05000318/LER-2022-002, Unplanned Safety Injection Actuation Signal Due to Human Error

From kanterella
(Redirected from ML22316A019)
Jump to navigation Jump to search
Unplanned Safety Injection Actuation Signal Due to Human Error
ML22316A019
Person / Time
Site:  Constellation icon.png
Issue date: 11/11/2022
From:
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML22316A017 List:
References
LER 2022-002-00
Download: ML22316A019 (1)


LER-2022-002, Unplanned Safety Injection Actuation Signal Due to Human Error
Event date:
Report date:
3182022002R00 - NRC Website

text

Abstract

OnSeptember14,2022,withUnit2inMode5(ColdShutdown)duringcooldownforamaintenanceoutage, OperationscommencedperformanceofOI342,Section6.8/AppendixJ,BypassingSIASandSIASBlockSensor ModulesinMode5,6,orDefueled,insupportofOP052,PlantShutdownfromHotStandbytoColdShutdown.During performanceoftheOI342evolution,anunplannedSafetyInjectionActuationSignal(SIAS)occurredduetoOperator failuretocomplywithstationprocedureuseandadherencestandards.TheunplannedSIASresultedintheautomatic startofthesites2ADieselGenerator(DG)and2BDG.TheunplannedSIASdidnotresultinsafetyinjectionintothe reactorcoolantsystemnordiditadverselyimpactshutdowncoolingoperations.

(See Page 3 for required number of digits/characters for each block)

(See NUREG-1022, R.3 for instruction and guidance for completing this form http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1022/r3/)

Page 5 of 5 SafetyImpact

Thesafetysignificanceofthiseventwasminimal.Atthetimeoftheevent,Unit2wasinMode5andtheHPSILTOP tagoutwasinplace,preventingtheinjectionofhighpressuremakeupintothereactorcoolantsystemwhileinalow temperaturecondition.BothLPSIPumpswerealreadyinoperationprovidingcoolingflowviatheSDCsystem.SDC operationwasnotadverselyimpactedbytheunplannedSIAS.AlthoughbothUnit2dieselgenerators,the2ADGand 2BDG,receivedautomaticstartsignalsfromtheunplannedSIASAandB,sincetherewasnolossofeitherthe214KV Bus(safetyrelatedZAtrainbussupportedbythe2ADG)orthe244KVBus(safetyrelatedZBtrainbussupportedby the2BDG),neitherofthedieselgeneratorsloadedontotheirrespectivebus.Followingtheautomaticstartofthe2A DGand2BDG,bothdieselgeneratorsoperatedsatisfactorilyuntilsecured.

F.CORRECTIVEACTIONS

TheCAPproductperformedunderIR4522477identifiedthefollowingcorrectiveactionsthatareplannedtobetaken toaddresscauseandextentofconditionfromtheeventinvestigation:

(1)PerformedaCorrectiveActionProgramevaluation.

(2)AddressedpersonnelaccountabilityactionsinaccordancewithHumanResourcepolicies.

(3)ReviseapplicableESFAS/AuxiliaryFeedwaterActuationSystem(AFAS)procedurestoclearlydelineate supervisoryoversightwhileperformingthetasks.

G.PREVIOUSOCCURRENCES

AreviewofCalvertCliffsreportableeventsbacktoJanuary2012wasperformed.TherewerenoLERsthatinvolved unplannedESFASactuationsastheresultofpersonnelerrors.

LER3182021004,Unit2ManualReactorTripDuetoLoweringSteamGeneratorLevels,doesdocumentaUnit2 manualreactortripthatwasinitiatedbyapersonnelerrorwhenbreakerstabcoverswerenotremovedpriorto attemptingtoenergizethe12SpentFuelPoolCoolingPump(SFPCP).Uponattemptingtoenergizethe12SFPCP,an arcflasheventoccurredthatresultedinthelossofthe24A480VLoadCenterthatledultimatelytotheneedfor OperationstomanuallytriptheUnit2reactor.

H.COMPONENTFAILUREDATA

Therewerenocomponentfailuresidentifiedthatcontributedtothiseventoroccurredasaresultofthisevent.