ES-301 Transient and Event Checklist Form ES-301-5 Facility: Braidwood Crew 1 Date of Exam: 5/29/18 Operating Test No.: 17-1 NRC A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO SRO-I SRO-U RX 1
1 1
1 0 NOR 1
1 2
1 1 1 I/C 2
2 2
6 4
4 2 MAJ 2
2 1
5 2
2 1 TS 0
2 2 RO SRO-I SRO-U RX 1
1 2
1 1 0 NOR 1
1 2
1 1 1 I/C 2
2 4
8 4
4 2 MAJ 2
2 1
5 2
2 1 TS 3
3 0
2 2 RO SRO-I SRO-U RX 1
1 1
3 1
1 0 NOR 1
1 1
1 1 I/C 4
4 2
10 4
4 2 MAJ 2
2 1
5 2
2 1 TS 3
2 5
0 2 2 RO SRO-I SRO-U RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 TS 0
2 2 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Braidwood Crew 2&3 Date of Exam: 5/29/18 Operating Test No.: 17-1 NRC A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO SRO-I SRO-U RX 1
1 1
1 0 NOR 1
1 2
1 1 1 I/C 2
2 2
6 4
4 2 MAJ 2
2 1
5 2
2 1 TS 0
2 2 RO SRO-I SRO-U RX 1
1 1
1 0 NOR 1
1 1
1 1 I/C 2
2 4
4 4 2 MAJ 2
2 4
2 2 1 TS 0
2 2 RO SRO-I SRO-U RX 1
1 1
3 1
1 0 NOR 1
1 1
1 1 I/C 4
4 2
10 4
4 2 MAJ 2
2 1
4 2
2 1 TS 3
2 5
0 2 2 RO SRO-I SRO-U RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 TS 0
2 2 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.