October 4, 2022 Mr. Lance Stephens Site Manager Framatome Inc.

2101 Horn Rapids Road Richland, WA 99354

SUBJECT:

FRAMATOME-RICHLAND - INTEGRATED INSPECTION REPORT 07001257/2022003

Dear Mr. Stephens:

This letter refers to the Nuclear Regulatory Commission (NRC) inspection oversight activities conducted from July 1 to September 30, 2022, for the Framatome facility in Richland, WA.

During this calendar quarter, the NRC did not conduct inspection activities as originally scheduled in the NRCs calendar year 2022 inspection schedule (ADAMS Accession Number ML21179A234). All third quarter inspections were rescheduled to the fourth quarter.

Although there were no inspections conducted in the third quarter of calendar year 2022, inspectors continued to conduct supplemental reviews of licensee-submitted reports (e.g., semi-annual effluent reports, plant modification reports, and changes to the Integrated Safety Analysis Summary) and maintained bi-weekly communications with your staff to discuss the status of plant operations.

No violations of more than minor significance were identified during this period.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Signed by Michel, Eric on 10/04/22 Eric C. Michel, Chief Projects Branch 2 Division of Fuel Facility Inspection Docket No. 70-1257 License No. SNM-1227 cc w/ encl: Distribution via LISTSERV

ML22272A025 x SUNSI Review x Non-Sensitive x Publicly Available Sensitive Non-Publicly Available OFFICE RII: DFFI RII: DFFI RII: DFFI NAME G. Goff C. Taylor E.Michel DATE 09/29/2022 09/29/2022 10/04/2022