floors, 5 locations on walls, and 5 locations on ceilings (including elevated locations). If elevated areas were identified based on scan measurements, select the location of the highest activity for direct survey measurements. Perform direct alpha and direct beta surface activity measurements independently at each of the 30 measurement locations for 1 minute each.
- 3. Note any wall locations that exceed 40 cpm/100 cm2 total alpha or 450 cpm/100 cm2 total beta activity and determine the extent of the elevated area. Note any floor locations that exceed 50 cpm/100 cm2 total alpha or 1,500 cpm/100 cm2 total beta activity and determine the extent of the elevated area. (The elevated area limits are based on estimated backgrounds of 4 cpm/100 cm2 alpha and 250 cpm/100 cm2 beta on a 43-68 and estimated backgrounds of 15 cpm/100 cm2 alpha and 1,000 cpm/100 cm2 beta on a 43-37.)
- 4. Collect a removable surface activity sample over an area of 100 cm2 in size at 100% of the locations chosen in step #2, plus at judgmental locations, if needed. A minimum of 30 removable activity measurement locations are required. Note removable results that exceed 10 dpm/100 cm2 alpha or 200 dpm/100 cm2 beta.
- 5. Perform a gamma scan survey of surfaces and penetrations (if applicable) at a speed not to exceed 0.5 meters per second, on 20% of floor and 20% of the wall areas. Perform at least 20 gamma direct survey measurements at 1 cm and at 1 m from the surface at locations chosen in step #2. Record readings in µR/hr.
- 6. Prepare survey diagrams of walls, floor and ceiling for each area or room, with approximate dimensions.
- 7. Note the locations of direct alpha, direct beta, smears, and gamma fixed measurements. Also mark measurement and sample locations in the field using round adhesive backed circular stickers, markers, or equivalent.
- 8. Record the maximum and average scan results, in cpm, on each wall and floor survey diagram.
- 9. Record the scan percentages completed for alpha/beta and gamma scans on each wall and floor diagram.
Rev.0 Page 2 of4
Survey Package Worksheet ARRR-C007 (cont'd) I Special Instructions I Source check instrumentation to Th-230 for alpha, Sr/Y-90 for alpha+
- Notify the ES Project Manager of locations that were flagged due to beta, and Cs-137 for gamma measurements.
elevated readings on surfaces. Use gas proportional detector model 43-68 (or equivalent) for total surface
- Notify the ES Project Manager of smear samples that were flagged due to activity surveys on walls and ceilings. Use gas proportional detector elevated removable results.
model 43-37 (or equivalent) for total surface activity surveys on floors.
- Notify the ES Project Manager of any exposure rate measurements that
- Perform 3 one-minute field background alpha and beta counts, using an exceed 25 µR/hr or 2 X background.
empty source holder prior to surveys. If needed, perform 3 one-minute Attach photographic records if available and provide descriptive background counts on a reference surface similar to the surface to be comments for each image under Survey Comments. Ensure that the surveyed. Package ID No. and a page number ( e.g., Page Al) are included on each
- Use a model 44-10 (or equivalent) for gamma scan surveys and exposure attachment.
rate measurements. Complete Survey Cover page with required location, date and instrument
- The MDC for removable alpha activity shall be less than 20 dpm/100 cm2 information. Complete remainder of Survey Form as applicable.
(preferable < 10 dpm/100 cm2) and for removable beta activity measurements shall be less than 150 dpm/100 cm2 (preferably< 100 dpm/100 cm2). Survey performance (Initial and date each survey task after completion) i+-/tL4. " Gamma 1cm Im General Description Be a Scan Direct Beta Direct Alpha Smear Gross Scan Exposure Exposure Rate Samples Rate Wa11s ~ y/{,-1/.,>,l'c. S---f6-II fa2c...f:°-1/:rr/ J.Lc, S"--/t-11 Ve... S----,1,*{/ ~c.... ~ ---1£-/J x s-#-11 AJ)A-Floors jLc_ ~-/C-11 fa c. 5:-fl<-/f,:Le.f.Z/t-/f )1-j--((-11 ~ 0l6-l1 54. 0-({-/f ~c: 57.£-// i Ceilings .,v,4 P,c,. ~-/(-((,;z'c S--f t-11 ~ ~--((~(( ,.;vA- ~y/{-// Jrc, s--16-lr JI Rev.0 Page 3 of4
Survey Package Worksheet ARRR-C006 (cont'd) Survey Comments Package Review Date Package Completed: S / fR // Package Reviewed by and Date: --dlJ1/ ~; $/ ~/JI Rev. 0
Survey Diagram Page # / fr:/JM}. Room/Area: Chemical Lab Date:.s-/ & - / ( l 8.0 ft l I 8.0 ft j Avgcpm: Max cpm: Avgcpm: Maxcpm: 11.2 ft ----
+
10.5 ft Avgcpm: Max cpm: ,*~ J'-),Lv ~-s_, ~-~----. r/f s~ StX.J,iril. L VJ I W O ""f fl( t l 8.0 ft l Avg cpm: Max cpm: !V'A Wall Wall 11.2 ft 10.5 ft Avg cpm: Max cpm: I Avgcpm: Maxcpm: 8.0 ft l JV Wall Wall 11.2 ft ---- -- l 10.5 ft l I 10.5 ft l Floor 11.2ft Ceiling / 300 1 ~ ~~ 1P/4 s ~~ T 1~dolt /10 d( p ~UL~ ~~,
Page # 2-- ftlt,..rJ Survey Diagram Room/Area: Preparation Lab Date: 5 r/{:,,,,,--(1 -- 10.1 ft --- -- 8.5 ft I 8.0 ft l l 8.0 ft j
- 7\\1: Wall
~G- -- 10.1ft Wall I 8.5 ft l l 8.5 ft l l l 8.0 ft l t __ __.t l(.) Wall 8.5 ft I 8.0 ft l 10.1ft - ----- Floor 10.1 ft Ceiling 1 (!i) roo <I) /60') @ ~7oo /SVO /S?JO
Survey Diagram Page # ~ Room/Area: N-Ray Gauge Office Date: _ _ S"""_---'--" /t"----4--//_ 9.0ft 8.7 ft l @lh~ 1 l tj'SD J, [~e,~ .r!:,-V sr:P 8.0 ft 8.0 ft
- 700 l
t j l t t Wall Wall 9.0 ft 8.7 ft I l 8.0 ft
- v/k 8.0 ft ll/lt j
l Wall Wall 9.0 ft ~/h l ( C W"\\. ( IA-\\. I if.Ser,,"' 600 l <fJ &:r; 7cJo 8.7 ft l GJ {Joo S-70 s~ t_ 1' (i) 'flo <fl:£> ~ Floor no (X,f/3~~~: 9.0 ft I f~1 (j) CL.fa\\. ) it,(~ 8.7 ft l ~ Ceiling
Survey Diagram Room/Area: Instrument Cal Area -- 20.5 ft ---- l 12.0 ft l I 12.0 ft l ~.~: Cftn. flvj ; (oo /1 lso< c rr. J1t,1.1: 1"00 f J *;Jf l>l Wall -- 20.5ft NA ~pt-~ Wall 20.5 ft ft~ l ! @ t (/) ;;, rf/,D f/p 15.3 ft ..sc..-~"' i 12.0 ft l I 12.0 ft l i;A1if, 1 Page # ~ Date: -- 15.3ft 15.3ft r <r 100 l /SV Sc.ti.. u Wall /4~ r C. ""' I""" {_ - fs"() ol-76 @) {j 3 d-- )Zh/q ~ l t 1ctw J'lo /9o @ t;CX///6~ tG~ life> ([J/Ool..1 ~1i~ Floor 3£o
- J-fO 20.5 ft I
~,=i ~
- t/A 15.3 ft t ~V'~,u.
- : t l
A Ceiling
Survey Diagram Page#~ Date: S 1£-/f Room/Area: Electronics Lab I 8.0 ft l /A) Wall 20.5 ft __ I l 8.0 ft 8.0 ft j l Wall 20.5 ft J @ ~ 60 S~ (b6 <li) l Floor 20.5 ft I 8.8 ft l Ceiling 8.8 ft t ___ __i1' J, l ~- Wall 8.8 ft
- tl,A Wall
~lk Jc~ J-
- 11)
Sl ((i) 35" @ 7< 1/#~~ r 0( S" CML~f; 7cf,_ ~~K,(J1m ps~;t/:J: _b::_ 5-v 32... foCJ
Page # £ ft~tJi Survey Diagram Room/Area: Sheet Metal Fab Date: 5=-/t-(( 24.4 ft 18.0 ft l I @ [o /oD l1\\lt ~ 12.0 ft 1:_Jc"~ I 3U /II~ 'ff!- 12.0 ft l l }Jfr Wall Wall 24.4 ft 18.0 ft l I 12.0 ft 12.0 ft j
- Ir l
- UA Wall Wall
-5rrmtcV(1/4~ 24.4 ft ~ ~~n-l /c.,.,_ ( "1A, _/4,(f, ~ 18.0ft l L <lJJ '/J J-l t 3oo"f g t Jc.&i.V'\\ SW /KA "I' ([j) /?U
- J.fv
_1. (!JJ 3,C){' 23S-Floor 24.4 ft 9o I?£" l 1------i NA t~ '.I 18.0 ft l Ceiling
l ft l l ft j Room/Area: Mezzanine Hallway /J Wall -- 21.1ft _s Wall Survey Diagram Date: J r Page# ~ /tfuJl s-;r;-11 4.0 ft KA-Wall 4.0 ft Wall +------ 21.1 ft ---- 7.. 7 9o ?O
Page # 7 lrM Survey Diagram Room/Area: Storage Area Date: S,/.{,-/f I 12.0 ft l l 12.0 j 61.6 ft 3o ::1 1_ rr ts~ ~7) 1' w Wall 61.6 ft l r l _5C?v'- 50(> ~ (;tJO £ Wall --- 61.6ft Floor --- 61.6ft I 12.0 ft l I 12.0 ft l tr (_~ 13.3 ft ~A Adf Wall 13.3 ft /V/f /1/_4 Wall 6:itF (c,,.,_ I (7~ 7u 'f 30 boo /oOCJ SDOO 1:.... '-fso S-30 (/00 /500 .r,~_s ~kel~ ) JJ,A,/'4 o..).l.l.v1..~ ~"c..,._.,.,,,../ ~3oo /'foo \\o) ~~Ng,t~e.. /3co 70
Survey Package Worksheet for ARRRC-008 Package Identification No.: ARRR-C008 Prepared by: Steve Croslin Location: Building Addition l Date Prepared: 5/10/2011 Area Classification: Preliminary Class 3 Reviewed By: Area Description This characterization survey includes the following areas in Building Addition l: Office, Viewing Area, QC Room, Dark Room, Hallway, Safe, Film Storage, Shipping & Receiving & N-Ray Set-up (Rooms 1-8). All surfaces are to be surveyed, including floors, interior walls and ceilings. Historical Information Building Addition 1 is a 45 foot by 60-foot steel structure with internal rooms built of fire resistant framing and sbeetrock covering. An automatic sprinkler system covers the entire building. The building as a whole is not sealed or contained and requires no air locks. This area provides essential support functions for the N-Ray operation. This is a Class 3 area based on a low potential for the presence of contaminated or activated materials. General Survey Instructions
- 1. Perform alpha + beta scans at a speed not to exceed 1 detector width per second on 20 % of floors using a 43-37 detector and 20% of wall surfaces using a 43-68 detector. Listen to audible output using headphones, if available.
- 2. Choose a minimum of 20 measurement locations on floors and 10 locations on walls (including elevated locations).
Distribute locations proportionately based on relative sizes of rooms or areas. If elevated areas were identified based on scan measurements, select the location of the highest activity for direct survey measurements. Perform direct alpha and direct beta surface activity measurements independently at each of the 30 measurement locations for 1 minute each.
- 3. Note any wall locations that exceed 40 cpm/100 cm2 total alpha or 450 cpm/100 cm2 total beta activity and determine the extent of the elevated area. Note any floor locations that exceed 60 cpm/100 cm2 total alpha or 1,500 cpm/100 cm2 total beta activity and determine the extent of the elevated area. (The elevated area limits are based on estimated backgrounds of 3 cpm/100 cm2 alpha and 340 cpm/100 cm2 beta on a 43-68 and estimated backgrounds of7 cpm/100 cm2 alpha and 1,330 cpm/100 cm2 beta on a 43-37.)
- 4. Collect a removable surface activity sample over an area of 100 cm2 in size at 100% of the locations chosen in step
- 2, plus at judgmental locations at the discretion of the surveyor. A minimum of 30 removable activity measurement locations are required. Note any removable results that exceed 10 dpm/100 cm2 alpha or 200 dpm/100 cm2 beta.
- 5. Perform a gamma scan survey of surfaces and penetrations (if applicable) at a speed not to exceed 0.5 meters per second, on 20% of floor and 20% of the wall areas. Perform at least 10 gamma direct survey measurements at 1 cm and at I m from the surface or source at locations chosen in step #2. Record readings in µR/hr.
- 6. Prepare survey diagrams of walls, floor and ceiling for each area or room, with approximate dimensions and any unique features.
- 7. Note the locations of direct alpha, direct beta, smears, and gamma fixed measurements and all samples. Also mark measurement and sample locations in the field using round adhesive backed circular stickers, markers, etc.
- 8. Record the maximum and average scan results, in cpm, on each wall and floor survey diagram.
- 9. Record the scan percentages completed for alpha/beta and gamma scans on each wall and floor diagram.
Rev. 0 Page I of3
Survey Package Worksheet ARRR-C008 (cont'd) I Special Instructions I Source check instrumentation using Th-230 for alpha, Sr/Y-90 for alpha + beta, and Cs-137 for gamma measurements.
- Notify the ES Project Manager of locations that were flagged in Step #2
- Use gas proportional detector model 43-68 (or equivalent) for total surface due to elevated readings on surfaces.
activity surveys on walls and ceilings. Use gas proportional detector Notify the ES Project Manager of smear samples that were flagged in Step model 43-37 (or equivalent) for total surface activity surveys on floors.
- 4 due to elevated removable results.
- Perform 3 one-minute field background alpha and beta counts, using an
- Notify the ES Project Manager of any exposure rate measurements that empty source holder prior to surveys. If needed, perform 3 one-minute exceed 25 µR/hr or 2 X background.
background counts on a reference surface similar to the surface to be Attach photographic records if available and provide descriptive surveyed. comments for each image under Survey Comments. Ensure that the Use a model 44-10 (or equivalent) for gamma scan surveys and exposure Package ID No. and a page number (e.g., Page Al) are included on each rate measurements. attachment.
- The MDC for removable alpha activity shall be less than 20 dpm/100 cm2
- Complete Survey Cover page with required location, date and instrument (preferable < 10 dpm/100 cm2) and for removable beta activity infonnation. Complete remainder of Survey Form as applicable.
measurements shall be less than 150 dpm/100 cm2 (preferably< 100 dpm/100 cm2). Survey performance (Initial and date each survey task after completion) ~/ (L~ t Gamma 1cm lm Samples General Description e a Scan Direct Beta Direct Alpha Smear Gross Scan Exposure Rate Exposure Rate North Wall Surfaces S - /2.. -I ( Jee. £"-fz_-/1 Jk_ .s-lt. *I(~ S -IJ-11 {.... S'-IJ-11 ~.s--rs-11 I,,-e-s--11 -11Y-c.. Y/lt East Wall Surfaces .s-11..-I1 ~ ~-n.- 11 ~ r-( t.,, *I( Y e-c;----11-0 -5,,c:._ S-/J-rr~ I S,,g_l/ y,,, S--/J -/1 ~ South Wall Surfaces ~--lz..-1(,Ye- ~-(t--1/ ;,'<... ~,(1.-11..'A::. ~({-;fl..7c_ S:-1~-,,.>"l'.. ';J'-(1-/1 C. S---/J-/( d'(:_ West Wall Surfaces s--I2.*f( ~ s-12.-I1 ~ K-{ Z,-11 eXC 5'-/J-1/.Jt:_ c;'_-J~-fl ~ S"-(J-/1-5,e; .s-11>-11.J4, Floor
- /-/{-!/ "f:3,_ Sv/5-11~ s-1 J-J/;;...
S -1}-//YC S--13-llk S-'(3-fi,7c_ S--/!,-//X v, Ceiling .N'.4 /VA ,,,.J A /VA rJA ,,VA- /VA-A.IA I \\ "\\ I I ~ \\ I ~, ~ V 11 '\\, \\_,. \\JI \\IJ Rev.0 Page 2 of 3
Survey Package Worksheet ARRR-C008 (cont'd) Survey Comments Package Review Sucveyor(s) S;goatures, C:::: Y ~~ Date Package Completed: Package Reviewed by and Date: ;x(}p( C ~ ._5j JJ, 1// Rev.0
Survey Diagram Room/Area: #1 Office 16.1 ft I Avgcpm: 5v i Max cpm: S 175 /)/* ~ S' - {, ( 8.0 8.0 l l )JN':li, Wall I Avgcpm: ,;J.SO r Max cpm: 'Ii ls I 30( t::_s 11J~ I t/ 8.0ft -z_ 8.0 ft l j 7r
- ), ~ (
~ <<JI I IN:} CPrrJ: tf /JoD 4/'6oo j\\1 A~ Cfl'YI ~ lf-/ /4<JO Avg cpm: 4,v_e, 13.0 ~ r-Maxcpm: ~ l ~ i /1;.YII *. JlldOO ~ A-v1 #/~ / i --~ ~°')( 4/t.._ 7 Floor 16.1 ft I
- J(r Avgcpm
- jK 13.0 Max cpm:
l Ceiling Page # / trJf,dl Date: S-/ t-1/ 13.0 ft Avgcpm: 3 :J..70 Max cpm:c, }'i 311 Avt h ~ 1 1/4{- J a,J,<,c... Avgcpm: ~/ Max cp : 7,)g' 3/S-frl? ~ s: lw..."' ~ l(J-<L.51'..f.a J-\\:-: Wall _.5.¢c. \\)~<.1c-t5 @ 2-Cffllt C>l- ~,, I d,,s I (, ( '~l-v\\.11-\\.lt,d./t,.. -=---- l a.""' (..,_ s-6
Survey Diagram Room/Area: Customer Viewing Rm l 8.0 ft l I 8.0 ft j Avg cpm: 1/J}? Maxcpm:~ tl//()g0 Av) ~"' *i ~'l)C ~1~ 9 Avgcpm: J/A Max cpm: l I 0.3 ft l I I 0.3 ft l 16.1 ft 16.1 ft 16.1 ft Floor 16.1 ft Ceiling r 8.0 ft l l 8.0 ft l Page# k ~ Date: S -II-I/ 10.3 ft I 0.3 ft lue ;.k Wall -=------- ~l/).ltC,1 (9.. """rvt Ao/I,. Gb D(_ 2.- Cf'f11 P ';). 1 q CP!V) ~ ~ f 7
Survey Diagram Page #,l ~ Room/Area: OC Rm 16.1 ft l Avg cpm: 3 :J..80 AttMVI.,,. 11 Max cprr"l,N/31:r";J/1,, /7, b I 8.0 ft l (D 16.1 ft I Avgcpm: ~/
- Max cpm:
k I L----1---r--:---jb' 8.0 ft j Avgcpm 1/-To{ 3 l Max cpm: S30;'-f,78 8.9 fl Flooll. A \\JG CP;n. o/.' * ~ l 'Pl?oBe ~JA~ Cf'lll ~12.k A-.it A-8-/~ / 0 ~ ~,~ /l, Avg cpm: j Max cpm: }JP\\ I 8.9 ft l 16.I ft Floor 16.1 ft Ceiling Date:.5-((-/( 8.9 ft l Avg cpm: NA-Max cpm:,,vk 1--==----------i6' 8.0 ft l all 8.9 ft I 8.0 ft Avg cpm: :J.&; 3 /l-tc.tf.1/_~ I Max cpm: S ( 11 ~, '(fr ;J/"' I --..----.--,-Gr l lva.sk Wall
Room/Area: Dark Rm i Avg cpm: Max cpm: 3/lfS-7 ti 8.0 ft l p.y}h Wall I l Avg cpm: A-- Max cpmfo ,7t~ 8.0 ft jy ff) ~~ Wall l Avg cpm: l Max cpm: /JC,,, I 0.8 ft l ~ Survey Diagram Page # 1/ fHl71di.. (:/ D 70 (' Floor 16.1 ft Ceiling i 8.0 ft l i 8.0 ft l Date: _')-//-// I 0.8 ft Avg cpm: 'l.~ 3 Av7 ~ 4 )..o Max cpm: J 3 / 'f,? /~..J/~
- J.!;°
(, f 3 / I Avg cpm '351> ~ '::: ~ ~~ Max cpm: l/S-r SJ>"D b ( lu@sk Wall
- ~....,~
~ b, ~-t> ~ f 'f-3 2-- c..-r 1,-\\ pf.. 6 ll (}) b~re.c-\\-~ '. f 'f;tl C..C"" r;k' 0 CD ti,~c\\-~ / ~ 3,;;_7 ce~ G>(__ 5 If fJJ 1>~~ : i /008Cf""' tA.. s
\\~-\\s ~} +oi cqw--
o/....,, r,, (o_..,_ (""' )_o -;; I I~ :)..r) I l/b Sb I (oS lf{,
r 9.5ft l I 9.5 ft j Survey Diagram Room/Area: Bldg Addition #1 Hallway .7 ft Avg cpm:
- SO Maxc
- *,3':J... S:/
~ 13.7 ft ~sd-Wall 13.7 ft Date: I 9.5 ft l I 9.5 ft l Page# s-*tr-lftldi .J-fl-1I 4.2 ft 11vs-AAP/i fl 1---e.x rfl./l-9 JVo.-..Y, W a II 4.2 ft Av1 1,,1,t/~ 'fo Avg~: 3 7v t.--"-1<. ~,~ bD Maxcp? !;°1 ;;._7i3 ~4'.Wall
- 2* I I~--========--@-I 4.2 ft
@ t\\ ~c-ls: % Yn ce~ I I Nfr I cl-- Lf .__ _ _ _____ ___. @~\\~+s: ~ ~6g ct--- d-6,, /.,.,, -- Ceiling Avgcpm: Max cpm: // 1-r' ~.._..._e-)f ~ /c..,_ - Ci) 60 Sb / 0
Page # 6 ff-if tl(}, Survey Diagram Room/Area: Safe I 8.0ft l I 8.0 ft j Avgcpm: ~ ~ Max cpm: 6-;J./ f~.78"'-"-l<~I,.. J-_ ____ 1_1-.-----,bl
- r.4
- H-.M.., W a I Avgcpm: 3 Max g 1/9, TL
~---~ ---,--~bl 0K+/-b Wall j --- 9.8ft Floor 4------
- 9. 8 ft Avgcpm: /JA Max cpm:
I 6.0 ft l Ceiling Date: S-1/-1/ r, 4 I 8.0 ft l i 8.0 ft l Avgcpm: W Max cpm: b 2-g, Z'l.. i----,-----..,.....-:'-1,/ (Ji)
- 6.
Avgcpm: 5 3
- b/ z,/ S, 3S-
_!hiCA~----,--~6 1 /o /2. /0
Page # 7 /Hta/4 Survey Diagram Date: S-/ t. - II Room/Area: Film Storage Avg cpm: 1 I Max cpm: /() £r \\ 8.0 ft l ?... ( K::\\::h Wall 8.0 ft j lJt(+/-f.. Wall ex)!> Avg cpm: J./-,f'/000 i Max cpm: q/ f,3/< I Au1 d-/l 7.r6.o ft f,,.;14 d) 1.. l' ( l Avgcpm: /JA Max cpm: l 6.0 ft l 9.8ft Floor -- 9.8ft Ceiling I 8.0 ft l i 8.0 ft l 6.0ft -~.ft: Wall Avgcpm: $ 3-SZ) Avg -. n*l-I~ Max cpm: c ~ ~l,. &,lb '.S'2,0 Gr 0GUt Wall $ 5~2_7°M ,:,I.._ s- @) f7 L/L?-..Cffl) =(
- 2._..
I] @ $ SJ I C(~ , r; /ck /""' d.., 7 q AK: -- {[j) ~ 3(:S ~~ II /(; o<.. 3 ()) /() 9'
$ 3/85 'iM !
7 9 .,.:( 0 11 g '1 ~ 1 .r-:
Survey Diagram Room/ Area: Shipping & Receiving i Avg cpm: ~ ~ 7 Max cpm: ;2_3rf /6,78 {,,.._~,.,,.;._ 1.-. % tr 13.7 ft l Wall r 13.7ft j - Avgcpm: 11111 Max cpm: /Vr\\ r 14.5 ft l - -- 25.3ft Floor
25.3 ft
/V;r Ceiling i 13.7 ft l I 13.7 ft l \\>> ! 'S;, ~ \\ Page # f *//if}ci Date: j--/z-// t_ 6 Max cpm:_s-I._ g \\ z1 1 ~,~ C, Avg cpm: 7 Max cpm:.;i (, ( CU{lrf Wall -\\ ~ ha\\ _s~~ ~<-<.-\\~ \\),-fee \\s ~1~ G.--~ @1 389 er,~ /e,_...._ h
- a.
p /C
- s58' C{Vl-1_
b s s / I ~!
- 29:J... Cf""'
Gt Lf I/ @J Lf~ Cf"" if II ~ ~ ).f3 3tl/- C/Jr17 lo 5 c:,,-.,. I CPIYI l @e.~ ~:
- 7
Page# _ _,_J __ Room/Area: N-Ray Setup Area Survey Diagram Date: f;z_-// r Avg cpm:.:J.51>/ i r Avgcpm: Max cpm: '3 /z-jl,f.J' Max cpm:{,7(/7,.r:3 A~ro ~ r ,4v ~ ~ (, I / ~ er
- -2.
I 3.7 ft 13.7 ft l l I' Wall zc,4-Wall ~; 3 r Avg cpm: IO I Avgcpm: ;;l. Max cpm: /J-71/ J, 6 z__ Max cpm: ;). 7o/6, ?3 fws4, J" Au k I 13.7 ft /61. ~( 13.7 ft bl j l /21/2ti Wall lUe.:,.f-: Wall ~ff 38.5 ft r::-/,60/L Avgopm 4/t.'fK r S-- '--- ~o&; Max cpm: 'f/ Z.OI< ~~ I 33.8 ft A--Ji J l..r /7. f I kt...-1,,../,, ).3 l ~,; .. -l \\. I \\2..o~ Floor 5u_f~ \\\\{"e 6-t5 e~ 38.5 ft Avgcpm: NA r Maxcpm: NA-33.8 ft @ 1/> Nn-Cf~ i Ca,-,. 1-. - J... lf ff 7'f. s6' @ ~SJJCf~ ?\\ olS J,__ 'I I/ l Ceiling i ~ lf err.~ lo /3 @ i ~~ / ~~ Cj 7 11 d- ~
I Survey Package Worksheet for ARRRC-009 Package Identification No.: ARRR-C009 Prepared by: Steve Croslin Location: Reactor Building - Business Office, Date Prepared: 5/10/201 l Accounting Office, Ladies Room, Men's Room Area Classification: Preliminary Class 3 Reviewed By: Area Description This characterization survey includes the following areas in the Reactor Building: Men's Room, Ladies Room, Business Office and Accounting Office (Rooms 14, 15, 18 & 19). Historical Information Rooms 14 and 15 are the Men's Restroom and the Ladies Restroom, respectively. They appear to have 12-in by 12-in vinyl floor tiles, false ceilings and drains that connect to the city sewer system. Room 18 includes a hallway and the Business Office and Room 19 is the Accounting Office. These offices have floors covered with industrial grade carpet and they both have false ceilings. No records indicating radiological or chemical use or storage were identified. This is a Class 3 survey unit based on a low potential for the presence of contaminated or activated materials. General Survey Instructions
- 1. Perform alpha + beta scans at a speed not to exceed 1 detector width per second on 20% of floors using a 43-37 detector and 20% of wall surfaces using a 43-68 detector. Listen to audible output using headphones, if available.
- 2. Choose a minimum of 20 measurement locations on floors and 10 locations on walls (including elevated locations). Distribute locations proportionately based on relative sizes of rooms or areas. If elevated areas were identified based on scan measurements, select the location of the highest activity for direct survey measurements.
Perform direct alpha and direct beta surface activity measurements independently at each of the 30 measurement locations for 1 minute each.
- 3. Note any wall locations that exceed 40 cpm/ 100 cm2 total alpha or 450 cpm/100 cm2 total beta activity and determine the extent of tl1e elevated area. Note any floor locations that exceed 60 cpm/100 cm2 total alpha or 1,500 cpm/100 cm2 total beta activity and determine the extent of the elevated area. (The elevated area limits are based on estimated backgrounds of 3 cpm/100 cm2 alpha and 340 cpm/100 cm2 beta on a 43-68 and estimated backgrounds of 7 cpm/100 cm2 alpha and 1,330 cpm/100 cm2 beta on a 43-37.)
- 4. Collect a removable surface activity sample over an area of 100 cm2 in size at 100% of the locations chosen in step #2, plus at judgmental locations at the discretion of the surveyor. A minimum of 30 removable activity measurement locations are required. Note removable results that exceed 10 dpm/100 cm2 alpha or 200 dpm/100 cm2 beta.
- 5. Perform a gamma scan survey of surfaces and penetrations (if applicable) at a speed not to exceed 0.5 meters per second, on 20% of floor and 20% of the wall areas. Perform at least 30 gamma direct survey measurements at 1 cm and at 1 m from the surface or source at locations chosen in step #2. Record readings in µ,R/hr.
- 6. Prepare survey diagrams of walls, floor and ceiling for each area or room, with approximate dimensions and any unique features.
- 7. Note the locations of, direct alpha, direct beta, smears, and gamma fixed measurements and all samples. Also mark measurement and sample locations in the field using round adhesive backed circular stickers, markers, or equivalent.
- 8. Record the maximum and average scan results, in cpm, on each wall and floor survey diagram.
- 9. Record the scan percentages completed for alpha/beta and gamma scans on each wall and floor diagram.
Rev.O I
I Rev. 0 Survey Package Worksheet ARRR-C009 (cont'd) Special Instructions Source check instrumentation using Th-230 for alpha, Sr/Y-90 for alpha+
- Notify the ES Project Manager of locations that were flagged in Step #2 beta, and Cs-137 for gamma measurements.
due to elevated readings on surfaces. Use gas proportional detector model 43-68 ( or equivalent) for total surface
- Notify the ES Project Manager of smear samples that were flagged in Step activity surveys on walls and ceilings. Use gas proportional detector
- 4 due to elevated removable results.
model 43-37 (or equivalent) for total surface activity surveys on floors. Notify the ES Project Manager of any exposure rate measurements that Perform 3 one-minute field background alpha and beta counts, using an exceed 25 µR/hr or 2 X background. empty source holder prior to surveys. If needed, perform 3 one-minute Attach photographic records if available and provide descriptive background counts on a reference surface similar to the surface to be comments for each image under Survey Comments. Ensure that the surveyed. Package ID No. and a page number (e.g., Page Al) are included on each Use a model 44-10 ( or equivalent) for gamma scan surveys and exposure attachment. rate measurements. Complete Survey Cover page with required location, date and instrument The MDC for removable alpha activity shall be less than 20 dpm/100 cm2 information. Complete remainder of Survey Form as applicable. (preferable < 10 dpm/100 cm 2 ) and for removable beta activity measurements shall be less than 150 dpm/100 cm2 (preferably < 100 dpm/100 cm2). Survey performance (Initial and date each survey task after completion) Gamma General Description Beta Scaf Direct Beta Direct Alpha Smear Gross Scan AtR-IA 5CA North Wall Surfaces 5*t3--lf!?-...- G-t3-tl Vi.---,G-13-l\\M.-- 5-,,z,111J.- ~/"2.-11 ~ East Wall Surfaces "\\ ~ ~ South Wall Surfaces ) ) ) } ) West Wall Surfaces ~&- ( ( I I Floor 5~1~1/ l)._ -t w ~ \\V 1)y- '\\Y ~ Ceiling t-1 I A, ,N/4 N/4 tv/11 NIA-1cm Im Exposure Exposure Rate Rate t;,z,1, PY 6 --rZ-!f W \\. } 7 I JT)v ~Vy N]f/ AJ/4 Samples N IA \\ \\ ) I I/ Pagc'"°r3
- -V" I
Survey Package Worksheet ARRR-C009 (cont'd) Survey Comments Ek.3-rbRrJ,4~ C),F
- gltSI t,J"6S.S
'J> I f o ~r:::, u;;:, Lil res + ME}J_s / 12co~ s A~~ \\,V /T\\-\\ 1iJ #- 4-l )GH 13ACJ<6~(.,(J5j b -//!<IE-A, 1<-AJ> I lfTl 6 N f O i11 IVG- -r +t fl CJU 6-f-l ~ AST W -L.L--S A-$ WELL A'5 (:;E f L ING-/ ~ .,,l,_M11 /f,aJ), ur () dr z:f;n;u~p (Y{_ ~A,11;,bn) ~ M co4}'JT1~6-t)FF t c_~ E A-$~12.tJ /4fc:6A t S W1-n-,,"1 AN 1::L-:G-VAT£b -~f!.fJLAND ~ ~ ~ lt-7T-ACJ.\\-£P *ni~cr ~_g r,\\t2:,/-DCA (!:£.~ N*T \\<_,e$V.. L'T$ ( G-A-t11 n1A ~ 1<J;.$ u~S, A-ffA(f-( c:b ~ CCN \\ft:-N I G ~cc;:. I Package Review I Sumyo,(,) s;gnatum~tuJJ-- Date Package Completed: 5 I I Package Reviewed by and Date: Jx114~ 1111 Rev_ 0
Survey Diagram Room/Area: Business Office K '.(J5i_ud_V:,,____ l 9.5 ft l I 9.5 ft j Avgcpm: Max cpm: Avg cpm: Max cpm: 23.4 ~ Avg cpt
- l 6J./-OO <1_/\\A.
,Max cpw; z[_C/3CO i~ j Wall Avg cpm: Max cpm: :1.zoo j m rzJ ~ l0.3 fl l I I 0.3 ft l Wall
- 23.
W<[ Floor --- 23.4ft Ceiling l 9.5 ft l I 9.5 ft l Avgcpm: z_ Max cpm: i3c>, 7 Avgcpm:l7~on -~ Max cpm: :>/24-0oO I (2/f;f Wall j! Jlf /rnat'K ~ ~ I CPM f8 :;;.. of 3bl< c..p fV1 ~ .t!.. 4-n;: /-I, r;.µ E~ -rfl-~4 N ORfl/ 13"/J5', WA LL.
Survey Diagram Room/ Area: Accounting Office l Avgcpm:,i~ l Maxcpm: Avgcpm: / 3o/O Max cpm: -i.. 'fZ..D f"../\\/\\.._ 9.5 ft l Sou.~ Wall 11 3 f1 i Avg cpm: I Lft/-t> Max cpm: G,'-t() 3 9.5 ft j ~ \\'!OR:{1t Wall Avg cpm: i Max cpm: ~ \\ ~ 9.8 ft l ( '\\ @ t@} I "Doo\\2-Avgcpm: Max cpm: i 9.8 ft l 9.5 ft l r 9.5 ft l 11.3 ft ~~ -~ Floor 11.3 ft Ceiling I "1 t -~ Wt:fST Wall @tr: Wall fl1J 0 Jrn&K.__ ~ 7 CPrv; ~of '2,3 I< <..P1rV\\
Survey Diagram Room/Area: Ladies Room o</J 5ut ver5 r 9.5 ft l l 9.5 ft j Avgcpm: Max cpm: Avg cpm: Max cpm: Avgcpm: ( Cj'<l0. ~ Max cpm: if 3<' 30 ~ ID Avgcpm: / //W
- Max cpm: '2./ IS'</() £/'L,,~
~t\\ Wall 8.3 ft i ~ / 5.8 ft // l -- -~ Floor 8.3 ft l
- J/r+
5.8 ft l Ceiling r 9.5 ft l I 9.5 ft l / ?1l~!Y Page#~ Date: 5,.;f.-1/ Avg cpm: I /0/0 Max cpm: 2-3 t"30 '-"'),/Vy &l9C Wall Avg cpm: / / (:,'zj O ~'1_ Max cpm: 7'2,-?) \\ ~T Wall f+'u/>>to>J. o<.. ~ / (/Jff) /5 /,Cff 2.. ~/< CPJYJ
Room/Area: Men's Room Page # ~ i!!;f/;!fafJ Survey Diagram c-* ~v 1 /4 Date: :;;,..-/I~ ({ ~~5'#vr5___
+
I I 9.5 ft 9.5 ft l l NO Wall I 9.5 ft Avgcpm: Maxcpm: i 9.5 ft j ~ll Wall l l 8.3 ft Avgcpm: I @ Max cpm: 6.9 ft - ---~ l \\ \\ I l I -@1 ~ - 1/2/ ( Au3/ 1J1aY ~ I CPM ,
- qX/ z,to k cfrY)
Floor 8.3 ft Avgcpm: I Max cpm: 6.9 ft _tJ I A-l Ceiling
Room/Area: Business Office I 9.5 ft l i 9.5 ft j ~ Wall 23.4ft Wall Avgcpm: i Max cpm: 10.3 ft l Ceiling 9.5 ft l 2m A._,.__ __ r 9.5 ft fef/0 t/itdd_ Cl Page#w*~1' Date: 5 -f:Z.-//
- .~
10.3ft --- ~ Wall 10.3 ft l i~~~ 'EA5..--r Wall
Survey Diagram Room/Area: Accounting Office r ~uril.ty \\33 r 9.5 ft l I 9.5 ft j Avg cpm: Max cpm: -- 11.3ft Avg~: 411 );LI\\ Max..pm; \\ 3 g /4 -- 11.3ft rJOf?.:.11-\\- Wall --- 11.3ft I 9.8 ft l I 9.8 ft l 'f0/'5?JJA ti./.fA <i:l> t-z/rc7 JJ fl 54-Floor 11.3ft Ceiling r 9.5 ft l I 9.5 ft l
9.8ft Avg~ 30 ~j/J,,
Max~ 5c;.AIVV{' lt&?'f Wall 9.8 ft EA~r Wall
if~#t-d Survey Diagram Page#~~ Date: 5-IZ.-tf w Room/Area: Ladies Room r 9.5 ft l i 9.5 ft j 8.3ft Avg cpm: 2-,5 /,A, Max cpm: Atf 5 NOR.Tl-! Wall Av cpm:(lfS Maxcpm: 2,_CJ; .smmt wa11 Avg-Q;)+-r Max~ t t<f -!,- 5.8 ft 8.3 ft L~ -ro/1 "2.5,1.,.,1.J~ / '-f<fl '!5!5 Id~ Floor 8.3 ft Avgcpm: i Max cpm: fl/A 5.8 ft l Ceiling '-f If> t---,----
- 5. 8 ft Avg cpm: \\ '66 11 Max cpm: 4 ( <,S ~
r ~,_________, 9.5 ft l ~-r' Wall 5.8 ft I 9.5 ft l r ('I ~5/1615~ I
Survey Diagram Room/Area: Men's Room o~r 8.3 ft 6.9 ft l Avg ~: <\\O. JA.,ff lvL.. Max £:PIH': \\ t1 '::, 1,.5 l Avg~ \\W 4~/1} Max~ 4--t5 "r4-416 9.5 ft 9.5 ft l l ~(t:n\\- Wall ~s,..- Wall 8.3 ft 6.9 ft I Avg~ f'50 /,t I\\. Max~: ~rt? 9.5 ft ?;1'5 j qi ~o ~rve ~ ~.,-. ~~ '*r~ I 9.5 ft l Avg~ \\00 J.,tf,µ Max~ ({d} 0 lfoo
- 1>>/ "" a b
I ~ Wall 8.3 ft Avg.,_ ~ I Lf I I~ JJJ/J 'b 'f}m>1Ms lfRJ;., 1N Max~ q5A~t 6.9 ft Ah~ @ {c1N1/tm 1~ fc-zf_qo >>t/A 155hJ1/f. @ ~ ~ 6 r;( 1-z.()
- 0/'f-rlA~JM Floor 8.3 ft Avgcpm
I Maxcpm: JJ/fl 6.9 ft l Ceiling
0 L I -p I I Lf
- 2 l 5
I ( J ~ I _t.. ~ ~ II' 1 \\ I.. l I I ~. I l _J,_ K 1 1 cs ~ /() I -; l ( I . (' \\ (2-12.\\ z_ *.'. '/({J )- :.. Cofi J .~--,-, -~--- C) -- 6ii \\ _
- Of
- 7 J._*.. *
.i*"'L I J 4-J._rt._t: ... ~......, _-- . r l I J-I ~ I I L , *r ll O \\ VSC\\ 1 ,J I I .~ ... 1.... ~ C
- 702-- -------,--,,---------
I~ ~ -I 5 8'_q6 ZJJ.50 17 I L -. 13 3 I ....... _1* ~ (._ *- L f 1 C)"'Z-9
,---J-.-=------,--,
- IC 37 I l l 1 /__'J l . 1'
- J_i..
I~ 2-CJ 7 I ~\\ -,.-- \\ ~ -z.-z- \\ . r I* 'fl~ -**----------"*~--- L ~70~_ -----~----*~_-*_ I 2-~ \\ 37? J..,i_ -. 0 ~1<::J _1. --15 I 2/; 0
- ..1r1*L
<J,,.1 2:> 2.<t ' 3
,L l .Lr; l J ' I
- 1111 l I
I ~. 1 ~ I I i
- ~ *..J" I 1
I** l.. /0 J' f* I, ', )7,_ -. I ' (1,l I I I l, ~ t l ~ I.-- l J..
-. r
- ~ - 4l+- s~ I L c...,,.._ J :I ~ J ' I I I ~ a --f
- ~.,. _ _,*
7o t'SO \\ 3?.:>_ '6'r< 9~ I .J ' tf "2-06 506 tpqs l lfCO l e~c Cf3o 715 -5'2- ~7 73 too Y, \\) 0~
Survey Package Worksheet for ARRR C-010 Package Identification No.: ARRR-C0 10 Prepared by: Steve Croslin Location: Reactor Building - Entry Vestibule, Tagging Area, Tagging Back Room, Storage Building, Compressor Building and Chemical Shed. Date Prepared: 5/17/2011 Area Classification: Preliminary Class 3 Reviewed By: Area Description This characterization survey includes the following areas in the Reactor Building: Entry Vestibule, Tagging Area, Tagging Back Room, Storage Building, Compressor Building and Chemical Shed (Areas 22, 42, 28 & 46). Historical Information The Tagging Area Building is a 20 foot by 40 foot steel structure with internal rooms built of fire resistant framing and sheetrock covering except for the wall toward the Reactor Building, which is a cinderblock wall. It contains the Tagging Area, the Tagging Area Back Room, and an The Tagging Area includes a 35-foot by 19-foot portion of the Tagging Area Building. The floors are bare concrete, the ceiling is over 12 feet in height and there are dooiways to the outside and operating areas. This area also includes many heavy-duty work tables that are used to set up the exposure trays for N-Ray radiography work. It has a concrete floor with drywall on wa s an e ce1 mg. c torage m mg, a so own as the forklift garage, is an uninsulated 24-foot by 26-foot steel structure built of fire resistant framing and metal walls and ceiling. The Storage Building is not connected to any other buildings and it has a garage door that opens to the lllllland a personnel door that opens to the - It is used for forklift parking, equipment and supply storage, and as a fabrication area. The Compressor Building is a 14-foot by 8-foot by 8-foot tall metal structure on the...a>f the Operations Building. It contains two conventional piston type air compressors and three oil-filled vacuum pumps. The Chemical Shed is a 6.5-foot by 4-foot by 6-foot tall metal structure mounted on wooden skids located the-of the Operations Building. No records indicating radiological use or storage were identified for any of the areas. This is a Class 3 survey unit based on a low potential for the presence of contaminated or activated materials. Pagel of4
Survey Package Worksheet ARRR-C0l0 (cont'd) General Survey Instructions
- 1. Perform alpha + beta scans at a speed not to exceed 1 detector width per second on 20% of floors using a 43-37 detector and 20% of wall surfaces using a 43-68 detector. Listen to audible output using headphones, if available.
~ s~7A
- 2. Choose a minimum of 20 measurement locations on floors and 10 locations on walls aitt1eeilitijj(~ncluding elevated locations). Distribute locations proportionately based on relative sizes of rooms or areas. If elevated areas were identified based on scan measurements, select the location of the highest activity for direct survey measurements. Perform direct alpha and direct beta surface activity measurements independently at each of the 30 measurement locations for 1 minute each.
- 3. Note any wall locations that exceed 40 cpm/100 cm2 total alpha or 450 cpm/100 cm2 total beta activity and determine the extent of the elevated area. Note any floor locations that exceed 60 cpm/100 cm2 total alpha or 1,500 cpm/100 cm2 total beta activity and determine the extent of the elevated area.
- 4. Collect a removable surface activity sample over an area of 100 cm2 in size at 100% of the locations chosen above, plus at judgmental locations at the discretion of the surveyor. A minimum of 30 removable activity measurement locations are required.
- 5. Perform a gamma scan survey of surfaces and penetrations (if applicable) at a speed not to exceed 0.5 meters per second, on 20% of floor and 20% of the wall areas. Perform at least 20 gamma direct survey measurements at 1 cm and at 1 m from the surface or source at locations chosen above. Record readings in µR/hr.
- 6. Prepare survey diagrams of walls and floor for each area or room, with approximate dimensions and any unique features.
- 7. Note the locations of direct alpha, direct beta, smears, and gamma fixed measurements and all samples. Mark measurement and smear locations in the field using round adhesive backed circular stickers, markers, etc.
- 8. Record the maximum and average scan results, in cpm, on each wall and floor survey diagram.
- 9. Record the scan percentages completed for alpliaibeta and gamma scans on each wall and floor diagram.
Rev. 0 Page2 of4
Survey Package Worksheet ARRR-C0I0 (cont'd) Special Instructions I
- Source check instrumentation using Th-230 for alpha, Sr/Y-90 for alpha+
- Notify the ES Project Manager of locations that were flagged due to beta, and Cs-137 for gamma measurements.
elevated readings on surfaces. Use gas proportional detector model 43-68 (or equivalent) for total surface
- Notify the ES Project Manager of smear samples that were flagged due to activity surveys on walls. Use gas proportional detector model 43-37 ( or elevated removable results.
equivalent) for total surface activity surveys on floors. Notify the ES Project Manager of any exposure rate measurements that
- Perform 3 one-minute field background alpha and beta counts, using an exceed 25 µR/hr or 2 X background.
empty source holder prior to surveys. If needed, perform 3 one-minute
- Attach photographic records if available and provide descriptive background counts on a reference surface similar to the surface to be comments for each image under Survey Comments. Ensure that the surveyed.
Package ID No. and a page number ( e.g., Page Al) are included on each Use a model 44-10 (or equivalent) for gamma scan surveys and exposure attachment. rate measurements. Complete Survey Cover page with required location, date and instrument
- The MDC for removable alpha activity shall be less than 20 dpm/100 cm2 information. Complete remainder of Survey Form as applicable.
(preferable < 10 dpm/100 cm2) and for removable beta activity measurements shall be less than 150 dpm/100 cm2 (preferably< 100 dpm/100 cm2). Survey performance (Initial and date each survey task after completion) fl! L- ~ Gamma 1cm Im General Description efaSca~ Direct Beta Direct Alpha Smear Gross Scan Exposure Exposure Rate Samples Rate Floors J-tc. S-IR-f/ ~c__.r~ IJ-11,Ylr f:-18-(f Jee s-~17-11,Y<-r r--lt'fl ~ k/7-lt hs-n--rr NIA WaJJs JR-c. S--(i-// >(/ C-;f-/1 >t,, '!;--{!-(/ ~ S--/7-/( >C ~ff-fl ~ S-/7-rf ~c ~-/7---(/ NIA Rev. 0 Page 3 of4
Survey Package Worksheet ARRR-C0l0 (cont'd) Survey Comments /Sv,k -S~~,,.,.,+ cR~ '. "' ~ ~ ~)-\\.. i Jo)+i l '1 IPc ~ L~L r--rvf (-PAM li V V d ~ 1/4VI'\\: v,. ~ rJ,,,. <:L,.,J __ ~t:--~ to,ll_ ~-n~~,, h,.~..Jee.,_.,:,Q.,,Ao,,, i ~ L'~ V V I Package Review I Surveyor(s) Signatures: C~DL ~ Date Package Completed: S--(f-11 Package Reviewed by and Date: ff!I/} Ct~ 5)1, Rev.0 Page4 of4
Survey Diagram Room/Area: Tagging Area Entry Vestibule {!!_aJJwccy) --- 9.3ft I I 8.0 ft 8.0 ft l /Vk /V Wall l f 9.3 ft I
- ,,.,;;._'I
~ cA (fOCftl 7DCf>rt ~ 7,0oo Cf*..57Joo Cf(JA 8.0 ft 0~ I lfOO /,l~.J,,,oor j
- If, 1
.5 Wall I 8.0 ft l 9.3 ft I 031 'f1'fS'c 3'-f 4.5 ft ~ ~v1 c.t.Yll~ l i '31'~ _:,.~QtO rJ-- 3G. 'f> *7(;9~(D ~ ~ Floor L (D (f) (j) 9.3 ft (j) I /VA 4.5 ft ~ l Ceiling Date: ~--/7-// 4.5 ft --=:::.._ Wall 4.5 ft l/) Wall If- ~ I Q_ ""1. li--Oo
- 700, s?u (iO lo8D s3 b
I J,.rJ{J /300 3,9o g) 6<;o 37
Survey Diagram Room/ Area: Tagging Area 35.3ft __ r 12.3 ft l I 12.3 j Wall 35.3 ft /\\) Wall I 18.7 ft l I 18.7 ft l r 12.3 ft l i 12.3 ft l 35.3ft - -- Floor 35.3 ft 7 /VA I Ceiling Page # Z 4 G.Jl:4f ~ Date: I-/ 7-[(
- 18. 7 ft
=~
Wall 18.7 ft £ Wall
Room/Area: Tagging Area Back Rm Survey Diagram 10.0 ft r ~ r ( 12.3 ft \\Y I Ill a( It¥ 12.3 ft l l N Wall 10.0 ft I 12.3 ft I 12.3 ft j l Wall 10.0 ft i 10.0 ft l 10.0 ft I 10.0 ft NA l I Ceiling Page # 3 <Jtf-P Af Gicl Date: ~--/7-// 10.0 ft MA Wall 10.0ft CU Wall
(@ ([j} (/J) (jy <ff) (@ © 0 Survey Diagram Page # ~ f C f/Jt~ Room/Area: Storage Bldg #42 -- 24.3 ft ------+ I 11.0 ft l )..I.A-N Wall 24.3ft --- . ~~~v C suc1 1/oo l 11.0 ft lc-'---,.J:--, 'f}JJJ/,& ::l~ j r _£ Wall ~ ~<-i~ Cf!!J-t ~ I 't~o S 24.o ft s {L; 6 l si7 ii s.-o 3 I 4-07 t '-f Z.b 3 7 S-/ s 17 1s-, bJo/ s71 r io /U 3 ~ 0 3 I Lf l 24.0 ft l 24.3ft Floor --- 24.3ft Ceiling I 11.0 ft l I 11.0 ft l Date: S-/J-/( 24.0 ft -------+ .;.....;.-'-,,.....;J-~-,,.,--~c.:~ v ~~ lfi)o f--(1--...J.Jh"'() A.fs-.,,,.-,,.,,_.v lu Wall 24.0 ft Wall fl </ /J /3
Survey Diagram Room/ Area: Compressor Bldg Interior Page # C6fG~ Date: 5-/fl>-!( 14.2 ft --- 7.7ft l ~ ~. t'. l t .Jt>V Z.Sb / 2-. { 8.0 ft z<.u.1~ -2,,(),lj_ /Jt. 8.0 ft ,A l l v I'&, 7ltJ x z,- r ~Cfj4l, J 20 Z.,i'"Z:> j.r /O IV Wall 14.2 ft 7.7 ft l ~&'-';('(!/tf.. e::...v,. l 33v 8.0 ft o< 'it if 8.0 ft j J-- 2-z_ f.b lo l 'l)<lO~ N,A-tu Wall -..S Wall 14.2 ft I ~ i :i-oo 700 /~ f JooJl..fl 7.7 ft J-- l ~ jcAV>J 49 /t,. Floor 14.2 ft l £_ ,:::,(
- VA-3~3
~~- 7.7 ft '3>7lf _s-l Ceiling
Room/Area: Chemical Shed I 6.0 ft l I 6.0 ft j 6.7 ft ./l I Wall 6.7 ft _____;:=--- Wall I 4.1 ft l I 4.1 ft l Survey Diagram I 6.0 ft l I 6.0 ft l 6.7 ft "2 Floor 6.7 ft /V,A Ceiling Page # b 1 c r1:-l/tuR Date: S -JZ-1/ 4.1 ft 4.1 ft £,.. Wall ~ /c~ I ~ 7 r J ? II
Survey Package Worksheet for ARRRC-011 Package Identification No.: ARRR-C0l 1 Prepared by: Steve Croslin Location: Exterior Walls-Reactor Building, Building Date Prepared: 5/10/2011 Addition 1, Tagging Building, Storage Building Area Classification: Preliminary Class 3 Reviewed By: Area Description This characterization survey includes the exterior walls of the Reactor Building, Building Addition I, the Tagging Building, and the Storage Building. Historical Information This survey unit consists of the exterior walls of the Reactor Building, Building Addition 1, the Tagging Building, and the Storage Building. No releases of radioactive material that would have resulted in contamination of exterior walls were identified in the Historical Site Assessment. This is a Class 3 survey unit based on a low potential for the presence of contaminated or activated materials. General Survey Instructions
- 1. Choose a minimum of 20 measurement locations on exterior walls ( 4-6 on each building). Distribute locations proportionately based on relative sizes of buildings. Perform direct alpha and direct beta surface activity measurements independently at each of the 20 measurement locations for 1 minute each.
- 2. Note any wall locations that exceed 40 cpm/100 cm 2 total alpha or 450 cpm/100 cm2 total beta activity and determine the extent of the elevated area. (The elevated area limits are based on estimated backgrounds of 3 cpm/100 cm2 alpha and 340 cpm/100 cni2 beta on a 43-68)
- 3. Collect a removable surface activity sample over an area of 100 cm2 in size at 100% of the locations chosen in step
- 1, plus at judgmental locations at the discretion of the surveyor. A minimum of 20 removable activity measurement locations are required. Note removable results that exceed 10 dpm/100 cm2 alpha or 200 dpm/100 cm2 beta.
- 4. Perform 20 gamma direct survey measurements at 1 cm and at 1 m from the surface or source at locations chosen in step #1. Record readings in µR/hr.
- 5. Prepare survey diagrams of exterior walls for each building, with approximate dimensions and any unique features.
Identify exterior walls by side of building (e.g., north side of building).
- 6. Note the locations of direct alpha, direct beta, smears, and gamma fixed measurements. Also mark measurement locations in the field using round adhesive backed circular stickers, markers or equivalent.
Survey Package Worksheet ARRR-COll (cont'd) I Special Instructions I Source check instrumentation using Th-230 for alpha, SrN-90 for alpha+ Notify the ES Project Manager of locations that were flagged due to beta, and Cs-137 for gamma measurements. elevated readings on surfaces. Use gas proportional detector model 43-68 (or equivalent) for total surface
- Notify the ES Project Manager of smear samples that were flagged due to activity surveys on exterior walls.
elevated removable results. Perform 3 one-minute field background alpha and beta counts, using an
- Notify the ES Project Manager of any exposure rate measurements that empty source holder prior to surveys. If needed, perform 3 one-minute exceed 25 µR/hr or 2 X background.
background counts on a reference surface similar to the surface to be
- Attach photographic records if available and provide descriptive surveyed.
comments for each image under Survey Comments. Ensure that the Use a model 44-10 (or equivalent) for gamma exposure rate Package ID No. and a page number ( e.g., Page Al) are included on each measurements. attachment.
- The MDC for removable alpha activity shall be less than 20 dpm/100 cm2 Complete Survey Cover page with required location, date and instrument (preferable < 10 dpm/100 cm2) and for removable beta activity information. Complete remainder of Survey Form as applicable.
measurements shall be less than 150 dpm/100 cm2 (preferably< 100 dpm/100 cm2). Survey performance (Initial and date each survey task after completion) .4-iJ;~" \\ Gamma 1cm lm General Description Be a Scan Direct Beta Direct Alpha Smear Gross Scan Exposure Exposure Rate Samples Rate t:;:,J./ti73/{/~ I.. U}o,,UG ~ \\-IV-It Ye. S-i'f--/f ~L- ~-('f-{ I /l..lA A/A- ,~... ye s--N-tt ¥<:..- S--('f-/1 ..-dA ~ - I f f --c-Rev. 0 Page2 of4
f ~ All-A-I {, I ~ ~ ( ' ~
- ==-=+'I
-=- --=I =--i---------i-- I ~ ~ I I I I I I I I I i ~ I I I I S I -~ _,,,.--- I I I / ~ I I ~ ~ I I t I~ I /1 I ~ I I I / I ) / I I ~ \\,! I I I ~ ~ V /I I I I I~ I I I I I ~ I I - I Survey Package Worksheet ARRR-CO Rev. 0 Page 3 of 4
Survey Package Worksheet ARRR-COll (cont'd) Survey Comments JU-_,,, 'lr,-.. "°' ~,1 of ~x ~LO LtA+f-s 1/4-1) tlf4-,WJ-st.n-J( Cu4f v-f-BI.J I - Package Review Surveyor(s) Signatures: ~02-~ Date Package Completed: J--f'-l-! I Pa<kag, Reviewed by and Date, ~ ~ 0'flf'/ff Rev,0
Survey Diagram Building Addition 1 Exterior Walls
60.7 ft r I Bldg Add l ~
Side Wall 13.7 ft l 13.7 ft j l 13.7 ft l r 13.7 ft l CD i tt<t Cf"" o< I::, /c-7,Jl./~ I-e,,,
45.0 ft
~ti{ Cf"" ,A 7 /c..,_ 1 d1/~ I- /;;.. I Bldg Add 1 ~ Side Wall .$ B t; 1ft 3 Cj'.., @; 437 er'~ ,I... (o le-. 1.H.J1/i,._ Z-7.. @)-£> 'tff Cf-
60.7 ft I Bldg Add 1 ~
Side Wall
45.0 ft I Bldg Add 1 _lj__ Side Wall 7
/c.,.., ;iC -~t.. /ws 3$ ~ Page #: / M, v1t Date: S-/'f-1/
Survey Diagram Reactor Bid g Exterior Walls r 22.5 ft l 22.5 ft l r 22.5 ft l 81.9 ft I Reactor Bldg /v' Side Wall I fo'lr 40.2 ft ___ j Reactor Bldg _s;====---=== Side Wall I SJ Mt 'f3/tf (!!) i 'tl/tf,y-o1--. 3o fc..-. r,, /'!,..Jyh (,,.... 3/t; 40.2 ft 1de Wall j I Reactor Bldg l,tJ S. Page #: z.. ~ Date:..:::,--/ lf - I I
Survey Diagram Tagging Building Exterior Walls
39.8 ft 12.7 ft 12.7 ft 12.7 ft I Tagging Bldg ~
Side Wall g ~\\:y/oJ3 (!j) ~ I 2.}f 7 Cf""' /6 lt Jc.,.... r" J/"' /...,... /oj,..
- 18. 7 ft I Tagging Bldg_!:!_ Side Wall
@.j) </3't(,, Cf>""" ,,c..,)J. --r:r+ It ~<.:_ Jc..... ~-8-VAA/~ I- '-160 1 - ---- 18.7 ft I Tagging Bldg ~ Side Wall ~ S-ll Cf vv- ,,,t.- II " / c.,.,_ 'f '-I p}t I h /""' 4d 1 Page #:.3 /rift{) Date: ~--/'-f-1(
Survey Diagram Storage Building Exterior Walls 24.3 ft I I Storage Bldg~ Side Wall 11.0 ft l
24.0ft ------
1 I Storage Bldg __!:_ Side Wall 11.0 ft l 24.3 ft I I Storage Bldg~ Side Wall I 1.0 ft l
24.0 ft - -----
I I Storage Bldg __0d__ Side Wall I 1.0 ft l Page #: 'f 1t:~ p 11, ~ 5oui/,, W ~. 1()11,JC
Survey Package Worksheet for ARRRC-012 Package Identification No.: ARRR-C012 Prepared by: Steve Croslin Location: Exterior Walls-Demineralizer Building, Heat Exchanger Building, Compressor Building, Maintenance Date Prepared: 5/10/2011 Office, Chemical Storage Shed Area Classification: Preliminary Class 3 Reviewed By: Area Description This characterization survey includes the exterior walls of the Demineralizer Building, the Heat Exchanger Building, the Compressor Building, the Maintenance Office and the Chemical Storage Shed. Historical Information This survey unit consists of the exterior walls of Demineralizer Building, the Heat Exchanger Building, the Compressor Building, the Maintenance Office and the Chemical Storage Shed (Areas 24, 26, 28, 25, & 46). No releases of radioactive material that would have resulted in contamination of exterior walls were identified in the Historical Site Assessment. This is a Class 3 survey unit based on a low potential for the presence of contaminated or activated materials. General Survey Instructions V 1. Choose a minimum of 20 measurement locations on exterior walls (4-5 on each building). Distribute locations proportionately based on relative sizes of buildings. Perfo1m direct alpha and direct beta surface activity measurements independently at each of the 20 measurement locations for 1 minute each.
- 2. Note any wall locations that exceed 40 cpm/100 cm2 total alpha or 450 cpm/100 cm2 total beta activity and determine the extent of the elevated area. (The elevated area limits are based on estimated backgrounds of 3 cpm/100 cm2 alpha and 340 cpm/100 cm2 beta on a 43-68)
- 3. Collect a removable surface activity sample over an area of 100 cm2 in size at 100% of the locations chosen in step
- 1, plus at judgmental locations at the discretion of the surveyor. A minimum of 20 removable activity measurement locations are required. Note removable results that exceed 10 dpm/100 cm2 alpha or 200 dpm/100 cm2 beta.
v
- 4. Perform 20 gamma direct survey measurements at 1 cm and at 1 m from the surface or source at locations chosen in step #1. Record readings in µR/hr.
v
- 5. Prepare survey diagrams of exterior walls for each building, with approximate dimensions and any unique features.
V Identify exterior walls by side of building (e.g., no1tb side of building).
- 6. Note the locations of direct alpha, direct beta, smears, and gamma fixed measurements. Also, mark measurement locations in the field using round adhesive backed circular stickers, markers or equivalent.
Survey Package Worksheet ARRR-C012 (cont'd) I Special Instructions I Source check instrumentation using Th-230 for alpha, Sr/Y-90 for alpha +
- Notify the ES Project Manager of locations that were flagged due to beta, and Cs-137 for gamma measurements.
elevated readings on surfaces. Use gas proportional detector model 43-68 (or equivalent) for total surface
- Notify the ES Project Manager of smear samples that were flagged due to activity surveys on exterior walls.
elevated removable results. Perform 3 one-minute field background alpha and beta counts, using an
- Notify the ES Project Manager of any exposure rate measurements that empty source holder prior to surveys. If needed, perform 3 one-minute exceed 25 µR/hr or 2 X background.
background counts on a reference surface similar to the surface to be Attach photographic records if available and provide descriptive surveyed. comments for each image under Survey Comments. Ensure that the
- Use a model 44-10 (or equivalent) for gamma scan surveys and exposure Package ID No. and a page number ( e.g., Page Al) are included on each rate measurements.
attachment.
- The MDC for removable alpha activity shall be less than 20 dpm/100 cm2 Complete Survey Cover page with required location, date and instrument (preferable < 10 dpm/100 cm2) and for removable beta activity information. Complete remainder of Survey Form as applicable.
measurements shall be less than 150 dpm/100 cni2 (preferably< 100 dpm/100 cm2). Survey performance (Initial and date each survey task after completion) Gamma 1cm lm General Description Beta Scan Direct Beta Direct Alpha Smear Gross Scan Exposure Exposure Rate Samples Rate '!)em uJ'fRAu-u:R. ?;)CT' Wiks NIA ,J/1t 5..,i,,1 W 1..,,,,,/(~ NIA J:;1'1-../I ~ /Tl-I( W NIA W).AASf--pl l~ l/ C Ofl=( ~ ffi°\\JJ.1.ll h NIA .) ( NIA r NIA \\ ~ ~ ~'1,C/M~ ~ ~ NIA ~ \\ I NIA ) '\\ NIA &vnf~ *Fr:D~ WAU.~ ~ Zn g.,;8-11 0v ) NIA ) NIA (' Jfuri1 I (A-L ~14.U'G ~~ NIA 0 1 'b-{( <p., ~ ~ NIA '\\ '/ \\.V NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA Rev. 0 Page2 of4
s 'J Package Worksheet ARRR-C012 (cont'd)
- ~
NIA NIA NIA NIA NIA NIA NIA [' NIA NIA NIA \\ NIA NIA NIA \\ NIA NIA NIA \\ NIA NIA \\ NIA \\ NIA NIA NIA \\ I NIA NIA NIA I / NIA NIA NIA / NIA NIA NIA / / NIA NIA NIA / NIA NIA NIA / NIA NIA NIA / \\ NIA NIA \\ NIA 7 \\ NIA NIA / NIA / \\ NIA NIA NIA I \\ NIA NIA \\ NIA / NIA NIA NIA / NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA Rev. 0 Page 3 of4
Survey Package Worksheet ARRR-C012 (cont'd) Survey Comments Package Review Date Package Completed: £,_,,, / % / / / Package Reviewed by and Date: 0l1I' ~ ~/ (, / / Rev.0
Survey Diagram Demineralizer Building Exterior Walls 7.5 ft Demineralizer Bldg ~ Side 7.0 ft I 3.6 ft I Demmeraiizer Bldg ~ Side I 7.0 ft _k!._ ft Dernineralizer Bldg 1'1,tJ".f!: Side Wall 7.0 ft &) Page #: l ~53/4/J-a4t._ Date: 5 tl
Survey Diagram Heat Exchanger Building Exterior Walls 11.3 ft I Heat Exch Bldg~ Side 7.0 ft 4.1 ft Heat Exch Bld~ Side 7.0 ft I 4.1 ft Heat Exch Bldg ~ iide 7.0 ft Page #: 2- &F 5* Date: 5 1/ /1;~
Survey Diagram Compressor Building Exterior Walls 14.2 ft I Compressor Bldg ~rfllSide I Lt,~ (::i... 1'1~1( ~ 8.0 ft I 7.7 ft Compressor Bldg ~ Side NO ~ 15.-,t1* 1/ 8.0 ft 14.2 ft I Compressor Bldg ~ Side I 0&ri ~,,,1111 8.0 ft Page#: 3 {}f" S Date: 6-1'1-I { ~ - --* 7 '7'.--, CtiMPPl&JcJfL p"u:;> ~
Survey Diagram Maintenance Office Exterior Walls I o/ i,~1'1~/ 1)4 ft Maintenance Office ~ Side 7.0 ft 9.3 ft Maintenance Office Side Wall 7.0 ft
~
ft Maintenance Office~ ide Wall 7.0 ft I Page#: 1 ~F6-~ Date: 6/JJ..-/ I
Survey Diagram Chemical Storage Shed Exterior Walls 6.7 ft Page#:~ Date: Jf--1'1.,, f I 4.1 ft Chemical Storage Shed lliR:ffi-Side Wall Chemical Storage ShedG45f" Side Wall 6.0 ft l 6.7 ft 4.1 ft r Chemical Storage She~ Side Wall Chemical Storage She~1Side Wall 6.0 ft
.' 1* ~ I r~,- .";i......_ j ~,- l_ L z_ I I =. I
- I
' *-,.I I r.... -:..~ I 't \\**\\I_.. - t * - .. -r-
- ...r...
I r I ~cM-Gt \\:2-- I * .~mma_-!!J/_4 ~ I tV"i l
- r.*
- 7 _,
LC ~ 0 D ' - \\ II
- t.*
.,..,. 3700 Y~t>o 37d)
- uoo 3Du 2<<J
- ... -rr *.. -f-
- , i I
- r.
I + 1, 11 I "'I* -.. ?_ .., 'J -*, I r /D I ' I -i I l"2....- S -tr-/ I _c;-t ~ - I ( ~ i°lO 1:U:f '31 ,I r
- 7 r
- 3,o rj11 j l
-: r '~- 2..o
- I i I
~ I I _n .L T-
- ..i I,*
lo ..., L I
- 3
,_ I i I-. I I II ..,A_. ._. I* I *; i..J I r - J"
- n.,.
--. ---- ~.- *. )- =-- ---,..... "z:"'.,_- - i..l ~..... _ -,_I.' !> 77 I
- L I '1 ~
~- I I* I ~ ?-SC -, ---c.. -~ ~ ,,.. I 'Z.i J l 1 I I zs-, ~ ~ ~7'1 J. I I ' l -r
Survey Package Worksheet for ARRRC-0'09 Package Identification No.: ARRR-C009 Prepared by: Steve Croslin Location: Reactor Building - Business Office, Date Prepared: 5/10/2011 Accounting Office, Ladies Room, Men's Room Area Classification: Preliminary Class 3 Reviewed By: Area Description This characterization survey includes the following areas in the Reactor Building: Men's Room, Ladies Room, Business Office and Accounting Office (Rooms 14, 15, 18 & 19). Historical Information Rooms 14 and 15 are the Men's Restroom and the Ladies Restroom, respectively. They appear to have 12-in by 12-in vinyl floor tiles, false ceilings and drains that connect to the city sewer system. Room 18 includes a hallway and the Business Office and Room 19 is the Accounting Office. These offices have floors cover~d with industrial grade carpet and they both have false ceilings. No records indicating radiological or chemical use or storage were identified. This is a Class 3 survey unit based on a low potential for the presence of contaminated or activated materials. General Survey Instructions
- 1. Perform alpha + beta scans at a speed not to exceed 1 detector width per second on 20 % of floors using a 43-37 detector and 20% of wall surfaces using a 43-68 detector. Listen to audible output using headphones, if available.
- 2. Choose a minimum of 20 measurement locations on floors and 10 locations on walls (including elevated locations). Distribute locations proportionately based on relative sizes of rooms or areas. If elevated areas were identified based on scan measurements, select the location of the highest activity for direct survey measurements.
Perform direct alpha and direct beta surface activity measurements independently at each of the 30 measurement locations for 1 minute each.
- 3. Note any wall locations that exceed 40 cprn/100 cm2 total alpha or 450 q~rn/100 cm2 total beta activity and determine the extent of the elevated area. Note any floor locations that exceed 60 cprn/100 cm2 total alpha or 1,500 cprn/ 100 cm2 total beta activity and determine the extent of the elevated area. (The elevated area limits are based on estimated backgrounds of 3 cprn/100 cm2 alpha and 340 cprn/100 cm2 beta on a 43-68 and estimated backgrounds of 7 cprn/100 cm2 alpha and 1,330 cprn/100 cm2 beta on a 43-37.)
- 4. Collect a removable surface activity sample over an area of 100 cm2 in size at 100% of the locations chosen in step #2, plus at judgmental locations at the discretion of the surveyor. A minimum of 30 removable activity measurement locations are required. Note removable results that exceed 10 dprn/100 cm2 alpha or 200 dprn/100 cm2 beta.
- 5. Perform a gamma scan survey of surfaces and penetrations (if applicable) at a speed not to exceed 0.5 meters per second, on 20% of floor and 20% of the wall areas. Perform at least 30 gamma direct survey measurements at 1 cm and at 1 m from the surface or source at locations chosen in step #2. Record readings in µR/hr.
- 6. Prepare survey diagrams of walls, floor and ceiling for each area or room, with approximate dimensions and any unique features.
- 7. Note the locations of, direct alpha, direct beta, smears, and gamma fixed measurements and all samples. Also mark measurement and sample locations in the field using round adhesive backed circular stickers, markers, or equivalent.
- 8. Record the maximum and average scan results, in cpm, on each wall and floor survey diagram.
- 9. Record the scan percentages completed for alpha/beta and gamma scans on each wall and floor diagram.
Rev. 0 Pagel o~C
I Rev. 0 Survey Package Worksheet ARRR-C009 (cont'd) Special Instructions Source check instrumentation using Th-230 for alpha, Sr/Y-90 for alpha+
- Notify the ES Project Manager oflocations that were flagged in Step #2 beta, and Cs-137 for. gamma measurements.
due to elevated readings on surfaces. Use gas proportional detector model 43-68 (or equivalent) for total surface
- Notify the ES Project Manager of smear samples that were flagged in Step activity surveys on walls and ceilings. Use gas proportional detector
- 4 due to elevated removable results.
model 43-37 (or equivalent) for total surface activity surveys on floors.
- Notify the ES Project Manager of any exposure rate measurements that Perform 3 one-minute field background alpha and beta counts, using an exceed 25 µR/hr or 2 X background.
empty source holder prior to surveys. If needed, perform 3 one-minute
- Attach photographic records if available and provide descriptive background counts on a reference surface similar to the surface to be comments for each image under Survey Comments. Ensure that the surveyed.
Package ID No. and a page number (e.g., Page Al) are included on each Use a model 44-10 ( or equivalent) for gamma scan surveys and exposure attachment. rate measurements. Complete Survey Cover page with required location, date and instrument The MDC for removable alpha activity shall be less than 20 dpm/100 cm2 information. Complete remainder of Survey Form as applicable. (preferable < 10 dpm/100 cm2) and for removable beta activity measurements shall be less than 150 dprn/100 cm2 (preferably< 100 dprn/100 cm2). Survey performance (Initial and date each survey task after completion) Gamma General Description BetaSca:I Direct Beta Direct Alpha Smear Gross At.Fi-IA 5CA Scan North Wall Surfaces 5... (5-1/!7-,,-- 6; ~( 3'.-,1 \\/),,.-.,G--13-(\\ 11...-- 5...,z...-11 r,;_.t5--tz-tt ~ East Wall Surfaces "\\ ~ "'\\ ~ South Wall Surfaces ) ) ) } ) West Wall Surfaces
- lr-(
( I I Floor S~l~I( lL ~\\,/)/ ~ ,J; -~ ~Or-- Ceiling t-J/A- ,/4J /4 NIA tv/1/ NI# 1cm lm Exposure Rate Exposure Rate
- trz--11 w 6,-./1-1( W
~ } I I JPv {,tJ;/ N/fl t1J/4 Samples NIA \\ \\ ) \\. I/ i Page~ fj ~ " I
w Survey Package Worksheet ARRR-C009 (cont'd)
I Survey Comments I
~A-$'T'ERJJ A-~Ards + M~S
/
12cevYtS A"'R"G.
\\rv1T\\--\\ I rJ It- {-t )Gt-f 13Aci<-G~~ b
~/:/;
1<.Avt ATl 6~ Co rJ1, r.1 G- -r +r /lo u 6-1-1 GAST W./4-LL-$
A--5 ~L
~ (?:E I LI N G-/ ~
~
JVh1 1ial; UJ (} dr-~/Ullf_ rn-Mfu,;,/4,>;
V fl-tcOClN!l~6-
~
EA--5~12-IJ
/4-fe£A e)',F
{)FFl (__~ ($
w t--n-\\\\N AN e.~VAT£b -~f!_Oi"-ND A-/2EA_.
~
47f.A-tJ+£D ut!t-Gcr ~~ V\\'\\tz~l{ '2El'Y7N'T \\<_1351..t L'T$
I 62-A-J11n11t ~
1<.f::SulQ's If 1TAC# E:D ~
- CON\\ft::Nl6~Cc;;- ~
Package Review Sumyo,(s) S;gn,turns~iu:1-Date Package Completed:
£-1?>-I /
Package Reviewed by and Date: xfW~ 5/111 Rev.0
Room/Area: Business Office 23.4 f_p Al 011:t\\} Wall I
Avgcp 9.5 ft m
j rzJ
~tc:r~ Wall Avgcpm:
Maxcpm:
10.3 ft l
Avgcpm:
Maxcpm:
I I 0.3 ft l
Survey Diagram r
9.5 ft l
I 9.5 ft l
Ceiling Avgcpm:
tf2.{)
Max cpm: i( ~3c> /
Avgcpm:I,c,n
- ~
, Max cpm: °:Jf 2H-Oo0 --- j1 Vf /rn,u,1 ~ ~ I CPM
- 0 ~- 03/ 3bk.. cp m
~ .!!,. G%! fl l Gt-{- B~ -r!-1-12..l{ N ~EJJ-1 ~$;'(' u.)/JlL rn::: {-l(<:645 N6T SCANNED
Survey Diagram Room/Area: Accounting Office r Avgcpm:,i~ Maxcpm: 9.5 ft l rJ' Scv-,-n,\\- Wall I 9.5 ft j ~ NOR:rftwan 11.3 ft Avgcpm: Maxcpm: I 9.8 ft l --- 11.3ft Avgcpm: Maxcpm: I 9.8 ft l Ceiling r 9.5 ft l I 9.5 ft l Avgcpm: ro Maxcpm: z.of\\/\\/\\__ WB'=>TWall Avg cpm: 7t.o40 Max cp,2/1 030 ~ I N t fi'V0/'IM(_ ~JCPM ~of '2~3 I< <-P JIY1
Survey Diagram ?-u{JtJu71f!! Page#~ Room/Area: Ladies Room c!_/.fJ 5U{/)'o/ 5 Date: 5--1/.-(/ I 9.5 ft l I 9.5 ft j Avgcpm: Maxcpm: Avgcpm: Maxcpm: Avg cpm: f C[<!(J° l,/7 Max cpm: i/ '303D - Avg cpm: / / 1 MtsiJ /,,'7 Maxcpm:-z//1={<fQ I/ l/f~ m ~TH Wall I 5.8 ft l I 5.8 ft l --- 8.3ft Floor --- 8.3ft Ceiling I 9.5 ft l I 9.5 ft l Avg cpm: / IOtO Max cpm:? 3 {?,0 ~~y f#ST: Wall 5,. . 7 Avg cpm: ( / (o?, 0 /l_/L.,.-1_ ~ax cpm: 7=/ T2;V== WST Wall t f}v ?/>>ta>>_ r-J c<. ~-; r1111 [ L5 /.. Cff 2.,~/< CPJrJ f
Survey Diagram Room/Area: Men's Room oe IP 5'/lrtvrr 5 Date: 5 ---lf.,. tl r 9.5 ft l I 9.5 ft j Avgcpm: Maxcpm: Avgcpm: Maxcpm: ft NOltt1+Wall Avg cpm: fl. ?,~C / Max cpm: z I 2..DO SJ\\,\\.,~ Wall I 6.9 ft l I /tiSI~ CU"iCI 8.3 ft Floor -~- 8.3ft I 6.9 ft l Ceiling r 9.5 ft l I Avg cpm: IJ L/l/0 -~--- Maxcpm:il / ~ 9.5ft ~:- _,,) ~ l I '---,,'-'-----"----=------ liJ'r&,1 W, all Av3 I ffli!..X v-- ~ 7 C,fJ'Y) /8
- 1. qX/ Z, &> k crrn
Room/Area: Business Office -- 23.4ft --- 10.3ft I Avg~ ~6 41 'Jv., Max~ \\ ;75~R hR-. 9.5 ft l t3t/n.. 9.5 ft l ~ Wall -- 23.4 ft --- 2m;zh-it==--- 10.3 ft ----+ I t Avg~ \\.,\\ ~ h~ I Max~ ;)_~/AIL 9.5 ft 9.5 ft j l
- ~ogo~~
@ tm/Jn St._11\\- Wall e\\5,T Wall --- 23.4ft --- ')] °RE:+1P1tX'-oS ARE 1"1/'ARjhr Avg~zoc44 Max~ i ~00 Ar# 10.3 ft J l i-l l Avgcpm: Maxcpm: I 10.3 ft l /:J-r / (! /11 I/ /VI ll tJ Le'S:5 iuri/f irl, ~0Tc1) <-1ta/12.s w/.l 'g8/qi /Jv14 __ 2E/3o Jt/iv - -- 23.4 ft --- I'\\, ~~ts\\! ,-------------, 1)..~1e... Ceiling
Survey Diagram Room/Area: Accounting Office \\33 r 9.5 ft l I 9.5 ft j Avgcpm: Maxcpm: -- 11.3 ft --- AvgSf)ffl"'. 4t? )k~ .(11) Max~ \\ 3fi' /4rtµU.- 11.3 ft r 9.5 ft l I 9.5 ft l 11.3ft --- I (ij) ,zs/-g6 J,t,. /1.i
9.8ft lL@"" Wall 9.8 ft 9.8 ft l
40/53))}..j./A ~ ,/'1 'i ~IIJ65 ARE 1N ,;uR/hf2-@ \\ c:rh / I ~ I 9.8 ft l _<2J);;jra7 JJf?./ I 9 Floor 11.3 ft --- Ceiling
Survey Diagram Room/ Area: Ladies Room I 9.5 ft l I 9.5 ft j --- 8.3ft Avg cpm: *:, -:15 Max cpm: Afi5 NOR:i"#-1 Wall 8.3 ft Avgcpm:(i.f'S Maxcpm:2-CJ; .93:Wff wall - -- 8.3ft Avg~: 8:-) Max~ lltf' Avgcpm: Maxcpm: I --- 8.3ft I 5.8 ft l Ceiling 5.8 ft 415-..... j .-A-v~g.-cp_m_: -\\-'r,':;>-------. 1 Maxcpm: 415 9.5 ft l I 9.5 ft l f {'I I 5.8 ft Avg cpm: (oQ Max cpm: \\OS ---- W-£St Wall
Survey Diagram Room/Area: Men's Room I 9.5 ft l I 9.5 ft 8.3 ft Avg~:~c) Max~: ltl'? N.-Om-Wall 8.3 ft Avg~ ('5 Max~: ~;1? 1f1S i" I 9.5 ft l 1 9.5 ft qi 101qi l -,J,rPt& ./~ -.,, /~f l i@ \\.,...., ~+I Wall 8.3 ft Avg,epm, ~ I ( lf / /tf'rl Max~ q-5 6.9 ft r\\ fQ-zf_qo -2JJ./55 !1{J!;.{) J;c/Jft7 Floor 8.3 ft Avgcpm: I Maxcpm:
- v/11 6.9 ft l
Ceiling Date: --- 6.9ft Avg~ \\W Max~ 4-\\5 q6 ~St" Wall. 6.9 ft Avg~ \\00 Max.,;pm; f {.l) 0 lioO ~,- Wall
+-i---- ___ ff~ h~_;_-~~3_';_?
- 1 _ ____ _
~ c:::::,L_ t ~ 2... z_ 0 +/-21> ~-~?0"==F_i)__,_l __ ~_ff:_,__ ____ _ -~-+!----~---'--'* '-"'-. h.. -~-*~-------- 3 D --1--++--":----7::...:,:;.33_, ______ ~------- 5 ( -~{3~--++--~--_,6~i-~. -~~~------- _ l__,__c/ ___ \\ ___ 1-Qf---=---,~------- _ 1::s_~_ o_* ~--1_\\i?L. __________ _ 1(p 5 7oz. --' '---H-- -~--3:_q~:..-~-*-~-------- 1 S zg _ !_9_---+t--_ l_~ __ ~_f_1~C)_V __ 9~-~-~--------- _ z_o _ --H--_J~.--- *37 ~~~ ~ ~\\ \\
,H------- -*~ -~----------
-z_-z_... 10
H-_o_*.. -**~--J.{?2________~--------
~_ 1-'-,,--+t--- 2=>_.~--------*-~ ~~-~~*~ -~------- 2.t 3 1 *~~I
\\OS _1 __ -fi-f!-'-"2_;_5 ____ ?>O .2-2-__
- 3..,.,~o _________
2- -* l '35 t(8 J5 Ji]___ _ \\ ___ ZO ________ (po sz-_ ~ ~\\3cr q2-
- J6
?Fl ,A7 ]-S ~S '6 ~ 0 1 [ /() C _!Jj _____. __________ f I 4<+- ~S 7o t2.S !...__-~=---\\62 _ __..:.._~-=-~----------- r v::5o , 3 ?.:> ---'--+-----++----~--=-..-----**-=a-------------
H---i-~ ___ 91.__~ *-~- -----------
_Q_~v __ q ___ ~_o ___ 7~---------- _Z-_r __________ ~_ -1L ____ ~-----~------------- riv 00 ---"---H-~--~--------- :3 4\\'> 0~
Survey Package Worksheet for ARRRC-010 Package Identification No.: ARRR-C0l0 Prepared by: Steve Croslin Location: Reactor Building - Entry Vestibule, Tagging Area, Tagging Back Room, Storage Building, Compressor Date Prepared: 5/17/2011 Building and Chemical Shed. Area Classification: Preliminary Class 3 Reviewed By: Area Description This characterization. survey includes the following areas in the Reactor Building: ~ estibule, Tagging Area, Tagging Back Room, Storage Building, Compressor Building and Chemical Shed (Areas 22, 42, 28 & 46). Historical Information The Tagging Area Building is a 20 foot by 40 foot steel structure with internal rooms built of fire resistant framing and
- sheetrock covering except for the wall toward the Reactor Building, which is a cinderblock wall. It contains the Tagging Area, the Tagging Area Back Room, and an estibule. The Tagging Area includes a 35-foot by 19-foot portion of the Tagging Area Building. The floors are bare concrete, the ceiling is over 12 feet in height and there are doorways to the outside and operating areas. This area also includes many heavy-duty work tables that are used to set up the exposure trays for N-Ray radiography work.
the Reactor Building and the Tagging Area. It has a concrete floor with drywall on walls and the c.:tiling. The Storage Building, also known as the forklift garage, is an uninsulated 24-foot by 26-foot steel structure built of fire resistant framing and metal walls and ceiling. The Storage Building is not connected to any other buildings and it has a garage door that opens to the east and a personnel door that opens to the south. It is used for forklift parking, equipment and supply storage, and as a fabrication area. The Compressor Building is a 14-foot by 8-foot by 8-foot tall metal structure on the south side of the Operations Building. It contains two conventional piston type air compressors and three oil-filled vacuum pumps. The Chemical Shed is a 6.5-foot by 4-foot by 6-foot tall metal strncture mounted on wooden skids located the north side of the Operations Building. No records indicating radiological use or storage were identified for any of the areas. This is a Class 3 survey unit based on a low potential for the presence of contaminated or activated materials. Page 1 of4 I
Survey Package Worksheet ARRR-C0IO (cont'd) General Survey Instructions
- 1. Perform alpha + beta scans at a speed not to exceed 1 detector width per second on 20% of floors using a 43-37 detector and 20 % of wall surfaces using a 43-68 detector. Listen to audible output using headphones, if
- 2. ~~a~~~~le~ minimum of 20 measurement locations on floors and 10 locations on walls ~il~including elevated locations). Distribute locations proportionately based on relative sizes of rooms or areas. If elevated areas were identified based on scan measurements, select the location of the highest activity for direct survey measurements. Perform direct alpha and direct beta surface activity measurements independently at each of the 30 measurement locations for 1 minute each.
- 3. Note any wall locations that exceed 40 cpm/100 cm2 total alpha or 450 cpm/100 cm2 total beta activity and determine the extent of the elevated area. Note any floor locations that exceed 60 cpm/100 cm2 total alpha or 1,500 cpm/100 cm2 total beta activity and determine the extent of the elevated area.
- 4. Collect a removable surface activity sample over an area of 100 cm2 in size at 100% of the locations chosen above, plus at judgmental locations at the discretion of the surveyor. A minimum of 30 removable activity measurement locations are required.
- 5. Perform a gamma scan survey of surfaces and penetrations (if applicable) at a speed not to exceed 0.5 meters per second, on 20% of floor and 20 % of the wall areas. Perform at least 20 gamma direct survey measurements at 1 cm and at 1 m from the surface or source at locations chosen above. Record readings in µR/hr.
- 6. Prepare survey diagrams of walls and floor for each area or room, with approximate dimensions and any unique features.
- 7. Note the locations of direct alpha, direct beta, smears, and gamma fixed measurements and all samples. Mark measurement and smear locations in the field using round adhesive backed circular stickers, markers, etc.
- 8. Record the maximum and average scan results, in cpm, on each wall and floor survey diagram.
- 9. Record the scan percentages completed for alplia/beta and gamma scans on each wall and floor diagram.
Rev. 0 Page2 of 4
Survey Package Worksheet ARRR-COlO (cont'd) I Special Instructions I Source check instrumentation using Th-230 for alpha, Sr/Y-90 for alpha+
- Notify the ES Project Manager of locations that were flagged due to beta, and Cs-137 for gamma measurements.
elevated readings on surfaces.
- Use gas proportional detector model 43-68 (or equivalent) for total surface
- Notify the ES Project Manager of smear samples that were flagged due to activity surveys on walls. Use gas proportional detector model 43-37 (or elevated removable results.
equivalent) for total surface activity surveys on floors. Notify the ES Project Manager of any exposure rate measurements that
- Perform 3 one-minute field background alpha and beta counts, using an exceed 25 µR/hr or 2 X background.
empty source holder prior to surveys. If needed, perform 3 one-minute Attach photographic records if available and provide descriptive background counts on a reference surface similar to the surface to be comments for each image under Survey Comments. Ensure that the surveyed. Package ID No. and a page number (e.g., Page Al) are included on each
- Use a model 44-10 (or equivalent) for gamma scan surveys and exposure attachment.
rate measurements.
- Complete Survey Cover page with required location, date and instrument The MDC for removable alpha activity shall be less than 20 dpm/100 cm2 information. Complete remainder of Survey Form as applicable.
(preferable < 10 dpm/100 cm2) and for removable beta activity measurements shall be less than 150 dpm/100 cm2 (preferably< 100 dpm/100 cm2). Survey performance (Initial and date each survey task after completion) ii l. ~ Gamma 1cm lm General Description efa&a~ Direct Beta Direct Alpha Smear Gross Scan Exposure Exposure Rate Samples Rate Floors fa-c s-~18-I1 J#-c_ r~ IR-/1 t.t,~ S":f8-tf Jee s-~17-11 >-7-(' S"-/trb ~ k:.17-lt kS-t7--fl NIA Walls k s--rf-11 >u C-1g-(1 ..>t,,, r~1r-11 ~ S"-/7-f(.J..c Sii-11 ~ .S--(7-tf 5,Rc ')-/7-f I NIA Rev. O Page 3 of 4
Survey Package Worksheet ARRR-COlO (cont'd) Survey Comments
- Be>--\\-t;.
-S~~ IA.+ ~ ': "' ~ .~ ~)- \\.. l Jo J--h l d Q_. A '-0 L~L fi,y.R '°A~>-e ( ~ ~ V 3 £__.,.,._ ~.,,_ *" rl.,,~ cL,,.l ~f~-&Y-- tv~. <:;{<<~~,, h,) _£_.,_ < Jl...,.,A),., i ~ ~/Ji V () J - Package Review Surveyor(s) Signatures: ~
~ce_ ~
Date_ Package Completed: S-*-l!-1/ Package Reviewed by and Date: x)l;J t~. J)~, Rev. 0 Page4 of4
Survey Diagram Room/ Area: Tagging Area Entry Vestibule ~wCLy) --- 4.5ft 9.3 ft Date: S-/7-/f r r ~ !3:<:!t t:,o C(J1/., 'f6 C/>t 8()00 8.0 ft l /Vk 8.0 ft l 'f-SbJ,l f ft- /V Wall --='----Wall 9.3 ft 4.5 ft I d-.. !::+/-:f__ ~ f/0 Cfl'A.
- 7DCfdi,
~ 7,0oo tpt1-.5()06 Cf(JA 8.0 ft 0~ {oo J,t#k 300,r j Jlf"'\\ 1 .J Wall I 8.0 ft l l/J Wall 9.3 ft 4 I QJl 'f1'f~c ?.,'f -~ 4.5 ft ...,,._,,c ~ ~ "1 <:/!!' l i '32~ [).!.t(JtO rf.. J(;. 0 i '169~(D ~~ Floor L {c..£--1. b (D /.~7>0 (.5,,'1.>i.J {J) 700 /300 (r) s?o 370 (j) 60 .g) 9.3 ft (j) /o8o 670 I /VA 4.5 ft 33 37 l Ceiling
Survey Diagram Room/ Area: Tagging Area 35.3 ft I ~..f:JL..¥ f /SOD
- I'/
ITT)D ->>t, oZ /0 g-1 12.3 ft JJ.1-j;_ @~ l/4} l 6JJA!k L -tte-j I 12.3 ft l -5 Wall 35.3 ft I I 12.3 12.3 ft j
- Vlt l
I\\) Wall 35.3 ft I 18.7 ft l Floor 35.3 ft I 18.7 ft
- Vf}
l Ceiling Page# Z &[ 0 /r4f~ Date:.r-J?-f{ 18.7 ft .. t.,.c..."f.' avl ~'-Du tf'!JJ l.foo c:f11t ol.. 1 Cf 1'--
- S- <?f)1.)
a lfo /41.it 0t Jo,l,{~./lt - Wall 18.7 ft ,,,t>A £ Wall
Room/ Area: Tagging Area Back Rm Survey Diagram i [?, .:,,i... { 12.3 ft l I 12.3 ft j 10.0 ft e,.,,_c,_y:;. ,0 ) o( 8¥ N Wall 10.0 ft --=-- Wall I 10.0 ft l I 10.0 ft l 'Jtl i 12.3 ft l I 12.3 ft l 10.0 ft 10.0 ft NA Ceiling Page# 31Jf+/-ffed_ Date: ~--/7- // 10.0 ft _.:;:__Wall 10.0ft CU Wall
Survey Diagram Page# 'f,C~ Room/ Area: Storage Bldg #42 Date:.S--{J-/ { 24.3 ft 24.0ft --- i i J ~-'-"-~ - ~(} l--""-"1d--9----.:J.J~,.._.fr 11.0 ft 11.0 ft l pk 7v Wall l Cu Wall 24.3 ft 24.0ft -----+ I . ~~t<u C St,'1 I/or) [ if 'fS-M/1" :10 I 11.0 ft 11.0 ft j r l ~- Wall Wall -- 24.3 ft -----+ ~ ~ t<, i:em--1
- 1.
i:- l/fo S 24.o ft @) st£ 6 l (@ s-57 I I µ;((LLi = I r l~ I "'t-(ii) -'2,7-zf? /l ~3. ([J) s-03 I. Q}) 4-01 t (ff) 12-D 3 {jj) . 7~/ Ju I ~ S17 3 24.0 ft Floor 24.3 ft -----+ )_/ft
- 15)
<? /3 ([j) /? 2,0 J\\ z.:z_ ((, 7,-0. f)) '-js-b Lf l 6Jo/ 0 v s11 3 - ~ k/o I Lf Ceiling ['~~ ~~Vfrb
Survey Diagram Room/Area: Compressor Bldg Interior Page# C~~ Date: /f? ~f/ 14.2 ft --- 7.7ft r 8.0 ft ~c.u. t* j t><J ZSb I "L (;, l.,...._....,.f----.zs-~~ U}.,(j_. IJA_. r 8.0 ft ~Cf~ J20 z..rz:> /S- /O l v z,
- g l
N Wall -- 14.2ft 7.7 ft i 8.0 ft j l,.,..a. *,cct;~ .a. "" 33v,_-;;.._.., 2S if d' 2*-Z-r_JA /b too+. 1 8.0 ft l NA-fU Wall _j Wall 14.2 ft I t 700 _d)VL /~ 100),{fl 7.7 ft } lc.-. 1-l ~ /g SCAV\\J f'L Floor 14.2 ft ~\\\\~c{~~ i 1-d
- VA-3~3 s-7.7 ft l
-:!>7'1 S' Ceiling
~ Room/Area: Chemical Shed r 6.0 ft l I 6.0 ft j ~JJ Sc.ti."' 6.7 ft /1 I Wall 6.7 ft ____;::~ Wall I 4.1 ft l I 4.1 ft l Survey Diagram r Page# b 7" ht1;~ Date: S-/1[--// 4.1 ft f....a..¥: ff!:, ~ C ~ 3/6 z.n> 6.0 ft l .f. g-6 _@_o_ J-liti~ g.,1,tf/'A J,, \\)x-, 4.1 ft I 6.0 ft l )/fr £, Wall 6.7 ft ~ NA µc~P\\0 J- {c~ [~ 7 f/ 1 ~ f JI Floor 6.7 ft Ceiling
Survey Package Worksheet for ARRRC-011 Package Identification No.: ARRR-C0 11 Prepared by: Steve Croslin Location: Exterior Walls-Reactor Building, Building Date Prepared: 5/10/2011 Addition 1, Tagging Building, Storage Building Area Classification: Preliminary Class 3 Reviewed By: Area Description This characterization survey includes the exterior walls of the Reactor Building, Building Addition 1, the Tagging Building, and the Storage Building. Historical Information This survey unit consists of the exterior walls of the Reactor Building, Building Addition 1, the Tagging Building, and the Storage Building. No releases of radioactive material that would have resulted in contamination of exterior walls were identified in the Historical Site Assessment. This is a Class 3 survey unit based on a low potential for the presence of contaminated or activated materials. General Survey Instructions
- 1. Choose a minimum of 20 measurement locations on exterior walls (4-6 on each building). Distribute locations proportionately based on relative sizes of buildings. Perform direct alpha and direct beta surface activity measurements independently at each of the 20 measurement locations for 1 minute each.
- 2. Note any wall locations that exceed 40 cpm/100 cm2 total alpha or 450 cpm/100 cm2 total beta activity and determine the extent of the elevated area. (The elevated area limits are based on estimated backgrounds of 3 cpm/100 cm 2 alpha and 340 cpm/100 cm2 beta on a 43-68)
- 3. Collect a removable surface activity sample over an area of 100 cm2 in size at 100% of the locations chosen in step
- 1, plus at judgmental locations at the discretion of the surveyor. A minimum of 20 removable activity measurement locations are required. Note removable results that exceed 10 dpm/100 cm2 alpha or 200 dpm/100 cm2 beta.
- 4. Perform 20 gamma direct survey measurements at 1 cm and at 1 m from the surface or source at locations chosen in step #1. Record readings in µR/hr.
- 5. Prepare survey diagrams of exterior walls for each building, with approximate dimensions and any unique features.
Identify exterior walls by side of building (e.g., north side of building).
- 6. Note the locations of direct alpha, direct beta, smears, and gamma fixed measurements. Also mark measurement locations in the field using round adhesive backed circular stickers, markers or equivalent.
Survey Package Worksheet ARRR-COll (cont'd) I Special Instructions I Source check instrwnentation using Th-230 for alpha, Sr/Y-90 for alpha +
- Notify the ES Project Manager of locations that were flagged due to beta, and Cs-137 for gamma measurements.
elevated readings on surfaces.
- Use gas proportional detector model 43-68 (or equivalent) for total surface
- Notify the ES Project Manager of smear samples that were flagged due to activity surveys on exterior walls.
elevated removable results.
- Perform 3 one-minute field background alpha and beta counts, using an
- Notify the ES Project Manager of any exposure rate measurements that empty source holder prior to surveys. If needed, perform 3 one-minute exceed 25 µR/hr or 2 X background.
background counts on a reference surface similar to the surface to be Attach photographic records if available and provide descriptive surveyed. comments for each image under Survey Comments. Ensure that the
- Use a model 44-10 ( or equivalent) for gamma exposure rate Package ID No. and a page number ( e.g., Page Al) are included on each measurements.
attachment.
- The MDC for removable alpha activity shall be less than 20 dpm/100 cm2 Complete Survey Cover page with required location, date and instrument (preferable < 10 dpm/100 cm2) and for removable beta activity information. Complete remainder of Survey Form as applicable.
measurements shall be less than 150 dpm/100 cm2 (preferably< 100 dpm/100 cm2). Survey performance (Initial and date each survey task after completion) A-11ii" ~ Gamma 1cm lm General Description Be a Scan Direct Beta Direct Alpha Smear Gross Scan Exposure Exposure Rate Samples Rate f:;%~it> I( IAJciLls ':/.lt.S:Jv-ll Jf<,:. Si'f~lf Yc!,-fY-f r ,l'lh'\\ !:,LC.S--/'{--/( ,..vA ,.uA- ~ S--('f-/1 -,c.. Rev. 0 Page 2 of4
UUA *~;y I"""'"!;~ H Ul.n.:,11,:,:t ~-'-,U.l.l lCUill"UJ Al I-A-( I \\ ~ " ~ ~ I...,____ ~ ~ ,,..,..,..,./ .. ~.... "x--- / ~ ,,/ / I/ ~ / ~-- / V ~ / ~ / I/ \\ I / \\; I / V / Rev.O Page 3 of4
Survey Package Worksheet ARRR-COll (cont'd) Survey Comments N,:r<t,l ~,, a-t Q..x ~LO hu.tfs ~ C4_.....,WJ-.s~ Cu<lJ o+ BIJ l - Package Review Surveyor(s) Signatures: ~CQ_~ Date Package Completed: ~-f<f"-1 I Package Reviewed by and Date, ~~ 0 'ft/' /?t Rev. 0
Survey Diagram Building Add.. 1t10n 1 Ext. er10r Walls r 13.7 ft i 13.7 ft j i 13.7 ft l r 13.7 ft l 60.7 ft I Bldg Add 1 l(.) Side Wall J CD i /,f'f ~M o( /e-i-,,. 7_J./~ I= b fl 45.0 ft I Bldg Add 1.s Side Wall J -$ B1t 'fr3 'i'..... @4, 43191- .,L.. lo le- ?!( d/t... Z.7., ,I... /c,,,.., /,__ ~t l( 'i'"" 7 " 1.d/4 /:J-60.7 ft I BBMld;:gA~d;d=~ 1 _::-c~~-s=-=.-=-=~~~=----- ~ ---=--===-~i~de~W~a~n _J 45.0 ft Page #:~ Date: S-/Cf-lf
Survey Dia gram Page#: z.. irffptcA x enor Walls Reactor Bldg E t. Date: S-i<-f-ff I 22.5 ft r 22.5 ft j r 22.5 ft l r 22.5 ft l 81.9 ft J Reactor Bid.,,,V---:---- __:_:_~g ~ _ Side Wall I fo'A-40.2 ft J Reactor Bid g _L Side J ~ N. 8L9ft ~ T 40.2 ft J Reactor Bldg tu Side Wall J {J) f.30'('- (IDf> lf((f"" C?'-- 7cf"" _le,.,,.. _. ?)f k I= "c " .?-- 311 ( c,,-. > J d/t... /..,. 7.$ " ([3 ]'ft 'f""' -, I,, c-z.~~,~ __ J
Survey Diagram Tagging Building Exterior Walls
39.8ft I Tagging Bldg~ Side Wall 12.7 ft (ii) ~ i2>{7Cfw-,
~ /b It /Ci-, rr,J./ k /.;.,,... fo.!l,- u 18.7 ft I Tagging Bldg~ Side Wall 12.7 ft (jj) ~ 'f31-(,, c_pvr,- J ,is:...f;F-f (( J?C...... /c..... 5-8v~,~ 1/60 Ct 18.7 ft I Tagging Bldg~ Side Wall 12.7 ft (p S1,l q,~ ~ (( er I c,,..,. lf '-( µt/ h /IN\\. Lfd 1 ' Page#: 3./fJJJ}.. Date: ..s--/ Y-/ (
Survey Diagram Storage Building Exterior Walls r 11.0 ft l i 11.0 ft l I 11.0 ft l i 11.0 ft l 24.3 ft I Storage Bldg~ Side Wall ~ gi:.¥- J77 @ f YcOCf.- .,( .:l:J-. 0 /c-- ,;:-~,vJ./ t.. /1,,v,,. S--S"
24.0ft ------
J Storage Bldg~ Side Wall 24.3 ft I Storage Bldg ____+/-_ Side Wall 24.0 ft - - -----+ J Storage Bldg __0j___ Side Wall Page#: 'f -ft.~
Survey Package Worksheet for ARRRC-012 Package Identification No.: ARRR-C012 Prepared by: Steve Croslin Location: Exterior Walls-Demineralizer Building, Heat Exchanger Building, Compressor Building, Maintenance Date Prepared: 5/10/2011 Office, Chemical Storage Shed Area Classification: Preliminary Class 3 Reviewed By: Area Description This characterization survey includes the exterior walls of the Demineralizer Building, the Heat Exchanger Building, the Compressor Building, the Maintenance Office and the Chemical Storage Shed. Historical Information This survey unit consists of the exterior walls of Demineralizer Building, the Heat Exchanger Building, the Compressor Building, the Maintenance Office and the Chemical Storage Shed (Areas 24, 26, 28, 25, & 46). No releases of radioactive material that would have resulted in contamination of exterior walls were identified in the Historical Site Assessment. This is a Class 3 survey unit based on a low potential for the presence of contaminated or activated materials. General Survey Instructions V
- 1. Choose a minimum of 20 measurement locations on exterior walls (4-5 on each building). Distribute locations proportionately based on relative sizes of buildings. Perform direct alpha and direct beta surface activity measurements independently at each of the 20 measurement locations for 1 minute each.
- 2. Note any wall locations that exceed 40 cpm/100 cm2 total alpha or 450 cpm/100 cm2 total beta activity and determine the extent of the elevated area. (The elevated area limits are based on estimated backgrounds of 3 cpm/100 cm2 alpha and 340 cpm/100 cm2 beta on a 43-68) v
- 3. Collect a removable surface activity sample over an area of 100 cm2 in size at 100% of the locations chosen in step
- 1, plus at judgmental locations at the discretion of the surveyor. A minimum of 20 removable activity measurement locations are required. Note removable results that exceed 10 dpm/100 cm2 alpha or 200 dpm/100 cm2 beta.
V
- 4. Perform 20 gamma direct survey measurements at 1 cm and at 1 m from the surface or source at locations chosen in step #1. Record readings in µR/hr.
v
- 5. Prepare survey diagrams of exterior walls for each building, with approximate dimensions and any unique features.
V Identify exterior walls by side of building (e.g., north side of building).
- 6. Note the locations of direct alpha, direct beta, smears, and gamma fixed measurements. Also, mark measurement locations in the field using round adhesive backed circular stickers, markers or equivalent.
Survey Package Worksheet ARRR-C012 (cont'd) I Special Instructions I
- Source check instrumentation using Th-230 for alpha, Sr/Y-90 for alpha+
- Notify the ES Project Manager of locations that were flagged due to beta, and Cs-137 for gamma measurements.
elevated readings on surfaces.
- Use gas proportional detector model 43-68 (or equivalent) for total surface
- Notify the ES Project Manager of smear samples that were flagged due to activity surveys on exterior walls.
elevated removable results.
- Perform 3 one-minute field background alpha and beta counts, using an
- Notify the ES Project Manager of any exposure rate measurements that empty source holder prior to surveys. If needed, perform 3 one-minute exceed 25 µR/hr or 2 X background.
background counts on a reference surface similar to the surface to be Attach photographic records if available and provide descriptive surveyed. comments for each image under Survey Comments. Ensure that the
- Use a model 44-10 (or equivalent) for gamma scan surveys and exposure Package ID No. and a page number (e.g., Page Al) are included on each rate measurements.
attachment.
- The MDC for removable alpha activity shall be less than 20 dpm/100 cm2 Complete Survey Cover page with required location, date and instrument (preferable < 10 dpm/100 cm 2
) and for removable beta activity information. Complete remainder of Survey Form as applicable. measurements shall be less than 150 dpm/100 cm2 (preferably< 100 dpm/100 cm2). Survey performance (Initial and date each survey task after completion) Gamma 1cm lm General Description Beta Scan Direct Beta Direct Alpha Smear Gross Exposure Samples Scan Rate Exposure Rate ~ \\ t-.l-fRt\\-l--1-zE:12 "E¥:T \\,J,t1k.s NIA JJ!lf 5~1i,11 w '5--n--"<vv NIA ~1'1--11 ~ Vl,t( W NIA WWJ\\lT-p114~/ c Offiri::, -mhl.l\\11'~ NIA .} ( NIA c-NIA \\ ~ ~ NIA ~ ~ I NIA ) \\ NIA ~ 1;;):(t{Jt~(L 'EX\\ llv'Af-t_S ~'tv- ) NIA f ) NIA &vnf~ 1?rD ~ WAU-<( ~l'b,11,g.,,i.. 11 Qv r,~ICA-L ~
- ~i"-; "Q(fvJA-u; NIA
? l~lf~ \\V ~ V NIA '\\ v w NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA Rev. 0 Page 2 of 4
'J NIA NIA NIA s Packal!e Worksheet ARRR-C012 (cont'd) NIA NIA NIA NIA f'* NIA NIA NIA \\ NIA NIA NIA \\ NIA NIA NIA \\ NIA NIA \\ NIA \\ NIA NIA \\ NIA \\ \\ I NIA NIA NIA \\ \\, / NIA NIA NIA C / NIA NIA \\ \\ NIA \\ / NIA N/A \\ / NIA X NIA NIA NIA / \\ \\ N/A NIA NIA / NIA NIA \\ NIA V \\ N/A N/A / NIA / \\ NIA NIA NIA I \\ NIA NIA NIA / NIA NIA N/A // NIA NIA NIA NIA N/A NIA NIA NIA NIA NIA NIA Rev.0 Page 3 of4
J I Survey Package Worksheet ARRR-C012 (cont'd) Survey Comments -re Package Review Date Package Completed: £ *-/ ;,,,,,, / / Package Reviewed by and Date: ~ -~ ~/ fi / / Rev. 0
Survey Diagram Demineralizer Building Exterior Walls 7.5 ft Demineralizer Bldg ~Side v~tz. l 7.0 ft I ~ (D 3.6 ft I
- __.., _;
I Demineralizer Bldg ~Side 7.0 ft _k__ft Demineralizer Bldg ?t@li Side Wall 7.0 ft Date: 5 --/f
Survey Diagram Heat Exchanger Building Exterior Walls 11.3 ft I Heat Exch Bldg~ Side 7.0 ft 4.1 ft Heat Exch Bld~Side 7.0 ft \\ 4.1 ft I Heat Exch Bldg ~fide 7.0 ft Page #: 2-OF 5* Date: /'1-I( **/tif-ud,,
Survey Diagram Compressor Building Exterior Walls 14.2 ft I Compressor Bldg ~rthSide I Lt,~ 6 1'1 ~1< ~ 8.0 ft I 7.7 ft Compressor Bldg YJ,&t Side I f'JoWvv 15.*,(}~ if 8.0 ft 14.2 ft Compressor Bldg ~ Side 8.0 ft Page #: 3 "F 5 Date: 6--1'1-I ( ~ --- *?'?'--~ CtJMfP-e:ti c1/2..,B'u.) ~
Survey Diagram Maintenance Office Exterior Walls I o/ z,~,11~1 1}4 ft Maintenance Office ~Side 7.0 ft 9.3 ft Maintenance Office Side Wall 7.0 ft
~ft Maintenance Office~ide Wall 7.0 ft I
Page#: tf@FS~ Date: 6/IJ-! f
Survey Diagram Chemical Storage Shed Exterior Walls Date: l,?'-/1.,. f l 6.7 ft 4.1 ft Chemical Storage Shed ~Side Wall Chemical Storage Shed~'( Side Wall 6.0 ft l 6.7 ft 4.1 ft I Chemical Storage She~ Side Wall Chemical Storage She~'iSide Wall 6.0 ft
~c.e-A-Gt \\2--- S -tr-/ I f );krs, f' lrufLCi ~YltvrtJL-M/4 ..c:;-1i--1r C>-1/-15' ,- r , A-&rli I -~ r ~ ---L1£ I C*'-'"1 1,.._ I 4'500 3700 LfDf_O All#; I I ~ z_ 5*~ Y~oo j4_1Er ' ) I 7 q *300 37o:) 31,_J y lo5b "UDO I (1 )
- 7:/?lJ 3-au 7
b ~-z;y ~ ~-A }/\\ / _......., 7.1JJ
- 3,o
- '1 Lf7o Lfto i l1
~ -s:<oO \\ "3(,0 lo i ,q~ --ZOD ' "-1 I
- ./
<g ,1/ /0 )7..Q) 5(~ I I
- I l I&
3 z...is I 2-q IG 1 2-2..'-f /) 14 2-3> s 2&i:.- Ii I ~ Z"J 3
- 2-c--:>
- 1.._ L_
f.;- ~s 3 °/ Lf Lf '-1 ' I ~ -z.s; ~D '-/
- 3. 77 It JO
\\ L. ~7 ~7S70 It ID /D 'io --~
- z_:y~
/q H ' I 2-cs-, I *w \\I l ?...- 1 "'.) > ~ ""l..! ~
Survey Package Worksheet for ARRRC-013 Package Identification No.: ARRR-C013 Prepared by: Steve Croslin Location: Public Parking Lot Date Prepared: 5/10/2011 Area Classification: Preliminary Class 3 Reviewed By: Area Descriptio.n This characterization survey includes the Public Parking Lot in front of the Aerotest Facility. This characterization includes obtaining 5 deep soil samples at locations marked on surfaces. Historic.al*Infonnation This survey unit consists of the Public Parking Lot in front of the Aerotest Facility. No releases of radioactive material that would have resulted in contamination of the Public Parking Lot were identified in the Historical Site Assessment. This is a Class 3 survey unit based on a low potential for the presence of contaminated or activated materials. I. Perform alpha + beta scans at a speed not to exceed I detector width per second on 10% of pavement in the Public Parking Lot using a floor monitor with a 43-37 detector. Listen to audible output using headphones, if available.
- 2.
Choose a minimum of IO measurement locations on pavement areas. If elevated areas were identified based on scan measurements, select the location of the highest activity for direct survey measurements. Perform direct alpha and direct beta surface activity measurements independently at each of the IO measurement locations for I minute each.
- 3. Note any pavement locations that exceed 40 cpm/100 cm2 total alpha or 450 cpm/100 cm2 total beta activity and determine the extent of the elevated area. (The elevated area limits are based on estimated backgrounds of 3 cpm/100 cm2 alpha and 340 cpm/100 cm2 beta on a 43-68.)
- 4. Collect a removable surface activity sample over an area of I 00 cm2 in size at I 00% of the locations chosen in step
- 3, plus at judgmental locations at the discretion of the surveyor. A minimum of 20 removable activili1 measurement locations are required. Note removable results that exceed IO dpm/100 cm2 alpha or 200 dpm/100 cm2 beta.
- 5. Perform at least 20 gamma direct survey measurements at I cm and at I 111 from the pavement surface at locations chosen in step #3. Record readings in µR/hr.
- 6.
Collect 5 deep soil samples using Geoprobe and complete chain of custody form. Store samples in a secure location until shipped to the off-site lab for analysis.
- 7.
Prepare survey diagram of the Public Parking Lot, with approximate dimensions and any unique features.
- 8. Note the locations of direct alpha, direct beta, smears, and gamma fixed measurements. Also, mark measurement locations in the field using surveyors paint, indelible markers or equivalent.
- 9.
Record the maximum and average scan results, in cpm, on the survey diagram.
- 10. Record the scan percentages completed for alpha/beta and gamma scans on the survey diagram.
Survey Package Worksheet ARRR-C013 (cont'd) I Special Instructions I Source check instrumentation using Th-230 for alpha, Sr/Y-90 for alpha+
- Notify the ES Project Manager of locations that were flagged due to beta, and Cs-137 for gamma measurements.
elevated readings on surfaces.
- Use gas proportional floor monitor with a 43-37 detector (or equivalent)
Notify the ES Project Manager of smear samples that were flagged due to for total surface activity surveys on pavement surfaces. elevated removable results.
- Perform 3 one-minute field background alpha and beta counts, using an Notify the ES Project Manager of any exposure rate measurements that empty source holder prior to surveys. If needed, perform 3 one-minute exceed 25 µR/hr or 2 X background.
background counts on a reference surface similar to the surface to be Attach photographic records if available and provide descriptive surveyed. comments for each image under Survey Comments. Ensure that the Use a model 44-10 (or equivalent) for gamma scan surveys and exposure Package ID No. and a page number (e.g., Page Al) are included on each rate measurements. attachment.
- The MDC for removable alpha activity shall be less than 20 dpm/100 cm2 Complete Survey Cover page with required location, date and instrument (preferable< 10 dpm/100 cm 2
) and for removable beta activity information. Complete remainder of Survey Form as applicable. measurements shall be less than 150 dpm/100 cm2 (preferably < 100 dpm/100 cm2). Survey performance (Initial and date each survey task after completion) 1cm
- 1" /."La_ f Gamma lm General Description Beta Scan Direct Beta Direct Alpha Smear Gross Scan Exposure Exposure Rate Samples Rate Public Parking Lot Surfaces J.tc 5:-/l-lr Ye S--('f-(r
.>c S~/'f-if.J.<t. S:i'(-!r Ye ff't-!t he S-f<r~I/ .S.,.c S-f<.f - 1 \\ AA. Rcv.0 Page2 of3
Survey Package Worksheet ARRR-C013 (cont'd) Survey Comments I Package Review I (L) Surveyor(s) Signatures:~ ~<-2,Q,~Q..Q_ G1/4) p 0 Date Package Completed: _!_; /lb//! l .5)/J; /!! Package Reviewed by and Date:.xJUJl~1 Rev.O
ID G:Y CD (C[) (D
- "!)
(iJ 0"', ~ (y cr0 (!]) <v) 0 3) ()y' ) (ff) ({l\\ 1/ a~ <Js) (ic;) 0:0 Survey Diagram Page#~ Room/Area: Public Parking Area Date: s--/</-// l,)-zed 1 &,) L~. 0-- ,9, 'II y
- JS7 ff i!-1?7
'f
- 'rii 3
,-)y:), S' ,? g:;* (, )St ~1 J 71,:J- .30[," & ,2_7.3 7 98,0 ft ,:l8'6 1/ 31 /) ,) J.95' lf 3i s* 7 ,, I> 3
- ~ :CS' If J.6C
'!, ()5 s
- -;i ') I
(, ,).7/1 Lf .__ ______ 4L0 ft q V;j- ':f"" q.5-0 /3 ,.,,,__c-.X' ':f"" 7,:).0 Jg Aerotest Building I > /o.5.c;, /:S~ q I J -S, 1//0: { I ~-'ll/i<,I iJ-7.l/7-7 14-17,7/t.o I 'J- ?,6},i.7 Ji-'7,1/7, (:; n-'r;}/'l r? I <'.J;;,/j' *7 *r' () -I<.. I C/-1")/9, a, 2o 71;7,r;
Survey Package Worksheet for ARRRC-014 Package Identification No.: ARRR-C014 Prepared by: Steve Croslin Location: Parking Lot & Paved Areas Inside Fence Date Prepared: 5/10/2011 Area Classification: Preliminary Class 3 Reviewed By: Area Description This characterization survey includes the Parking Lot & Paved Areas inside the facility fence. This includes sidewalks and other hard surfaces. Historical Information This survey unit consists of the Parking Lot & Paved Areas inside the facility fence. This includes sidewalks and other hard surfaces. No releases of radioactive material that would have resulted in contamination were identified in the Historical Site Assessment. This is a Class 3 survey unit based on a low potential for the presence of contaminated or activated materials. General Survey Instructions
- 1. Perform alpha + beta scans at a speed not to exceed 1 detector width per second on I 0% of pavement in the parking lot using a floor monitor with 43-37 detector. Listen to audible output using headphones, if available.
- 2. Choose a minimum of IO measurement locations on pavement areas. If elevated areas were identified based on scan measurements, select the location of the highest activity for direct survey measurements. Perfom1 direct alpha and direct beta surface activity measurements independently at each of the IO measurement locations for I minute each.
- 3. Note any pavement locations that exceed 40 cpm/100 cm2 total alpha or 450 cpm/100 cm2 total beta activity and determine the extent of the elevated area. (The elevated area limits are based on estimated backgrounds of 3 cpm/100 cm2 alpha and 340 cpm/100 cm2 beta on a 43-68.)
- 4. Collect a removable surface activity sample over an area of I 00 cm2 in size at I 00% of the locations chosen in step
- 2, plus at judgmental locations at the discretion of the surveyor. A minimum of 20 removable activity measurement locations are required. Note removable results that exceed 10 dpm/100 cm2 alpha or 200 dpm/100 cm 2 beta.
- 5. Perform a gamma scan survey of surfaces at a speed not to exceed 0.5 meters per second, on 10% of the pavement area. Perfonn at least 20 gamma direct survey measurements at I cm and at I m from the pavement surface at locations chosen in step #2. Record readings in µR/hr.
- 6. Prepare survey diagram of the Parking Lot & Paved Areas inside the facility fence, with approximate dimensions and any unique features.
- 7. Note the locations of direct alpha, direct beta, smears, and gamma fixed measurements. Also, mark measurement locations in the field using surveyors paint, indelible markers or equivalent.
- 8. Record the maximum and average scan results, in cpm, on the survey diagram.
- 9. Record the scan percentages completed for alpha/beta and gamma scans on the survey diagram.
Survey Package Worksheet ARRR-C014 (cont'd) I Special Instructions I Source check instrumentation using Th-230 for alpha, Sr/Y-90 for alpha+
- Notify the ES Project Manager of locations that were flagged due to beta, and Cs-137 for gamma measurements.
elevated readings on surfaces. Use gas proportional floor monitor with a 43-37 detector ( or equivalent)
- Notify the ES Project Manager of smear samples that were flagged due to for total surface activity surveys on pavement surfaces.
elevated removable results.
- Perform 3 one-minute field background alpha and beta counts, using an
- Notify the ES Project Manager of any exposure rate measurements that empty source holder prior to surveys. If needed, perform 3 one-minute exceed 25 µR/hr or 2 X background.
background counts on a reference surface similar to the surface to be Attach photographic records if available and provide descriptive surveyed. comments for each image under Survey Comments. Ensure that the Use a model 44-10 (or equivalent) for gamma scan surveys and exposure Package ID No. and a page number (e.g., Page Al) are included on each rate measurements. attachment.
- The MDC for removable alpha activity shall be less than 20 dpm/100 cm2
- Complete Survey Cover page with required location, date and instrument (preferable< IO dpm/100 cm2) and for removable beta activity information. Complete remainder of Survey Form as applicable.
measurements shall be less than 150 dpm/100 cm2 (preferably< I 00 dpm/100 cm 2). Survey performance (Initial and date each survey task after completion) A i,1.,c. ', Gamma 1cm Im General Description Bela Scan Direct Beta Direct Alpha Smear Gross Scan Exposure Exposure Rate Samples Rate Fenced Parking Lot Surfaces ..kc. s--!c **Ir ¥c s--rq Ir [Se,, S:1<r-rr ?,:_ >7'(-i/.Ye ;-..J:..-lj Ye.fi'{-rr J-<c.._.5.-:._('f-rr Other Paved Surfaces Inside Fence I,\\=- C.,--//, *. i ( x c 5~/'f-11 1/2
- --('-(-(( Y'c- {;-1 'f,ff lw, 1-/(,--// ;xe 5,--(7-1(
- ,-----z
- .,.',-f'f-1 I Rcv.0 Page 2 of3
Survey Package Worksheet ARRR-C014 (cont'd) Survey Comments /5 (')Vf12_ C//UlM., Jc{J,J,l;,o) Jr,c!Cm~ k -j(IJ /jy/,.a,~:L k,Jo /I,1r:/-~1 ~~M &1_ /((LJ. t1!/,1fr 5fo1t~1 /) loom I /,J(*a:htl/.> g _;t/) lj (f Package Review /"~ l/: (o/:Pr) Surveyor(s) Signatures:, r':? /- hA no
- ,-/
IJ Date Package Completed: c5')10/I! /J(Jw '). Package Reviewed by and Date: U&-:tl( ~r)0/I Rev. 0
Survey Diagram Room/Area: Parking & Paved Areas Inside Fence ft Page# / *f/ft1v:ft 1 ............................... ?*~-~-*u*.............................................................. 1 _:;-**-------- --~'.;,(;7"-,-'V\\-*
- 0)
I ~ --~-~ r~i ~ r:r-1 /::::,"\\ C"fiJ I v.:!} \\:::/ ~ 1' _______ _ *---------1' Ci) I j};tc{sg .a_ A -4 ~ j d) .s?io II ft t2~ V1c,'\\ ':f-!.J (ij) <[j) Aerotest Building {_ij 411 S: j (!) Lf os* I 3 ! (i) 4-fs S !<J.) 78l N 1@ {;Jg l.f !av (41 r I ilJY .r k\\ ~ :u {iSI ____ _J 0 ~ 10_ 1/SV 7 / i....................................... Qi.......... @............... (1,) A/,,A-t ! {[j).S,-_
- 3
,7 7 .. )-- vJJ w .............................. L, @,'l,'{I,, I/~ ffi u. le.""' bvg cpm* f,.vy1 1 ~ ) - '7 :J.h, 7 q ' fr:,d., 0 /'rt'b'pm I 0 -}/}"/:J If..5 ?-- '7,Dj 6 & /0*5/2<5)76-6 17-1f5/~.$ 3-l.Kl C, :1 j I -c).0,1/ ?J;),/ ) ¥- ;;lJ.1/ ;,1,'J 4 C 7,5/'l,!J-J J_- ?1* q /JV, q I '1~ /Cl,Jj:,;1_,i/ 5-_ :_. 6/ f'{ ) )- ~ ~-;~/ 7~, ;,_
- J.fj - 'i,q /1 I,J 0 7 i-' 1 /fo 7
} lJ,, ~-u 1, l / c; /, O 1:..)!~ 11,~yj; J 1-j)11;4-t.f-,J* Q ~o.~J,;3.v
Survey Package Worksheet for ARRRC-015 Package Identification No.: ARRR-C0 15 Prepared by: Steve Croslin Location: Soil Areas Inside Fence Date Prepared: 5/16/2011 Area Classification: Preliminary Class 3 Reviewed By: Area Description This characterization survey includes the Soil Areas inside the facility fence. Historical Information This survey unit consists of the Soil Areas inside the facility fence. No releases of radioactive material that would have resulted in contamination were identified in the Historical Site Assessment. This is a Class 3 survey unit based on a low potential for the presence of contaminated or activated materials. General Survey Instructions I. Choose a minimum of 10 measurement locations for soil and mark with paint.
- 2. Perform alpha+ beta direct measurements at the 10 locations chosen in Step #1 using a 43-68 detector.
- 3. Perform at least 10 gamma direct survey measurements at 1 cm and at__l_m from soil surface locations. Record readings in µR/hr. Q[.5*of&ti'.f"ot11n 'ifamv,i,t 5"il'CiJl on ;2090 "'f.57)-it. a;(JJa.
- 4. Prepare a survey diagram of the Soil Areas inside the fence, with approximate dimensions and any unique features.
- 5. Note the locations of all fixed measurements on the diagram.
Survey Package Worksheet ARRR-C015 (cont'd) I Special Instructions I Source check instrumentation using Th-230 for alpha, Sr/Y-90 for alpha+
- Notify the ES Project Manager of any exposure rate measurements that beta, and Cs-137 for gamma measurements.
exceed 25 µR/hr or 2 X background.
- Use gas proportional floor monitor with a 43-68 detector ( or equivalent)
Attach photographic records if available and provide descriptive for total surface activity surveys on soil surfaces. comments for each image under Survey Comments. Ensure that the
- Perform 3 one-minute field background alpha and beta counts, using an Package ID No. and a page number ( e.g., Page Al) are included on each empty source holder prior to surveys.
attachment.
- Use a model 44-10 ( or equivalent) for gamma scan surveys and exposure Complete Survey Cover page with required location, date and instrument rate measurements.
information. Complete remainder of Survey Form as applicable.
- Notify the ES Project Manager of locations that were flagged due to elevated readings on surfaces Survey performance (Initial and date each survey task after completion)
Alpha/Beta Gamma 1cm Im General Description Direct Beta Direct Alpha Smear Gross Exposure Samples Scan Scan Rate Exposure Rate Soil Surfaces Inside Fence NIA J4-c r:-/t-ir s£c.. _)-/t:-11 NIA ~ ,-t// fee 57{/'/ YC.5:/t-l( NIA Rev. 0 Pagc2of3
Survey Package Worksheet ARRR-COJS (cont'd) pJct 3 Survey Comments 11 )t, .50'1 ( ,. --- \\.~ ' ~ E'.45 +-* s,dk. s*/Jd. / "'7/ fl/J /# /1,,,,,,,-,,, °"' / u 0 C I Package Review I Surveyor(s) Signatures: ~ () - ~~CJ<.. __ c....z~:J Date Package Completed: .,;-//l-!/ Package Reviewed by and Date: xf[Jj(l~ / ,f I? /II Rev. 0
Page# Survey Diagram Room/ Area: Soil Areas Inside Fence
Survey Package Worksheet for ARRRC-016 Package Identification No.: ARRR-C0 16 Prepared by: Steve Croslin Location: Cooling Towers Date Prepared: 5/10/2011 Area Classification: Preliminary Class 3 Reviewed By: Area Description This characterization survey includes the exterior and accessible interior surfaces of the Main Cooling Tower and the Backup Cooling Tower (Areas 27 & 39). All accessible interior surfaces are to be surveyed, including floors, interior walls and other surfaces. Historical Information The original Cooling Tower was replaced and is currently referred to as the Backup Cooling Tower. The original tower is approximately 8-ft by 16-ft by 7-ft tall with a painted steel shell, blower on top and redwood vanes on the interior. The newest Cooling Tower, which is routinely used, is approximately 6-ft by 5.5-ft by 8-ft tall with a painted steel shell, a blower on top and galvanized steel packing on the interior. No records indicating radiological use or storage were identified for the cooling towers. This is a Class 3 survey unit based on a low potential for the presence of contaminated or activated materials. General Survey Instructions 1. Perform alpha + beta scans at a speed not to exceed 1 detector width per second on 20 % of total surface area (20% of exterior and interior surfaces and floors, if accessible, on both Cooling Towers) using a 43-68 detector. Listen to audible output using headphones, if available.
- 2. Choose a minimum of 5 measurement locations on each Cooling Tower (including elevated locations). If elevated areas were identified based on scan measurements, select the location of the highest activity for direct survey measurements. Perform direct alpha and direct beta surface activity measurements independently at each of the :5_
measurement locations for 1 minute each.
- 3. Note any locations that exceed 40 cpm/100 cm 2 total alpha or 450 cpm/100 cm2 total beta activity and determine the extent of the elevated area. (The elevated area limits are based on estimated backgrounds of 4 cpm/100 cm2 alpha and 250 cpm/100 cm2 beta on a 43-68.)
- 4.
Collect a removable surface activity sample over an area of 100 cm2 in size at 100% of the locations chosen in step
- 2, plus at judgmental locations at the discretion of the surveyor. A minimum of 6 removable activity measurement locations are required. Note removable results that exceed 10 dpm/100 cm2 alpha or 200 dpm/100 cm2 beta.
- 5. Perform a gamma scan survey of surfaces at a speed not to exceed 0.5 meters per second, on 20% of the total interior, exterior and floor area of both Cooling Towers. Perform at least 5 gamma direct survey measurements at 1 cm and at 1 m from the surface at locations chosen in step #2. Record readings in µR/hr.
- 6. Prepare survey diagrams of exterior and interior surfaces for each Cooling Tower, with approximate dimensions and any unique features or take a photo from several angles including measurement locations.
- 7. Note the locations of direct alpha, direct beta, smears, and gamma fixed measurements and any samples. At least one sample ( ~ 100-200 g) should be taken of redwood in the Backup Cooling Tower. Also, mark measurement and sample locations in the field using round adhesive backed circular stickers, markers, or equivalent.
- 8. Record the maximum and average scan results, in cpm, on each survey diagram.
- 9. Record the scan percentages completed for alpha/beta and gamma scans on each survey diagram.
Rev.O Page I of3
Survey Package Worksheet ARRR-C016 (cont'd) I Special Instructions I
- Source check instrumentation using Th-230 for alpha, Sr/Y-90 for alpha+
- Notify the ES Project Manager of locations that were flagged in Step #2 beta, and Cs-137 for gamma measurements.
due to elevated readings on surfaces. Use gas proportional detector model 43-68 ( or equivalent) for total surface
- Notify the ES Project Manager of smear samples that were flagged in Step activity surveys.
- 4 due to elevated removable results.
- Perform 3 one-minute field background alpha and beta counts, using an
- Notify the ES Project Manager of any exposure rate measurements that empty source holder prior to surveys. If needed, perform 3 one-minute exceed 25 µR/hr or 2 X background.
background counts on a reference surface similar to the surface to be
- Attach photographic records if available and provide descriptive surveyed.
comments for each image under Survey Comments. Ensure that the
- Use a model 44-10 ( or equivalent) for gamma scan surveys and exposure Package ID No. and a page number ( e.g., Page Al) are included on each rate measurements.
attachment.
- The MDC for removable alpha activity shall be less than 20 dpm/100 cm2 Complete Survey Cover page with required location, date and instrument (preferable< 10 dpm/100 cm2
) and for removable beta activity information. Complete remainder of Survey Form as applicable. measurements shall be less than 150 dpm/100 cm2 (preferably< 100 dpm/100 cm2). Survey performance (Initial and date each survey task after completion) ,4/ f k ;;-'; General Description Befa Scan Direct Beta Direct Alpha Smear Gross Gamma Scan 1cm Exposure Rate lm Exposure Rate Samples-, m>""'"- North Exterior Wall Surfaces tt'/1( !;-/L *I' 2"'L .,-*/L
- r 1 ~ S:-r-,-r ! Yc.-.-
1 EastExteriorWallSurfacesPt'fi .s,-:..(7.-/( Ye.. ,;-:..1 2 - 11 k
- ,*-tz-ir _;,;;__
c Q_-i{ !,/L-ff,. ,;--r,-r,~ 5-fz_-f(.>L(_ I SouthExteriorWallSur,aces* *-L "c.._ t 1, West Exterior Wall Surfaces fotA I S--/ z. -({-""- I S-,/Z. -(( >-c.-l ',-(Z *-(( ),,cc_ I 11; I i I@ 27)~.trl l/-0.tJ.liit I / (~~ I Gt 5 £i441f ~ s t!i~L I / / !t',i/ North Interior Wall Surfaces ...Ea,;t Interior Wall Surfaces South Interior Wall Surfaces Cwefil))lterior Wall Surfaces ____..==t' Other Surfaces Other Surfaces Rev. 0 Ci,-rrcif cf.-:'.P'JA"-* _ __, __ > /V. '°\\ /p fl' li1 Li_~ ( I I _J /-f 1#~~;~2\\ ( ( ~~A,/ ! *,Y f j~"/ ' I / IL! I I f I 1/f I' I riu 1 ,v r-n-l r ~ I 1,. A '/1 +1-ti f;l1 ,V :/ r\\l_J_J_ \\Y GJ/,4//./J/; I / /)1) 1 /1~1£ / ,/ / \\ //\\ / I q~~-l;vfc0ti-"7 "' /;-- I i 0 ""_:/* / /'<\\ ,.....-r,:;. ~log_ )( / \\ . \\ L i/ /!J. I\\! 1_1 / I \\j, \\/ Page 2 of3
Survey Package Worksheet ARRR-C016 (cont'd) Survey Comments I~ r, t(..,;,:; O-~- ~V\\£<</1 . ? Package Review Date Package Completed: Package Reviewed by and Date: Rev. 0
Survey Diagram Room/Area: Main Cooling Tower Exterior 6.0 ft Avg cpm: 1*~00.3o fi <>( 1 _M_a_x_cp_m_: _n_7_z.:_,/_;_Y,_7 _____ 7 6 t 1 8.0 ft 6.0 ft 1 1 Avg cpm: Max cpm: (I 8.0 ft 8.0 ft l Clt \\ CD _5v-c-vo~J)
- c Page#
I lfdd 5.5 ft Avg cpm: /J 0<) z,.s-Max cpm: ;r:2.1 (2-9,2, --....,-,_------.-- 6 I 5.5 ft Avg cpm: / '3GV Maxcpm: /Ya/ ~ st2s q,,~ J_ '(!;- p Q8co Cf-cA
- 3. 2-
'I
Survey Diagram Room/Area: Backup Cooling Tower Exterior 15.6 ft t Avg cpm: 't/-000 0( //? 1 I ~ax cpm 9, '-Is/,t;" b 7 / r G I 1 7.0 ft j
- ,l,c\\
- h Wall
<&cx10Y<<Q~tc9D_ -~U1* ... :r~.o:~4--'-rJi,J Wtl~, 15.6 ft Avg cpm: / 0 -Oo q~ Max cpm: /),3/ 1 l/ t/ ,~ (1 -.s-~c v'.3-'y 1 7.0 ft l /9 \\> '/iJr; 1,Z-r ( o/0 .d-1 Page# z_ ftflad Date: 5-,_/Z -/( --~~- 7.9 ft cf"' II CZ""'
Survey Package Worksheet for ARRRC-017 Package Identification No.: ARRR-COl 7 Prepared by: Steve Croslin Location: Waste Storage Tanks Date Prepared: 5/13/2011 Area Classification: Preliminary Class 1 Reviewed By: Area Description This characterization survey includes the exterior and accessible interior surfaces of the Waste Storage Tanks (Area 30). Note: The interior of the Waste Storage Tanks may be confined spaces. Do not place any part of the body inside tanks. Use an extension tool to obtain smears and for direct surveys. Historical Information The Waste Storage Tanks are located on the south end of the Reactor Building. There is a larger tank and a smaller tank. The smaller tank is out of service and lying on its side, awaiting repair. The larger tank is upright and standing on a concrete pad. This is a Class 1 survey unit based on the potential for the presence of contaminated or activated materials. General Survey Instructions 1. Perform alpha + beta scans at a speed not to exceed 1 detector width per second on 20 % of total surface area (20% of the exterior and accessible interior surfaces) using a 43-68 detector. Listen to audible output using headphones, if available.
- 2.
Choose a minimum of 10 measurement locations on the Waste Storage Tanks (including elevated locations). If elevated areas were identified based on scan measurements, select the location of the highest activity for direct survey measurements. Perfonn direct alpha and direct beta surface activity measurements independently at each of the 10 measurement locations for 1 minute each.
- 3. Note any locations that exceed 40 cpm/100 cm2 total alpha or 450 cpm/100 cm2 total beta activity and determine the extent of the elevated area. (The elevated area limits are based on estimated backgrounds of 4 cpm/100 cm2 alpha and 250 cpm/100 cm2 beta on a 43-68).
- 4.
Collect a removable surface activity sample over an area of 100 cm2 in size at 100% of the locations chosen in step
- 2, plus at judgmental locations at the discretion of the surveyor. A minimum of 10 removable activity measurement locations are required. Note removable results that exceed 10 dpm/100 cm2 alpha or 200 dpm/100 cm 2 beta.
- 5. Perform a gamma scan survey of surfaces and penetrations (if applicable) at a speed not to exceed O.5 meters per second, on 20% of the total area of both Waste Storage Tanks. Perform at least 10 gamma direct survey measurements at 1 cm and at I m from IO surface at locations chosen in step #2. Record readings in µR/hr.
- 6. Prepare survey diagrams or obtain photos of each Waste Storage Tank, with approximate dimensions and any unique features.
- 7. Note the locations of direct alpha, direct beta, smears, and gamma fixed measurements. Also, mark measurement and sample locations in the field using round adhesive backed circular stickers, markers, or equivalent.
- 8. Record the maximum and average scan results, in cpm, on each survey diagram.
- 9. Record the scan percentages completed for alpha/beta and gamma scans on each survey diagram.
Rev. 0 Page I of4
Survey Package Worksheet ARRR-C017 (cont'd) I Special Instructions I Source check instrumentation using Th-230 for alpha, Sr/Y-90 for alpha+
- Notify the ES Project Manager of locations that were flagged in Step #2 beta, and Cs-137 for gamma measurements.
due to elevated readings on surfaces.
- Use gas proportional detector model 43-68 ( or equivalent) for total surface
- Notify the ES Project Manager of smear samples that were flagged in Step activity surveys.
- 4 due to elevated removable results.
- Perform 3 one-minute field background alpha and beta counts, using an
- Notify the ES Project Manager of any exposure rate measurements that empty source holder prior to surveys. If needed, perform 3 one-minute exceed 25 µR/hr or 2 X background.
background counts on a reference surface similar to the surface to be
- Attach photographic records if available and provide descriptive surveyed.
comments for each image under Survey Comments. Ensure that the
- Use a model 44-10 ( or equivalent) for gamma scan surveys and exposure Package ID No. and a page number ( e.g., Page Al) are included on each rate measurements.
attachment.
- The MDC for removable alpha activity shall be less than 20 dpm/100 cm2
- Complete Survey Cover page with required location, date and instrument (preferable< 10 dpm/100 cm 2
) and for removable beta activity information. Complete remainder of Survey Form as applicable. measurements shall be less than 150 dpm/100 cm2 (preferably< I 00 dpm/100 cm 2 )
- Survey performance (Initial and date each survey task after completion)
General Description Beta Scan Direct Beta Direct Alpha Smear Gross Gamma 1cm lm Samples Scan Exposure Rate Exposure Rate Large Tanlc North Exterior Wall NIA NIA NIA NIA NIA NIA NIA NIA Surfaces Large Tanlc East Exterior Wall NIA NIA NIA NIA NIA NIA NIA NIA Surfaces Large Tanlc South Exterior Wall ~5'/J, J;r NIA Surfaces
- ti/.
Large Tanlc West Exterior Wall -51/13)/r /4, ~ NIA Surfaces ) Small Tank North Exterior Wall NIA NIA NIA NIA NIA NIA NIA NIA Surfaces Small Tanlc East Exterior Wall
- S /13 /i I J.9/J c
-~ NIA Surfaces Small Tank South Exterior Wall 5/13//f_;J,i/JC NIA Surfaces / Small Tank West Exterior Wall NIA NIA NIA NIA NIA NIA NIA NIA Surfaces Rev.O Page 2 of 4
f' 0 Survey Package Worksheet ARRR-C017 (cont'd) Survey Comments Note: Could not do surveys on north and east sides oflarge tank or on north and west sides of small tank due to high background from Radioactive Waste Storage Room inside south end of Reactor Bldg. Only took 7 direct measurements and 7 smears due to limited amount of area that could be surveyed without interference from high background. Could not access interior of large tank at all and could only access a small interior area on smaller tank. Could not do scans of interiors of either tank. Package Review (,J Q Surveyor(s) Signatures~~ _.12"Y'[..'fl_... 0 Date Package Completed:,~~/3*-lf Package Reviewed by and Date: jJtJ (;~~,sf,)1 Rev.0
Room/Area: Waste Storage tanks Mi14s i]&- 1J I : Survey Diagram Page# Lf 6( lf Large Tank; ESE Side View Date: --=5,,..:/""3-P};'-'-; __ I I bf)Jrc~\\, + ~drc _ 5'c,a~ 0{:io,J!, f /1/NJ-44(/eJ U:f '-lo 7-f'-f.,f<,f;f, 6'/Jv)')\\ lit <t :::- 6 o,{(_ fc/A au*', ,O<'/JA'l 'iJ() iJJy_,1/4_ vnlt Beta Scan Avg cpm: O? !) Beta Scan Max cpm:1/115 (;;i,5' () Alpha Scan Avg cpm: 7,5 .,(J,,;C,, j i',]-- Alpha Scan Max cpm: :ff.u'
- Survey Package Worksheet for ARRRC-018 Package Identification No.: ARRR-C018 Prepared by: Steve Croslin Location: Soil Samples Date Prepared: 5/23/2011 Area Classification: Preliminary Class 3 Reviewed By:
Area Description This characterization includes obtaining surface and deep soil samples at 3 locations inside the facility fence, I location in the Reactor High Bay area and in the public parking lot in front of the ARRR facility, as indicated on the attached map. Historical Information This survey unit consists of surface and deep soil samples from inside the facility fence, under the concrete floor in the Reactor High Bay area and in the front public parking lot. There are seepages of gronndwater upward through cracks in the pavement on the northern section of the site that are collected and drained by a ditch located just outside the north side fence. No releases of radioactive material that would have resulted in contamination were identified in the Historical Site Assessment. This is a Class 3 survey unit based on a low potential for the presence of contaminated or activated materials. General Survey Instructions Rev. 0 Pagel of4
Snrvev Packarre Worksheet ARRR-COll (cont'd) I. The attached map shows the 5 soil sample locations and numbers.
- 2. Perform a gamma fixed measurement on contact with each sample, record reading in µR/hr and mark the sample locations in the field using surveyors paint or equivalent.
- 3. Complete sample Chain-of-Custody forms and store samples in a secure place until shipment to the off-site laboratory.
Rev.0 Page2 of4
Survey Package Worksheet ARRR-C018 (cont'd) I Special Instructions I Source check instrumentation using Cs-137 for gamma measurements.
- Complete Survey Cover page with required location, date and instrument
- Use a model 44-10 (or equivalent) for gamma scan surveys and exposure information. Complete remainder of Survey Form as applicable.
rate measurements.
- Notify the ES Project Manager of any exposure rate measurements that exceed 25 µR/hr or 2 X background.
- Attach photographic records if available and provide descriptive comments for each image under Survey Comments. Ensure that the Package ID No. and a page number ( e.g., Page Al) are included on each attachment.
Snrvey performance (Initial and date each survey task after completion) Gamma 1cm lm General Description Beta Scan Direct Beta Direct Alpha Smear Gross Scan Exposure Exposure Rate Samples Rate Total of!O samples-Soil Samples NIA NIA NIA NIA NIA NIA NIA ARRR-06 through ARRR-15. Rev. 0 Pagc3 of4
Survey Package Worksheet ARRR-C018 (cont'd) Survey Comments -()7 (}'J-;) I 0~ 0-/1 -0 /f/-.51- )5,51 ~;o t)-// ~
- /_ 3 - ;;21/, I
/R {)-{o Ir 13 2 '-zl./ 1 ~ /lf {)-{ (J z.3-zy 1 Package Review Date Package Completed: J ';J3 // Package Reviewed by and Date: M. ~- ~~ 1// Rev. 0
Survey Diagram Page # }~~ Room/Area: Overall Site Layout Date: Jfej;;}}