November 29, 2022

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000387/2022403 AND 05000388/2022403

Dear Brad Berryman:

On October 27, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Susquehanna Steam Electric Station, Units 1 and 2 and discussed the results of this inspection with Douglas J. LaMarca, Director, Strategic Planning and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Daniel L. Schroeder, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security

Docket Nos. 05000387 and 05000388 License Nos. NPF-14 and NPF-22

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000387 and 05000388

License Numbers:

NPF-14 and NPF-22

Report Numbers:

05000387/2022403 and 05000388/2022403

Enterprise Identifier: I-2022-403-0013

Licensee:

Susquehanna Nuclear, LLC

Facility:

Susquehanna Steam Electric Station, Units 1 and 2

Location:

Berwick, PA

Inspection Dates:

October 24, 2022 to October 27, 2022

Inspectors:

K. Hussar, Senior Physical Security Inspector

S. McCarver, Physical Security Inspector

M. Ordoyne, Physical Security Inspector

Approved By:

Daniel L. Schroeder, Chief

Security, Emergency Preparedness and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Susquehanna Steam Electric Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: 8 Requirements (02.06 a - c, 02.07 a, 02.08 a - d)
  • Tier III: 1 Requirement (02.09)

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from this IP dated January 1, 2019.

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All requirements
  • Tier II: 9 requirements (02.09 a & b, 02.11 a - e, 02.12 a, 02.13 a)
  • Tier III: All requirements

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

===procedure elements:

Security Training===

(1)

  • Tier I: All Requirements
  • Tier II: 8 Requirements (02.05 a - d, 02.06 a - b, 02.07 a, 02.08 a)
  • Tier III: 8 Requirements (02.10, 02.11 a, 02.12 a, 02.13 a - c, 02.14 a & c)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

===procedure elements:

Security Plan Changes===

(1) The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2) since the last performance of this IP.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

Performance Indicator Data for Intrusion Detection System and CCTV was reviewed for the past 4 quarters.

(1) September 1, 2021 through September 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 27, 2022, the inspectors presented the security baseline inspection results to Douglas J. LaMarca, Director, Strategic Planning and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

21-01931

21-06293

21-15923

21-16194

21-16824

22-05744

22-07656

22-08024

22-08440

22-08457

22-09059

22-12674

22-14122

Corrective Action

Documents

Resulting from

Inspection

22-15767

Miscellaneous

22 Security/Cyber Security Audit Report

Semi-Annual Security Controlled Key and Lock Core

Inventory

10/06/2022

20 Security and Access Authorization Nuclear Oversight

Internal Audit Report

Procedures

NDAP-QA-0902

Safeguard Information Program and the Protection of

Sensitive Unclassified Non Safeguards Information

Revision 25

NS-SSP-002

Control, Issuance and Assignment of Security Controlled

Locks and Keys

Revision 21

NS-SSP-002

Control Issuance and Assignment of Security Controlled

Locks and Keys

Revision 21

SI-SO-002

Duties and Responsibilities of the Alarm Station Operators

Revision 56

SI-SO-003

Duties and Responsibilities of the Access Control Officer

Revision 50

SI-SO-006

Duties and Responsibilities of the South Gate House Search

Officer

Revision 76

SI-SO-008

Emergency Access and Egress

Revision 22

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SI-SO-034

Vehicle Search

Revision 15

SI-SO-036

Searches Conducted Outside the OCA

Revision 10

SI-SO-037

Duties and Responsibilities of the Warehouse Search Officer

Revision 11

SI-SO-038

Vital Area Access During Periods of Site-Specific Credible

Threat to Include Insider Threat

Revision 2

71130.04

Corrective Action

Documents

21-16104

21-16989

22-02048

Procedures

NS-SSP-003

Tests, Checks, and Inspections of Security Systems and

Equipment

Revision 58

NS-SSP-004

Tests, Checks and Inspections of the Susquehanna Security

Computer System

Revision 59

OP-032-003

Security 480V AC System

Revision 27

SI-SO-033

Weapons Maintenance

Revision 3

71130.07

Corrective Action

Documents

22-10200

22-09565

22-08193

22-08188

22-06492

22-06492

Procedures

Weapons Familiarization Course of Fire

Lesson Plan 12

Perform Testing of Intrusion Detection Equipment and

Special Purpose Detectors

Revision 8

Lesson Plan

31AB

Handgun and Semi-Automatic Rifle Firearms Familiarization

Revision 0

Lesson Plan

HP007PF

Respiratory Protection

11/6/2013

SI-ST-004

Nuclear Security On-The-Job Training Program for Alarm

Station Operators; Security Officer Levels I and II and

Response Team Leader

Revision 23

Task 16

Determine Amount of Force Required to Prevent an

Unauthorized Act

Revision 5

Task 29

Annual Written Exam