MONTHYEARML22304A6802022-11-17017 November 2022 Audit Plan in Support of Review of License Amendment Request Regarding Reinsertion of a High Burnup Accident Tolerant Fuel Lead Test Assembly ML22265A0132022-09-28028 September 2022 Steam Generator License Renewal Response to Commitment 10 - Audit Plan ML22214A0042022-08-0202 August 2022 Audit Plan to Support the Review of Amendments to Revise Criticality Safety Analysis Methodologies (Epids L-2022-LLA-0085, L-2021-LLA-0124, and L-2021-LLA-0159) ML19133A0862019-05-20020 May 2019 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 ML19038A4892019-02-0707 February 2019 Combine Fuels and Quality Assurance Braidwood Tvel LTA LAR Audit Plan ML16259A1892016-12-0505 December 2016 Nuclear Regulatory Commission Plan for the Audit of Mitigation Strategies Assessment Submittals Related to Order EA-12-049, Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML14198A5592014-07-24024 July 2014 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 ML14083A6202014-03-26026 March 2014 Nuclear Regulatory Commission Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051 ML13182A0482013-07-10010 July 2013 Audit Plan for Braidwood and Byron Licensee Action Taken to Resolve Turbine Building High Energy Line Break Non-Conformance 2022-09-28
[Table view] Category:Letter
MONTHYEARIR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 ML24022A2722024-01-23023 January 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 ML23320A1762023-12-13013 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0027 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23318A5102023-12-0101 December 2023 Relief from the Requirements of the ASME Code IR 05000454/20233012023-11-27027 November 2023 NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 BYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline2023-11-17017 November 2023 Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) IR 05000454/20230032023-11-13013 November 2023 Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion RS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23313A0852023-11-0909 November 2023 Submittal of 2023-301 Byron Initial License Examination Post-Examination Comments RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML23297A2352023-10-26026 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection RS-23-100, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23251A1622023-09-29029 September 2023 Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 752023-09-29029 September 2023 Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 RS-23-091, Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals2023-09-26026 September 2023 Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23242A3282023-09-0101 September 2023 Amendment No. 233 Correction IR 05000454/20235012023-08-31031 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000454/2023501 and 05000455/2023501 IR 05000454/20230052023-08-30030 August 2023 Updated Inspection Plan for Byron Station (Report 05000454/2023005 and 05000455/2023005) IR 05000454/20230022023-08-0303 August 2023 Integrated Inspection Report 05000454/2023002 and 05000455/2023002 ML23209A7242023-07-31031 July 2023 Request for Information on the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000454/2024010 and 05000455/2024010 ML23192A0362023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23122A3022023-07-20020 July 2023 Issuance of Amendments Technical Specifications 2.1.1 and 4.2.1 to Allow a Previously Irradiated Accident Tolerant Fuel Lead Test Assembly to Be Further Irradiated in Unit No. 2 IR 05000454/20234022023-07-18018 July 2023 Baseline Security Inspection Document; 05000454/2023402; 05000455/2023402 ML23198A0372023-07-17017 July 2023 Information Request to Support Upcoming Problem Identification and Resolution (PIR) Inspection at Byron Nuclear Plant ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators ML23172A1172023-06-22022 June 2023 Notification of NRC Fire Protection Team Inspection Request for Information RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23159A1302023-06-0808 June 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B1R25) ML23159A1542023-06-0808 June 2023 2022 Regulatory Commitment Change Summary Report RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process ML23157A2832023-06-0606 June 2023 Notification of NRC Baseline Inspection and Request for Information BYRON 2023-0029, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements2023-06-0101 June 2023 Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements ML23138A1342023-05-18018 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Braidwood Station and Byron Station ML23003A7882023-05-11011 May 2023 Report for December 12-16, 2022, Regulatory Audit Regarding Reinsertion of a High Burnup Accident Tolerant Fuel Lead Test Assembly 2024-02-02
[Table view] |
Text
November 17, 2022 Mr. David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BYRON STATION, UNIT NO. 2 - AUDIT PLAN IN SUPPORT OF REVIEW OF LICENSE AMENDMENT REQUEST REGARDING REINSERTION OF A HIGH BURNUP ACCIDENT TOLERANT FUEL LEAD TEST ASSEMBLY (EPID L-2022-LLA-0131)
Dear Mr. Rhoades:
By letter dated August 31, 2022, Constellation Energy Generation, LLC (Constellation) submitted a license amendment request (LAR) for Byron Station, Unit No. 2 (Byron). In its LAR, Constellation proposes to revise language in Technical Specifications 2.1.1, Reactor Core SLs
[Safety Limits], and 4.2.1, Fuel Assemblies, to allow a previously irradiated accident tolerant fuel (ATF) lead test assembly (LTA) to be further irradiated during Byron Station, Unit 2, Cycle 25.
During the acceptance review of the LAR, the U.S. Nuclear Regulatory Commission (NRC) staff identified several items that require further clarification and additional detail. The NRC staff will conduct a regulatory audit to support its review of the LAR in accordance with the enclosed audit plan. A regulatory audit is a planned activity that includes the examination and evaluation of primarily non-docketed information. The audit will be conducted to increase the NRC staffs understanding of the LAR and identify information that will require docketing to support the NRC staffs regulatory finding.
The audit will be conducted December 12-16, 2022, using audio/video conferencing and a portal to allow the NRC staff to review non-docketed information and details regarding the analysis to demonstrate safe operation of the ATF LTA during further operation. The logistics and scope of this audit were discussed with your staff on November 15, 2022. The audit plan is enclosed.
D. Rhoades If you have any questions, please contact me by telephone at 301-415-6606 or by e-mail to Joel.Wiebe@nrc.gov.
Sincerely,
/RA/
Joel S. Wiebe, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. STN 50-455
Enclosure:
Audit Plan cc: Listserv
AUDIT PLAN BY THE OFFICE OF NUCLEAR REACTOR REGULATION REGARDING LICENSE AMENDMENT REQUEST REGARDING THE REINSERTION OF AN ACCIDENT TOLERANT FUEL LEAD TEST ASSEMBLY BYRON STATION, UNIT NO. 2 DOCKET NO. STN 50-455 EPID L-2022-LLA-0131
1.0 BACKGROUND
By letter dated August 31, 2022 (Agencywide Documents and Management System ML22243A094), Constellation Energy Generation, LLC (Constellation) submitted a license amendment request (LAR) for Byron Station, Unit No. 2 (Byron). In its LAR, Constellation proposes to revise language in Technical Specifications (TSs) 2.1.1, Reactor Core SLs [Safety Limits], and 4.2.1, Fuel Assemblies, to allow a previously irradiated accident tolerant fuel (ATF) lead test assembly (LTA) to be further irradiated during Byron Station, Unit No. 2, Cycle 25.
During the acceptance review of the LAR, the U.S. Nuclear Regulatory Commission (NRC) staff identified several items that require further clarification and additional detail. The NRC staff will conduct a regulatory audit December 12-16, 2022, to support its review of the LAR in accordance with the enclosed audit plan. A regulatory audit is a planned activity that includes the examination and evaluation of primarily non-docketed information. The audit will be conducted to increase the NRC staffs understanding of the LAR and identify information that will require docketing to support the NRC staffs regulatory finding.
2.0 REGULATORY AUDIT BASES The NRC staff will perform the audit to support its evaluation of whether the licensees request can be approved per Title 10 of the Code of Federal Regulations (10 CFR), section 50.92, Issuance of Amendment, which states, in part, that, In determining whether to issue an amendment to a license, , the Commission will be guided by the considerations which govern issuance of initial licenses. Applicable regulations considered in that review include 10 CFR, section 50.34, Contents of Applications; Technical Information, and applicable general design criteria (GDC) from appendix A to 10 CFR part 50.
Consistent with section 50.90 of 10 CFR, an application for an amendment to a license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the Enclosure
design and operating characteristics, unusual or novel design features, and principal safety considerations.
Regulation 10 CFR 50.46(b)(4) requires emergency core cooling systems to maintain a coolable core geometry during a postulated loss-of-cooling accident (LOCA).
3.0 REGULATORY AUDIT SCOPE AND METHODOLOGY of Constellations August 31, 2022, letter states the licensees conclusion that the fuel rods in the high-burnup LTA will not rupture during a LOCA. The licensee further states that The LTA will have significant reductions of power and peaking factors relative to the core lead such that the LTA does not pose any additional FFRD [fuel fragmentation, relocation, and disposal] risk.
As noted in the NRC staffs letter concerning the Clarification of Regulatory Path for Lead Test Assemblies, dated June 24, 2019 (ML18323A169), the evaluation of LTAs may necessitate the use of modified or different codes and methods than those currently approved. The letter further emphasizes the expectation that uncertainties in inputs and models conservatively use available data to the extent practical.
4.0 INFORMATION AND OTHER MATERIAL NECESSARY FOR THE AUDIT
- 1. The licensee should provide an overview of all of the analyses used to demonstrate that the high burnup LTA will operate safely in the Byron, Unit No. 2, reactor during Cycle 25.
The licensee should make these analyses available to the NRC staff via portal.
- 2. The licensee should specifically point out where engineering judgment was used to conclude the ATF LTA and rods will operate safely, during Cycle 25. Identify the basis for the engineering judgement conclusion. The analyses that use engineering judgment should be made available to the NRC staff via portal.
- 3. The licensee should make available the results of all applicable Post-irradiation Examinations that are applicable to the ATF LTA rods.
- 4. To determine whether the requirement in 10 CFR 50.46(b)(4) to maintain a coolable core geometry is satisfied, the licensee should make available to the NRC staff via portal the information relevant to the potential for the high-burnup LTA to experience fuel rod rupture during a LOCA, including:
- a. Clarification of the existing LOCA analysis methods described in revision 18 of the UFSAR (apparently ASTRUM for large-break and NOTRUMP for small-break) for demonstrating non-rupture of high-burnup fuel, and the applicability of these methods to such analysis for high-burnup fuel.
- b. Clarification of the fuel thermal-mechanical analysis methods used to provide input to the LOCA evaluation models and their applicability for calculating phenomena necessary to assure no dispersal of high-burnup fuel.
- c. Clarification of the peaking factors assumed for fuel rods in the high-burnup LTA, the method for their determination, their relationship to operating limits in technical specifications and the core operating limits report, and the amount of margin they provide to cladding rupture after accounting for relevant uncertainties.
- 5. The licensee should clarify how the evaluations account for recent test data, analysis, and other information that relates to the potential for high-burnup fuel rods to rupture during a LOCA.
5.0 AUDIT TEAM The audit team will consist of the following NRC staff from NRR:
Joel Wiebe, Plant Licensing Branch III John Lehning, Nuclear Methods and Fuel Analysis Branch (SFNB)
Hanry Wagage, Containment and Plant Systems Branch (SCPB)
Nan Chien, SCPB Santosh Bhatt, Nuclear Systems Performance Branch (SNSB)
Sean Meighan. Radiation Protection and Consequence Branch (ARCB)
Robert Elliott, Technical Specifications Branch (STSB) 6.0 LOGISTICS The audit will be conducted December 12-16, 2022, using audio/video conferencing via TEAMS.
The NRC staff requests the licensee to have the information discussed in Section 4.0 readily available for the audit via portal. The NRC staff requests the licensee to have its staff available at a mutually agreeable time to present and discuss the information identified in section 4.0. The NRC staff will not take possession of any of the information made available by the licensee for discussion. If information is needed to be placed on the docket in order for the NRC staff to make a decision regarding the August 31, 2022, submittal, the information will be requested via a subsequent request for additional information.
7.0 DELIVERABLES After the audit, the NRC staff will develop any requests for information which it will provide the licensee via separate docketed correspondence. The NRC staff intends to issue an audit summary within approximately 30 days of completion of the audit.
ML22304A680 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DSS/SCPB/BC NAME JWiebe SRohrer BWittick DATE 10/31/2022 11/1/2022 11/15/2022 OFFICE NRR/DSS/SNSB/BC(A) NRR/DSS/STSB/BC NRR/DEX/SFNB/BC NAME DWoodyatt VCusumano SKrepel DATE 11/15/2022 11/16/2022 11/15/2022 OFFICE NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME NSalgado JWiebe DATE 11/17/2022 11/17/2022