ML21179A234

From kanterella
Jump to navigation Jump to search
Framatome, Inc. - Calendar Year 2022 Inspection Schedule
ML21179A234
Person / Time
Site: Framatome ANP Richland
Issue date: 06/28/2021
From: Eric Michel
NRC/RGN-II/DFFI
To: Travis Tate
Framatome
References
Download: ML21179A234 (3)


Text

June 28, 2021 Mr. Timothy J. Tate EHS&L Manager Framatome Inc.

2101 Horn Rapids Road Richland, WA 99354

SUBJECT:

FRAMATOME INC. - CALENDAR YEAR 2022 INSPECTION SCHEDULE

Dear Mr. Tate:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the Framatome Inc., Richland facility for calendar year 2022.

The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative or other reactive inspection is not included in the schedule. If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Tom Vukovinsky at (404) 997-4622 with any questions or concerns you may have regarding this letter or the inspection schedule.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Eric C. Michel, Chief Projects Branch 2 Division of Fuel Facility Inspection Docket No. 70-1257 License No. SNM-1227

Enclosure:

2022 Framatome Inspection Schedule cc: w/ encl: Distribution via LISTSERV

ML21179A234 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DFFI RII:DFFI NAME GGoff EMichel DATE 06/22/2021 06/28/2021 FRAMATOME INC.

2022 INSPECTION/ACTIVITY PLAN CALENDAR FRAMATOME OPS1 Dates 01/24 -28/2022 Number of Inspectors 2 Inspection Procedure (IP) 88020 - Operational Safety FRAMATOME NCS1/ENV/RP Dates 05/23-27/2022 Number of Inspectors 4 88015 - Nuclear Criticality Safety Inspection Procedures (IPs) 88030 - Radiation Protection 88045 - Effluent Control and Environmental Protection FRAMATOME PMT Dates 07/25-29/2022 Number of Inspectors 3 Inspection Procedures (IP) 88072 - Plant Modifications (Triennial)

FRAMATOME OPS2 Dates 09/12-16/2022 Number of Inspectors 2 Inspection Procedure (IP) 88020 - Operational Safety FRAMATOME NCS2/EP Dates 11/14-18/2022 Number of Inspectors 2 88015 - Nuclear Criticality Safety Inspection Procedure (IPs) 88050 - Emergency Preparedness Enclosure