ND-22-0667, ITAAC Closure Notification on Completion of ITAAC Item 2.3.15.03 (Index Number 483)

From kanterella
(Redirected from ML22224A216)
Jump to navigation Jump to search
ITAAC Closure Notification on Completion of ITAAC Item 2.3.15.03 (Index Number 483)
ML22224A216
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 08/12/2022
From: Coleman J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-22-0667
Download: ML22224A216 (7)


Text

>-a Southern Nuclear Jamie M . Coleman Regulatory Affairs Director 7825 River Road Waynesboro , GA 30830 Vogtle 3 & 4 706-848-6926 August 12, 2022 Docket No. : 52-026 ND-22-0667 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Wash ington , DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 4 ITAAC Closure Notification on Completion of ITAAC Item 2.3.15.03 [Index Number 483]

Ladies and Gentlemen:

In accordance with 10 CFR 52 .99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP)

Unit 4 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.3.15.03 [Index Number 483]. This ITAAC concludes that the displays identified in Table 2.3.15-1 can be retrieved in the Main Control Room (MCR). The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01 , Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments . Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52 .99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted ,

~~

Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 4 Completion of ITAAC Item 2.3.15.03 [Index Number 483]

JMC/DLW/sfr

U.S. Nuclear Regulatory Commission ND-22-0667 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. D. Pitts Mr. J.B. Williams Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M . Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE : VND .LI .L06 File AR .01 .02.06 Nuclear Regulatory Commission Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall

U.S . Nuclear Regulatory Commission ND-22-0667 Page 3 of 3 Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S.L. Zwack Other Mr. S. W. Kline , Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS , Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-22-0667 Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-22-0667 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 4 Completion of ITAAC Item 2.3.15.03 [Index Number 483]

U.S. Nuclear Regulatory Commission ND-22-0667 Enclosure Page 2 of 4 ITAAC Statement Design Commitment

3. Displays of the parameters identified in Table 2.3.15-1 can be retrieved in the MCR.

Inspections. Tests, Analyses Inspection will be performed for retrievability of parameters in the MCR.

Acceptance Criteria The displays identified in Table 2.3.15-1 can be retrieved in the MCR.

ITAAC Determination Basis An inspection was performed to verify the retrievability of the Vogtle Electric Generating Plant (VEGP) Unit 4 plant parameters in the Main Control Room (MCR). The inspection for retrievability confirms that the displays of the parameters identified in COL Appendix C Table 2.3.15-1 (Attachment A) can be retrieved in the MCR.

The inspection was performed in accordance with the Unit 4 component test package work order identified in Reference 1 for compressed and instrument air system (CAS) component indication verifications, and visually confirmed that when each of the displays of parameters identified in Attachment A was summoned at an MCR workstation, the summoned plant parameter appeared on a display monitor at that MCR workstation.

The Unit 4 component test results were reviewed (Reference 1) and confirmed that the VEGP Unit 4 plant parameter displays listed in Attachment A can be retrieved in the MCR.

Reference 1 is available for NRC inspection as part of Unit 4 ITAAC 2.3.15.03 Completion Package (Reference 2).

IT AAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all lTAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC . The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.3.15.03, Unit 4 (Reference 2) and is available for NRC review.

IT AAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.3.15.03 was performed for VEGP Unit 4 and that the prescribed acceptance criteria are met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

U.S. Nuclear Regulatory Commission ND-22-0667 Enclosure Page 3 of 4 References (available for NRC inspection)

1. SV4-CAS-ITR-800483, Rev 0, Unit 4 Recorded Results of CAS Parameters Displays in MCR: ITAAC 2.3.15.03.
2. 2.3.15.03-U4-CP-Rev 0, ITAAC Completion Package

U.S. Nuclear Regulatory Commission ND-22-0667 Enclosure Page 4 of 4 Attachment A Table 2.3.15-1 Equipment Name Tag No. Display Control Function Instrument Air Pressure CAS-011 Yes -

Note: Dash (-) indicates not applicable.