05000456/LER-2022-001, Liquid Penetrant Indications in Control Rod Drive Mechanism Nozzle Seal Weld Repair Due to Subsurface Weld Defects Opening Up from Thermal and Pressure Stresses During Operation
| ML22334A008 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 11/30/2022 |
| From: | Constellation Energy Generation |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML22334A006 | List:
|
| References | |
| BW220078 LER 2022-001-00 | |
| Download: ML22334A008 (1) | |
| Event date: | |
|---|---|
| Report date: | |
| Reporting criterion: | 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(ii) |
| 4562022001R00 - NRC Website | |
text
Abstract
On October 7, 2022, during a Liquid Penetrant examination on the embedded flaw seal weld repair of Control Rod Drive Mechanism Penetration 69, five 1/4-inch rounded indications were discovered that were determined to be unacceptable per the acceptance criteria in ASME Section Ill.
The cause of these indications is attributed to existing mechanical discontinuities/minor subsurface voids growing or opening to the weld surface due to thermal and/or pressure stresses during plant operation. The indications were reduced to an acceptable dimension by grinding/blending the indications to meet the applicable acceptance criteria in SME Section Ill.
This event is reportable in accordance with 10 CFR 50.73(a)(2)(ii)(A), "any event or condition that results in the condition of the nuclear power plant, including its principal safety barriers, being seriously degraded" since the as-found indications did not meet the applicable acceptance criterion referenced in ASME Section Ill to remain in service without repair.
A. Plant Operating Conditions Before the Event
Event Date:
Unit: 1 October 7, 2022 MODE: 6 Unit 1 Reactor Coolant System (RCS) [AB]:
05000456 Not Applicable YEAR 2022 SEQUENTIAL NUMBER 001 REV NO.
00 No structures, systems or components were inoperable at the start of this event that contributed to the event.
B. Description of Event
On October 07, 2022, a Liquid Penetrant (PT) examination on the embedded flaw seal weld repair of Control Rod Drive Mechanism (CROM) Penetration 69 was performed. During the PT examination, five unacceptable 1/4-inch rounded indications were discovered on the embedded flaw seal weld repair of the penetration. Rounded indications that exceed 3/16 inches in any dimension are unacceptable per the acceptance criteria in ASME Section Ill.
The first indication is a 1/4-inch rounded indication located at 90 degrees at the weld saddle of the penetration.
The second indication is a 1/4-inch rounded indication located at 90 degrees on the nozzle portion of the seal weld and 0.5 inches from the transition of the head to the penetration.
The third indication is a 1/4-inch rounded indication located at 90 degrees on the nozzle portion of the seal weld and 1.5 inches from the transition of the head to the penetration.
The fourth indication is a 1 /4-inch rounded indication located at 180 degrees on the nozzle portion of the seal weld and 1 inch from the transition of the head to the penetration.
The fifth indication is a 1/4-inch rounded indication located at 180 degrees on the nozzle portion of the seal weld and 2.5 inches from the transition of the head to the penetration. This indication was discovered during a prior TP examination in refueling outage A1R21 (October 10, 2019), and at the time was at an acceptable size per ASME Section Ill. This was the only indication of the five that was present during a prior examination.
0 degrees azimuth is the location at the outermost portion of the penetration on the flange side ( downhill/outermost side). The transition is the point where the vertical portion of the penetration meets the horizontal area of the reactor head.
This event is reportable in accordance with 10 CFR 50.73(a)(2)(ii)(A}, "any event or condition that results in the condition of the nuclear power plant, including its principal safety barriers, being seriously degraded" since the as-found indications did not meet the applicable acceptance criterion referenced in ASME Section Ill to remain in service without repair. This LER is being submitted in follow-up to ENS 56153 made on October 7, 2022, at 0735 CDT.
C. Cause of Event
The cause of these indications is attributed to existing mechanical discontinuities/minor subsurface voids growing or opening to the weld surface due to thermal and/or pressure stresses during plant operation. Unacceptable rounded indications have previously been identified on the embedded flaw seal weld repair on CROM Penetration
- 69.
D. Safety Consequences
This condition had no actual safety consequences impacting plant or public safety.
YEAR 2022 SEQUENTIAL NUMBER 001 REV NO.
00 Each unacceptable indication was identified in a timely manner during routine inspection activities and repaired prior to through wall leakage occurring. None of the indications penetrated through the embedded seal weld repair.
Were these indications to go undetected, they could have potentially propagated through the embedded seal weld repair over time, creating a leak path through the reactor coolant pressure boundary. With these required inspections being performed at the required intervals, detected degradation that does not meet acceptance criteria will be repaired or evaluated prior to reaching any level of significance. This condition is limited to CROM Penetration 69 at Braidwood Unit 1. CROM Penetration 69 is the only penetration at Braidwood Unit 1 that has been repaired utilizing this embedded flaw seal weld repair method.
Bare metal visual examination on the reactor vessel closure head did not detect any evidence of reactor coolant pressure boundary leakage. Volumetric examination did not detect any evidence of through-wall reactor coolant pressure boundary leakage. Based on the characteristics and dimensions of the unacceptable indications discovered during PT examination, there was no loss of safety function due to these indications.
E. Corrective Actions
Actions were completed to grind/blend the indications to remove or reduce the indication size to meet the applicable acceptance criteria in ASME Section Ill. Progressive PT examination was performed during the grinding/blending to determine if the indications met acceptance criteria, and all five of the previously unacceptable indications were determined to meet acceptance criteria via PT examination.
F.
Previous Occurrences
Previous Licensee Event Reports were made in June 2012, November 2013, June 2015 and November 2016 at Braidwood Station Unit 1 for indications on CROM penetration 69 (LER 2012-002-00, LER 2013-002-00, LER 2015-002-00 and LER 2016-003-00).
G. Component Failure Data
Manufacturer Westinghouse Nomenclature Reactor Vessel Integrated Head Package Termination 1718E72 Mfg. Part Number N/A Page_3_ of _3_