ML22186A120

From kanterella
Jump to navigation Jump to search
2018 DB Ile Administered Simulator and Inplant JPMs
ML22186A120
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/15/2018
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
FirstEnergy Nuclear Operating Co
Baker R
Shared Package
ML17068A443 List:
References
Download: ML22186A120 (99)


Text

Davis-Besse Initial License Exam 2018 Simulator JPM S1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S1 AG Facility: Davis-Besse Task No: 001-044-04-100 Task

Title:

Manual Latch and PI Reset of Dropped Control Rod K/A

Reference:

(003) AA1.02 3.6/3.4 Job Performance Measure No: S1 (NEW)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant was at 100% power and experienced a dropped rod.

DB-OP-02516, CRD Malfunctions, was entered and the plant stabilized at 55% power.

The cause of the dropped rod has been determined and corrected.

Rod recovery is scheduled to be performed this shift Task Standard:

Manually Latch and PI Reset a single fully inserted control rod following a dropped rod.

Required Materials:

DB-OP-06402, CRD Operating Procedure, Section 4.8 and Limits and Precautions General

References:

Initiating Cue:

The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.

Time Critical Task:

No Alternate Path:

No Validation Time:

11 Minutes NUREG-1021, Revision 11 Page 1 of 8 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S1 AG SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Manually Latch and PI Reset a single fully inserted control rod following a dropped rod.

INITIAL CONDITION:

55% Power Rod 7-3 Dropped ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

None MALFUNCTIONS/FAILURE TO INSERT:

None NUREG-1021, Revision 11 Page 2 of 8 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S1 AG EXAMINER COPY INITIAL CONDITIONS:

The plant was at 100% power and experienced a dropped rod.

DB-OP-02516, CRD Malfunctions, was entered and the plant stabilized at 55% power.

The cause of the dropped rod has been determined and corrected.

Rod recovery is scheduled to be performed this shift INITIATING CUES:

The Unit Supervisor has directed you to perform Manual Latch and PI Reset of rod 7-3 in accordance with section 4.8 of DB-OP-06402, CRD Operating Procedure.

(Provide examinee a copy of section 4.8 of DB-OP-06402, CRD Operating Procedure, and Limits and Precautions.)

NUREG-1021, Revision 11 Page 3 of 8 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S1 AG CANDIDATE COPY INITIAL CONDITIONS:

The plant was at 100% power and experienced a dropped rod.

DB-OP-02516, CRD Malfunctions, was entered and the plant stabilized at 55% power.

The cause of the dropped rod has been determined and corrected.

Rod recovery is scheduled to be performed this shift INITIATING CUES:

The Unit Supervisor has directed you to perform Manual Latch and PI Reset of rod 7-3 in accordance with section 4.8 of DB-OP-06402, CRD Operating Procedure.

NUREG-1021, Revision 10 Page 4 of 8 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S1 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Document direction of Shift Manager to Latch and PI Reset STANDARD: Identify Group 7 and Rod 3 as rod directed to be latched and reset and complete prerequisite step 4.8.1.

CUE: The Unit Supervisor will refer to Tech Specs as applicable SAT UNSAT

2. PERFORMANCE STEP: Verify Group Select Switch is selected to required group.

........C........

STANDARD: Verify Group Select Switch is selected group 7.

CUE: Role play to perform IV of selected position. (Concur with the position selected)

SAT UNSAT

3. PERFORMANCE STEP: Verify Single Select Switch is selected to required rod.

........C........

STANDARD: Verify Single Select Switch is selected to rod 3 position.

CUE: Role play to perform IV of selected position. (Concur with the position selected)

SAT UNSAT

4. PERFORMANCE STEP: Verify completion of Prerequisites.

STANDARD: Verify completion of Prerequisites and sign Prerequisites completed by block.

CUE: Role play and sign Independent Verification by block.

SAT UNSAT NUREG-1021, Revision 11 Page 5 of 8 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S1 AG

5. PERFORMANCE STEP: Identify proper procedure step for manual Rod Latch and Reset STANDARD: Identify step 4.8.4 is for Automatic Latch and Reset and mark as N/A.

CUE: None SAT UNSAT

6. PERFORMANCE STEP: Identify proper procedure step for manual Rod Latch and Reset STANDARD: Identify step 4.8.5 is the proper step for Manual Latch and Reset.

CUE: None SAT UNSAT

7. PERFORMANCE STEP: Check Rod PIP Control ON light is ON.

STANDARD: Document Group 7 and Rod 3 in step 4.8.5.a and check Rod PIP Control On light is lit.

NOTE: All Group 7 rod PIP Control On lights will be lit. Rod 7-3 is in manual control, the other group 7 rods are under automatic control.

CUE: None SAT UNSAT

8. PERFORMANCE STEP: Check indication of Auto Rod Recovery mode.

STANDARD: Check Auto Rod Recovery mode indicates backlight for AUTO is ON and MANUAL is FLASHING.

CUE: None SAT UNSAT

9. PERFORMANCE STEP: Select LATCH MANUAL.

........C........

STANDARD: Select LATCH MANUAL and verify backlight comes ON.

CUE: None __________

SAT UNSAT

10. PERFORMANCE STEP: Select IN LIMIT BYPASS.

........C........

STANDARD: Select IN LIMIT BYPASS and verify backlight comes ON.

CUE: None __________

SAT UNSAT NUREG-1021, Revision 11 Page 6 of 8 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S1 AG

11. PERFORMANCE STEP: Insert selected rod for approximately 5 seconds.

........C........

STANDARD: Document selected rod 7-3 in step 4.8.5.e and insert the rod for approximately 5 seconds.

NOTE: Critical action is to insert the rod for approximately 5 seconds.

CUE: None SAT UNSAT

12. PERFORMANCE STEP: Deselect IN LIMIT BYPASS.

STANDARD: Deselect IN LIMIT BYPASS and verify backlight goes off.

CUE: None SAT UNSAT

13. PERFORMANCE STEP: Withdraw selected rod until the IN LIMIT clears.

........C........

STANDARD: Document selected rod 7-3 in step 4.8.5.g and Withdraw until the IN LIMIT clears as indicated by the Rod PIP bar graph changing from Green to Blue.

NOTE: Critical action is to withdraw the rod until the IN LIMIT clears.

CUE: None SAT UNSAT

14. PERFORMANCE STEP: Insert selected rod to the IN LIMIT.

........C........

STANDARD: Document selected rod 7-3 in step 4.8.5.h and Insert to the IN LIMIT as indicated by the Rod PIP bar graph changing from Blue to Green.

NOTE: Critical action is to Insert the rod to the IN LIMIT.

CUE: None SAT UNSAT NUREG-1021, Revision 11 Page 7 of 8 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S1 AG

15. PERFORMANCE STEP: Select RPI RESET

........C........

STANDARD: Select RPI RESET as indicated by the backlight ON while depressed.

CUE: None SAT UNSAT

16. PERFORMANCE STEP: Deselect LATCH MANUAL.

........C........

STANDARD: Deselect LATCH MANUAL as indicated by backlight goes OFF.

CUE: None SAT UNSAT

17. PERFORMANCE STEP: Verify selected rod RPI indicates approximately zero.

STANDARD: Document selected rod 7-3 in step 4.8.5.k and verify RPI indicates approximately zero.

CUE: None SAT UNSAT

18. PERFORMANCE STEP: Complete section 4.8.

STANDARD: Initial step 4.5.l to go to step 4.8.8. Initial step 4.8.8 with intent to go to Section 4.2 and sign and date for Subsection 4.8 completed by.

CUE: Another RO will perform section 4.2 SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME ________

NUREG-1021, Revision 11 Page 8 of 8 FENOC Facsimile r1

Davis-Besse Audit Exam 2018 Simulator JPM S2

Appendix C Rev. 11 Job Performance Measure Form ES-C-1 Worksheet JPM S2 AG Facility: Davis-Besse Task No: 000-082-05-0100 Task

Title:

Emergency Borate the RCS in response to a failure of the Reactor to Trip K/A

Reference:

004 A2.14 (3.8/3.9) Job Performance Measure No: S2 (JPM NEW)

Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Manually initiate Emergency Boration flow to the RCS using the Boric Acid Tank Method Required Materials:

DB-OP-02000, RPS, SFAS, SFRCS TRIP, OR SG TUBE RUPTURE, IOAs, Specific Rule 1 and 3 General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

Yes Validation Time:

15 minutes Page 2 of 11

Appendix C Rev. 11 Job Performance Measure Form ES-C-1 Worksheet JPM S2 AG SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Manually initiate Emergency Boration flow to the RCS using the Boric Acid Tank Method INITIAL CONDITION:

Approximately 5% Power Reactor has failed to trip Turbine is offline due to initial low power conditions ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Fail the Automatic Reactor Trips and Manual Pushbuttons Fail the Reactor Trip Test Key Fail 480 V Unit Substations E2 and F2 to trip Fail MU6405 and MU3971 in the MU Tank position to prevent them from aligning to the BWST MALFUNCTIONS/FAILURE TO INSERT:

None ACTION/CUES:

None Page 3 of 11

Appendix C Rev. 11 Job Performance Measure Form ES-C-1 Worksheet JPM S2 AG EXAMINER COPY INITIAL CONDITIONS:

A plant startup was in progress at 5% Power The Reactor has failed to trip from an automatic trip signal INITIATING CUE:

The Unit Supervisor directs you to perform the Immediate Actions of DB-OP-02000, RPS, SFAS, SFRCS TRIP, OR SG TUBE RUPTURE and respond to the Reactor trip failure.

(When simulator copy located provide examinee a copy of DB-OP-02000, RPS, SFAS, SFRCS TRIP, OR SG TUBE RUPTURE 1, Section 3, Immediate Actions)

Do not provide a copy of Specific Rule 1 or Attachment 13 until they request the procedure or locate it themselves.

Page 4 of 11

Appendix C Rev. 11 Job Performance Measure Form ES-C-1 Worksheet JPM S2 AG CANDIDATE COPY INITIAL CONDITIONS:

A plant startup was in progress at 5% Power The Reactor has failed to trip from an automatic trip signal INITIATING CUE:

The Unit Supervisor directs you to perform the Immediate Actions of DB-OP-02000, RPS, SFAS, SFRCS TRIP, OR SG TUBE RUPTURE and respond to the Reactor trip failure.

Page 5 of 11

Appendix C Rev. 11 Job Performance Measure Form ES-C-1 Worksheet JPM S2 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT required unless denoted in the "Comments".

START TIME:

1. PERFORMANCE STEP: Trip Reactor and Verify Reactor Power is lowering on the Intermediate Range.

STANDARD: Push manual trip pushbuttons. Recognizes that Reactor Power is NOT lowering, implements step 3.3 RNO.

CUE: None SAT UNSAT

2. PERFORMANCE STEP: If At Any Time, the Reactor is Shutdown, informs the Shift Manager and transitions to Step 3.4 STANDARD: Continues with the RNO as the reactor is not shutdown CUE: None SAT UNSAT
3. PERFORMANCE STEP: At the Rod Control Panel, insert the Reactor Trip Test key AND rotate clockwise to depower the CRDMs STANDARD: Attempt to trip the reactor using the Trip Test Key. Reports the CRDMs failed to denergize CUE: None SAT UNSAT Page 6 of 11

Appendix C Rev. 11 Job Performance Measure Form ES-C-1 Worksheet JPM S2 AG

4. PERFORMANCE STEP: Momentarily Deenergize 480 volt Unit Substations E2 AND F2 STANDARD: Turns the E2 and F2 Substation control switches to trip the breakers, recognizes that they fail to open CUE: None SAT UNSAT
5. PERFORMANCE STEP: Locally open Reactor Trip Breakers A, B, AND C in the Low Voltage Switchgear Rooms 2 STANDARD: Dispatches an Operator to locally open the Reactor Trip Breakers CUE: Respond as local operator that you will locally open the breakers As the Unit Supervisor, direct the Candidate to implement Emergency Boration with the BWST method NOTE: The intent is for the candidate to implement Specific Rule 1 to Emergency Borate, if asked cue that another operator will address the actions for feedwater SAT UNSAT ALTERNATE PATH: This is where alternate path begins. Operator must recognize that the MU Pumps Suctions cannot be locked to the BWST and implements the Boric Acid Addition Tank Method per Attachment 13 Section 2.
6. PERFORMANCE STEP: Lock MU Pump suctions in the BWST position.

STANDARD: Recognizes that MU6405 and MU3971 cannot be locked in the BWST position, routes to the Boric Acid Addition Tank Method.

CUE: If candidate refers to the RNO, report that the Aux Building is not Accessible SAT UNSAT Page 7 of 11

Appendix C Rev. 11 Job Performance Measure Form ES-C-1 Worksheet JPM S2 AG

7. PERFORMANCE STEP: Line up to add Boric acid to the MU Tank using Attachment 13 Section 2.0. Determines if the Aux Building Accessible STANDARD: Routes to Attachment 13 Section 2.0 CUE: If needed, report as Rad Pro that the Aux Building is NOT accessible. Provide Attachment 13 when requested or located.

SAT UNSAT

8. PERFORMANCE STEP: Routes to Attachment 13 Method B to add Boric Acid via the Batch Controller.

STANDARD: Routes to Attachment 13 Section 2.0 Method B CUE: If asked if DB-OP-06001 should be referenced, cue as the supervisor to continue with Attachment 13 SAT UNSAT

9. PERFORMANCE STEP: Verify MU 39, Batch Flow Control Valve is closed.

___C___

STANDARD: On Batch Controller presses:

  • VALVE SET
  • ACK (0)
  • ENTER
  • Verifies the indicated Valve % is ZERO CUE: NONE SAT UNSAT
10. PERFORMANCE STEP: Verify MU 23 is closed, using HCMU23 STANDARD: Verifies MU23 is closed CUE: NONE SAT UNSAT Page 8 of 11

Appendix C Rev. 11 Job Performance Measure Form ES-C-1 Worksheet JPM S2 AG

11. PERFORMANCE STEP: Verify WC3526 is closed, using HIS3526 STANDARD: Verifies WC3526 is closed CUE: NONE SAT UNSAT
12. PERFORMANCE STEP: Set the Batch Controller to the desired batch size.

___C___

STANDARD: On Batch Controller presses:

  • BATCH SET
  • Enters batch size of 1000 gallons
  • ENTER
  • DISPLAY (Lower)
  • BATCH (4)

Verifies the displayed batch size is correct CUE: Direct the candidate to emergency borate 1000 gallons SAT UNSAT

13. PERFORMANCE STEP: Reset the indicated total on the Batch Controller as follows.

___C___

STANDARD: On Batch Controller presses:

  • DISPLAY (Lower)
  • TOTAL (7)
  • TOTAL RESET (6)

Verifies the indicated total is ZERO CUE: NONE SAT UNSAT Page 9 of 11

Appendix C Rev. 11 Job Performance Measure Form ES-C-1 Worksheet JPM S2 AG

14. PERFORMANCE STEP: Display the FLOW RATE in the upper display as follows STANDARD: On Batch Controller presses:
  • DISPLAY (upper)
  • Rate (8)

CUE: NONE SAT UNSAT

15. PERFORMANCE STEP: Notifies the Command SRO that the Batch Controller is aligned for Boric Acid addition STANDARD: Reports to the Command SRO CUE: As Command SRO, acknowledge the report SAT UNSAT
16. PERFORMANCE STEP: Enable the Batch Controller by pressing RUN

___C___

STANDARD: RUN is pressed CUE: NONE SAT UNSAT

17. PERFORMANCE STEP: Open MU40, BATCH ISO, using HIS MU 40.

___C___

STANDARD: Open MU40, BATCH ISO, using HIS MU 40.

CUE: NONE SAT UNSAT Page 10 of 11

Appendix C Rev. 11 Job Performance Measure Form ES-C-1 Worksheet JPM S2 AG

18. PERFORMANCE STEP: Start a Boric Acid Pump

___C___

STANDARD: Starts Boric Acid Pump 1 by using HIS MU50A or Boric Acid Pump 2 by using HIS MU50B SAT UNSAT CUE: NONE

19. PERFORMANCE STEP: Throttles Boric Acid Flow with MU23 FLOW CONTROL

__C__ while observing the flow indication on the upper display of the Batch Controller.

STANDARD: Manually adjusts MU23 to ensure adequate boration flow.

CUE: Once boration flow is adjusted the JPM may be terminated.

SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by examinee)

END TIME: ____________

Page 11 of 11

Davis-Besse Initial License Exam 2018 Simulator JPM S3

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S3 AG Facility: Davis-Besse Task No: 10-018-01-0100 Task

Title:

Boron equalization between Pressurizer and the Reactor Coolant System K/A

Reference:

(010) A4.01 __3.7/3.5______ Job Performance Measure No: S3 Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant is operating at 100% power.

Task Standard:

Perform boron equalization between Pressurizer and the Reactor Coolant System, recognize spray valve failure, and take required immediate action.

Required Materials:

DB-OP-06003, Pressurizer Operating Procedure General

References:

Initiating Cue:

The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.

Time Critical Task: No Alternate Path: Yes Validation Time: 18 Minutes NUREG-1021, Revision 11 Page 1 of 6 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S3 AG SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Perform boron equalization between Pressurizer and the Reactor Coolant System, recognize spray valve failure, and take required immediate action.

INITIAL CONDITION:

Mode 1 (RX Pwr >95%)

ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

MALFUNCTIONS/FAILURE TO INSERT:

HV00E fails to 0.401; RC2, Pressurize Spray, will fail to ~40% on Event 1 H10I21GL==0; Event 1: when RC2 CLOSE (green) light goes off.

Manually insert failure if throttle position is established without triggering failure.

NUREG-1021, Revision 11 Page 2 of 6 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S3 AG EXAMINER COPY INITIAL CONDITIONS:

The plant is operating at 100% power.

Chemistry reports Pressurizer boron is 130 ppmB higher than the RCS boron INITIATING CUES:

The Unit Supervisor directs you to equalize Boron between the Reactor Coolant System and the Pressurizer using Section 4.3 of DB-OP-06003, Pressurizer Operating Procedure, for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Maximize spray flow to expedite equalization.

(Hand Candidate a copy of DB-OP06003 Section 4.3)

NUREG-1021, Revision 11 Page 3 of 6 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S3 AG CANDIDATE COPY INITIAL CONDITIONS:

The plant is operating at 100% power.

Chemistry reports Pressurizer boron is 130 ppmB higher than the RCS boron INITIATING CUES:

The Unit Supervisor directs you to equalize Boron between the Reactor Coolant System and the Pressurizer using Section 4.3 of DB-OP-06003, Pressurizer Operating Procedure, for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Maximize spray flow to expedite equalization.

NUREG-1021, Revision 11 Page 4 of 6 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S3 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".

START TIME:

1. PERFORMANCE STEP: Review prerequisites of DB-OP-06003 Section 4.3 STANDARD: Reviews prerequisites of DB-OP-06003 Section 4.3 Determines boron difference is >100 ppm from Initial Conditions CUE: (If Asked) Nuclear Engineering has determined rods will be within Reactor Operator Guidance for Rod Index SAT UNSAT
2. PERFORMANCE STEP: Place desired Pressurizer (Pzr) heater banks in ON C

STANDARD: Rotate selected Pzr heater switches clockwise to ON Note: The Standard is to place additional heater(s) in service.

Candidate may not start with all heaters ON but may leave some OFF to provide additional confidence of pressure control. The number of heaters placed in service is not Critical for this JPM CUE: None SAT UNSAT

3. PERFORMANCE STEP: Throttle open RC2, Pzr Spray, when RCS pressure C Is between 2170 and 2200 psig STANDARD: Rotate HISRC2-1 clockwise momentarily then release HISRC2-1 CUE: None SAT UNSAT NUREG-1021, Revision 11 Page 5 of 6 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S3 AG ALTERNATE PATH: This is where alternate path begins. Operator must recognize the spray valve is failed to 40% and not responding and take appropriate actions to isolate.

4. PERFORMANCE STEP: Recognize RCS pressure is lowering C

NOTE: RC2 malfunction may have to be manually inserted.

Examiner will cue I/F when to insert malfunction.

STANDARD: Observe RCS pressure indication CUE: None SAT UNSAT

5. PERFORMANCE STEP: Close RC 2 STANDARD: Rotate RC2-1 counterclockwise and hold until CLOSE light comes ON NOTE: RC 2 will fail to close; Step 6 is the RNO CUE: None SAT UNSAT
6. PERFORMANCE STEP: Close RC 10, Pzr Spray Block valve C

STANDARD: Depress HIS RC 10 CLOSE button NOTE: Candidate performs DB-OP-02513 Immediate actions to close RC2, Pzr Spray and then RC10 Pzr Spray Block valve CUE: None SAT UNSAT TERMINATING CUES This JPM is complete. (Terminated by the evaluator)

END TIME NUREG-1021, Revision 11 Page 6 of 6 FENOC Facsimile r1

Davis-Besse Initial License Exam 2018 Simulator JPM S4

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S4 AG Facility: Davis-Besse Task No: 000-081-04-0100 Task

Title:

Commence a Rapid Cooldown of the RCS via TBVs and AVVs K/A

Reference:

(041) K3.01 3.2/3.3 Job Performance Measure No: S4 Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

Task Standard:

Commence a Rapid Cooldown of the RCS via TBVs, recognize failure of TBVs and use AVVs Required Materials:

DB-OP-02543, Rapid Cooldown General

References:

Initiating Cue:

The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.

Time Critical Task: No Alternate Path: Yes Validation Time: 24 minutes NUREG-1021, Revision 11 Page 1 of 7 FENOC Facsimile R1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S4 AG SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Commence a Rapid Cooldown of the RCS via TBVs and AVVs INITIAL CONDITION:

Reactor tripped with the Main Condenser available Supplemental actions of DB-OP-02000 complete ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

DB-OP-02543 complete up through 4.12.1 MALFUNCTIONS/FAILURE TO INSERT:

7 minutes after TBVs taken to HAND - Fail all TBVs closed L2012bh==1&&L2012bh==1 NUREG-1021, Revision 11 Page 2 of 7 FENOC Facsimile R1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S4 AG EXAMINER COPY INITIAL CONDITIONS:

The Reactor has been tripped and the supplemental actions of DB-OP-02000 have been completed. Preparations to place the Motor Driven Feed Pump in service are in progress. The Shift Manager has determined a Rapid Cooldown to mode 5 is required. DB-OP-02543, Rapid Cooldown is in progress up through step 4.12.1.

INITIATING CUES:

The Unit Supervisor has directed you to establish an 80-100 °F/Hr Cooldown starting at step 4.12.2 of DB-OP-02543, Rapid Cooldown.

(Provide a copy of DB-OP-02543, Rapid Cooldown, signed off through step 4.12.1, to the examinee)

NUREG-1021, Revision 11 Page 3 of 7 FENOC Facsimile R1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S4 AG CANDIDATE COPY INITIAL CONDITIONS:

The Reactor has been tripped and the supplemental actions of DB-OP-02000 have been completed. Preparations to place the Motor Driven Feed Pump in service are in progress. The Shift Manager has determined a Rapid Cooldown to mode 5 is required. DB-OP-02543, Rapid Cooldown is in progress up through step 4.12.1.

INITIATING CUES:

The Unit Supervisor has directed you to establish an 80-100 °F/Hr Cooldown starting at step 4.12.2 of DB-OP-02543, Rapid Cooldown.

NUREG-1021, Revision 11 Page 4 of 7 FENOC Facsimile R1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S4 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Place Line 1/2 Turbine Bypass Valves in HAND

..C.

STANDARD: Depresses Line 1/2 hand buttons. Verifies White light lit, red light not lit CUE: None SAT UNSAT

2. PERFORMANCE STEP: Open Turbine Bypass Valves to commence cooldown

..C.

STANDARD: Toggle Turbine Bypass valves Line 1 and Line 2 to open Verify Amber lights lit above ICS control station CUE: (If necessary) The Primary Operator will maintain RCS pressure and inventory during the cooldown. Another operator will respond to ICS Mismatch alarm if required.

SAT UNSAT

3. PERFORMANCE STEP: Attempts to establish 80 - 100 °F Cooldown of the RCS STANDARD: Depresses open on TBV controls to attempt to establish cooldown of 80 -

100 °F/hr Monitors SPDS Cooldown graph. (~ 1.33 - 1.67 °F/min).

COMMENT: Actual Cooldown rate of 80 - 100 °F not critical as TBVs will fail closed CUE: None SAT UNSAT NUREG-1021, Revision 11 Page 5 of 7 FENOC Facsimile R1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S4 AG NOTE:

Alternate Path Starts here. 7 minutes after TBVs are place in hand, the TBVs will fail closed. This will stop the RCS cooldown. The Examinee must recognize the failure and refer back to step 4.12 RNO (response not obtained) which provides guidance on the use of the AVVs to continue the cooldown.

4. PERFORMANCE STEP: Recognizes Turbine Bypass Valves fail to maintain cooldown STANDARD: Observes amber lights not lit. Plant commences to heatup. TBVs do not respond to control station.

CUE: If necessary, ask examinee what other methods are available for cooldown?

Once examinee IDs AVVs are available, CUE Unit Supervisor directs you to continue with the Cooldown in accordance with step 4.12 of DB-OP-02543, Rapid Cooldown using AVVs (RNO step).

SAT UNSAT

5. PERFORMANCE STEP: Place SG 1 AVV Hand/Auto Station in HAND

..C.

STANDARD: Positions slider up to hand on PIC ICS11B COMMENTS: For procedural guidance may refer to DB-OP-02000, Attachment 3:

Operation of AVVs which includes the following additional steps which are NOT CRITICAL:

1. Reduce SG 1 AVV demand to zero
2. Press SG 1 AVV BLOCK pushbutton
3. Press AUTO SG 1 AVV Hand Indicating Switch CUE: None SAT UNSAT
6. PERFORMANCE STEP: Begin to control Steam Generator Pressure as required to

..C. establish a cooldown STANDARD: Incrementally increases PIC ICS11B demand controller output Monitor SPDS Cooldown graph to establish a cooldown CUE: None SAT UNSAT NUREG-1021, Revision 11 Page 6 of 7 FENOC Facsimile R1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S4 AG

7. PERFORMANCE STEP: Place SG 2 AVV Hand/Auto Station in HAND

..C.

STANDARD: Positions slider up to hand on PIC ICS11A COMMENTS: For procedural guidance may refer to DB-OP-02000, Attachment 3:

Operation of AVVs which includes the following additional steps which are NOT CRITICAL:

1. Reduce SG 2 AVV demand to zero
2. Press SG 2 AVV BLOCK pushbutton
3. Press AUTO SG 2 AVV Hand Indicating Switch CUE: None SAT UNSAT
8. PERFORMANCE STEP: Begin to control Steam Generator Pressure as required to

..C. establish a cooldown STANDARD: Incrementally increases PIC ICS11A demand controller output Monitor SPDS Cooldown graph to establish a cooldown CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME NUREG-1021, Revision 11 Page 7 of 7 FENOC Facsimile R1

Davis-Besse Initial License Exam 2018 Simulator JPM S5

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S5 AG Facility: Davis-Besse Task No: 13-021-04-0100 Task

Title:

Recover from Inadvertent SFAS Level 4 Actuation K/A

Reference:

(013) A2.06 3.7/4.0 Job Performance Measure No: S5 Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

Reactor tripped All RCPs tripped Task Standard:

Recover from Inadvertent SFAS Level 4 Actuation and restore CCW to/from containment Required Materials:

DB-OP-06910, Trip Recovery DB-OP-06405, Safety Features Actuation System Procedure.

General

References:

Initiating Cue:

The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.

Time Critical Task: No Alternate Path: No Validation Time: 23 minutes Page 1 of 8

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S5 AG SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Recover from Inadvertent SFAS Level 4 Actuation INITIAL CONDITION:

Reactor tripped All RCPs tripped ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Trip Containment HI HI pressure bistables in SFAS channels 1 and 3 MALFUNCTIONS/FAILURE TO INSERT:

None ACTION/CUES:

None Page 2 of 8

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S5 AG EXAMINER COPY INITIAL CONDITIONS:

The plant was at 100% power.

A sequence of events has occurred that has resulted in an inadvertent SFAS Level 4 actuation.

The Reactor was tripped.

All four RCPs were stopped The plant has been stabilized in accordance with DB-OP-02000.

INITIATING CUES:

The Unit Supervisor directs you to recover from the SFAS Level 4 actuation in accordance with section 6.0 of DB-OP-06910, Trip Recovery and reset SFAS in accordance with section 3.7 of DB-OP-06405, Safety Features Actuation System Procedure. Shift Manager approval and the Technical Support Center concurrence has been obtained.

(Provide the examinee a copy of section 6.0 of DB-OP-06910 and section 3.7 of DB-OP-06405)

Page 3 of 8

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S5 AG CANDIDATE COPY INITIAL CONDITIONS:

The plant was at 100% power.

A sequence of events has occurred that has resulted in an inadvertent SFAS Level 4 actuation.

The Reactor was tripped.

All four RCPs were stopped The plant has been stabilized in accordance with DB-OP-02000.

INITIATING CUES:

The Unit Supervisor directs you to recover from the SFAS Level 4 actuation in accordance with section 6.0 of DB-OP-06910, Trip Recovery and reset SFAS in accordance with section 3.7 of DB-OP-06405, Safety Features Actuation System Procedure. Shift Manager approval and the Technical Support Center concurrence has been obtained.

Page 4 of 8

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S5 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Verify containment pressure <18.7 psia STANDARD: Observe SFAS containment pressure indicators.

CUE: None SAT UNSAT

2. PERFORMANCE STEP: Depress the block button HIS 1533A for CS Pump 1 C

STANDARD: Depress BLOCK on HIS 1533A CUE: None __________

SAT UNSAT

3. PERFORMANCE STEP: Stop CS Pump 1 C

STANDARD: HIS 1533 rotated to STOP CUE: None __________

SAT UNSAT

4. PERFORMANCE STEP: Depress the block button HIS 1532A for CS Pump 2 C

STANDARD: Depress BLOCK on HIS 1532A CUE: None ______

SAT UNSAT

5. PERFORMANCE STEP: Stop CS Pump 2 using HIS 1532 C

STANDARD: HIS 1532 rotated to STOP CUE: None SAT UNSAT Page 5 of 8

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S5 AG

6. PERFORMANCE STEP: Reset SFAS trips STANDARD: Refer to section 3.7 of DB-OP-06405, Safety Features Actuation System Procedure CUE: None SAT UNSAT
7. PERFORMANCE STEP: Obtain the door keys for all four SFAS channels STANDARD: SFAS cabinet keys obtained CUE: None SAT UNSAT
8. PERFORMANCE STEP: Check SFAS channels 1 and 3 red POWER ON lights are on STANDARD: Visual check of red power lights lit at top of the SFAS cabinets 1 and 3 CUE: None SAT UNSAT
9. PERFORMANCE STEP: Check Shutdown Bypass POWER AVAILABLE green LEDs are ON in SFAS channels 1 and 3 STANDARD: Visual check of green LEDs lit on shutdown bypass section CUE: None SAT UNSAT Page 6 of 8

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S5 AG

10. PERFORMANCE STEP: Reset the CTMT PRESSURE HI HI TRIP bistable C

STANDARD: Depress RESET pushbutton on the CTMT PRESSURE HI HI TRIP bistables in SFAS Channel 1 AND in SFAS Channel 3 CUE: None SAT UNSAT

11. PERFORMANCE STEP: Reset the tripped output modules in all SFAS channels C

STANDARD: Depress RESET pushbutton on all tripped output modules in SFAS channels 1, 2, 3 AND 4 CUE: None __________

SAT UNSAT

12. PERFORMANCE STEP: Verify all 1/5 lights are OFF in each SFAS Channel STANDARD: Visual check of Output Module 1/5 lights CUE: None SAT UNSAT
13. PERFORMANCE STEP: Verify SFAS cabinet doors closed and locked STANDARD: Doors CLOSED and LOCKED CUE: None SAT UNSAT
14. PERFORMANCE STEP: Return the SFAS door keys STANDARD: Door keys returned to key cabinet CUE: None __

SAT UNSAT

15. PERFORMANCE STEP: Return to DB-OP-06910, Step 6.1.3 STANDARD: Identifies the need to return to DB-OP-06910, Step 6.1.3 CUE: (If asked) The Unit Supervisor directs you to restore Component Cooling Water to Containment SAT UNSAT Page 7 of 8

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S5 AG

16. PERFORMANCE STEP: Open CC 1407A, CC Wtr from CTMT Motor Operated Iso C

STANDARD: Depress OPEN on HIS 1407A CUE: None SAT UNSAT

17. PERFORMANCE STEP: Open CC 1407B, CC Wtr from CTMT Motor Operated Iso C

STANDARD: Depress OPEN on HIS 1407B CUE: None SAT UNSAT

18. PERFORMANCE STEP: Open CC 1411A, CC Wtr from CTMT Motor Operated Iso C

STANDARD: Depress OPEN on HIS 1411A CUE: None SAT UNSAT

19. PERFORMANCE STEP: Open CC 1411B, CC Wtr from CTMT Motor Operated Iso

........C........

STANDARD: Depress OPEN on HIS 1411B CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator)

END TIME Page 8 of 8

Davis-Besse Initial License Exam 2018 Simulator JPM S6

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S6 AG Facility: Davis-Besse Task No: 062-023-01-100 Task

Title:

Remove Transformer CE1-1 From Service K/A

Reference:

(062) A4.01.02 3.3/3.1 Job Performance Measure No: S6 Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

Any Mode 1 condition Task Standard:

Remove transformer CE1-1 from service, recognize high temperature condition on transformer CE1-2 and return transformer CE1-1 to service.

Required Materials:

DB-OP-06317, 480V System Switching Procedure, section 3.1 (prerequisites signed off)

DB-OP-02001, Electrical Distribution Alarm Panel 1 Annunciators, 1-4-C XFMR CE1-2 TRBL General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: No Alternate Path: Yes Validation Time: 12 minutes NUREG-1021, Revision 11 Page 1 of 7 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S6 AG SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Remove transformer CE1-1 from service, recognize high temperature condition on transformer CE1-2 and return transformer CE1-1 to service.

INITIAL CONDITION:

Any Mode 1 Condition ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

None MALFUNCTIONS/FAILURE TO INSERT:

Transformer E1-2 high temperature 1 minute after in service Insert remote E20A after 60 to 95.00000 on event 1 From event file E30IECR==1 NUREG-1021, Revision 11 Page 2 of 7 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S6 AG EXAMINER COPY INITIAL CONDITIONS:

The plant is at 100%

All systems are in a normal lineup INITIATING CUES:

The Unit Supervisor directs you to transfer E1 Bus to transformer CE1-2 in accordance with section 3.1 of DB-OP-06317, 480V System Switching Procedure, to support planned maintenance.

Transformer CE1-2 is set to the required on-line tap setting.

The Shift Manager has given approval (Provide the trainee a copy of section 3.1 of DB-OP-06317)

NUREG-1021, Revision 11 Page 3 of 7 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S6 AG CANDIDATE COPY INITIAL CONDITIONS:

The plant is at 100%

All systems are in a normal lineup INITIATING CUES:

The Unit Supervisor directs you to transfer E1 Bus to transformer CE1-2 in accordance with section 3.1 of DB-OP-06317, 480V System Switching Procedure, to support planned maintenance.

Transformer CE1-2 is set to the required on-line tap setting The Shift Manager has given approval NUREG-1021, Revision 10 Page 4 of 7 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S6 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Transfer Unit Substation E1 to Transformer CE1-2 STANDARD: Route to Subsection 3.1, Unit Substation E1 Live Bus Transfer, mark step 3.1.6 as not applicable CUE: Provide a copy of subsection 3.1 All prerequisites are complete SAT UNSAT
2. PERFORMANCE STEP: Place HIS6244 in the designated) position and release

........C........

STANDARD: Place HIS6244 in the RESERVE SOURCE (BCE12) position and release Comment: Starts 1 minute delay until high temperature alarm (alternate path)

CUE: None SAT UNSAT

3. PERFORMANCE STEP: Verify BCE12 is closed STANDARD: Check BCE12 RED light on CUE: None SAT UNSAT
4. PERFORMANCE STEP: Verify BCE11 is open STANDARD: Check BCE11, GREEN light is on CUE: None SAT UNSAT NUREG-1021, Revision 11 Page 5 of 7 FENOC Facsimile AG

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S6 AG

5. PERFORMANCE STEP: Check for normal voltage on Unit Substation E1 STANDARD: Verifies normal voltage on Unit Substation E1 using EI6266, 480V BUS E1 CUE: None SAT UNSAT
6. PERFORMANCE STEP: Check for grounds using the Ground Fault panel associated with the designated transformer STANDARD: Communicates with Equipment Operator to check Panel C4621B for Transformer CE1-2 CUE: (I/S) No ground fault exists on Panel C4621B SAT UNSAT
7. PERFORMANCE STEP: Inform the Shift Manager that the Live Transfer of Bus E1 is complete STANDARD: Communicate with the Shift Manager that the Live Transfer of Bus E1 is complete CUE: Shift Manager acknowledges SAT UNSAT Alternate path begins with the receipt of annunciator 1-4-C, XFMR CE1-2 TRBL
8. PERFORMANCE STEP: Respond to receipt of annunciator 1-4-C, XFMR TRBL STANDARD: Acknowledge annunciator 1-4-C, XFMR CE1-2 TRBL and route to Alarm Response Procedure CUE: Provide Alarm Response Procedure for annunciator 1-4-C, XFMR CE1-2 TRBL, if requested or once located in simulator SAT UNSAT
9. PERFORMANCE STEP: Dispatch an Equipment Operator to XFMR CE1-2 to Investigate STANDARD: Instruct Equipment Operator to proceed to XFMR CE1-2 and Investigate CUE: Equipment Operator acknowledges and will investigate XFMR Liquid Temperature Indicator reads 91°C SAT UNSAT NUREG-1021, Revision 11 Page 6 of 7 FENOC Facsimile AG

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S6 AG

10. PERFORMANCE STEP: Close 480V Breaker BCE11 by momentarily turning Control

........C........ Switch HIS 6244 to NORMAL SOURCE position STANDARD: Place HIS6244 in the NORMAL SOURCE position and release, verify BCE11 red light lit indicating closed CUE: None SAT UNSAT

11. PERFORMANCE STEP: Verify BCE12 is open STANDARD: Verify BCE12 green light lit indicating open NOTE: Not a required action per the alarm procedure but is a good practice to ensure the transformer is unloaded CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator)

END TIME NUREG-1021, Revision 11 Page 7 of 7 FENOC Facsimile AG

Davis-Besse Initial License Exam 2018 Simulator JPM S7

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S7 AG Facility: Davis-Besse Task No: 012-019-01-0100 Task

Title:

Restore a Tripped RPS Channel to Service K/A

Reference:

(012) A4.04 3.3/3.3 Job Performance Measure No: S7 Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

Mode 1 Task Standard:

Restore a Tripped RPS Channel to Service Required Materials:

DB-OP-06403, Reactor Protection System and Nuclear Instrumentation Operating Procedure, Section 4.2 General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: No Alternate Path: No Validation Time: 13 minutes NUREG-1021, Revision 11 Page 1 of 6 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S7 AG SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Restore a Tripped RPS Channel to Service INITIAL CONDITION:

Trip RPS channel 4 by placing the CONTACT MONITOR Test Module in TEST OPERATE ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

None MALFUNCTIONS/FAILURE TO INSERT:

None NUREG-1021, Revision 11 Page 2 of 6 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S7 AG EXAMINER COPY INITIAL CONDITIONS:

The plant is in MODE 1 To comply with Tech Spec 3.3.1, RPS Channel 4 was manually tripped using the CONTACT MONITOR TEST module RPS Channel 4 has subsequently been repaired and declared OPERABLE INITIATING CUES:

The Unit Supervisor directs you to reset RPS Channel 4 in accordance with section 4.2 of DB-OP-06403, Reactor Protection System and Nuclear Instrumentation Operating Procedure.

(Provide the examinee a copy of DB-OP-06403 section 4.2)

NUREG-1021, Revision 11 Page 3 of 6 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S7 AG CANDIDATE COPY INITIAL CONDITIONS:

The plant is in MODE 1 To comply with Tech Spec 3.3.1, RPS Channel 4 was manually tripped using the CONTACT MONITOR TEST module RPS Channel 4 has subsequently been repaired and declared OPERABLE INITIATING CUES:

The Unit Supervisor directs you to reset RPS Channel 4 in accordance with section 4.2 of DB-OP-06403, Reactor Protection System and Nuclear Instrumentation Operating Procedure.

NUREG-1021, Revision 10 Page 4 of 6 FENOC Facsimile AG

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S7 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Complete prerequisite steps STANDARD: Circle Channel 4, complete SM authorization step, and sign prerequisites complete.

CUE: None SAT UNSAT

2. PERFORMANCE STEP: Obtain the door key for RPS Channel 4 STANDARD: Obtain RPS Channel 4 door key from the Control Room key cabinet CUE: Another Operator will make entry into Key Log SAT UNSAT
3. PERFORMANCE STEP: Place Channel 4 CONTACT MONITOR TEST switch in C OPERATE STANDARD: CONTACT MONITOR TEST module switch rotated to OPERATE COMMENT: Must be performed prior to Step 6 CUE: None SAT UNSAT
4. PERFORMANCE STEP: Check Channel 4 CONTACT MONITOR TEST in OPERATE indications are proper STANDARD: Check ON TEST light DIM Check TEST TRIP light DIM on the Reactor Trip Module CUE: None SAT UNSAT
5. PERFORMANCE STEP: Reset any tripped bistables STANDARD: Verify OUTPUT STATE and OUTPUT MEMORY status lights DIM CUE: None NUREG-1021, Revision 11 Page 5 of 6 FENOC Facsimile r1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S7 AG SAT UNSAT

6. PERFORMANCE STEP: Energize Channel Trip Relay C

STANDARD: RESET switch on Reactor Trip Module depressed COMMENT: May use step 4.2.7.b and reset by rotating the Manual By-pass Key Switch to actuate the Manual Bypass relay. If this method is used it would be critical to return the switch to the non-bypass position.

CUE: None SAT UNSAT

7. PERFORMANCE STEP: Check channel reset STANDARD: Visual check of PROTECTIVE SUBSYSTEM light DIM CUE: None SAT UNSAT
8. PERFORMANCE STEP: Lock cabinet door and return the door key for RPS Channel 4 STANDARD: Lock cabinet door and return RPS Channel 4 door key to the Control Room key cabinet.

CUE: Another Operator will make entry into Key Log SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the evaluator)

END TIME NUREG-1021, Revision 11 Page 6 of 6 FENOC Facsimile r1

Davis-Besse Initial License Exam 2018 Simulator JPM S8

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S8 AG Facility: Davis-Besse Task No: 078-009-04-0100 Task

Title:

Vacuum and Gland Steam Systems Actions during a Loss of Instrument Air K/A

Reference:

(065) AA2.08 2.9/3.3 Job Performance Measure No: S8 Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance ___ Actual Performance _X_

Classroom ___ Simulator _X_ Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The Reactor has been tripped due to a loss of Instrument Air SFRCS has been manually actuated Task Standard:

Perform actions for Vacuum and Gland Steam Systems during a Loss of Instrument Air by completing Attachment 13 and Attachment 11 of DB-OP-02528, Loss of Instrument Air.

Required Materials:

DB-OP-02528, Loss of Instrument Air, Attachment 13 and Attachment 11 General

References:

Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: No Alternate Path: No Validation Time: 7 minutes NUREG-1021, Revision 11 Page 1 of 7 FENOC Facsimile AG

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S8 AG SIMULATOR INSTRUCTIONS TASK DESCRIPTION:

Perform actions for Vacuum and Gland Steam Systems during a Loss of Instrument Air by completing Attachment 13 and Attachment 11 of DB-OP-02528, Instrument Air System Malfunctions.

INITIAL CONDITION:

The Reactor has been tripped due to a loss of Instrument Air SFRCS has been manually actuated ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:

Prevent Heater Drain Pumps from automatically tripping IMR DDVIB (2)

IRF DDN5 (2) 0.5 IMF DDVJB (2)

IRF DDN6 (2) 0.5 IMF DDLGC 0.0 (2)

Prevent EIAC, SAC 1 and SAC 2 from starting IMF KFS1G IMF KFECE MALFUNCTIONS/FAILURE TO INSERT:

None ACTION/CUES:

None NUREG-1021, Revision 11 Page 2 of 7 FENOC Facsimile AG

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S8 AG EXAMINER COPY INITIAL CONDITIONS:

The Reactor has been tripped due to a loss of Instrument Air SFRCS has been manually actuated INITIATING CUES:

The Unit Supervisor directs you to:

Perform Vacuum and Gland Steam System actions in accordance with Attachment 13 of DB-OP-02528, Loss of Instrument Air, AND THEN Perform Condensate System actions in accordance with Attachment 11 of DB-OP-02528, Instrument Air System malfunctions.

(Provide the examinee a copy of Attachment 13 and Attachment 11 of DB-OP-02528, Instrument Air System Malfunctions)

NUREG-1021, Revision 11 Page 3 of 7 FENOC Facsimile AG

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S8 AG CANDIDATE COPY INITIAL CONDITIONS:

The Reactor has been tripped due to a loss of Instrument Air SFRCS has been manually actuated INITIATING CUES:

The Unit Supervisor directs you to:

Perform Vacuum and Gland Steam System actions in accordance with Attachment 13 of DB-OP-02528, Loss of Instrument Air, AND THEN Perform Condensate System actions in accordance with Attachment 11 of DB-OP-02528, Instrument Air System malfunctions.

NUREG-1021, Revision 11 Page 5 of 7 FENOC Facsimile AG

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S8 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Lock out the Mechanical Hogger C

STANDARD: HIS 1005, Mechanical Hogger, rotated to OFF and pulled to lock out position.

CUE: None SAT UNSAT

2. PERFORMANCE STEP: Open VS 634 and VS 635, Condenser Vacuum Breakers C

STANDARD: HIS 634, Condenser Vacuum Breakers, rotated to the OPEN BOTH position CUE: None SAT UNSAT

3. PERFORMANCE STEP: Shutdown Steam Packing Exhauster Fans C

STANDARD: HIS 2411 (HIS 2412), Packing Exhauster Fan 1 (2) rotated to the OFF position CUE: None SAT UNSAT

4. PERFORMANCE STEP: Check the Gland Steam Header Relief Valves are not lifting STANDARD: Check Gland Steam header pressure at 0 psig CUE: (After checking Gland Steam) The Unit Supervisor directs you to perform the Control Room actions for a loss of Instrument Air to the Condensate System in accordance with Attachment 11 of DB-OP-02528, Loss of Instrument Air (Provide the examinee a copy of Attachment 11 of DB-OP-02528)

SAT UNSAT NUREG-1021, Revision 11 Page 6 of 7 FENOC Facsimile AG

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S8 AG

5. PERFORMANCE STEP: Verify a Condensate Pump is running STANDARD: Check RED light LIT on HIS for #1 and/or #2 Condensate Pump CUE: None SAT UNSAT
6. PERFORMANCE STEP: Verify Heater Drain Pump 1 is shutdown C

STANDARD: Recognize RED light is LIT on HIS for Heater Drain Pump 1 Rotate Heater Drain Pump 1 HIS to STOP CUE: None SAT UNSAT

7. PERFORMANCE STEP: Verify Heater Drain Pump 2 is shutdown C

STANDARD: Recognize RED light is LIT on HIS for Heater Drain Pump 2 Rotate Heater Drain Pump 2 HIS to STOP CUE: None SAT UNSAT

8. PERFORMANCE STEP: Verify CD420 has failed closed STANDARD: Verify CD420, Deaer 2-3 Level Control Valve, position indicator indicates closed CUE: None SAT UNSAT NUREG-1021, Revision 11 Page 7 of 7 FENOC Facsimile AG

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM S8 AG

9. PERFORMANCE STEP: Verify CD421 has failed closed STANDARD: Verify CD421, Deaer 1-3 Level Control Valve, position indicator indicates closed CUE: None SAT UNSAT
10. PERFORMANCE STEP: Verify CD550A/B have failed closed STANDARD: Check controller for CD550A/B is in manual with 0% demand (both valves closed)

NOTE: Valves are also isolated with closed manual valves as indicated by placard CUE: None SAT UNSAT

11. PERFORMANCE STEP: Verify CD578 has failed open STANDARD: Check RED light LIT on HIS for CD578, Cond Pump Min Recirc CUE: None SAT UNSAT
12. PERFORMANCE STEP: Verify CD2796 has failed open STANDARD: Check RED light LIT on HIS for CD2796, Cond Pump Disch Header Press Control Valve CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator)

END TIME NUREG-1021, Revision 11 Page 8 of 7 FENOC Facsimile AG

Davis-Besse Initial License Exam 2018 Plant JPM P1

Appendix C, Rev. 11 Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - P1 AG Facility: Davis-Besse Task No: 000-008-05-0403 Task

Title:

Perform OP2000 Section 1 of Attachment 7 for actions to close breakers for DH7A, DH7B, DH9A, DH9B, and HP31 K/A

Reference:

(011) EA1.11 4.2/4.2 Job Performance Measure No: P1 Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance _X__ Actual Performance ____

Classroom ___ Simulator ____ Plant __X_

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

A large break loss of coolant accident has occurred.

Task Standard:

The Unit Supervisor directs you to perform Section 1 of Attachment 7 of DB-OP-02000, actions to close breakers for DH7A, DH7B, DH9A, DH9B, and HP31.

Required Materials:

DB-OP-02000, Attachment 7, Transferring LPI Suction to the Emergency Sump.

General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: Yes (23 minutes)

Alternate Path: No Validation Time: 12 minutes NUREG-1021, Revision 11 Page 1 of 9 FENOC Facsimile AG

Appendix C, Rev. 11 Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - P1 AG EXAMINER COPY INITIAL CONDITIONS:

A large break loss of coolant accident has occurred.

INITIATING CUES:

The Unit Supervisor directs you to perform Section 1 of Attachment 7 of DB-OP-02000, actions to close breakers for DH7A, DH7B, DH9A, DH9B, and HP31.

This is a time critical task. You will be informed when the time critical clock starts.

Provide the examinee a copy of Attachment 7 of DB-OP-02000 Direct Candidate to proceed to the Control Room Vestibule and once there start the time critical clock NUREG-1021, Revision 11 Page 2 of 9 FENOC Facsimile AG

Appendix C, Rev. 11 Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - P1 AG CANDIDATE COPY INITIAL CONDITIONS:

A large break loss of coolant accident has occurred.

INITIATING CUES:

The Unit Supervisor directs you to perform Section 1 of Attachment 7 of DB-OP-02000, actions to close breakers for DH7A, DH7B, DH9A, DH9B, and HP31.

This is a time critical task. You will be informed when the time critical clock starts.

NUREG-1021, Revision 11 Page 3 of 9 FENOC Facsimile AG

Appendix C, Rev. 11 Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - P1 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".

START TIME:

Time Critical Clock is started when the examinee assumes control of the Job Performance Measure CUE: The time critical clock starts now TIME CRITICAL START TIME

1. PERFORMANCE STEP: Locate the correct procedure and attachment STANDARD: Hand copy of DB-OP-02000, Attachment 7 to the trainee CUE: None SAT UNSAT
2. PERFORMANCE STEP: Obtain dosimetry for entering the Auxiliary Building STANDARD: Locate and select dosimetry for entrance into the Auxiliary Building.

COMMEMT: DO NOT obtain dosimetry, just note which dosimetry will be used.

CUE: You have obtained the appropriate dosimetry.

SAT UNSAT NUREG-1021, Revision 11 Page 4 of 9 FENOC Facsimile AG

Appendix C, Rev. 11 Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - P1 AG

3. PERFORMANCE STEP: Enter the old RCA entrance Auxiliary Building 603 Elevation (Door 408)

STANDARD: Locate old RCA entrance COMMENT: DO NOT enter RCA through old RCA entrance. Provide the following cue and proceed to the normal RCA entrance:

CUE:

  • Entrance to the Radiologically Controlled Area through the old entrance has been made.
  • Use the normal Radiologically Controlled Area entrance and go to door 408.
  • The Time Critical Clock has been stopped.

COMMENT: The Time Critical Clock will be paused while entering the Radiological Restricted Area using the normal entrance to go to the inside of the old RCA entrance door.

TIME CRITICAL CLOCK STOP TIME SAT UNSAT

4. PERFORMANCE STEP: Go to the Radiologically Restricted Area side of the old RCA Entrance.

STANDARD: Go to the Radiologically Restricted Area side of the old RCA Entrance.

COMMENT: The time Critical Clock will start when the examinee reaches the inside of the old RCA entrance door.

CUE: The Time Critical Clock restarts now TIME CRITICAL CLOCK START TIME SAT UNSAT NUREG-1021, Revision 11 Page 5 of 9 FENOC Facsimile AG

Appendix C, Rev. 11 Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - P1 AG

5. PERFORMANCE STEP: Move through Chemistry Lab Room 424 and go to F11B STANDARD: Route through the Chemistry Lab Room 424 and go to F11B located in the Fuel Handling Storage Room (Room 405)

CUE: None SAT UNSAT

6. PERFORMANCE STEP: Close Breaker BF 1148, DH7A C

STANDARD: Press up on Handle of BF 1148 on F11B until breaker snaps to ON position CUE: Breaker BF 1148 handle has been raised to ON and released Handle remains ON SAT UNSAT

7. PERFORMANCE STEP: Return down Passageway 404 and 411 to the Southeast stairs near the elevator and descend the stairs. Go to F11D located in Passageway 227 South of the Makeup Pump Room.

STANDARD: Follow the prescribed path to F11D CUE: None SAT UNSAT

8. PERFORMANCE STEP: Close Breaker BF 1142, DH9A C

STANDARD: Press up on handle of BF 1142 on F11D until breaker snaps to ON position CUE: Breaker BF 1142 handle has been raised to ON and released Handle remains ON SAT UNSAT NUREG-1021, Revision 11 Page 6 of 9 FENOC Facsimile AG

Appendix C, Rev. 11 Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - P1 AG

9. PERFORMANCE STEP:
  • Continue down passageway toward Makeup Pump Room and over stairs (Pygmy Pass) to Borated Water Storage Tank Heat Exchanger Area.
  • Proceed down Passageway 209 to Auxiliary Building Central Stairs.
  • Descend to bottom of stairs and exit into Emergency Core Cooling System Train 1 room and descend stairs to Borated Water Storage Tank pipe tunnel.
  • Go to F11E in Borated Water Storage Tank pipe tunnel.

STANDARD: Follow prescribed route NOTE: At the discretion of Evaluator pictures may be used instead of staging Security for entering BWST Piping Tunnel COMMENT: Ensure proper notification of the Central Alarm Station prior to opening Door 100. State to the operator that this action would not be necessary during an actual emergency.

CUE: None SAT UNSAT

10. PERFORMANCE STEP: Close Breaker BF1194, HP31 C

STANDARD: Press up on handle of BF1194 on F11E until the breaker snaps to the ON position CUE: Breaker BF1194 handle has been raised to ON and released Handle remains ON SAT UNSAT

11. PERFORMANCE STEP:
  • Return to Auxiliary Building Central Stairs and Climb stairs to 565 ft elevation.
  • Go to E11A in Passageway 209 STANDARD: Follow prescribed route CUE: None SAT UNSAT NUREG-1021, Revision 11 Page 7 of 9 FENOC Facsimile AG

Appendix C, Rev. 11 Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - P1 AG

12. PERFORMANCE STEP: Close Breaker BE1157, DH7B C

STANDARD: Press up on handle of BE1157 on E11A until breaker snaps to ON position CUE: Breaker BE1157 handle has been raised to ON and released Handle remains ON SAT UNSAT

13. PERFORMANCE STEP: Close Breaker BE1112, DH9B C

STANDARD: Press up on handle of BE1112 on E11A until breaker snaps to ON position CUE: Breaker BE1112 handle has been raised to ON and released Handle remains ON SAT UNSAT

14. PERFORMANCE STEP:
  • Go down passageway 209 to the Auxiliary Building Southwest Corner Stairs.
  • Climb stairs to 558 elevation (Fuel Handling Train Bay)
  • Exit Door 301 to the outside STANDARD: Follow prescribed route COMMENT: DO NOT exit through Door 301.

CUE:

  • You have exited Door 301.
  • The Time Critical Clock has stopped Time Critical Clock Stop Time SAT UNSAT NUREG-1021, Revision 11 Page 8 of 9 FENOC Facsimile AG

Appendix C, Rev. 11 Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - P1 AG TERMINATING CUES This JPM is complete. (Terminated by the evaluator)

END TIME Time Critical Clock total time TOTAL TIME NUREG-1021, Revision 11 Page 9 of 9 FENOC Facsimile AG

Davis-Besse Initial License Exam 2018 Plant JPM P2

Appendix C, Rev. 11 Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - P2 AG Facility: Davis-Besse Task No: 064-008-05-0401 Task

Title:

Emergency Shutdown the Emergency Diesel Generator K/A

Reference:

(026) AA2.06 2.8/3.1 Job Performance Measure No: P2 Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance _X__ Actual Performance _

Classroom _ _ __ Simulator _ Plant X __

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

A loss of offsite power has occurred The reactor tripped CCW Pump 1/2 did not start (use EDG not protected)

Task Standard:

Emergency shutdown the Emergency Diesel Generator using the fuel racks and isolate air to the air start motors.

Required Materials:

DB-OP-06316, Diesel Generator Operating Procedure, Section 5.4, Emergency Shutdown or Operation Following an Automatic Trip of EDG 1, for EDG 1 or Section 5.10, Emergency Shutdown or Operation Following an Automatic Trip of EDG 2, for EDG 2.

General

References:

Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: No Alternate Path: Yes Validation Time: 7 minutes NUREG-1021, Revision 11 Page 1 of 9 FENOC Facsimile AG

Appendix C, Rev. 11 Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - P2 AG Train 1 Student Copy INITIAL CONDITIONS:

A loss of offsite power has occurred The reactor tripped CCW Pump 1 did not start INITIATING CUES:

The Unit Supervisor directs you to perform an emergency shutdown of Emergency Diesel Generator 1, in accordance with section 5.4 of DB-OP-06316, Diesel Generator Operating Procedure.

NUREG-1021, Revision 11 Page 2 of 9 FENOC Facsimile AG

Appendix C, Rev. 11 Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - P2 AG Train 1 Instructor Copy INITIAL CONDITIONS:

A loss of offsite power has occurred The reactor tripped CCW Pump 1 did not start INITIATING CUES:

The Unit Supervisor directs you to perform an emergency shutdown of Emergency Diesel Generator 1, in accordance with section 5.4 of DB-OP-06316, Diesel Generator Operating Procedure.

(Provide examinee a copy of section 5.4 of DB-OP-06316)

NUREG-1021, Revision 11 Page 3 of 9 FENOC Facsimile AG

Appendix C, Rev. 11 Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - P2 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Shutdown EDG 1 STANDARD: Emergency shutdown pushbutton on Panel C3621 is depressed CUE: Emergency shutdown pushbutton is DEPRESSED EDG 1 is still running at 900 RPM SAT UNSAT ALTERNATE PATH starts here. The emergency shutdown button fails to stop the EDG requiring an alternate path to be selected. This path will be to use the fuel rack lever.
2. PERFORMANCE STEP: Stop EDG 1 C

STANDARD: Pull and hold the fuel rack lever until the EDG is shutdown CUE 1: (If Asked) No other Operators are available CUE 2: Fuel Rack lever has been pulled and EDG speed slows CUE 3: EDG Stops NOTE: EDG will lockout after 7 seconds SAT UNSAT

3. PERFORMANCE STEP: Verify EDG 1 output breaker Open STANDARD: Verify Breaker AC101, Bus C1 to DG1, green light on and red light off CUE: AC101 GREEN (open) light is LIT; RED (close) light is OFF SAT UNSAT
4. PERFORMANCE STEP: Close EDG 1 air start valves C

STANDARD: Unlock and close DA30 CUE: (If asked) Unit Supervisor has given permission to unlock valves DA30 rotated CLOCKWISE; stem is DOWN NUREG-1021, Revision 11 Page 4 of 9 FENOC Facsimile AG

Appendix C, Rev. 11 Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - P2 AG SAT UNSAT

5. PERFORMANCE STEP: Close EDG 1 air start valves C

STANDARD: Unlock and close DA44 CUE: (If asked) Unit Supervisor has given permission to unlock valves DA44 rotated CLOCKWISE; stem is DOWN SAT UNSAT

6. PERFORMANCE STEP: Observe the EDG stops by 0 RPM indicated on the engine tachometer STANDARD: Observe the engine tachometer indicator (SI-6222A)

CUE: Engine speed indicates 0 RPM SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator)

END TIME NUREG-1021, Revision 11 Page 5 of 9 FENOC Facsimile AG

Appendix C, Rev. 11 Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - P2 AG Train 2 Student Copy INITIAL CONDITIONS:

A loss of offsite power has occurred The reactor tripped CCW Pump 2 did not start INITIATING CUES:

The Unit Supervisor directs you to perform an emergency shutdown of Emergency Diesel Generator 2, in accordance with section 5.10 of DB-OP-06316, Diesel Generator Operating Procedure.

NUREG-1021, Revision 11 Page 6 of 9 FENOC Facsimile AG

Appendix C, Rev. 11 Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - P2 AG Train 2 Instructor Copy INITIAL CONDITIONS:

A loss of offsite power has occurred The reactor tripped CCW Pump 2 did not start INITIATING CUES:

The Unit Supervisor directs you to perform an emergency shutdown of Emergency Diesel Generator 2, in accordance with section 5.10 of DB-OP-06316, Diesel Generator Operating Procedure.

(Provide examinee a copy of section 5.10 of DB-OP-06316)

NUREG-1021, Revision 11 Page 7 of 9 FENOC Facsimile AG

Appendix C, Rev. 11 Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - P2 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Shutdown EDG 2 STANDARD: Emergency shutdown pushbutton on Panel C3622 is depressed CUE: Emergency shutdown pushbutton is DEPRESSED EDG 2 is still running at 900 RPM SAT UNSAT ALTERNATE PATH starts here. The emergency shutdown button fails to stop the EDG requiring an alternate path to be selected. This path will be to use the fuel rack lever.
2. PERFORMANCE STEP: Stop EDG 2 C

STANDARD: Pull and hold the fuel rack lever until the EDG is shutdown CUE: Fuel Rack lever has been pulled until it stops EDG speed slows and then stops running (If Asked) No other Operators are available SAT UNSAT

3. PERFORMANCE STEP: Verify EDG 2 output breaker Open STANDARD: Verify Breaker AD101, Bus D1 to DG2, green light on and red light off CUE: AD101 GREEN (open) light is LIT; RED (close) light is OFF SAT UNSAT
4. PERFORMANCE STEP: Close EDG 2 air start valves C

STANDARD: Unlock and close DA31 CUE: (If asked) Field Supervisor has given permission to unlock valves DA31 rotated CLOCKWISE; stem is DOWN SAT UNSAT NUREG-1021, Revision 11 Page 8 of 9 FENOC Facsimile AG

Appendix C, Rev. 11 Job Performance Measure Form ES-C-1 Worksheet PLANT JPM - P2 AG

5. PERFORMANCE STEP: Close EDG 2 air start valves C

STANDARD: Unlock and close DA45 CUE: (If asked) Field Supervisor has given permission to unlock valves DA45 rotated CLOCKWISE; stem is DOWN SAT UNSAT

6. PERFORMANCE STEP: Observe the EDG stops by 0 RPM indicated on the engine tachometer STANDARD: Observe the engine tachometer indicator (SI-6232A)

CUE: Engine speed indicates 0 RPM SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator)

END TIME NUREG-1021, Revision 11 Page 9 of 9 FENOC Facsimile AG

Davis-Besse Initial License Exam 2018 Plant JPM P3

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet Plant JPM P3 AG Facility: Davis-Besse Task No: 078-009-04-0100 Task

Title:

Dedicate the EIAC To Supply Instrument Air K/A

Reference:

(065) AA1.02 2.6/2.8 Job Performance Measure No: P3 Examinee:

NRC Examiner: Date:

Method of testing:

Simulated Performance _X__ Actual Performance __

Classroom __ ___ Simulator _ __ Plant X __

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant is in Mode 1 Station Air Compressor 2 is running Station Air Compressor 1 is tagged out for maintenance Emergency Instrument Air Compressor is lined up as the lag compressor Task Standard:

Dedicate the EIAC To Supply Instrument Air IAW DB-OP-02528, Instrument Air System Malfunctions, as directed by the Unit Supervisor/Control Room operators.

Required Materials:

DB-OP-02528, Instrument Air System Malfunctions, Section 4.1 for Severe Loss of Instrument Air General

References:

Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: No Alternate Path: No Validation Time: 13 minutes NUREG-1021, Revision 11 Page 1 of 6 FENOC Facsimile AG

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet Plant JPM P3 AG EXAMINER COPY INITIAL CONDITIONS:

The plant is in Mode 1 Station Air Compressor 2 is running Station Air Compressor 1 is tagged out for maintenance Emergency Instrument Air Compressor is lined up as the lag compressor INITIATING CUES:

The following Control Room annunciators have just alarmed:

STA AIR HDR PRESS LO (9-3-E)

INST AIR HDR PRESS LO (9-1-F)

The Emergency Instrument Air Compressor has started Instrument air header pressure, as read on PI 810, is 88 psig and lowering The Unit Supervisor directs you to perform step 4.1.4 of DB-OP-02528 and inform the Control Room when the step is complete.

(Provide the examinee a copy of DB-OP-02528 section 4.1)

(Do not give DB-OP-02528 Attachment 10 until cued at step 6)

NUREG-1021, Revision 11 Page 2 of 6 FENOC Facsimile AG

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet Plant JPM P3 AG CANDIDATE COPY INITIAL CONDITIONS:

The plant is in Mode 1 Station Air Compressor 2 is running Station Air Compressor 1 is tagged out for maintenance Emergency Instrument Air Compressor is lined up as the lag compressor INITIATING CUES:

The following Control Room annunciators have just alarmed:

STA AIR HDR PRESS LO (9-3-E)

INST AIR HDR PRESS LO (9-1-F)

The Emergency Instrument Air Compressor has started Instrument air header pressure, as read on PI 810, is 88 psig and lowering The Unit Supervisor directs you to perform step 4.1.4 of DB-OP-02528 and inform the Control Room when the step is complete.

NUREG-1021, Revision 11 Page 3 of 6 FENOC Facsimile AG

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet Plant JPM P3 AG PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".

START TIME:

1. PERFORMANCE STEP: Isolation of instrument air to station air C

STANDARD: Close SA6445 or SA234 COMMENT: The Student may choose to perform the RNO column.

Depending on choice of isolation, provide appropriate CUE.

CUE: Provide cue that indication shows SA6445 is open (Red light ON at NV6445) if candidate is assessing status of the indicator.

Provide the following as applicable:

CLOSE button NV6445 is pushed. SV6445 Red light goes OFF; Green light comes ON.

OR SA234 handwheel is rotated clockwise, valve stem is down.

SAT UNSAT

2. PERFORMANCE STEP: Close SA236, bypass valve for SA/IA crosstie STANDARD: Check SA236 position CUE: SA236 valve stem is down, there is no movement of handwheel if checked closed in CW direction.

SAT UNSAT

3. PERFORMANCE STEP: Contact the Control Room to report the completion of step 4.1.4 of DB-OP-02528 STANDARD: Contact the Control Room via the gai-tronics or radio CUE:
  • Instrument Air header pressure and Station Air header pressures are 86 psig and lowering.
  • Station Air Compressor 2 and Emergency Instrument Air Compressor are running.
  • The Control Room directs you to perform step 4.1.5 of DB-OP-02528 and contact the control room when the step is complete.

SAT UNSAT NUREG-1021, Revision 11 Page 4 of 6 FENOC Facsimile AG

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet Plant JPM P3 AG

4. PERFORMANCE STEP: Close SA18 C

STANDARD: Close SA18, STATION AIR HEADER BACK PRESSURE REV VALVE INLET Cue: SA18 handwheel is rotated clockwise, valve stem is down.

SAT UNSAT

5. PERFORMANCE STEP: Close SA20, STATION AIR HEADER BACKPRESSURE REG VALVE BYPASS STANDARD: Check SA20 position closed CUE: SA20 valve stem is down, there is no movement of handwheel if checked closed in CW direction.

SAT UNSAT

6. PERFORMANCE STEP: Contact the Control Room to report the completion of step 4.1.5 of DB-OP-02528 STANDARD: Contact the Control Room via the gai-tronics or radio CUE:
  • Instrument Air header pressure and Station Air header pressure have stabilized at 82 psig, Standby for further instructions
  • The Control Room directs you to perform the first three steps of Attachment 10 of DB-OP-02528
  • (Provide the examinee a copy of DB-OP-02528 Attachment 10)

SAT UNSAT NUREG-1021, Revision 11 Page 5 of 6 FENOC Facsimile AG

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet Plant JPM P3 AG

7. PERFORMANCE STEP: Throttle the operating Turbine Plant Cooling Water Pump Discharge Valves C

STANDARD: Throttle CW 5 and CW 4 in the CLOSED direction CUE: Turbine Plant Cooling Water Pumps 2 and 3 are running (For Turbine Plant Cooling Water Pump 2)

  • PI 1583 indicates 47 psig
  • CW 5 rotated in the CLOSED direction
  • PI 1583 indicates 52 psig (For Turbine Plant Cooling Water Pump 3)
  • PI 1584 indicates 47 psig
  • CW 4 rotated in the CLOSED direction
  • PI 1584 indicates 52 psig SAT UNSAT
8. PERFORMANCE STEP: Verify the in-service Turbine Plant Cooling Water Heat Exchangers Service Water Outlet Isolation Valves are throttled to the marked position STANDARD: Verify SW 54 and SW 55 are at the marked position CUE: Turbine Plant Cooling Water Heater Exchangers 1 and 2 are in service:
  • SW 54 pointer is at the marked position
  • SW 55 pointer is at the marked position SAT UNSAT
9. PERFORMANCE STEP: Verify the Standby Turbine Plant Cooling Water Heat Exchanger Outlet Isolation Valve is closed STANDARD: Check SW 56 for Turbine Plant Cooling Water Heat Exchanger 3 closed CUE:
  • SW 56 indicator points to Closed SAT UNSAT TERMINATING CUES This JPM is complete. (Terminated by the evaluator)

END TIME NUREG-1021, Revision 11 Page 6 of 6 FENOC Facsimile AG