ML22244A238

From kanterella
Jump to navigation Jump to search
Kairos Power Response to NRC Question on Dhrs Testing (Non-Proprietary)
ML22244A238
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 09/01/2022
From:
Kairos Power
To:
Office of Nuclear Reactor Regulation
Shared Package
ML22244A235 List:
References
KP-NRC-2209-003
Download: ML22244A238 (2)


Text

Page1of2

AspartoftheNRCauditofPSARChapter6,NRCstaffaskedaquestionregardingqualification testingoftheDHRS.

ThePSARincludescommitmentstotestsafetyrelatedstructures,systems,andcomponentsto ensurethesuccessfulperformanceofsafetyfunctions.AsdescribedinPSARSection6.3.3,theDHRS willmeetPDC4,whichrequiresthattheDHRScanperformitssafetyfunctionunderthe environmentalconditionsassociatedwithnormalplantoperationaswellasduringpostulated events.AsdescribedinPSARChapter12,AppendixB,Section2.3.3,theadequacyofthedesignwill beverifiedusingmethodsincludingtheperformanceofqualificationtests.Qualificationtestingfor thesafetyrelatedportionoftheDHRSwillbedefinedinatestplanthatincludesappropriate acceptancecriteriaanddemonstratesthesystemreliabilityandadequacyofperformanceunder conditionsthatsimulatethemostadversedesignbasisconditions.

((

))

Theresultsfromseparateandintegraleffectsteststhatsupportvalidationofthepostulatedevent boundaryconditionwillbeavailableduringtheoperatinglicenseapplicationphase,andstartup qualificationtestingresultswillbeavailableduringtheoperationphase.

Inaddition,thePSARincludescommitmentstoensuretheoperabilityoftheDHRSthrough inspectionandtesting,whichensuresdegradationmechanismswillnotpreventtheDHRSfrom performingitssafetyfunction.PSARSection14.1identifiesdecayheatremovalsystemoperability asanexpectedlimitingconditionofoperationthatwillbeincludedwiththetechnicalspecifications intheapplicationforanOperatingLicense.AsdescribedinPSARSection6.3.3,theDHRSwillmeet PDC36byincludingthecapabilityforonlinemonitoringandinspection.Whenthereactoris operatingabovethresholdpower,theDHRSisinanalwaysonoperatingconditionwhichprovides

Page2of2 anongoingdemonstrationofsystemavailability.Thesefeaturesdemonstrateconformancewiththe requirementsinPDC37.