Acknowledgement of Withdrawal of Proposed Alternative to Extend the Steam Generator Weld Inspection Intervals
ML22179A153
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/28/2022
From: Blake Purnell
NRC/NRR/DORL/LPL3
To: Tony Brown
Energy Harbor Nuclear Corp
Purnell B, NRR/DORL/LPL3
References
EPID L-2021-LLR-0067
Download: ML22179A153 (3)


Text

June 28, 2022 Mr. Terry J. Brown Site Vice President Energy Harbor Nuclear Corp.

Mail Stop P-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 ACKNOWLEDGEMENT OF WITHDRAWAL OF PROPOSED ALTERNATIVE TO EXTEND THE STEAM GENERATOR WELD INSPECTION INTERVALS (EPID L-2021-LLR-0067)

Dear Mr. Brown:

By application dated September 13, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21256A119), as supplemented by letter dated January 27, 2022 (ML22027A770), Energy Harbor Nuclear Corp. (the licensee) submitted a request for a proposed alternative to certain requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and standards, for Davis-Besse Nuclear Power Station, Unit No. 1 (Davis-Besse). Specifically, the proposed alternative would increase the examination interval for the Davis-Besse steam generator welds and nozzle inner radii from 10 years to 30 years.

By letter dated June 22, 2022 (ML22173A152), the licensee requested to withdraw its September 13, 2021, application. The U.S. Nuclear Regulatory Commission (NRC) staff acknowledges the licensees request to withdraw the application. The NRC staff activities associated with the review have ceased and the associated EPID L-2021-LLR-0067 has been closed. If the licensee decides to resubmit the request for the proposed alternative, the new application should also provide the information that the NRC staff requested by email dated April 28, 2022 (ML22118A686).

T. Brown If you have any questions, please contact me at 301-415-1380 or via email at Blake.Purnell@nrc.gov.

Sincerely,

/RA/

Blake A. Purnell, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346 cc: Listserv