Kairos Power LLC, Transmittal of Changes to Preliminary Safety Analysis Report Chapter 13
ML22284A152
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 10/11/2022
From: Hastings P
Kairos Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML22284A151 List:
References
KP-NRC-2210-005
Download: ML22284A152 (2)


Text

KP-NRC-2210- 005

October 11, 2022 Docket No. 50- 7513

US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Kairos Power LLC Transmittal of Changes to Preliminary Safety Analysis Report Chapter 13

References:

1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1, September 29, 2022 (ML22272A594)
2. Audit Plan, Nuclear Regulatory Commission, Plan for an Audit of the Hermes Construction Permit Preliminary Safety Analysis Report Chapters 4 and 13, February 23, 2022 (ML 22041B665)

In September 2022, Kairos Power submitted Revision 1 of the Preliminary Safety Analysis Report (PSAR)

(Reference 1) as part of the Construction Permit Application (CPA) for the Hermes non-power reactor.

This letter transmits changes to the pages of the PSA R to address NRC feedback received in the PSAR Chapter 4 and 13 Audit (Reference 2). Changes to the pages of the PSAR are provided in Enclosure 1.

Kairos Power requests NRC review of these changes as part of the continued review of the Hermes CPA.

If you have any questions or need any additional information, please contact Delaney Simmons at simmons@kairospower.com or (605) 838-5132, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on October 11, 2022

Peter Hastings, PE Vice President, Regulatory Affairs and Quality

Enclosure:

Changes to Hermes PSAR Chapter 13

Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211

KP-NRC-2210-005 Page 2

xc (w/enclosure):

William Kennedy, Acting Chief, NRR, Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR, Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR, Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR, Advanced Reactor Licensing Branch Matthew Hiser, NRR Advanced Reactor Licensing Branch