CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)

From kanterella
(Redirected from ML22164A806)
Jump to navigation Jump to search

and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)
ML22164A806
Person / Time
Site: Browns Ferry, Watts Bar, Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/13/2022
From: Jim Barstow
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNL-22-008
Download: ML22164A806 (187)


Text

1101 Market Street, Chattanooga, Tennessee 37402 CNL-22-008 June 1, 2022 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket Nos. 50-390 and 50-391

Subject:

Application to Revise Technical Specifications to Adopt TSTF-529, "Clarify Use and Application Rules" (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)

In accordance with the provisions of Title 10 of the Code of Federal Regulations (10 CFR) 50.90, "Application for amendment of license, construction permit, or early site permit," Tennessee Valley Authority (TVA) is submitting a request for an amendment to Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 for the Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3; Renewed Facility Operating License Nos. DPR-77 and DPR-79 for the Sequoyah Nuclear Plant (SQN), Units 1 and 2; and Facility Operating License Nos. NPF-90 and NPF-96 for the Watts Bar Nuclear Plant (WBN), Units 1 and 2, respectively.

The proposed amendment would modify the BFN, SQN, and WBN Technical Specification (TS) requirements in Section 1.3 and Section 3.0 regarding Limiting Condition for Operation and Surveillance Requirement usage. These changes are consistent with the Nuclear Regulatory Commission approved Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision 4, Clarify Use and Application Rules.

The enclosure to this submittal provides a description and assessment of the proposed change, a regulatory evaluation, and a discussion of environmental considerations. Attachments 1.1 through 1.3 to the enclosure provide the existing BFN Units 1, 2, and 3, SQN Units 1 and 2, and WBN Units 1 and 2 TS pages marked to show the proposed changes, respectively.

U.S. Nuclear Regulatory Commission CNL-22-008 Page 2 June 1, 2022 Attachments 2.1 through 2.3 to the enclosure provide the existing BFN Units 1, 2, and 3, SQN Units 1 and 2, and WBN Units 1 and 2 TS pages retyped to show the proposed changes, respectively. Attachments 3.1 through 3.3 provide the existing BFN Units 1, 2, and 3, SQN Units 1 and 2, and WBN Units 1 and 2 TS Bases page marked to show the proposed changes, respectively. Changes to the existing TS Bases are provided for information only and will be implemented under the Technical Specification Bases Control Program.

TVA requests approval of the proposed license amendment within one year from the date of this submittal with implementation within 60 days of issuance of the amendment.

TVA has determined that there are no significant hazards considerations associated with the proposed changes and that the TS changes qualify for a categorical exclusion from environmental review pursuant to the provisions of 10 CFR 51.22(c)(9). In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the Alabama Department of Public Health and the Tennessee Department of Environment and Conservation.

There are no new regulatory commitments contained in this letter. If you have any questions regarding this submittal, please contact Stuart L. Rymer, Senior Manager, Fleet Licensing, at slrymer@tva.gov.

I declare under penalty of perjury that the foregoing is true and correct. Executed on this 1th day of June 2022.

Respectfully, Digitally signed by Rearden, Pamela S Date: 2022.06.13 12:02:14 -04'00' James Barstow Vice President, Nuclear Regulatory Affairs & Support Services

Enclosure:

Description and Assessment of the Proposed Change cc: (Enclosure):

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRC Project Manager - Browns Ferry Nuclear Plant NRC Project Manager - Sequoyah Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant State Health Officer, Alabama Department of Public Health Division of Radiological Health - Tennessee Department of Environment and Conservation

Enclosure Description and Assessment of the Proposed Change

SUBJECT:

Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)

CONTENTS

1.0 DESCRIPTION

................................................................................................................... 2 2.0 ASSESSMENT ................................................................................................................... 2 2.1 Applicability of Safety Evaluation .................................................................................... 2 2.2 Variations ........................................................................................................................ 2

3.0 REGULATORY ANALYSIS

................................................................................................ 3 3.1 No Significant Hazards Consideration Analysis.............................................................. 3 4.0 ENVIRONMENTAL EVALUATION .................................................................................... 4 Attachments 1.1 Proposed Technical Specification Changes (Mark-up) Browns Ferry Nuclear Plant, Units 1, 2, and 3 1.2 Proposed Technical Specification Changes (Mark-up) Sequoyah Nuclear Plant, Units 1, and 2 1.3 Proposed Technical Specification Changes (Mark-up) Watts Bar Nuclear Plant, Units 1, and 2 2.1 Revised Technical Specification Pages (Retyped) Browns Ferry Nuclear Plant, Units 1, 2, and 3 2.2 Revised Technical Specification Pages (Retyped) Sequoyah Nuclear Plant, Units 1, and 2 2.3 Revised Technical Specification Pages (Retyped) Watts Bar Nuclear Plant, Units 1, and 2 3.1 Proposed Technical Specification Bases Changes (Markup) Browns Ferry Nuclear Plant, Units 1, 2, and 3 (for Information Only) 3.2 Proposed Technical Specification Bases Changes (Markup) Sequoyah Nuclear Plant, Units 1, and 2 (for Information Only) 3.3 Proposed Technical Specification Bases Changes (Markup) Watts Bar Nuclear Plant, Units 1, and 2 (for Information Only)

CNL-22-008 E1 of 4

Enclosure

1.0 DESCRIPTION

In accordance with the provisions of Title 10 of the Code of Federal Regulations (10 CFR) 50.90, "Application for amendment of license, construction permit, or early site permit," Tennessee Valley Authority (TVA) is submitting a request for an amendment to Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 for the Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3; Renewed Facility Operating License Nos. DPR-77 and DPR-79 for the Sequoyah Nuclear Plant (SQN), Units 1 and 2; and Facility Operating License Nos. NPF-90 and NPF-96 for the Watts Bar Nuclear Plant (WBN), Units 1 and 2, respectively.

The proposed change revises Section 1.3, Completion Times, and Section 3.0, LCO Applicability of the Technical Specifications (TS) to clarify the use and application of the TS usage rules, as described below:

x Section 1.3 is revised to clarify discovery.

x Section 1.3 is revised to discuss exceptions to starting the Completion Time at condition entry.

x Limiting Condition for Operation (LCO) 3.0.4.b is revised to clarify that LCO 3.0.4.a, LCO 3.0.4.b, and LCO 3.0.4.c are independent options.

x Surveillance Requirement (SR) 3.0.3 is revised to allow application of SR 3.0.3 when an SR has not been previously performed and to clarify the application of SR 3.0.3.

2.0 ASSESSMENT 2.1 Applicability of Safety Evaluation TVA has reviewed the safety evaluation for Technical Specifications Task Force (TSTF)

Traveler TSTF 529, Revision 4, Clarify Use and Application Rules, provided to the TSTF in a letter dated April 21, 2016. This review included a review of the Nuclear Regulatory Commission (NRC) staffs evaluation, as well as the information provided in TSTF-529. As described in the subsequent paragraphs, TVA has concluded that the justifications presented in the TSTF-529 proposal and the safety evaluation prepared by the NRC staff are applicable to BFN Units 1, 2, and 3; SQN Units 1 and 2; and WBN Units 1 and 2; and justify this amendment for the incorporation of the changes to the BFN, SQN, and WBN TS.

2.2 Variations TVA is not proposing any technical variations from the TS changes described in the TSTF-529 or the applicable parts of the NRC staffs safety evaluation dated April 21, 2016.

TVA is proposing the following administrative variation from the TS changes described in TSTF-529, Revision 4 or the applicable parts of the NRC staffs safety evaluation.

x The Description section for the General Electric and Westinghouse STS 1.3, Completion Times, on which TSTF-529, Revision 4, was based, states: For example, LCO 3.8.1, AC Sources - Operating, Required Action B.2, requires declaring required feature(s) supported by an inoperable diesel generator, inoperable when the redundant required feature(s) are inoperable. For BFN Units 1, 2, and 3; and WBN Units 1 and 2, the comparable TS is LCO 3.8.1, Required Action B.3.

CNL-22-008 E2 of 4

Enclosure

3.0 REGULATORY ANALYSIS

3.1 No Significant Hazards Consideration Analysis TVA requests adoption of TSTF-529, Clarify Use and Application Rules, that is an approved change to the standard technical specifications (STS), into the BFN Units 1, 2, and 3; SQN Units 1 and 2; and WBN Units 1 and 2 TS. The proposed change revises Section 1.3, Completion Times, and Section 3.0, LCO Applicability and SR Applicability of the TS to clarify the use and application of the TS usage rules and revise the application of SR 3.0.3.

Section 1.3 is modified to clarify the concept of discovery that a LCO is not met and to describe existing exceptions to the start of Completion Times in the TS. An editorial change is made to LCO 3.0.4.b to clarify that LCO 3.0.4.a, LCO 3.0.4.b, and LCO 3.0.4.c are independent options. SR 3.0.3 is revised to allow application of SR 3.0.3 when an SR has not been previously performed.

TVA has evaluated whether or not a significant hazards consideration is involved with the proposed amendment(s) by focusing on the three standards set forth in 10 CFR 50.92, Issuance of amendment, as described below:

1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

The proposed changes to Section 1.3 and LCO 3.0.4 have no effect on the requirement for systems to be Operable and have no effect on the application of TS actions. The proposed change to SR 3.0.3 states that the allowance may only be used when there is a reasonable expectation the surveillance will be met when performed. Because the proposed changes do not significantly affect system Operability, the proposed changes will have no significant effect on the initiating events for accidents previously evaluated and will have no significant effect on the ability of the systems to mitigate accidents previously evaluated.

Therefore, it is concluded that this change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No.

The proposed change to the TS usage rules does not affect the design or function of any plant systems. The proposed change does not change the Operability requirements for plant systems or the actions taken when plant systems are not operable.

Therefore, it is concluded that this change does not create the possibility of a new or different kind of accident from any accident previously evaluated.

CNL-22-008 E3 of 4

Enclosure

3. Does the proposed change involve a significant reduction in a margin of safety?

Response: No.

The proposed change clarifies the application or Section 1.3 and LCO 3.0.4 and does not result in changes in plant operation. SR 3.0.3 is revised to allow application of SR 3.0.3 when a SR has not been previously performed and there is reasonable expectation that the SR will be met when performed. This expands the use of SR 3.0.3 while ensuring the affected system is capable of performing its safety function. As a result, plant safety is either improved or unaffected.

Therefore, it is concluded that this change does not involve a significant reduction in a margin of safety.

Based on the above, TVA concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and accordingly, a finding of no significant hazards consideration is justified.

4.0 ENVIRONMENTAL EVALUATION The proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9).

Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.

CNL-22-008 E4 of 4

Enclosure Attachment 1.1 Proposed TS Changes (Markups)

Browns Ferry Nuclear Plant, Units 1, 2, and 3 CNL-22-008

&RPSOHWLRQ7LPHV



86($1'$33/,&$7,21

&RPSOHWLRQ7LPHV

385326( 7KHSXUSRVHRIWKLVVHFWLRQLVWRHVWDEOLVKWKH&RPSOHWLRQ7LPH

FRQYHQWLRQDQGWRSURYLGHJXLGDQFHIRULWVXVH

%$&.*5281' /LPLWLQJ&RQGLWLRQVIRU2SHUDWLRQ /&2V VSHFLI\PLQLPXPUHTXLUHPHQWV

IRUHQVXULQJVDIHRSHUDWLRQRIWKHXQLW7KH$&7,216DVVRFLDWHGZLWKDQ

/&2VWDWH&RQGLWLRQVWKDWW\SLFDOO\GHVFULEHWKHZD\VLQZKLFKWKH

UHTXLUHPHQWVRIWKH/&2FDQIDLOWREHPHW6SHFLILHGZLWKHDFKVWDWHG

&RQGLWLRQDUH5HTXLUHG$FWLRQ V DQG&RPSOHWLRQ7LPHV V 

'(6&5,37,21 7KH&RPSOHWLRQ7LPHLVWKHDPRXQWRIWLPHDOORZHGIRUFRPSOHWLQJD

5HTXLUHG$FWLRQ,WLVUHIHUHQFHGWRWKHWLPHRIGLVFRYHU\RIDVLWXDWLRQ

HJLQRSHUDEOHHTXLSPHQWRUYDULDEOHQRWZLWKLQOLPLWV WKDWUHTXLUHV

HQWHULQJDQ$&7,216&RQGLWLRQXQOHVVRWKHUZLVHVSHFLILHGSURYLGLQJWKH

XQLWLVLQD02'(RUVSHFLILHGFRQGLWLRQVWDWHGLQWKH$SSOLFDELOLW\RIWKH

/&2

8QOHVVRWKHUZLVHVSHFLILHGWKH&RPSOHWLRQ7LPHEHJLQVZKHQDVHQLRU

OLFHQVHGRSHUDWRURQWKHRSHUDWLQJVKLIWFUHZZLWKUHVSRQVLELOLW\IRUSODQW

RSHUDWLRQVPDNHVWKHGHWHUPLQDWLRQWKDWDQ/&2LVQRWPHWDQGDQ

$&7,216&RQGLWLRQLVHQWHUHG7KHRWKHUZLVHVSHFLILHGH[FHSWLRQVDUH

YDULHGVXFKDVD5HTXLUHG$FWLRQ1RWHRU6XUYHLOODQFH5HTXLUHPHQW

1RWHWKDWSURYLGHVDQDOWHUQDWLYHWLPHWRSHUIRUPVSHFLILFWDVNVVXFKDV

WHVWLQJZLWKRXWVWDUWLQJWKH&RPSOHWLRQ7LPH:KLOHXWLOL]LQJWKH1RWH

VKRXOGD&RQGLWLRQEHDSSOLFDEOHIRUDQ\UHDVRQQRWDGGUHVVHGE\WKH

1RWHWKH&RPSOHWLRQ7LPHEHJLQV6KRXOGWKHWLPHDOORZDQFHLQWKH

1RWHEHH[FHHGHGWKH&RPSOHWLRQ7LPHEHJLQVDWWKDWSRLQW7KH

H[FHSWLRQVPD\DOVREHLQFRUSRUDWHGLQWRWKH&RPSOHWLRQ7LPH)RU

H[DPSOH/&2$&6RXUFHV2SHUDWLQJ5HTXLUHG$FWLRQ%

UHTXLUHVGHFODULQJUHTXLUHGIHDWXUH V VXSSRUWHGE\DQLQRSHUDEOHGLHVHO

JHQHUDWRULQRSHUDEOHZKHQWKHUHGXQGDQWUHTXLUHGIHDWXUH V DUH

LQRSHUDEOH7KH&RPSOHWLRQ7LPHVWDWHVKRXUVIURPGLVFRYHU\RI

&RQGLWLRQ%FRQFXUUHQWZLWKLQRSHUDELOLW\RIUHGXQGDQWUHTXLUHG

IHDWXUH V ,QWKLVFDVHWKH&RPSOHWLRQ7LPHGRHVQRWEHJLQXQWLOWKH

FRQGLWLRQVLQWKH&RPSOHWLRQ7LPHDUHVDWLVILHG

5HTXLUHG$FWLRQVPXVWEHFRPSOHWHGSULRUWRWKHH[SLUDWLRQRIWKH

VSHFLILHG&RPSOHWLRQ7LPH$Q$&7,216&RQGLWLRQUHPDLQVLQHIIHFW

DQGWKH5HTXLUHG$FWLRQVDSSO\XQWLOWKH&RQGLWLRQQRORQJHUH[LVWVRUWKH

XQLWLVQRWZLWKLQWKH/&2$SSOLFDELOLW\

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

,IVLWXDWLRQVDUHGLVFRYHUHGWKDWUHTXLUHHQWU\LQWRPRUHWKDQRQH

'(6&5,37,21

&RQGLWLRQDWDWLPHZLWKLQDVLQJOH/&2 PXOWLSOH&RQGLWLRQV WKH

 FRQWLQXHG 

5HTXLUHG$FWLRQVIRUHDFK&RQGLWLRQPXVWEHSHUIRUPHGZLWKLQWKH

DVVRFLDWHG&RPSOHWLRQ7LPH:KHQLQPXOWLSOH&RQGLWLRQVVHSDUDWH

&RPSOHWLRQ7LPHVDUHWUDFNHGIRUHDFK&RQGLWLRQVWDUWLQJIURPWKHtime ofGLVFRYHU\RIWKHVLWXDWLRQWKDWUHTXLUHGHQWU\LQWRWKH&RQGLWLRQXQOHVV

RWKHUZLVHVSHFLILHG

2QFHD&RQGLWLRQKDVEHHQHQWHUHGVXEVHTXHQWGLYLVLRQV

VXEV\VWHPVFRPSRQHQWVRUYDULDEOHVH[SUHVVHGLQWKH&RQGLWLRQ

GLVFRYHUHGWREHLQRSHUDEOHRUQRWZLWKLQOLPLWVZLOOQRWUHVXOWLQVHSDUDWH

HQWU\LQWRWKH&RQGLWLRQXQOHVVVSHFLILFDOO\VWDWHG7KH5HTXLUHG$FWLRQV

RIWKH&RQGLWLRQFRQWLQXHWRDSSO\WRHDFKDGGLWLRQDOIDLOXUHZLWK

&RPSOHWLRQ7LPHVEDVHGRQLQLWLDOHQWU\LQWRWKH&RQGLWLRQXQOHVV

RWKHUZLVHVSHFLILHG

+RZHYHUZKHQDVXEVHTXHQWGLYLVLRQVXEV\VWHPFRPSRQHQWRU

YDULDEOHH[SUHVVHGLQWKH&RQGLWLRQLVGLVFRYHUHGWREHLQRSHUDEOHRUQRW

ZLWKLQOLPLWVWKH&RPSOHWLRQ7LPH V PD\EHH[WHQGHG7RDSSO\WKLV

&RPSOHWLRQ7LPHH[WHQVLRQWZRFULWHULDPXVWILUVWEHPHW7KH

VXEVHTXHQWLQRSHUDELOLW\

D 0XVWH[LVWFRQFXUUHQWZLWKWKHILUVWLQRSHUDELOLW\DQG E 0XVWUHPDLQLQRSHUDEOHRUQRWZLWKLQOLPLWVDIWHUWKHILUVWLQRSHUDELOLW\

LVUHVROYHG

7KHWRWDO&RPSOHWLRQ7LPHDOORZHGIRUFRPSOHWLQJD5HTXLUHG$FWLRQWR

DGGUHVVWKHVXEVHTXHQWLQRSHUDELOLW\VKDOOEHOLPLWHGWRWKHPRUH

UHVWULFWLYHRIHLWKHU

D 7KHVWDWHG&RPSOHWLRQ7LPHDVPHDVXUHGIURPWKHLQLWLDOHQWU\LQWR WKH&RQGLWLRQSOXVDQDGGLWLRQDOKRXUVRU E 7KHVWDWHG&RPSOHWLRQ7LPHDVPHDVXUHGIURPGLVFRYHU\RIWKH VXEVHTXHQWLQRSHUDELOLW\

7KHDERYH&RPSOHWLRQ7LPHH[WHQVLRQVGRQRWDSSO\WRWKRVH

6SHFLILFDWLRQVWKDWKDYHH[FHSWLRQVWKDWDOORZFRPSOHWHO\VHSDUDWH

UHHQWU\LQWRWKH&RQGLWLRQ IRUHDFKGLYLVLRQVXEV\VWHPFRPSRQHQWRU

YDULDEOHH[SUHVVHGLQWKH&RQGLWLRQ DQGVHSDUDWHWUDFNLQJRI&RPSOHWLRQ

7LPHVEDVHGRQWKLVUHHQWU\7KHVHH[FHSWLRQVDUHVWDWHGLQLQGLYLGXDO

6SHFLILFDWLRQV

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

/&2$SSOLFDELOLW\



/&2$33/,&$%,/,7< FRQWLQXHG 

/&2 :KHQDQ/&2LVQRWPHWHQWU\LQWRD02'(RURWKHUVSHFLILHG

FRQGLWLRQLQWKH$SSOLFDELOLW\VKDOORQO\EHPDGH

D :KHQWKHDVVRFLDWHG$&7,216WREHHQWHUHGSHUPLWFRQWLQXHG

RSHUDWLRQLQWKH02'(RURWKHUVSHFLILHGFRQGLWLRQLQWKH

$SSOLFDELOLW\IRUDQXQOLPLWHGSHULRGRIWLPH

E $IWHUSHUIRUPDQFHRIDULVNDVVHVVPHQWDGGUHVVLQJLQRSHUDEOH

V\VWHPVDQGFRPSRQHQWVFRQVLGHUDWLRQRIWKHUHVXOWV

GHWHUPLQDWLRQRIWKHDFFHSWDELOLW\RIHQWHULQJWKH02'(RU

RWKHUVSHFLILHGFRQGLWLRQLQWKH$SSOLFDELOLW\DQGHVWDEOLVKPHQW

RIULVNPDQDJHPHQWDFWLRQVLIDSSURSULDWH H[FHSWLRQVWRWKLV

6SHFLILFDWLRQDUHVWDWHGLQWKHLQGLYLGXDO6SHFLILFDWLRQV RU F :KHQDQDOORZDQFHLVVWDWHGLQWKHLQGLYLGXDOYDOXHSDUDPHWHU

RURWKHU6SHFLILFDWLRQ

7KLV6SHFLILFDWLRQVKDOOQRWSUHYHQWFKDQJHVLQ02'(6RURWKHU

VSHFLILHGFRQGLWLRQVLQWKH$SSOLFDELOLW\WKDWDUHUHTXLUHGWRFRPSO\

ZLWK$&7,216RUWKDWDUHSDUWRIDVKXWGRZQRIWKHXQLW

/&2 (TXLSPHQWUHPRYHGIURPVHUYLFHRUGHFODUHGLQRSHUDEOHWRFRPSO\

ZLWK$&7,216PD\EHUHWXUQHGWRVHUYLFHXQGHUDGPLQLVWUDWLYH

FRQWUROVROHO\WRSHUIRUPWHVWLQJUHTXLUHGWRGHPRQVWUDWHLWV

23(5$%,/,7<RUWKH23(5$%,/,7<RIRWKHUHTXLSPHQW7KLVLVDQ

H[FHSWLRQWR/&2IRUWKHV\VWHPUHWXUQHGWRVHUYLFHXQGHU

DGPLQLVWUDWLYHFRQWUROWRSHUIRUPWKHWHVWLQJUHTXLUHGWR

GHPRQVWUDWH23(5$%,/,7<

/&2 :KHQDVXSSRUWHGV\VWHP/&2LVQRWPHWVROHO\GXHWRDVXSSRUW

V\VWHP/&2QRWEHLQJPHWWKH&RQGLWLRQVDQG5HTXLUHG$FWLRQV

DVVRFLDWHGZLWKWKLVVXSSRUWHGV\VWHPDUHQRWUHTXLUHGWREH

HQWHUHG2QO\WKHVXSSRUWV\VWHP/&2$&7,216DUHUHTXLUHGWR

EHHQWHUHG7KLVLVDQH[FHSWLRQWR/&2IRUWKHVXSSRUWHG

V\VWHP,QWKLVHYHQWDQHYDOXDWLRQVKDOOEHSHUIRUPHGLQ

DFFRUGDQFHZLWK6SHFLILFDWLRQ6DIHW\)XQFWLRQ

'HWHUPLQDWLRQ3URJUDP 6)'3 ,IDORVVRIVDIHW\IXQFWLRQLV

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

65$SSOLFDELOLW\



6859(,//$1&(5(48,5(0(17 65 $33/,&$%,/,7<

65 65VVKDOOEHPHWGXULQJWKH02'(6RURWKHUVSHFLILHGFRQGLWLRQV

LQWKH$SSOLFDELOLW\IRULQGLYLGXDO/&2VXQOHVVRWKHUZLVHVWDWHGLQ

WKH65)DLOXUHWRPHHWD6XUYHLOODQFHZKHWKHUVXFKIDLOXUHLV

H[SHULHQFHGGXULQJWKHSHUIRUPDQFHRIWKH6XUYHLOODQFHRUEHWZHHQ

SHUIRUPDQFHVRIWKH6XUYHLOODQFHVKDOOEHIDLOXUHWRPHHWWKH/&2

)DLOXUHWRSHUIRUPD6XUYHLOODQFHZLWKLQWKHVSHFLILHG)UHTXHQF\

VKDOOEHIDLOXUHWRPHHWWKH/&2H[FHSWDVSURYLGHGLQ65

6XUYHLOODQFHVGRQRWKDYHWREHSHUIRUPHGRQLQRSHUDEOH

HTXLSPHQWRUYDULDEOHVRXWVLGHVSHFLILHGOLPLWV

65 7KHVSHFLILHG)UHTXHQF\IRUHDFK65LVPHWLIWKH6XUYHLOODQFHLV

SHUIRUPHGZLWKLQWLPHVWKHLQWHUYDOVSHFLILHGLQWKH)UHTXHQF\

DVPHDVXUHGIURPWKHSUHYLRXVSHUIRUPDQFHRUDVPHDVXUHGIURP

WKHWLPHDVSHFLILHGFRQGLWLRQRIWKH)UHTXHQF\LVPHW

)RU)UHTXHQFLHVVSHFLILHGDVRQFHWKHDERYHLQWHUYDOH[WHQVLRQ

GRHVQRWDSSO\,ID&RPSOHWLRQ7LPHUHTXLUHVSHULRGLF

SHUIRUPDQFHRQDRQFHSHUEDVLVWKHDERYH)UHTXHQF\

H[WHQVLRQDSSOLHVWRHDFKSHUIRUPDQFHDIWHUWKHLQLWLDOSHUIRUPDQFH

([FHSWLRQVWRWKLV6SHFLILFDWLRQDUHVWDWHGLQWKHLQGLYLGXDO

6SHFLILFDWLRQV

65 ,ILWLVGLVFRYHUHGWKDWD6XUYHLOODQFHZDVQRWSHUIRUPHGZLWKLQLWV

VSHFLILHG)UHTXHQF\WKHQFRPSOLDQFHZLWKWKHUHTXLUHPHQWWR

GHFODUHWKH/&2QRWPHWPD\EHGHOD\HGIURPWKHWLPHRI

GLVFRYHU\XSWRKRXUVRUXSWRWKHOLPLWRIWKHVSHFLILHG

)UHTXHQF\ZKLFKHYHULVJUHDWHU7KLVGHOD\SHULRGLVSHUPLWWHG

WRDOORZSHUIRUPDQFHRIWKH6XUYHLOODQFH7KHGHOD\SHULRGLVRQO\

DSSOLFDEOHZKHQWKHUHLVDUHDVRQDEOHH[SHFWDWLRQWKH

6XUYHLOODQFHZLOOEHPHWZKHQSHUIRUPHG$ULVNHYDOXDWLRQVKDOO

EHSHUIRUPHGIRUDQ\6XUYHLOODQFHGHOD\HGJUHDWHUWKDQKRXUV

DQGWKHULVNLPSDFWVKDOOEHPDQDJHG

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

&RPSOHWLRQ7LPHV



86($1'$33/,&$7,21

&RPSOHWLRQ7LPHV

385326( 7KHSXUSRVHRIWKLVVHFWLRQLVWRHVWDEOLVKWKH&RPSOHWLRQ7LPH

FRQYHQWLRQDQGWRSURYLGHJXLGDQFHIRULWVXVH

%$&.*5281' /LPLWLQJ&RQGLWLRQVIRU2SHUDWLRQ /&2V VSHFLI\PLQLPXP

UHTXLUHPHQWVIRUHQVXULQJVDIHRSHUDWLRQRIWKHXQLW7KH$&7,216

DVVRFLDWHGZLWKDQ/&2VWDWH&RQGLWLRQVWKDWW\SLFDOO\GHVFULEHWKH

ZD\VLQZKLFKWKHUHTXLUHPHQWVRIWKH/&2FDQIDLOWREHPHW

6SHFLILHGZLWKHDFKVWDWHG&RQGLWLRQDUH5HTXLUHG$FWLRQ V DQG

&RPSOHWLRQ7LPHV V 

'(6&5,37,21 7KH&RPSOHWLRQ7LPHLVWKHDPRXQWRIWLPHDOORZHGIRUFRPSOHWLQJD

5HTXLUHG$FWLRQ,WLVUHIHUHQFHGWRWKHWLPHRIGLVFRYHU\RIDVLWXDWLRQ

HJLQRSHUDEOHHTXLSPHQWRUYDULDEOHQRWZLWKLQOLPLWV WKDWUHTXLUHV

HQWHULQJDQ$&7,216&RQGLWLRQXQOHVVRWKHUZLVHVSHFLILHGSURYLGLQJWKH

XQLWLVLQD02'(RUVSHFLILHGFRQGLWLRQVWDWHGLQWKH$SSOLFDELOLW\RIWKH

/&2

8QOHVVRWKHUZLVHVSHFLILHGWKH&RPSOHWLRQ7LPHEHJLQVZKHQDVHQLRU

OLFHQVHGRSHUDWRURQWKHRSHUDWLQJVKLIWFUHZZLWKUHVSRQVLELOLW\IRUSODQW

RSHUDWLRQVPDNHVWKHGHWHUPLQDWLRQWKDWDQ/&2LVQRWPHWDQGDQ

$&7,216&RQGLWLRQLVHQWHUHG7KHRWKHUZLVHVSHFLILHGH[FHSWLRQVDUH

YDULHGVXFKDVD5HTXLUHG$FWLRQ1RWHRU6XUYHLOODQFH5HTXLUHPHQW

1RWHWKDWSURYLGHVDQDOWHUQDWLYHWLPHWRSHUIRUPVSHFLILFWDVNVVXFKDV

WHVWLQJZLWKRXWVWDUWLQJWKH&RPSOHWLRQ7LPH:KLOHXWLOL]LQJWKH1RWH

VKRXOGD&RQGLWLRQEHDSSOLFDEOHIRUDQ\UHDVRQQRWDGGUHVVHGE\WKH

1RWHWKH&RPSOHWLRQ7LPHEHJLQV6KRXOGWKHWLPHDOORZDQFHLQWKH

1RWHEHH[FHHGHGWKH&RPSOHWLRQ7LPHEHJLQVDWWKDWSRLQW7KH

H[FHSWLRQVPD\DOVREHLQFRUSRUDWHGLQWRWKH&RPSOHWLRQ7LPH)RU

H[DPSOH/&2$&6RXUFHV2SHUDWLQJ5HTXLUHG$FWLRQ%

UHTXLUHVGHFODULQJUHTXLUHGIHDWXUH V VXSSRUWHGE\DQLQRSHUDEOHGLHVHO

JHQHUDWRULQRSHUDEOHZKHQWKHUHGXQGDQWUHTXLUHGIHDWXUH V DUH

LQRSHUDEOH7KH&RPSOHWLRQ7LPHVWDWHVKRXUVIURPGLVFRYHU\RI

&RQGLWLRQ%FRQFXUUHQWZLWKLQRSHUDELOLW\RIUHGXQGDQWUHTXLUHG

IHDWXUH V ,QWKLVFDVHWKH&RPSOHWLRQ7LPHGRHVQRWEHJLQXQWLOWKH

FRQGLWLRQVLQWKH&RPSOHWLRQ7LPHDUHVDWLVILHG

5HTXLUHG$FWLRQVPXVWEHFRPSOHWHGSULRUWRWKHH[SLUDWLRQRIWKH

VSHFLILHG&RPSOHWLRQ7LPH$Q$&7,216&RQGLWLRQUHPDLQVLQHIIHFWDQG

WKH5HTXLUHG$FWLRQVDSSO\XQWLOWKH&RQGLWLRQQRORQJHUH[LVWVRUWKHXQLW

LVQRWZLWKLQWKH/&2$SSOLFDELOLW\

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

'(6&5,37,21 ,IVLWXDWLRQVDUHGLVFRYHUHGWKDWUHTXLUHHQWU\LQWRPRUHWKDQRQH

 FRQWLQXHG  &RQGLWLRQDWDWLPHZLWKLQDVLQJOH/&2 PXOWLSOH&RQGLWLRQV WKH

5HTXLUHG$FWLRQVIRUHDFK&RQGLWLRQPXVWEHSHUIRUPHGZLWKLQWKH

DVVRFLDWHG&RPSOHWLRQ7LPH:KHQLQPXOWLSOH&RQGLWLRQVVHSDUDWH

&RPSOHWLRQ7LPHVDUHWUDFNHGIRUHDFK&RQGLWLRQVWDUWLQJIURPWKHWLPH

RIGLVFRYHU\RIWKHVLWXDWLRQWKDWUHTXLUHGHQWU\LQWRWKH&RQGLWLRQXQOHVV

RWKHUZLVHVSHFLILHG

2QFHD&RQGLWLRQKDVEHHQHQWHUHGVXEVHTXHQWGLYLVLRQV

VXEV\VWHPVFRPSRQHQWVRUYDULDEOHVH[SUHVVHGLQWKH&RQGLWLRQ

GLVFRYHUHGWREHLQRSHUDEOHRUQRWZLWKLQOLPLWVZLOOQRWUHVXOWLQVHSDUDWH

HQWU\LQWRWKH&RQGLWLRQXQOHVVVSHFLILFDOO\VWDWHG7KH5HTXLUHG$FWLRQV

RIWKH&RQGLWLRQFRQWLQXHWRDSSO\WRHDFKDGGLWLRQDOIDLOXUHZLWK

&RPSOHWLRQ7LPHVEDVHGRQLQLWLDOHQWU\LQWRWKH&RQGLWLRQXQOHVV

RWKHUZLVHVSHFLILHG

+RZHYHUZKHQDVXEVHTXHQWGLYLVLRQVXEV\VWHPFRPSRQHQWRU

YDULDEOHH[SUHVVHGLQWKH&RQGLWLRQLVGLVFRYHUHGWREHLQRSHUDEOHRUQRW

ZLWKLQOLPLWVWKH&RPSOHWLRQ7LPH V PD\EHH[WHQGHG7RDSSO\WKLV

&RPSOHWLRQ7LPHH[WHQVLRQWZRFULWHULDPXVWILUVWEHPHW7KH

VXEVHTXHQWLQRSHUDELOLW\

D 0XVWH[LVWFRQFXUUHQWZLWKWKHILUVWLQRSHUDELOLW\DQG E 0XVWUHPDLQLQRSHUDEOHRUQRWZLWKLQOLPLWVDIWHUWKHILUVWLQRSHUDELOLW\

LVUHVROYHG

7KHWRWDO&RPSOHWLRQ7LPHDOORZHGIRUFRPSOHWLQJD5HTXLUHG$FWLRQWR

DGGUHVVWKHVXEVHTXHQWLQRSHUDELOLW\VKDOOEHOLPLWHGWRWKHPRUH

UHVWULFWLYHRIHLWKHU

D 7KHVWDWHG&RPSOHWLRQ7LPHDVPHDVXUHGIURPWKHLQLWLDOHQWU\LQWR WKH&RQGLWLRQSOXVDQDGGLWLRQDOKRXUVRU E 7KHVWDWHG&RPSOHWLRQ7LPHDVPHDVXUHGIURPGLVFRYHU\RIWKH VXEVHTXHQWLQRSHUDELOLW\

7KHDERYH&RPSOHWLRQ7LPHH[WHQVLRQVGRQRWDSSO\WRWKRVH

6SHFLILFDWLRQVWKDWKDYHH[FHSWLRQVWKDWDOORZFRPSOHWHO\VHSDUDWH

UHHQWU\LQWRWKH&RQGLWLRQ IRUHDFKGLYLVLRQVXEV\VWHPFRPSRQHQWRU

YDULDEOHH[SUHVVHGLQWKH&RQGLWLRQ DQGVHSDUDWHWUDFNLQJRI&RPSOHWLRQ

7LPHVEDVHGRQWKLVUHHQWU\7KHVHH[FHSWLRQVDUHVWDWHGLQLQGLYLGXDO

6SHFLILFDWLRQV

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

/&2$SSOLFDELOLW\



/&2$33/,&$%,/,7< FRQWLQXHG 

/&2 :KHQDQ/&2LVQRWPHWHQWU\LQWRD02'(RURWKHUVSHFLILHG

FRQGLWLRQLQWKH$SSOLFDELOLW\VKDOORQO\EHPDGH

D :KHQWKHDVVRFLDWHG$&7,216WREHHQWHUHGSHUPLWFRQWLQXHG RSHUDWLRQLQWKH02'(RURWKHUVSHFLILHGFRQGLWLRQLQWKH

$SSOLFDELOLW\IRUDQXQOLPLWHGSHULRGRIWLPH

E $IWHUSHUIRUPDQFHRIDULVNDVVHVVPHQWDGGUHVVLQJLQRSHUDEOH V\VWHPVDQGFRPSRQHQWVFRQVLGHUDWLRQRIWKHUHVXOWV

GHWHUPLQDWLRQRIWKHDFFHSWDELOLW\RIHQWHULQJWKH02'(RU RWKHUVSHFLILHGFRQGLWLRQLQWKH$SSOLFDELOLW\DQGHVWDEOLVKPHQW RIULVNPDQDJHPHQWDFWLRQVLIDSSURSULDWH H[FHSWLRQVWRWKLV 6SHFLILFDWLRQDUHVWDWHGLQWKHLQGLYLGXDO6SHFLILFDWLRQV RU F :KHQDQDOORZDQFHLVVWDWHGLQWKHLQGLYLGXDOYDOXHSDUDPHWHU

RURWKHU6SHFLILFDWLRQ

7KLV6SHFLILFDWLRQVKDOOQRWSUHYHQWFKDQJHVLQ02'(6RURWKHU

VSHFLILHGFRQGLWLRQVLQWKH$SSOLFDELOLW\WKDWDUHUHTXLUHGWRFRPSO\

ZLWK$&7,216RUWKDWDUHSDUWRIDVKXWGRZQRIWKHXQLW

/&2 (TXLSPHQWUHPRYHGIURPVHUYLFHRUGHFODUHGLQRSHUDEOHWRFRPSO\

ZLWK$&7,216PD\EHUHWXUQHGWRVHUYLFHXQGHUDGPLQLVWUDWLYH

FRQWUROVROHO\WRSHUIRUPWHVWLQJUHTXLUHGWRGHPRQVWUDWHLWV

23(5$%,/,7<RUWKH23(5$%,/,7<RIRWKHUHTXLSPHQW7KLVLVDQ

H[FHSWLRQWR/&2IRUWKHV\VWHPUHWXUQHGWRVHUYLFHXQGHU

DGPLQLVWUDWLYHFRQWUROWRSHUIRUPWKHWHVWLQJUHTXLUHGWR

GHPRQVWUDWH23(5$%,/,7<

/&2 :KHQDVXSSRUWHGV\VWHP/&2LVQRWPHWVROHO\GXHWRDVXSSRUW

V\VWHP/&2QRWEHLQJPHWWKH&RQGLWLRQVDQG5HTXLUHG$FWLRQV

DVVRFLDWHGZLWKWKLVVXSSRUWHGV\VWHPDUHQRWUHTXLUHGWREH

HQWHUHG2QO\WKHVXSSRUWV\VWHP/&2$&7,216DUHUHTXLUHGWR

EHHQWHUHG7KLVLVDQH[FHSWLRQWR/&2IRUWKHVXSSRUWHG

V\VWHP,QWKLVHYHQWDQHYDOXDWLRQVKDOOEHSHUIRUPHGLQ

DFFRUGDQFHZLWK6SHFLILFDWLRQ6DIHW\)XQFWLRQ

'HWHUPLQDWLRQ3URJUDP 6)'3 ,IDORVVRIVDIHW\IXQFWLRQLV

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

65$SSOLFDELOLW\



6859(,//$1&(5(48,5(0(17 65 $33/,&$%,/,7<

65 65VVKDOOEHPHWGXULQJWKH02'(6RURWKHUVSHFLILHGFRQGLWLRQV

LQWKH$SSOLFDELOLW\IRULQGLYLGXDO/&2VXQOHVVRWKHUZLVHVWDWHGLQ

WKH65)DLOXUHWRPHHWD6XUYHLOODQFHZKHWKHUVXFKIDLOXUHLV

H[SHULHQFHGGXULQJWKHSHUIRUPDQFHRIWKH6XUYHLOODQFHRUEHWZHHQ

SHUIRUPDQFHVRIWKH6XUYHLOODQFHVKDOOEHIDLOXUHWRPHHWWKH/&2

)DLOXUHWRSHUIRUPD6XUYHLOODQFHZLWKLQWKHVSHFLILHG)UHTXHQF\

VKDOOEHIDLOXUHWRPHHWWKH/&2H[FHSWDVSURYLGHGLQ65

6XUYHLOODQFHVGRQRWKDYHWREHSHUIRUPHGRQLQRSHUDEOH

HTXLSPHQWRUYDULDEOHVRXWVLGHVSHFLILHGOLPLWV

65 7KHVSHFLILHG)UHTXHQF\IRUHDFK65LVPHWLIWKH6XUYHLOODQFHLV

SHUIRUPHGZLWKLQWLPHVWKHLQWHUYDOVSHFLILHGLQWKH)UHTXHQF\

DVPHDVXUHGIURPWKHSUHYLRXVSHUIRUPDQFHRUDVPHDVXUHGIURP

WKHWLPHDVSHFLILHGFRQGLWLRQRIWKH)UHTXHQF\LVPHW

)RU)UHTXHQFLHVVSHFLILHGDVRQFHWKHDERYHLQWHUYDOH[WHQVLRQ

GRHVQRWDSSO\,ID&RPSOHWLRQ7LPHUHTXLUHVSHULRGLF

SHUIRUPDQFHRQDRQFHSHUEDVLVWKHDERYH)UHTXHQF\

H[WHQVLRQDSSOLHVWRHDFKSHUIRUPDQFHDIWHUWKHLQLWLDOSHUIRUPDQFH

([FHSWLRQVWRWKLV6SHFLILFDWLRQDUHVWDWHGLQWKHLQGLYLGXDO

6SHFLILFDWLRQV

65 ,ILWLVGLVFRYHUHGWKDWD6XUYHLOODQFHZDVQRWSHUIRUPHGZLWKLQLWV

VSHFLILHG)UHTXHQF\WKHQFRPSOLDQFHZLWKWKHUHTXLUHPHQWWR

GHFODUHWKH/&2QRWPHWPD\EHGHOD\HGIURPWKHWLPHRI

GLVFRYHU\XSWRKRXUVRUXSWRWKHOLPLWRIWKHVSHFLILHG

)UHTXHQF\ZKLFKHYHULVJUHDWHU7KLVGHOD\SHULRGLVSHUPLWWHG

WRDOORZSHUIRUPDQFHRIWKH6XUYHLOODQFH7KHGHOD\SHULRGLVRQO\

DSSOLFDEOHZKHQWKHUHLVDUHDVRQDEOHH[SHFWDWLRQWKH

6XUYHLOODQFHZLOOEHPHWZKHQSHUIRUPHG$ULVNHYDOXDWLRQVKDOO

EHSHUIRUPHGIRUDQ\6XUYHLOODQFHGHOD\HGJUHDWHUWKDQKRXUV

DQGWKHULVNLPSDFWVKDOOEHPDQDJHG

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

&RPSOHWLRQ7LPHV



86($1'$33/,&$7,21

&RPSOHWLRQ7LPHV

385326( 7KHSXUSRVHRIWKLVVHFWLRQLVWRHVWDEOLVKWKH&RPSOHWLRQ7LPH

FRQYHQWLRQDQGWRSURYLGHJXLGDQFHIRULWVXVH

%$&.*5281' /LPLWLQJ&RQGLWLRQVIRU2SHUDWLRQ /&2V VSHFLI\PLQLPXP

UHTXLUHPHQWVIRUHQVXULQJVDIHRSHUDWLRQRIWKHXQLW7KH$&7,216

DVVRFLDWHGZLWKDQ/&2VWDWH&RQGLWLRQVWKDWW\SLFDOO\GHVFULEHWKH

ZD\VLQZKLFKWKHUHTXLUHPHQWVRIWKH/&2FDQIDLOWREHPHW

6SHFLILHGZLWKHDFKVWDWHG&RQGLWLRQDUH5HTXLUHG$FWLRQ V DQG

&RPSOHWLRQ7LPHV V 

'(6&5,37,21 7KH&RPSOHWLRQ7LPHLVWKHDPRXQWRIWLPHDOORZHGIRUFRPSOHWLQJD

5HTXLUHG$FWLRQ,WLVUHIHUHQFHGWRWKHWLPHRIGLVFRYHU\RIDVLWXDWLRQ

HJLQRSHUDEOHHTXLSPHQWRUYDULDEOHQRWZLWKLQOLPLWV WKDWUHTXLUHV

HQWHULQJDQ$&7,216&RQGLWLRQXQOHVVRWKHUZLVHVSHFLILHGSURYLGLQJWKH

XQLWLVLQD02'(RUVSHFLILHGFRQGLWLRQVWDWHGLQWKH$SSOLFDELOLW\RIWKH

/&2

8QOHVVRWKHUZLVHVSHFLILHGWKH&RPSOHWLRQ7LPHEHJLQVZKHQDVHQLRU

OLFHQVHGRSHUDWRURQWKHRSHUDWLQJVKLIWFUHZZLWKUHVSRQVLELOLW\IRUSODQW

RSHUDWLRQVPDNHVWKHGHWHUPLQDWLRQWKDWDQ/&2LVQRWPHWDQGDQ

$&7,216&RQGLWLRQLVHQWHUHG7KHRWKHUZLVHVSHFLILHGH[FHSWLRQVDUH

YDULHGVXFKDVD5HTXLUHG$FWLRQ1RWHRU6XUYHLOODQFH5HTXLUHPHQW

1RWHWKDWSURYLGHVDQDOWHUQDWLYHWLPHWRSHUIRUPVSHFLILFWDVNVVXFKDV

WHVWLQJZLWKRXWVWDUWLQJWKH&RPSOHWLRQ7LPH:KLOHXWLOL]LQJWKH1RWH

VKRXOGD&RQGLWLRQEHDSSOLFDEOHIRUDQ\UHDVRQQRWDGGUHVVHGE\WKH

1RWHWKH&RPSOHWLRQ7LPHEHJLQV6KRXOGWKHWLPHDOORZDQFHLQWKH

1RWHEHH[FHHGHGWKH&RPSOHWLRQ7LPHEHJLQVDWWKDWSRLQW7KH

H[FHSWLRQVPD\DOVREHLQFRUSRUDWHGLQWRWKH&RPSOHWLRQ7LPH)RU

H[DPSOH/&2$&6RXUFHV2SHUDWLQJ5HTXLUHG$FWLRQ%

UHTXLUHVGHFODULQJUHTXLUHGIHDWXUH V VXSSRUWHGE\DQLQRSHUDEOHGLHVHO

JHQHUDWRULQRSHUDEOHZKHQWKHUHGXQGDQWUHTXLUHGIHDWXUH V DUH

LQRSHUDEOH7KH&RPSOHWLRQ7LPHVWDWHVKRXUVIURPGLVFRYHU\RI

&RQGLWLRQ%FRQFXUUHQWZLWKLQRSHUDELOLW\RIUHGXQGDQWUHTXLUHG

IHDWXUH V ,QWKLVFDVHWKH&RPSOHWLRQ7LPHGRHVQRWEHJLQXQWLOWKH

FRQGLWLRQVLQWKH&RPSOHWLRQ7LPHDUHVDWLVILHG

5HTXLUHG$FWLRQVPXVWEHFRPSOHWHGSULRUWRWKHH[SLUDWLRQRIWKH

VSHFLILHG&RPSOHWLRQ7LPH$Q$&7,216&RQGLWLRQUHPDLQVLQHIIHFWDQG

WKH5HTXLUHG$FWLRQVDSSO\XQWLOWKH&RQGLWLRQQRORQJHUH[LVWVRUWKHXQLW

LVQRWZLWKLQWKH/&2$SSOLFDELOLW\

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

'(6&5,37,21 ,IVLWXDWLRQVDUHGLVFRYHUHGWKDWUHTXLUHHQWU\LQWRPRUHWKDQRQH

 FRQWLQXHG  &RQGLWLRQDWDWLPHZLWKLQDVLQJOH/&2 PXOWLSOH&RQGLWLRQV WKH

5HTXLUHG$FWLRQVIRUHDFK&RQGLWLRQPXVWEHSHUIRUPHGZLWKLQWKH

DVVRFLDWHG&RPSOHWLRQ7LPH:KHQLQPXOWLSOH&RQGLWLRQVVHSDUDWH

&RPSOHWLRQ7LPHVDUHWUDFNHGIRUHDFK&RQGLWLRQVWDUWLQJIURPWKHWLPH

RIGLVFRYHU\RIWKHVLWXDWLRQWKDWUHTXLUHGHQWU\LQWRWKH&RQGLWLRQXQOHVV

RWKHUZLVHVSHFLILHG

2QFHD&RQGLWLRQKDVEHHQHQWHUHGVXEVHTXHQWGLYLVLRQV

VXEV\VWHPVFRPSRQHQWVRUYDULDEOHVH[SUHVVHGLQWKH&RQGLWLRQ

GLVFRYHUHGWREHLQRSHUDEOHRUQRWZLWKLQOLPLWVZLOOQRWUHVXOWLQVHSDUDWH

HQWU\LQWRWKH&RQGLWLRQXQOHVVVSHFLILFDOO\VWDWHG7KH5HTXLUHG$FWLRQV

RIWKH&RQGLWLRQFRQWLQXHWRDSSO\WRHDFKDGGLWLRQDOIDLOXUHZLWK

&RPSOHWLRQ7LPHVEDVHGRQLQLWLDOHQWU\LQWRWKH&RQGLWLRQXQOHVV

RWKHUZLVHVSHFLILHG

+RZHYHUZKHQDVXEVHTXHQWGLYLVLRQVXEV\VWHPFRPSRQHQWRU

YDULDEOHH[SUHVVHGLQWKH&RQGLWLRQLVGLVFRYHUHGWREHLQRSHUDEOHRUQRW

ZLWKLQOLPLWVWKH&RPSOHWLRQ7LPH V PD\EHH[WHQGHG7RDSSO\WKLV

&RPSOHWLRQ7LPHH[WHQVLRQWZRFULWHULDPXVWILUVWEHPHW7KH

VXEVHTXHQWLQRSHUDELOLW\

D 0XVWH[LVWFRQFXUUHQWZLWKWKHILUVWLQRSHUDELOLW\DQG E 0XVWUHPDLQLQRSHUDEOHRUQRWZLWKLQOLPLWVDIWHUWKHILUVWLQRSHUDELOLW\

LVUHVROYHG

7KHWRWDO&RPSOHWLRQ7LPHDOORZHGIRUFRPSOHWLQJD5HTXLUHG$FWLRQWR

DGGUHVVWKHVXEVHTXHQWLQRSHUDELOLW\VKDOOEHOLPLWHGWRWKHPRUH

UHVWULFWLYHRIHLWKHU

D 7KHVWDWHG&RPSOHWLRQ7LPHDVPHDVXUHGIURPWKHLQLWLDOHQWU\LQWR WKH&RQGLWLRQSOXVDQDGGLWLRQDOKRXUVRU E 7KHVWDWHG&RPSOHWLRQ7LPHDVPHDVXUHGIURPGLVFRYHU\RIWKH VXEVHTXHQWLQRSHUDELOLW\

7KHDERYH&RPSOHWLRQ7LPHH[WHQVLRQVGRQRWDSSO\WRWKRVH

6SHFLILFDWLRQVWKDWKDYHH[FHSWLRQVWKDWDOORZFRPSOHWHO\VHSDUDWH

UHHQWU\LQWRWKH&RQGLWLRQ IRUHDFKGLYLVLRQVXEV\VWHPFRPSRQHQWRU

YDULDEOHH[SUHVVHGLQWKH&RQGLWLRQ DQGVHSDUDWHWUDFNLQJRI&RPSOHWLRQ

7LPHVEDVHGRQWKLVUHHQWU\7KHVHH[FHSWLRQVDUHVWDWHGLQLQGLYLGXDO

6SHFLILFDWLRQV

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

/&2$SSOLFDELOLW\



/&2$33/,&$%,/,7< FRQWLQXHG 

/&2 :KHQDQ/&2LVQRWPHWHQWU\LQWRD02'(RURWKHUVSHFLILHG

FRQGLWLRQLQWKH$SSOLFDELOLW\VKDOORQO\EHPDGH

D :KHQWKHDVVRFLDWHG$&7,216WREHHQWHUHGSHUPLWFRQWLQXHG RSHUDWLRQLQWKH02'(RURWKHUVSHFLILHGFRQGLWLRQLQWKH

$SSOLFDELOLW\IRUDQXQOLPLWHGSHULRGRIWLPH

E $IWHUSHUIRUPDQFHRIDULVNDVVHVVPHQWDGGUHVVLQJLQRSHUDEOH V\VWHPVDQGFRPSRQHQWVFRQVLGHUDWLRQRIWKHUHVXOWV

GHWHUPLQDWLRQRIWKHDFFHSWDELOLW\RIHQWHULQJWKH02'(RU RWKHUVSHFLILHGFRQGLWLRQLQWKH$SSOLFDELOLW\DQGHVWDEOLVKPHQW RIULVNPDQDJHPHQWDFWLRQVLIDSSURSULDWH H[FHSWLRQVWRWKLV 6SHFLILFDWLRQDUHVWDWHGLQWKHLQGLYLGXDO6SHFLILFDWLRQV RU F :KHQDQDOORZDQFHLVVWDWHGLQWKHLQGLYLGXDOYDOXHSDUDPHWHU

RURWKHU6SHFLILFDWLRQ

7KLV6SHFLILFDWLRQVKDOOQRWSUHYHQWFKDQJHVLQ02'(6RURWKHU

VSHFLILHGFRQGLWLRQVLQWKH$SSOLFDELOLW\WKDWDUHUHTXLUHGWRFRPSO\

ZLWK$&7,216RUWKDWDUHSDUWRIDVKXWGRZQRIWKHXQLW

/&2 (TXLSPHQWUHPRYHGIURPVHUYLFHRUGHFODUHGLQRSHUDEOHWRFRPSO\

ZLWK$&7,216PD\EHUHWXUQHGWRVHUYLFHXQGHUDGPLQLVWUDWLYH

FRQWUROVROHO\WRSHUIRUPWHVWLQJUHTXLUHGWRGHPRQVWUDWHLWV

23(5$%,/,7<RUWKH23(5$%,/,7<RIRWKHUHTXLSPHQW7KLVLVDQ

H[FHSWLRQWR/&2IRUWKHV\VWHPUHWXUQHGWRVHUYLFHXQGHU

DGPLQLVWUDWLYHFRQWUROWRSHUIRUPWKHWHVWLQJUHTXLUHGWR

GHPRQVWUDWH23(5$%,/,7<

/&2 :KHQDVXSSRUWHGV\VWHP/&2LVQRWPHWVROHO\GXHWRDVXSSRUW

V\VWHP/&2QRWEHLQJPHWWKH&RQGLWLRQVDQG5HTXLUHG$FWLRQV

DVVRFLDWHGZLWKWKLVVXSSRUWHGV\VWHPDUHQRWUHTXLUHGWREH

HQWHUHG2QO\WKHVXSSRUWV\VWHP/&2$&7,216DUHUHTXLUHGWR

EHHQWHUHG7KLVLVDQH[FHSWLRQWR/&2IRUWKHVXSSRUWHG

V\VWHP,QWKLVHYHQWDQHYDOXDWLRQVKDOOEHSHUIRUPHGLQ

DFFRUGDQFHZLWK6SHFLILFDWLRQ6DIHW\)XQFWLRQ

'HWHUPLQDWLRQ3URJUDP 6)'3 ,IDORVVRIVDIHW\IXQFWLRQLV

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

65$SSOLFDELOLW\



6859(,//$1&(5(48,5(0(17 65 $33/,&$%,/,7<

65 65VVKDOOEHPHWGXULQJWKH02'(6RURWKHUVSHFLILHGFRQGLWLRQV

LQWKH$SSOLFDELOLW\IRULQGLYLGXDO/&2VXQOHVVRWKHUZLVHVWDWHGLQ

WKH65)DLOXUHWRPHHWD6XUYHLOODQFHZKHWKHUVXFKIDLOXUHLV

H[SHULHQFHGGXULQJWKHSHUIRUPDQFHRIWKH6XUYHLOODQFHRUEHWZHHQ

SHUIRUPDQFHVRIWKH6XUYHLOODQFHVKDOOEHIDLOXUHWRPHHWWKH/&2

)DLOXUHWRSHUIRUPD6XUYHLOODQFHZLWKLQWKHVSHFLILHG)UHTXHQF\

VKDOOEHIDLOXUHWRPHHWWKH/&2H[FHSWDVSURYLGHGLQ65

6XUYHLOODQFHVGRQRWKDYHWREHSHUIRUPHGRQLQRSHUDEOH

HTXLSPHQWRUYDULDEOHVRXWVLGHVSHFLILHGOLPLWV

65 7KHVSHFLILHG)UHTXHQF\IRUHDFK65LVPHWLIWKH6XUYHLOODQFHLV

SHUIRUPHGZLWKLQWLPHVWKHLQWHUYDOVSHFLILHGLQWKH)UHTXHQF\

DVPHDVXUHGIURPWKHSUHYLRXVSHUIRUPDQFHRUDVPHDVXUHGIURP

WKHWLPHDVSHFLILHGFRQGLWLRQRIWKH)UHTXHQF\LVPHW

)RU)UHTXHQFLHVVSHFLILHGDVRQFHWKHDERYHLQWHUYDOH[WHQVLRQ

GRHVQRWDSSO\,ID&RPSOHWLRQ7LPHUHTXLUHVSHULRGLF

SHUIRUPDQFHRQDRQFHSHUEDVLVWKHDERYH)UHTXHQF\

H[WHQVLRQDSSOLHVWRHDFKSHUIRUPDQFHDIWHUWKHLQLWLDOSHUIRUPDQFH

([FHSWLRQVWRWKLV6SHFLILFDWLRQDUHVWDWHGLQWKHLQGLYLGXDO

6SHFLILFDWLRQV

65 ,ILWLVGLVFRYHUHGWKDWD6XUYHLOODQFHZDVQRWSHUIRUPHGZLWKLQLWV

VSHFLILHG)UHTXHQF\WKHQFRPSOLDQFHZLWKWKHUHTXLUHPHQWWR

GHFODUHWKH/&2QRWPHWPD\EHGHOD\HGIURPWKHWLPHRI

GLVFRYHU\XSWRKRXUVRUXSWRWKHOLPLWRIWKHVSHFLILHG

)UHTXHQF\ZKLFKHYHULVJUHDWHU7KLVGHOD\SHULRGLVSHUPLWWHG

WRDOORZSHUIRUPDQFHRIWKH6XUYHLOODQFH7KHGHOD\SHULRGLVRQO\

DSSOLFDEOHZKHQWKHUHLVDUHDVRQDEOHH[SHFWDWLRQWKH

6XUYHLOODQFHZLOOEHPHWZKHQSHUIRUPHG$ULVNHYDOXDWLRQVKDOO

EHSHUIRUPHGIRUDQ\6XUYHLOODQFHGHOD\HGJUHDWHUWKDQKRXUV

DQGWKHULVNLPSDFWVKDOOEHPDQDJHG

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

Enclosure Attachment 1.2 Proposed TS Changes (Markups)

Sequoyah Nuclear Plant, Units 1 and 2 CNL-22-008

Completion Times 1.3 1.0 USE AND APPLICATION 1.3 Completion Times PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.

BACKGROUND Limiting Conditions for Operation (LCOs) specify minimum requirements for ensuring safe operation of the unit. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Time(s).

DESCRIPTION The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., inoperable equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the unit is in a MODE or specified condition stated in the Applicability of the LCO.

Unless otherwise specified, the Completion Time begins when a senior licensed operator on the operating shift crew with responsibility for plant operations makes the determination that an LCO is not met and an ACTIONS Condition is entered. The "otherwise specified" exceptions are varied, such as a Required Action Note or Surveillance Requirement Note that provides an alternative time to perform specific tasks, such as testing, without starting the Completion Time. While utilizing the Note, should a Condition be applicable for any reason not addressed by the Note, the Completion Time begins. Should the time allowance in the Note be exceeded, the Completion Time begins at that point. The exceptions may also be incorporated into the Completion Time. For example, LCO 3.8.1, "AC Sources - Operating," Required Action B.2, requires declaring required feature(s) supported by an inoperable diesel generator, inoperable when the redundant required feature(s) are inoperable. The Completion Time states, "4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition B concurrent with inoperability of redundant required feature(s)." In this case the Completion Time does not begin until the conditions in the Completion Time are satisfied.

Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the unit is not within the LCO Applicability.

If situations are discovered that require entry into more than one Condition at a time within a single LCO (multiple Conditions), the Required Actions for each Condition must be performed within the associated Completion Time. When in multiple Conditions, separate Completion Times are tracked for each Condition starting from the time of discovery of the situation that required entry into the Condition, unless otherwise specified.

SEQUOYAH - UNIT 1 1.3-1 Amendment 334,

Completion Times 1.3 1.3 Completion Times DESCRIPTION (continued)

Once a Condition has been entered, subsequent trains, subsystems, components, or variables expressed in the Condition, discovered to be inoperable or not within limits, will not result in separate entry into the Condition, unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition, unless otherwise specified.

However, when a subsequent train, subsystem, component, or variable expressed in the Condition is discovered to be inoperable or not within limits, the Completion Time(s) may be extended. To apply this Completion Time extension, two criteria must first be met. The subsequent inoperability:

a. Must exist concurrent with the first inoperability and
b. Must remain inoperable or not within limits after the first inoperability is resolved.

The total Completion Time allowed for completing a Required Action to address the subsequent inoperability shall be limited to the more restrictive of either:

a. The stated Completion Time, as measured from the initial entry into the Condition, plus an additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or
b. The stated Completion Time as measured from discovery of the subsequent inoperability.

The above Completion Time extensions do not apply to those Specifications that have exceptions that allow completely separate re-entry into the Condition (for each train, subsystem, component, or variable expressed in the Condition) and separate tracking of Completion Times based on this re-entry. These exceptions are stated in individual Specifications.

The above Completion Time extension does not apply to a Completion Time with a modified "time zero." This modified "time zero" may be expressed as a repetitive time (i.e., "once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />," where the Completion Time is referenced from a previous completion of the Required Action versus the time of Condition entry) or as a time modified by the phrase "from discovery . . ."

SEQUOYAH - UNIT 1 1.3-2 Amendment 334,

Completion Times 1.3 1.3 Completion Times EXAMPLES The following examples illustrate the use of Completion Times with different types of Conditions and changing Conditions.

EXAMPLE 1.3-1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. Required B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action and associated AND Completion Time not met. B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SEQUOYAH - UNIT 1 1.3- Amendment 334

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

&RQGLWLRQ%KDVWZR5HTXLUHG$FWLRQV(DFK5HTXLUHG$FWLRQKDVLWVRZQ

VHSDUDWH&RPSOHWLRQ7LPH(DFK&RPSOHWLRQ7LPHLVUHIHUHQFHGWRWKH

WLPHWKDW&RQGLWLRQ%LVHQWHUHG

7KH5HTXLUHG$FWLRQVRI&RQGLWLRQ%DUHWREHLQ02'(ZLWKLQKRXUV

$1'LQ02'(ZLWKLQKRXUV$WRWDORIKRXUVLVDOORZHGIRU

UHDFKLQJ02'(DQGDWRWDORIKRXUV QRWKRXUV LVDOORZHGIRU

UHDFKLQJ02'(IURPWKHWLPHWKDW&RQGLWLRQ%ZDVHQWHUHG,I02'(

LVUHDFKHGZLWKLQKRXUVWKHWLPHDOORZHGIRUUHDFKLQJ02'(LVWKH

QH[WKRXUVEHFDXVHWKHWRWDOWLPHDOORZHGIRUUHDFKLQJ02'(LV

KRXUV

,I&RQGLWLRQ%LVHQWHUHGZKLOHLQ02'(WKHWLPHDOORZHGIRUUHDFKLQJ

02'(LVWKHQH[WKRXUV

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QHSXPS $5HVWRUHSXPSWR GD\V

LQRSHUDEOH 23(5$%/(VWDWXV

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG $1'

&RPSOHWLRQ 7LPHQRWPHW  %%HLQ02'( KRXUV

KHQDSXPSLVGHFODUHGLQRSHUDEOH&RQGLWLRQ$LVHQWHUHG,IWKHSXPS

LVQRWUHVWRUHGWR23(5$%/(VWDWXVZLWKLQGD\V&RQGLWLRQ%LVDOVR

HQWHUHGDQGWKH&RPSOHWLRQ7LPHFORFNVIRU5HTXLUHG$FWLRQV%

DQG%VWDUW,IWKHLQRSHUDEOHSXPSLVUHVWRUHGWR23(5$%/(VWDWXV

DIWHU&RQGLWLRQ%LVHQWHUHG&RQGLWLRQV$DQG%DUHH[LWHGDQGWKHUHIRUH

WKH5HTXLUHG$FWLRQVRI&RQGLWLRQ%PD\EHWHUPLQDWHG

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

KHQDVHFRQGSXPSLVGHFODUHGLQRSHUDEOHZKLOHWKHILUVWSXPSLVVWLOO

LQRSHUDEOH&RQGLWLRQ$LVQRWUHHQWHUHGIRUWKHVHFRQGSXPS

/&2LVHQWHUHGVLQFHWKH$&7,216GRQRWLQFOXGHD&RQGLWLRQIRU

PRUHWKDQRQHLQRSHUDEOHSXPS7KH&RPSOHWLRQ7LPHFORFNIRU

&RQGLWLRQ$GRHVQRWVWRSDIWHU/&2LVHQWHUHGEXWFRQWLQXHVWREH

WUDFNHGIURPWKHWLPH&RQGLWLRQ$ZDVLQLWLDOO\HQWHUHG

KLOHLQ/&2LIRQHRIWKHLQRSHUDEOHSXPSVLVUHVWRUHGWR

23(5$%/(VWDWXVDQGWKH&RPSOHWLRQ7LPHIRU&RQGLWLRQ$KDVQRW

H[SLUHG/&2PD\EHH[LWHGDQGRSHUDWLRQFRQWLQXHGLQDFFRUGDQFH

ZLWK&RQGLWLRQ$

KLOHLQ/&2LIRQHRIWKHLQRSHUDEOHSXPSVLVUHVWRUHGWR

23(5$%/(VWDWXVDQGWKH&RPSOHWLRQ7LPHIRU&RQGLWLRQ$KDVH[SLUHG

/&2PD\EHH[LWHGDQGRSHUDWLRQFRQWLQXHGLQDFFRUGDQFHZLWK

&RQGLWLRQ%7KH&RPSOHWLRQ7LPHIRU&RQGLWLRQ%LVWUDFNHGIURPWKH

WLPHWKH&RQGLWLRQ$&RPSOHWLRQ7LPHH[SLUHG

2QUHVWRULQJRQHRIWKHSXPSVWR23(5$%/(VWDWXVWKH&RQGLWLRQ$

&RPSOHWLRQ7LPHLVQRWUHVHWEXWFRQWLQXHVIURPWKHWLPHWKHILUVWSXPS

ZDVGHFODUHGLQRSHUDEOH7KLV&RPSOHWLRQ7LPHPD\EHH[WHQGHGLIWKH

SXPSUHVWRUHGWR23(5$%/(VWDWXVZDVWKHILUVWLQRSHUDEOHSXPS$

KRXUH[WHQVLRQWRWKHVWDWHGGD\VLVDOORZHGSURYLGHGWKLVGRHVQRW

UHVXOWLQWKHVHFRQGSXPSEHLQJLQRSHUDEOHIRU!GD\V

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QH $5HVWRUH)XQFWLRQ; GD\V

)XQFWLRQ; WUDLQWR23(5$%/(

WUDLQ VWDWXV

LQRSHUDEOH

% 2QH  %5HVWRUH)XQFWLRQ< KRXUV

)XQFWLRQ< WUDLQWR23(5$%/(

WUDLQ VWDWXV

LQRSHUDEOH

& 2QH &5HVWRUH)XQFWLRQ; KRXUV

)XQFWLRQ; WUDLQWR23(5$%/(

WUDLQ VWDWXV

LQRSHUDEOH

25

$1'

&5HVWRUH)XQFWLRQ< KRXUV

2QH WUDLQWR23(5$%/(

)XQFWLRQ< VWDWXV

WUDLQ LQRSHUDEOH

KHQRQH)XQFWLRQ;WUDLQDQGRQH)XQFWLRQ<WUDLQDUHLQRSHUDEOH

&RQGLWLRQ$DQG&RQGLWLRQ%DUHFRQFXUUHQWO\DSSOLFDEOH7KH&RPSOHWLRQ

7LPHVIRU&RQGLWLRQ$DQG&RQGLWLRQ%DUHWUDFNHGVHSDUDWHO\IRUHDFK

WUDLQVWDUWLQJIURPWKHWLPHHDFKWUDLQZDVGHFODUHGLQRSHUDEOHDQGWKH

&RQGLWLRQZDVHQWHUHG$VHSDUDWH&RPSOHWLRQ7LPHLVHVWDEOLVKHGIRU

&RQGLWLRQ&DQGWUDFNHGIURPWKHWLPHWKHVHFRQGWUDLQZDVGHFODUHG

LQRSHUDEOH LHWKHWLPHWKHVLWXDWLRQGHVFULEHGLQ&RQGLWLRQ&ZDV

GLVFRYHUHG 

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

,I5HTXLUHG$FWLRQ&LVFRPSOHWHGZLWKLQWKHVSHFLILHG&RPSOHWLRQ7LPH

&RQGLWLRQV%DQG&DUHH[LWHG,IWKH&RPSOHWLRQ7LPHIRU5HTXLUHG

$FWLRQ$KDVQRWH[SLUHGRSHUDWLRQPD\FRQWLQXHLQDFFRUGDQFHZLWK

&RQGLWLRQ$7KHUHPDLQLQJ&RPSOHWLRQ7LPHLQ&RQGLWLRQ$LVPHDVXUHG

IURPWKHWLPHWKHDIIHFWHGWUDLQZDVGHFODUHGLQRSHUDEOH LHLQLWLDOHQWU\

LQWR&RQGLWLRQ$ 

,WLVSRVVLEOHWRDOWHUQDWHEHWZHHQ&RQGLWLRQV$%DQG&LQVXFKD

PDQQHUWKDWRSHUDWLRQFRXOGFRQWLQXHLQGHILQLWHO\ZLWKRXWHYHUUHVWRULQJ

V\VWHPVWRPHHWWKH/&2+RZHYHUGRLQJVRZRXOGEHLQFRQVLVWHQWZLWK

WKHEDVLVRIWKH&RPSOHWLRQ7LPHV7KHUHIRUHWKHUHVKDOOEH

DGPLQLVWUDWLYHFRQWUROVWROLPLWWKHPD[LPXPWLPHDOORZHGIRUDQ\

FRPELQDWLRQRI&RQGLWLRQVWKDWUHVXOWLQDVLQJOHFRQWLJXRXVRFFXUUHQFHRI

IDLOLQJWRPHHWWKH/&27KHVHDGPLQLVWUDWLYHFRQWUROVVKDOOHQVXUHWKDW

WKH&RPSOHWLRQ7LPHVIRUWKRVH&RQGLWLRQVDUHQRWLQDSSURSULDWHO\

H[WHQGHG

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QHRUPRUH $5HVWRUHYDOYH V WR KRXUV

YDOYHV 23(5$%/(VWDWXV

LQRSHUDEOH

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG $1'

&RPSOHWLRQ 7LPHQRWPHW  %%HLQ02'( KRXUV

$VLQJOH&RPSOHWLRQ7LPHLVXVHGIRUDQ\QXPEHURIYDOYHVLQRSHUDEOHDW

WKHVDPHWLPH7KH&RPSOHWLRQ7LPHDVVRFLDWHGZLWK&RQGLWLRQ$LV

EDVHGRQWKHLQLWLDOHQWU\LQWR&RQGLWLRQ$DQGLVQRWWUDFNHGRQDSHU

YDOYHEDVLV'HFODULQJVXEVHTXHQWYDOYHVLQRSHUDEOHZKLOH&RQGLWLRQ$

LVVWLOOLQHIIHFWGRHVQRWWULJJHUWKHWUDFNLQJRIVHSDUDWH&RPSOHWLRQ

7LPHV

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



 &RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

2QFHRQHRIWKHYDOYHVKDVEHHQUHVWRUHGWR23(5$%/(VWDWXVWKH

&RQGLWLRQ$&RPSOHWLRQ7LPHLVQRWUHVHWEXWFRQWLQXHVIURPWKHWLPHWKH

ILUVWYDOYHZDVGHFODUHGLQRSHUDEOH7KH&RPSOHWLRQ7LPHPD\EH

H[WHQGHGLIWKHYDOYHUHVWRUHGWR23(5$%/(VWDWXVZDVWKHILUVW

LQRSHUDEOHYDOYH7KH&RQGLWLRQ$&RPSOHWLRQ7LPHPD\EHH[WHQGHGIRU

XSWRKRXUVSURYLGHGWKLVGRHVQRWUHVXOWLQDQ\VXEVHTXHQWYDOYHEHLQJ

LQRSHUDEOHIRU!KRXUV

,IWKH&RPSOHWLRQ7LPHRIKRXUV LQFOXGLQJWKHH[WHQVLRQ H[SLUHVZKLOH

RQHRUPRUHYDOYHVDUHVWLOOLQRSHUDEOH&RQGLWLRQ%LVHQWHUHG

(;$03/(

$&7,216

127(

6HSDUDWH&RQGLWLRQHQWU\LVDOORZHGIRUHDFKLQRSHUDEOHYDOYH



&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QHRUPRUH $5HVWRUHYDOYH V WR KRXUV

YDOYHV 23(5$%/(VWDWXV

LQRSHUDEOH

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG $1'

&RPSOHWLRQ 7LPHQRWPHW  %%HLQ02'( KRXUV

7KH1RWHDERYHWKH$&7,2167DEOHLVDPHWKRGRIPRGLI\LQJKRZWKH

&RPSOHWLRQ7LPHLVWUDFNHG,IWKLVPHWKRGRIPRGLI\LQJKRZWKH

&RPSOHWLRQ7LPHLVWUDFNHGZDVDSSOLFDEOHRQO\WRDVSHFLILF&RQGLWLRQ

WKH1RWHZRXOGDSSHDULQWKDW&RQGLWLRQUDWKHUWKDQDWWKHWRSRIWKH

$&7,2167DEOH

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



 &RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

7KH1RWHDOORZV&RQGLWLRQ$WREHHQWHUHGVHSDUDWHO\IRUHDFKLQRSHUDEOH

YDOYHDQG&RPSOHWLRQ7LPHVWUDFNHGRQDSHUYDOYHEDVLV:KHQDYDOYH

LVGHFODUHGLQRSHUDEOH&RQGLWLRQ$LVHQWHUHGDQGLWV&RPSOHWLRQ7LPH

VWDUWV,IVXEVHTXHQWYDOYHVDUHGHFODUHGLQRSHUDEOH&RQGLWLRQ$LV

HQWHUHGIRUHDFKYDOYHDQGVHSDUDWH&RPSOHWLRQ7LPHVVWDUWDQGDUH

WUDFNHGIRUHDFKYDOYH

,IWKH&RPSOHWLRQ7LPHDVVRFLDWHGZLWKDYDOYHLQ&RQGLWLRQ$H[SLUHV

&RQGLWLRQ%LVHQWHUHGIRUWKDWYDOYH,IWKH&RPSOHWLRQ7LPHVDVVRFLDWHG

ZLWKVXEVHTXHQWYDOYHVLQ&RQGLWLRQ$H[SLUH&RQGLWLRQ%LVHQWHUHG

VHSDUDWHO\IRUHDFKYDOYHDQGVHSDUDWH&RPSOHWLRQ7LPHVVWDUWDQGDUH

WUDFNHGIRUHDFKYDOYH,IDYDOYHWKDWFDXVHGHQWU\LQWR&RQGLWLRQ%LV

UHVWRUHGWR23(5$%/(VWDWXV&RQGLWLRQ%LVH[LWHGIRUWKDWYDOYH

6LQFHWKH1RWHLQWKLVH[DPSOHDOORZVPXOWLSOH&RQGLWLRQHQWU\DQG

WUDFNLQJRIVHSDUDWH&RPSOHWLRQ7LPHV&RPSOHWLRQ7LPHH[WHQVLRQVGR

QRWDSSO\

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QHFKDQQHO $3HUIRUP65[[[ 2QFHSHUKRXUV

LQRSHUDEOH

25

$5HGXFH7+(50$/ KRXUV

32:(5WR

573

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG

&RPSOHWLRQ 7LPHQRWPHW

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



 &RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

(QWU\LQWR&RQGLWLRQ$RIIHUVDFKRLFHEHWZHHQ5HTXLUHG$FWLRQ$

RU$5HTXLUHG$FWLRQ$KDVDRQFHSHU&RPSOHWLRQ7LPHZKLFK

TXDOLILHVIRUWKHH[WHQVLRQSHU65WRHDFKSHUIRUPDQFHDIWHU

WKHLQLWLDOSHUIRUPDQFH7KHLQLWLDOKRXULQWHUYDORI5HTXLUHG$FWLRQ$

EHJLQVZKHQ&RQGLWLRQ$LVHQWHUHGDQGWKHLQLWLDOSHUIRUPDQFHRI

5HTXLUHG$FWLRQ$PXVWEHFRPSOHWHZLWKLQWKHILUVWKRXULQWHUYDO,I

5HTXLUHG$FWLRQ$LVIROORZHGDQGWKH5HTXLUHG$FWLRQLVQRWPHWZLWKLQ

WKH&RPSOHWLRQ7LPH SOXVWKHH[WHQVLRQDOORZHGE\65 

&RQGLWLRQ%LVHQWHUHG,I5HTXLUHG$FWLRQ$LVIROORZHGDQGWKH

&RPSOHWLRQ7LPHRIKRXUVLVQRWPHW&RQGLWLRQ%LVHQWHUHG

,IDIWHUHQWU\LQWR&RQGLWLRQ%5HTXLUHG$FWLRQ$RU$LVPHW

&RQGLWLRQ%LVH[LWHGDQGRSHUDWLRQPD\WKHQFRQWLQXHLQ&RQGLWLRQ$

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QH $9HULI\DIIHFWHG KRXU

VXEV\VWHP VXEV\VWHPLVRODWHG

LQRSHUDEOH $1'

2QFHSHUKRXUV

WKHUHDIWHU

$1'

$5HVWRUHVXEV\VWHP KRXUV

WR23(5$%/(

VWDWXV

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG $1'

&RPSOHWLRQ 7LPHQRWPHW  %%HLQ02'( KRXUV

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



 &RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

5HTXLUHG$FWLRQ$KDVWZR&RPSOHWLRQ7LPHV7KHKRXU&RPSOHWLRQ

7LPHEHJLQVDWWKHWLPHWKH&RQGLWLRQLVHQWHUHGDQGHDFK2QFHSHU

KRXUVWKHUHDIWHULQWHUYDOEHJLQVXSRQSHUIRUPDQFHRI5HTXLUHG

$FWLRQ$

,IDIWHU&RQGLWLRQ$LVHQWHUHG5HTXLUHG$FWLRQ$LVQRWPHWZLWKLQHLWKHU

WKHLQLWLDOKRXURUDQ\VXEVHTXHQWKRXULQWHUYDOIURPWKHSUHYLRXV

SHUIRUPDQFH SOXVWKHH[WHQVLRQDOORZHGE\65 &RQGLWLRQ%LV

HQWHUHG7KH&RPSOHWLRQ7LPHFORFNIRU&RQGLWLRQ$GRHVQRWVWRSDIWHU

&RQGLWLRQ%LVHQWHUHGEXWFRQWLQXHVIURPWKHWLPH&RQGLWLRQ$ZDV

LQLWLDOO\HQWHUHG,I5HTXLUHG$FWLRQ$LVPHWDIWHU&RQGLWLRQ%LV

HQWHUHG&RQGLWLRQ%LVH[LWHGDQGRSHUDWLRQPD\FRQWLQXHLQDFFRUGDQFH

ZLWK&RQGLWLRQ$SURYLGHGWKH&RPSOHWLRQ7LPHIRU5HTXLUHG$FWLRQ$

KDVQRWH[SLUHG

,00(',$7( :KHQ,PPHGLDWHO\LVXVHGDVD&RPSOHWLRQ7LPHWKH5HTXLUHG$FWLRQ

&203/(7,217,0( VKRXOGEHSXUVXHGZLWKRXWGHOD\DQGLQDFRQWUROOHGPDQQHU

6(482<$++/-81,7  $PHQGPHQW

LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2, LCO 3.0.7, LCO 3.0.8, and LCO 3.0.9.

LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.

If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required unless otherwise stated.

LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:

a. MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;
b. MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and
c. MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.

Exceptions to this Specification are stated in the individual Specifications.

Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.

LCO 3.0.3 is only applicable in MODES 1, 2, 3, and 4.

LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:

D When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicabilityfor an unlimited period of time; E After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; (exceptions to this Specification are stated in the individual Specifications;) or SEQUOYAH - UNIT 1 3.0-1 Amendment 334,

SR Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR.

Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

For Frequencies specified as "once," the above interval extension does not apply.

If a Completion Time requires periodic performance on a "once per . . ."

basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance. The delay period is only applicable when there is a reasonable expectation the surveillance will be met when performed. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.

SEQUOYAH - UNIT 1 3.0-4 Amendment 334,

Completion Times 1.3 1.0 USE AND APPLICATION 1.3 Completion Times PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.

BACKGROUND Limiting Conditions for Operation (LCOs) specify minimum requirements for ensuring safe operation of the unit. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Time(s).

DESCRIPTION The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., inoperable equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the unit is in a MODE or specified condition stated in the Applicability of the LCO.

Unless otherwise specified, the Completion Time begins when a senior licensed operator on the operating shift crew with responsibility for plant operations makes the determination that an LCO is not met and an ACTIONS Condition is entered. The "otherwise specified" exceptions are varied, such as a Required Action Note or Surveillance Requirement Note that provides an alternative time to perform specific tasks, such as testing, without starting the Completion Time. While utilizing the Note, should a Condition be applicable for any reason not addressed by the Note, the Completion Time begins. Should the time allowance in the Note be exceeded, the Completion Time begins at that point. The exceptions may also be incorporated into the Completion Time. For example, LCO 3.8.1, "AC Sources - Operating," Required Action B.2, requires declaring required feature(s) supported by an inoperable diesel generator, inoperable when the redundant required feature(s) are inoperable. The Completion Time states, "4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition B concurrent with inoperability of redundant required feature(s)." In this case the Completion Time does not begin until the conditions in the Completion Time are satisfied.

Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the unit is not within the LCO Applicability.

If situations are discovered that require entry into more than one Condition at a time within a single LCO (multiple Conditions), the Required Actions for each Condition must be performed within the associated Completion Time. When in multiple Conditions, separate Completion Times are tracked for each Condition starting from the time of discovery of the situation that required entry into the Condition, unless otherwise specified.

SEQUOYAH - UNIT 2 1.3-1 Amendment 327,

Completion Times 1.3 1.3 Completion Times DESCRIPTION (continued)

Once a Condition has been entered, subsequent trains, subsystems, components, or variables expressed in the Condition, discovered to be inoperable or not within limits, will not result in separate entry into the Condition, unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition, unless otherwise specified.

However, when a subsequent train, subsystem, component, or variable expressed in the Condition is discovered to be inoperable or not within limits, the Completion Time(s) may be extended. To apply this Completion Time extension, two criteria must first be met. The subsequent inoperability:

a. Must exist concurrent with the first inoperability and
b. Must remain inoperable or not within limits after the first inoperability is resolved.

The total Completion Time allowed for completing a Required Action to address the subsequent inoperability shall be limited to the more restrictive of either:

a. The stated Completion Time, as measured from the initial entry into the Condition, plus an additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or
b. The stated Completion Time as measured from discovery of the subsequent inoperability.

The above Completion Time extensions do not apply to those Specifications that have exceptions that allow completely separate re-entry into the Condition (for each train, subsystem, component, or variable expressed in the Condition) and separate tracking of Completion Times based on this re-entry. These exceptions are stated in individual Specifications.

The above Completion Time extension does not apply to a Completion Time with a modified "time zero." This modified "time zero" may be expressed as a repetitive time (i.e., "once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />," where the Completion Time is referenced from a previous completion of the Required Action versus the time of Condition entry) or as a time modified by the phrase "from discovery . . ."

SEQUOYAH - UNIT 2 1.3-2 Amendment 327,

Completion Times 1.3 1.3 Completion Times EXAMPLES The following examples illustrate the use of Completion Times with different types of Conditions and changing Conditions.

EXAMPLE 1.3-1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. Required B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action and associated AND Completion Time not met. B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SEQUOYAH - UNIT 2 1.3- Amendment 327,

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

&RQGLWLRQ%KDVWZR5HTXLUHG$FWLRQV(DFK5HTXLUHG$FWLRQKDVLWVRZQ

VHSDUDWH&RPSOHWLRQ7LPH(DFK&RPSOHWLRQ7LPHLVUHIHUHQFHGWRWKH

WLPHWKDW&RQGLWLRQ%LVHQWHUHG

7KH5HTXLUHG$FWLRQVRI&RQGLWLRQ%DUHWREHLQ02'(ZLWKLQKRXUV

$1'LQ02'(ZLWKLQKRXUV$WRWDORIKRXUVLVDOORZHGIRU

UHDFKLQJ02'(DQGDWRWDORIKRXUV QRWKRXUV LVDOORZHGIRU

UHDFKLQJ02'(IURPWKHWLPHWKDW&RQGLWLRQ%ZDVHQWHUHG,I02'(

LVUHDFKHGZLWKLQKRXUVWKHWLPHDOORZHGIRUUHDFKLQJ02'(LVWKH

QH[WKRXUVEHFDXVHWKHWRWDOWLPHDOORZHGIRUUHDFKLQJ02'(LV

KRXUV

,I&RQGLWLRQ%LVHQWHUHGZKLOHLQ02'(WKHWLPHDOORZHGIRUUHDFKLQJ

02'(LVWKHQH[WKRXUV

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QHSXPS $5HVWRUHSXPSWR GD\V

LQRSHUDEOH 23(5$%/(VWDWXV

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG $1'

&RPSOHWLRQ 7LPHQRWPHW  %%HLQ02'( KRXUV

KHQDSXPSLVGHFODUHGLQRSHUDEOH&RQGLWLRQ$LVHQWHUHG,IWKHSXPS

LVQRWUHVWRUHGWR23(5$%/(VWDWXVZLWKLQGD\V&RQGLWLRQ%LVDOVR

HQWHUHGDQGWKH&RPSOHWLRQ7LPHFORFNVIRU5HTXLUHG$FWLRQV%

DQG%VWDUW,IWKHLQRSHUDEOHSXPSLVUHVWRUHGWR23(5$%/(VWDWXV

DIWHU&RQGLWLRQ%LVHQWHUHG&RQGLWLRQV$DQG%DUHH[LWHGDQGWKHUHIRUH

WKH5HTXLUHG$FWLRQVRI&RQGLWLRQ%PD\EHWHUPLQDWHG

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

KHQDVHFRQGSXPSLVGHFODUHGLQRSHUDEOHZKLOHWKHILUVWSXPSLVVWLOO

LQRSHUDEOH&RQGLWLRQ$LVQRWUHHQWHUHGIRUWKHVHFRQGSXPS

/&2LVHQWHUHGVLQFHWKH$&7,216GRQRWLQFOXGHD&RQGLWLRQIRU

PRUHWKDQRQHLQRSHUDEOHSXPS7KH&RPSOHWLRQ7LPHFORFNIRU

&RQGLWLRQ$GRHVQRWVWRSDIWHU/&2LVHQWHUHGEXWFRQWLQXHVWREH

WUDFNHGIURPWKHWLPH&RQGLWLRQ$ZDVLQLWLDOO\HQWHUHG

KLOHLQ/&2LIRQHRIWKHLQRSHUDEOHSXPSVLVUHVWRUHGWR

23(5$%/(VWDWXVDQGWKH&RPSOHWLRQ7LPHIRU&RQGLWLRQ$KDVQRW

H[SLUHG/&2PD\EHH[LWHGDQGRSHUDWLRQFRQWLQXHGLQDFFRUGDQFH

ZLWK&RQGLWLRQ$

KLOHLQ/&2LIRQHRIWKHLQRSHUDEOHSXPSVLVUHVWRUHGWR

23(5$%/(VWDWXVDQGWKH&RPSOHWLRQ7LPHIRU&RQGLWLRQ$KDVH[SLUHG

/&2PD\EHH[LWHGDQGRSHUDWLRQFRQWLQXHGLQDFFRUGDQFHZLWK

&RQGLWLRQ%7KH&RPSOHWLRQ7LPHIRU&RQGLWLRQ%LVWUDFNHGIURPWKH

WLPHWKH&RQGLWLRQ$&RPSOHWLRQ7LPHH[SLUHG

2QUHVWRULQJRQHRIWKHSXPSVWR23(5$%/(VWDWXVWKH&RQGLWLRQ$

&RPSOHWLRQ7LPHLVQRWUHVHWEXWFRQWLQXHVIURPWKHWLPHWKHILUVWSXPS

ZDVGHFODUHGLQRSHUDEOH7KLV&RPSOHWLRQ7LPHPD\EHH[WHQGHGLIWKH

SXPSUHVWRUHGWR23(5$%/(VWDWXVZDVWKHILUVWLQRSHUDEOHSXPS$

KRXUH[WHQVLRQWRWKHVWDWHGGD\VLVDOORZHGSURYLGHGWKLVGRHVQRW

UHVXOWLQWKHVHFRQGSXPSEHLQJLQRSHUDEOHIRU!GD\V

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QH $5HVWRUH)XQFWLRQ; GD\V

)XQFWLRQ; WUDLQWR23(5$%/(

WUDLQ VWDWXV

LQRSHUDEOH

% 2QH  %5HVWRUH)XQFWLRQ< KRXUV

)XQFWLRQ< WUDLQWR23(5$%/(

WUDLQ VWDWXV

LQRSHUDEOH

& 2QH &5HVWRUH)XQFWLRQ; KRXUV

)XQFWLRQ; WUDLQWR23(5$%/(

WUDLQ VWDWXV

LQRSHUDEOH

25

$1'

&5HVWRUH)XQFWLRQ< KRXUV

2QH WUDLQWR23(5$%/(

)XQFWLRQ< VWDWXV

WUDLQ LQRSHUDEOH

KHQRQH)XQFWLRQ;WUDLQDQGRQH)XQFWLRQ<WUDLQDUHLQRSHUDEOH

&RQGLWLRQ$DQG&RQGLWLRQ%DUHFRQFXUUHQWO\DSSOLFDEOH7KH&RPSOHWLRQ

7LPHVIRU&RQGLWLRQ$DQG&RQGLWLRQ%DUHWUDFNHGVHSDUDWHO\IRUHDFK

WUDLQVWDUWLQJIURPWKHWLPHHDFKWUDLQZDVGHFODUHGLQRSHUDEOHDQGWKH

&RQGLWLRQZDVHQWHUHG$VHSDUDWH&RPSOHWLRQ7LPHLVHVWDEOLVKHGIRU

&RQGLWLRQ&DQGWUDFNHGIURPWKHWLPHWKHVHFRQGWUDLQZDVGHFODUHG

LQRSHUDEOH LHWKHWLPHWKHVLWXDWLRQGHVFULEHGLQ&RQGLWLRQ&ZDV

GLVFRYHUHG 

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

,I5HTXLUHG$FWLRQ&LVFRPSOHWHGZLWKLQWKHVSHFLILHG&RPSOHWLRQ7LPH

&RQGLWLRQV%DQG&DUHH[LWHG,IWKH&RPSOHWLRQ7LPHIRU5HTXLUHG

$FWLRQ$KDVQRWH[SLUHGRSHUDWLRQPD\FRQWLQXHLQDFFRUGDQFHZLWK

&RQGLWLRQ$7KHUHPDLQLQJ&RPSOHWLRQ7LPHLQ&RQGLWLRQ$LVPHDVXUHG

IURPWKHWLPHWKHDIIHFWHGWUDLQZDVGHFODUHGLQRSHUDEOH LHLQLWLDOHQWU\

LQWR&RQGLWLRQ$ 

,WLVSRVVLEOHWRDOWHUQDWHEHWZHHQ&RQGLWLRQV$%DQG&LQVXFKD

PDQQHUWKDWRSHUDWLRQFRXOGFRQWLQXHLQGHILQLWHO\ZLWKRXWHYHUUHVWRULQJ

V\VWHPVWRPHHWWKH/&2+RZHYHUGRLQJVRZRXOGEHLQFRQVLVWHQWZLWK

WKHEDVLVRIWKH&RPSOHWLRQ7LPHV7KHUHIRUHWKHUHVKDOOEH

DGPLQLVWUDWLYHFRQWUROVWROLPLWWKHPD[LPXPWLPHDOORZHGIRUDQ\

FRPELQDWLRQRI&RQGLWLRQVWKDWUHVXOWLQDVLQJOHFRQWLJXRXVRFFXUUHQFHRI

IDLOLQJWRPHHWWKH/&27KHVHDGPLQLVWUDWLYHFRQWUROVVKDOOHQVXUHWKDW

WKH&RPSOHWLRQ7LPHVIRUWKRVH&RQGLWLRQVDUHQRWLQDSSURSULDWHO\

H[WHQGHG

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QHRUPRUH $5HVWRUHYDOYH V WR KRXUV

YDOYHV 23(5$%/(VWDWXV

LQRSHUDEOH

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG $1'

&RPSOHWLRQ 7LPHQRWPHW  %%HLQ02'( KRXUV

$VLQJOH&RPSOHWLRQ7LPHLVXVHGIRUDQ\QXPEHURIYDOYHVLQRSHUDEOHDW

WKHVDPHWLPH7KH&RPSOHWLRQ7LPHDVVRFLDWHGZLWK&RQGLWLRQ$LV

EDVHGRQWKHLQLWLDOHQWU\LQWR&RQGLWLRQ$DQGLVQRWWUDFNHGRQDSHU

YDOYHEDVLV'HFODULQJVXEVHTXHQWYDOYHVLQRSHUDEOHZKLOH&RQGLWLRQ$

LVVWLOOLQHIIHFWGRHVQRWWULJJHUWKHWUDFNLQJRIVHSDUDWH&RPSOHWLRQ

7LPHV

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



 &RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

2QFHRQHRIWKHYDOYHVKDVEHHQUHVWRUHGWR23(5$%/(VWDWXVWKH

&RQGLWLRQ$&RPSOHWLRQ7LPHLVQRWUHVHWEXWFRQWLQXHVIURPWKHWLPHWKH

ILUVWYDOYHZDVGHFODUHGLQRSHUDEOH7KH&RPSOHWLRQ7LPHPD\EH

H[WHQGHGLIWKHYDOYHUHVWRUHGWR23(5$%/(VWDWXVZDVWKHILUVW

LQRSHUDEOHYDOYH7KH&RQGLWLRQ$&RPSOHWLRQ7LPHPD\EHH[WHQGHGIRU

XSWRKRXUVSURYLGHGWKLVGRHVQRWUHVXOWLQDQ\VXEVHTXHQWYDOYHEHLQJ

LQRSHUDEOHIRU!KRXUV

,IWKH&RPSOHWLRQ7LPHRIKRXUV LQFOXGLQJWKHH[WHQVLRQ H[SLUHVZKLOH

RQHRUPRUHYDOYHVDUHVWLOOLQRSHUDEOH&RQGLWLRQ%LVHQWHUHG

(;$03/(

$&7,216

127(

6HSDUDWH&RQGLWLRQHQWU\LVDOORZHGIRUHDFKLQRSHUDEOHYDOYH



&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QHRUPRUH $5HVWRUHYDOYH V WR KRXUV

YDOYHV 23(5$%/(VWDWXV

LQRSHUDEOH

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG $1'

&RPSOHWLRQ 7LPHQRWPHW  %%HLQ02'( KRXUV

7KH1RWHDERYHWKH$&7,2167DEOHLVDPHWKRGRIPRGLI\LQJKRZWKH

&RPSOHWLRQ7LPHLVWUDFNHG,IWKLVPHWKRGRIPRGLI\LQJKRZWKH

&RPSOHWLRQ7LPHLVWUDFNHGZDVDSSOLFDEOHRQO\WRDVSHFLILF&RQGLWLRQ

WKH1RWHZRXOGDSSHDULQWKDW&RQGLWLRQUDWKHUWKDQDWWKHWRSRIWKH

$&7,2167DEOH

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



 &RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

7KH1RWHDOORZV&RQGLWLRQ$WREHHQWHUHGVHSDUDWHO\IRUHDFKLQRSHUDEOH

YDOYHDQG&RPSOHWLRQ7LPHVWUDFNHGRQDSHUYDOYHEDVLV:KHQDYDOYH

LVGHFODUHGLQRSHUDEOH&RQGLWLRQ$LVHQWHUHGDQGLWV&RPSOHWLRQ7LPH

VWDUWV,IVXEVHTXHQWYDOYHVDUHGHFODUHGLQRSHUDEOH&RQGLWLRQ$LV

HQWHUHGIRUHDFKYDOYHDQGVHSDUDWH&RPSOHWLRQ7LPHVVWDUWDQGDUH

WUDFNHGIRUHDFKYDOYH

,IWKH&RPSOHWLRQ7LPHDVVRFLDWHGZLWKDYDOYHLQ&RQGLWLRQ$H[SLUHV

&RQGLWLRQ%LVHQWHUHGIRUWKDWYDOYH,IWKH&RPSOHWLRQ7LPHVDVVRFLDWHG

ZLWKVXEVHTXHQWYDOYHVLQ&RQGLWLRQ$H[SLUH&RQGLWLRQ%LVHQWHUHG

VHSDUDWHO\IRUHDFKYDOYHDQGVHSDUDWH&RPSOHWLRQ7LPHVVWDUWDQGDUH

WUDFNHGIRUHDFKYDOYH,IDYDOYHWKDWFDXVHGHQWU\LQWR&RQGLWLRQ%LV

UHVWRUHGWR23(5$%/(VWDWXV&RQGLWLRQ%LVH[LWHGIRUWKDWYDOYH

6LQFHWKH1RWHLQWKLVH[DPSOHDOORZVPXOWLSOH&RQGLWLRQHQWU\DQG

WUDFNLQJRIVHSDUDWH&RPSOHWLRQ7LPHV&RPSOHWLRQ7LPHH[WHQVLRQVGR

QRWDSSO\

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QHFKDQQHO $3HUIRUP65[[[ 2QFHSHUKRXUV

LQRSHUDEOH

25

$5HGXFH7+(50$/ KRXUV

32:(5WR

573

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG

&RPSOHWLRQ 7LPHQRWPHW

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



 &RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

(QWU\LQWR&RQGLWLRQ$RIIHUVDFKRLFHEHWZHHQ5HTXLUHG$FWLRQ$

RU$5HTXLUHG$FWLRQ$KDVDRQFHSHU&RPSOHWLRQ7LPHZKLFK

TXDOLILHVIRUWKHH[WHQVLRQSHU65WRHDFKSHUIRUPDQFHDIWHU

WKHLQLWLDOSHUIRUPDQFH7KHLQLWLDOKRXULQWHUYDORI5HTXLUHG$FWLRQ$

EHJLQVZKHQ&RQGLWLRQ$LVHQWHUHGDQGWKHLQLWLDOSHUIRUPDQFHRI

5HTXLUHG$FWLRQ$PXVWEHFRPSOHWHZLWKLQWKHILUVWKRXULQWHUYDO,I

5HTXLUHG$FWLRQ$LVIROORZHGDQGWKH5HTXLUHG$FWLRQLVQRWPHWZLWKLQ

WKH&RPSOHWLRQ7LPH SOXVWKHH[WHQVLRQDOORZHGE\65 

&RQGLWLRQ%LVHQWHUHG,I5HTXLUHG$FWLRQ$LVIROORZHGDQGWKH

&RPSOHWLRQ7LPHRIKRXUVLVQRWPHW&RQGLWLRQ%LVHQWHUHG

,IDIWHUHQWU\LQWR&RQGLWLRQ%5HTXLUHG$FWLRQ$RU$LVPHW

&RQGLWLRQ%LVH[LWHGDQGRSHUDWLRQPD\WKHQFRQWLQXHLQ&RQGLWLRQ$

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QH $9HULI\DIIHFWHG KRXU

VXEV\VWHP VXEV\VWHPLVRODWHG

LQRSHUDEOH $1'

2QFHSHUKRXUV

WKHUHDIWHU

$1'

$5HVWRUHVXEV\VWHP KRXUV

WR23(5$%/(

VWDWXV

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG $1'

&RPSOHWLRQ 7LPHQRWPHW  %%HLQ02'( KRXUV

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



 &RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

5HTXLUHG$FWLRQ$KDVWZR&RPSOHWLRQ7LPHV7KHKRXU&RPSOHWLRQ

7LPHEHJLQVDWWKHWLPHWKH&RQGLWLRQLVHQWHUHGDQGHDFK2QFHSHU

KRXUVWKHUHDIWHULQWHUYDOEHJLQVXSRQSHUIRUPDQFHRI5HTXLUHG

$FWLRQ$

,IDIWHU&RQGLWLRQ$LVHQWHUHG5HTXLUHG$FWLRQ$LVQRWPHWZLWKLQHLWKHU

WKHLQLWLDOKRXURUDQ\VXEVHTXHQWKRXULQWHUYDOIURPWKHSUHYLRXV

SHUIRUPDQFH SOXVWKHH[WHQVLRQDOORZHGE\65 &RQGLWLRQ%LV

HQWHUHG7KH&RPSOHWLRQ7LPHFORFNIRU&RQGLWLRQ$GRHVQRWVWRSDIWHU

&RQGLWLRQ%LVHQWHUHGEXWFRQWLQXHVIURPWKHWLPH&RQGLWLRQ$ZDV

LQLWLDOO\HQWHUHG,I5HTXLUHG$FWLRQ$LVPHWDIWHU&RQGLWLRQ%LV

HQWHUHG&RQGLWLRQ%LVH[LWHGDQGRSHUDWLRQPD\FRQWLQXHLQDFFRUGDQFH

ZLWK&RQGLWLRQ$SURYLGHGWKH&RPSOHWLRQ7LPHIRU5HTXLUHG$FWLRQ$

KDVQRWH[SLUHG

,00(',$7( :KHQ,PPHGLDWHO\LVXVHGDVD&RPSOHWLRQ7LPHWKH5HTXLUHG$FWLRQ

&203/(7,217,0( VKRXOGEHSXUVXHGZLWKRXWGHOD\DQGLQDFRQWUROOHGPDQQHU

6(482<$++/-81,7  $PHQGPHQW

LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2, LCO 3.0.7, LCO 3.0.8, and LCO 3.0.9.

LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.

If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required unless otherwise stated.

LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:

a. MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;
b. MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and
c. MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.

Exceptions to this Specification are stated in the individual Specifications.

Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.

LCO 3.0.3 is only applicable in MODES 1, 2, 3, and 4.

LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:

D When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicabilityfor an unlimited period of time; E After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; (exceptions to this Specification are stated in the individual Specifications;) or SEQUOYAH - UNIT 2 3.0-1 Amendment 327,

SR Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR.

Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

For Frequencies specified as "once," the above interval extension does not apply.

If a Completion Time requires periodic performance on a "once per . . ."

basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance. The delay period is only applicable when there is a reasonable expectation the surveillance will be met when performed. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.

SEQUOYAH - UNIT 2 3.0-4 Amendment 327,

Enclosure Attachment 1.

Proposed TS Changes (Markups)

Watts Bar Nuclear Plant, Units 1 and 2 CNL-22-008

Completion Times 1.3 1.3 Completion Times 1.0 USE AND APPLICATION 1.3 Completion Times PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.

BACKGROUND Limiting Conditions for Operation (LCOs) specify minimum requirements for ensuring safe operation of the unit. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Time(s).

DESCRIPTION The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., inoperable equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the unit is in a MODE or specified condition stated in the Applicability of the LCO.

Unless otherwise specified, the Completion Time begins when a senior licensed operator on the operating shift crew with responsibility for plant operations makes the determination that an LCO is not met and an ACTIONS Condition is entered.

The "otherwise specified" exceptions are varied, such as a Required Action Note or Surveillance Requirement Note that provides an alternative time to perform specific tasks, such as testing, without starting the Completion Time. While utilizing the Note, should a Condition be applicable for any reason not addressed by the Note, the Completion Time begins. Should the time allowance in the Note be exceeded, the Completion Time begins at that point. The exceptions may also be incorporated into the Completion Time. For example, LCO 3.8.1, "AC Sources - Operating," Required Action B., requires declaring required feature(s) supported by an inoperable diesel generator, inoperable when the redundant required feature(s) are inoperable. The Completion Time states, "4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition B concurrent with inoperability of redundant required feature(s)." In this case the Completion Time does not begin until the conditions in the Completion Time are satisfied.

Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the unit is not within the LCO Applicability.

If situations are discovered that require entry into more than one Condition at a time within a single LCO (multiple Conditions), the Required Actions for each (continued)

Watts Bar-Unit 1 1.3-1 $PHQGPHQW

Completion Times 1.3 1.3 Completion Times DESCRIPTION Condition must be performed within the associated Completion Time. When in (continued) multiple Conditions, separate Completion Times are tracked for each Condition starting from the time of discovery of the situation that required entry into the Condition, unless otherwise specified.

Once a Condition has been entered, subsequent trains, subsystems, components, or variables expressed in the Condition, discovered to be inoperable or not within limits, will not result in separate entry into the Condition, unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition, unless otherwise specified.

However, when a subsequent train, subsystem, component, or variable expressed in the Condition is discovered to be inoperable or not within limits, the Completion Time(s) may be extended. To apply this Completion Time extension, two criteria must first be met. The subsequent inoperability:

a. Must exist concurrent with the first inoperability; and
b. Must remain inoperable or not within limits after the first inoperability is resolved.

The total Completion Time allowed for completing a Required Action to address the subsequent inoperability shall be limited to the more restrictive of either:

a. The stated Completion Time, as measured from the initial entry into the Condition, plus an additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; or
b. The stated Completion Time as measured from discovery of the subsequent inoperability.

The above Completion Time extensions do not apply to those Specifications that have exceptions that allow completely separate re-entry into the Condition (for each train, subsystem, component, or variable expressed in the Condition) and separate tracking of Completion Times based on this re-entry. These exceptions are stated in individual Specifications.

The above Completion Time extension does not apply to a Completion Time with a modified "time zero." This modified "time zero" may be expressed as a repetitive time (i.e., "once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />," where the Completion Time is referenced from a previous completion of the Required Action versus the time of Condition entry) or as a time modified by the phrase "from discovery . . ." Example 1.3-3 illustrates one use of this type of Completion Time. The 10 day Completion Time specified for Conditions A and B in Example 1.3-3 may not be extended.

(continued)

Watts Bar-Unit 1 1.3-2 $PHQGPHQW

LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.4 b. After performance of a risk assessment addressing inoperable (continued) systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate (; exceptions to this Specification are stated in the individual Specifications,); or

c. When an allowance is stated in the individual value, parameter, or other Specification.

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.

LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered. Only the support system LCO ACTIONS are required to be entered. This is an exception to LCO 3.0.2 for the supported system. In this event, additional evaluations and limitations may be required in accordance with Specification 5.7.2.18, "Safety Function Determination Program (SFDP)." If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.

(continued)

Watts Bar-Unit 1 3.0-2 Amendment 55,

SR Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3.

Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

For Frequencies specified as "once," the above interval extension does not apply.

If a Completion Time requires periodic performance on a "once per . . ." basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance. The delay period is only applicable when there is a reasonable expectation the surveillance will be met when performed. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

(continued)

Watts Bar-Unit 1 3.0-4 Amendment 42, 114, 121, 135,

Completion Times 1.3 1.3 Completion Times 1.0 USE AND APPLICATION 1.3 Completion Times PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.

BACKGROUND Limiting Conditions for Operation (LCOs) specify minimum requirements for ensuring safe operation of the unit. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Time(s).

DESCRIPTION The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., inoperable equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the unit is in a MODE or specified condition stated in the Applicability of the LCO.

Unless otherwise specified, the Completion Time begins when a senior licensed operator on the operating shift crew with responsibility for plant operations makes the determination that an LCO is not met and an ACTIONS Condition is entered. The "otherwise specified" exceptions are varied, such as a Required Action Note or Surveillance Requirement Note that provides an alternative time to perform specific tasks, such as testing, without starting the Completion Time. While utilizing the Note, should a Condition be applicable for any reason not addressed by the Note, the Completion Time begins. Should the time allowance in the Note be exceeded, the Completion Time begins at that point. The exceptions may also be incorporated into the Completion Time. For example, LCO 3.8.1, "AC Sources - Operating," Required Action B., requires declaring required feature(s) supported by an inoperable diesel generator, inoperable when the redundant required feature(s) are inoperable. The Completion Time states, "4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition B concurrent with inoperability of redundant required feature(s)." In this case the Completion Time does not begin until the conditions in the Completion Time are satisfied.

Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the unit is not within the LCO Applicability.

(continued)

Watts Bar - Unit 2 1.3-1 $PHQGPHQW

Completion Times 1.3 1.3 Completion Times DESCRIPTION If situations are discovered that require entry into more than one (continued) Condition at a time within a single LCO (multiple Conditions), the Required Actions for each Condition must be performed within the associated Completion Time. When in multiple Conditions, separate Completion Times are tracked for each Condition starting from the time of discovery of the situation that required entry into the Condition, unless otherwise specified.

Once a Condition has been entered, subsequent trains, subsystems, components, or variables expressed in the Condition, discovered to be inoperable or not within limits, will not result in separate entry into the Condition, unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition, unless otherwise specified.

(continued)

Watts Bar - Unit 2 1.3-2 $PHQGPHQW

Completion Times 1.3 1.3 Completion Times However, when a subsequent train, subsystem, component, or variable expressed in the Condition is discovered to be inoperable or not within limits, the Completion Time(s) may be extended. To apply this Completion Time extension, two criteria must first be met. The subsequent inoperability:

a. Must exist concurrent with the first inoperability; and
b. Must remain inoperable or not within limits after the first inoperability is resolved.

The total Completion Time allowed for completing a Required Action to address the subsequent inoperability shall be limited to the more restrictive of either:

a. The stated Completion Time, as measured from the initial entry into the Condition, plus an additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; or
b. The stated Completion Time as measured from discovery of the subsequent inoperability.

The above Completion Time extensions do not apply to those Specifications that have exceptions that allow completely separate re-entry into the Condition (for each train, subsystem, component, or variable expressed in the Condition) and separate tracking of Completion Times based on this re-entry. These exceptions are stated in individual Specifications.

The above Completion Time extension does not apply to a Completion Time with a modified "time zero." This modified "time zero" may be expressed as a repetitive time (i.e., "once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />," where the Completion Time is referenced from a previous completion of the Required Action versus the time of Condition entry) or as a time modified by the phrase "from discovery . . ." Example 1.3-3 illustrates one use of this type of Completion Time. The 10 day Completion Time specified for Conditions A and B in Example 1.3-3 may not be extended.

(continued)

Watts Bar - Unit 2 1.3-2a $PHQGPHQW

LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.4 b. After performance of a risk assessment addressing inoperable (continued) systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; (exceptions to this Specification are stated in the individual Specifications),; or

c. When an allowance is stated in the individual value, parameter, or other Specification.

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.

LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered.

Only the support system LCO ACTIONS are required to be entered.

This is an exception to LCO 3.0.2 for the supported system. In this event, additional evaluations and limitations may be required in accordance with Specification 5.7.2.18, "Safety Function Determination Program (SFDP)." If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.

When a support system's Required Action directs a supported system to be declared inoperable or directs entry into Conditions and Required Actions for a supported system, the applicable Conditions and Required Actions shall be entered in accordance with LCO 3.0.2.

(continued)

Watts Bar - Unit 2 3.0-2 $PHQGPHQW

SR Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR.

Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

For Frequencies specified as "once," the above interval extension does not apply.

If a Completion Time requires periodic performance on a "once per . . ."

basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance. The delay period is only applicable when there is a reasonable expectation the surveillance will be met when performed. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

(continued)

Watts Bar - Unit 2 3.0-4 Amendment 3, 12, 39,

Enclosure Attachment 2.1 Proposed TS Changes (Final Typed)

Browns Ferry Nuclear Plant, Units 1, 2, and 3 CNL-22-008

&RPSOHWLRQ7LPHV



86($1'$33/,&$7,21

&RPSOHWLRQ7LPHV

385326( 7KHSXUSRVHRIWKLVVHFWLRQLVWRHVWDEOLVKWKH&RPSOHWLRQ7LPH

FRQYHQWLRQDQGWRSURYLGHJXLGDQFHIRULWVXVH

%$&.*5281' /LPLWLQJ&RQGLWLRQVIRU2SHUDWLRQ /&2V VSHFLI\PLQLPXPUHTXLUHPHQWV

IRUHQVXULQJVDIHRSHUDWLRQRIWKHXQLW7KH$&7,216DVVRFLDWHGZLWKDQ

/&2VWDWH&RQGLWLRQVWKDWW\SLFDOO\GHVFULEHWKHZD\VLQZKLFKWKH

UHTXLUHPHQWVRIWKH/&2FDQIDLOWREHPHW6SHFLILHGZLWKHDFKVWDWHG

&RQGLWLRQDUH5HTXLUHG$FWLRQ V DQG&RPSOHWLRQ7LPHV V 

'(6&5,37,21 7KH&RPSOHWLRQ7LPHLVWKHDPRXQWRIWLPHDOORZHGIRUFRPSOHWLQJD

5HTXLUHG$FWLRQ,WLVUHIHUHQFHGWRWKHGLVFRYHU\RIDVLWXDWLRQ HJ

LQRSHUDEOHHTXLSPHQWRUYDULDEOHQRWZLWKLQOLPLWV WKDWUHTXLUHVHQWHULQJ

DQ$&7,216&RQGLWLRQXQOHVVRWKHUZLVHVSHFLILHGSURYLGLQJWKHXQLWLVLQ

D02'(RUVSHFLILHGFRQGLWLRQVWDWHGLQWKH$SSOLFDELOLW\RIWKH/&2

8QOHVVRWKHUZLVHVSHFLILHGWKH&RPSOHWLRQ7LPHEHJLQVZKHQDVHQLRU

OLFHQVHGRSHUDWRURQWKHRSHUDWLQJVKLIWFUHZZLWKUHVSRQVLELOLW\IRUSODQW

RSHUDWLRQVPDNHVWKHGHWHUPLQDWLRQWKDWDQ/&2LVQRWPHWDQGDQ

$&7,216&RQGLWLRQLVHQWHUHG7KHRWKHUZLVHVSHFLILHGH[FHSWLRQVDUH

YDULHGVXFKDVD5HTXLUHG$FWLRQ1RWHRU6XUYHLOODQFH5HTXLUHPHQW

1RWHWKDWSURYLGHVDQDOWHUQDWLYHWLPHWRSHUIRUPVSHFLILFWDVNVVXFKDV

WHVWLQJZLWKRXWVWDUWLQJWKH&RPSOHWLRQ7LPH:KLOHXWLOL]LQJWKH1RWH

VKRXOGD&RQGLWLRQEHDSSOLFDEOHIRUDQ\UHDVRQQRWDGGUHVVHGE\WKH

1RWHWKH&RPSOHWLRQ7LPHEHJLQV6KRXOGWKHWLPHDOORZDQFHLQWKH

1RWHEHH[FHHGHGWKH&RPSOHWLRQ7LPHEHJLQVDWWKDWSRLQW7KH

H[FHSWLRQVPD\DOVREHLQFRUSRUDWHGLQWRWKH&RPSOHWLRQ7LPH)RU

H[DPSOH/&2$&6RXUFHV2SHUDWLQJ5HTXLUHG$FWLRQ%

UHTXLUHVGHFODULQJUHTXLUHGIHDWXUH V VXSSRUWHGE\DQLQRSHUDEOHGLHVHO

JHQHUDWRULQRSHUDEOHZKHQWKHUHGXQGDQWUHTXLUHGIHDWXUH V DUH

LQRSHUDEOH7KH&RPSOHWLRQ7LPHVWDWHVKRXUVIURPGLVFRYHU\RI

&RQGLWLRQ%FRQFXUUHQWZLWKLQRSHUDELOLW\RIUHGXQGDQWUHTXLUHG

IHDWXUH V ,QWKLVFDVHWKH&RPSOHWLRQ7LPHGRHVQRWEHJLQXQWLOWKH

FRQGLWLRQVLQWKH&RPSOHWLRQ7LPHDUHVDWLVILHG

5HTXLUHG$FWLRQVPXVWEHFRPSOHWHGSULRUWRWKHH[SLUDWLRQRIWKH

VSHFLILHG&RPSOHWLRQ7LPH$Q$&7,216&RQGLWLRQUHPDLQVLQHIIHFW

DQGWKH5HTXLUHG$FWLRQVDSSO\XQWLOWKH&RQGLWLRQQRORQJHUH[LVWVRUWKH

XQLWLVQRWZLWKLQWKH/&2$SSOLFDELOLW\

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

'(6&5,37,21 ,IVLWXDWLRQVDUHGLVFRYHUHGWKDWUHTXLUHHQWU\LQWRPRUHWKDQRQH

 FRQWLQXHG  &RQGLWLRQDWDWLPHZLWKLQDVLQJOH/&2 PXOWLSOH&RQGLWLRQV WKH

5HTXLUHG$FWLRQVIRUHDFK&RQGLWLRQPXVWEHSHUIRUPHGZLWKLQWKH

DVVRFLDWHG&RPSOHWLRQ7LPH:KHQLQPXOWLSOH&RQGLWLRQVVHSDUDWH

&RPSOHWLRQ7LPHVDUHWUDFNHGIRUHDFK&RQGLWLRQVWDUWLQJIURPWKH

GLVFRYHU\RIWKHVLWXDWLRQWKDWUHTXLUHGHQWU\LQWRWKH&RQGLWLRQXQOHVV

RWKHUZLVHVSHFLILHG

2QFHD&RQGLWLRQKDVEHHQHQWHUHGVXEVHTXHQWGLYLVLRQV

VXEV\VWHPVFRPSRQHQWVRUYDULDEOHVH[SUHVVHGLQWKH&RQGLWLRQ

GLVFRYHUHGWREHLQRSHUDEOHRUQRWZLWKLQOLPLWVZLOOQRWUHVXOWLQVHSDUDWH

HQWU\LQWRWKH&RQGLWLRQXQOHVVVSHFLILFDOO\VWDWHG7KH5HTXLUHG$FWLRQV

RIWKH&RQGLWLRQFRQWLQXHWRDSSO\WRHDFKDGGLWLRQDOIDLOXUHZLWK

&RPSOHWLRQ7LPHVEDVHGRQLQLWLDOHQWU\LQWRWKH&RQGLWLRQXQOHVV

RWKHUZLVHVSHFLILHG

+RZHYHUZKHQDVXEVHTXHQWGLYLVLRQVXEV\VWHPFRPSRQHQWRU

YDULDEOHH[SUHVVHGLQWKH&RQGLWLRQLVGLVFRYHUHGWREHLQRSHUDEOHRUQRW

ZLWKLQOLPLWVWKH&RPSOHWLRQ7LPH V PD\EHH[WHQGHG7RDSSO\WKLV

&RPSOHWLRQ7LPHH[WHQVLRQWZRFULWHULDPXVWILUVWEHPHW7KH

VXEVHTXHQWLQRSHUDELOLW\

D 0XVWH[LVWFRQFXUUHQWZLWKWKHILUVWLQRSHUDELOLW\DQG E 0XVWUHPDLQLQRSHUDEOHRUQRWZLWKLQOLPLWVDIWHUWKHILUVWLQRSHUDELOLW\

LVUHVROYHG

7KHWRWDO&RPSOHWLRQ7LPHDOORZHGIRUFRPSOHWLQJD5HTXLUHG$FWLRQWR

DGGUHVVWKHVXEVHTXHQWLQRSHUDELOLW\VKDOOEHOLPLWHGWRWKHPRUH

UHVWULFWLYHRIHLWKHU

D 7KHVWDWHG&RPSOHWLRQ7LPHDVPHDVXUHGIURPWKHLQLWLDOHQWU\LQWR WKH&RQGLWLRQSOXVDQDGGLWLRQDOKRXUVRU E 7KHVWDWHG&RPSOHWLRQ7LPHDVPHDVXUHGIURPGLVFRYHU\RIWKH VXEVHTXHQWLQRSHUDELOLW\

7KHDERYH&RPSOHWLRQ7LPHH[WHQVLRQVGRQRWDSSO\WRWKRVH

6SHFLILFDWLRQVWKDWKDYHH[FHSWLRQVWKDWDOORZFRPSOHWHO\VHSDUDWH

UHHQWU\LQWRWKH&RQGLWLRQ IRUHDFKGLYLVLRQVXEV\VWHPFRPSRQHQWRU

YDULDEOHH[SUHVVHGLQWKH&RQGLWLRQ DQGVHSDUDWHWUDFNLQJRI&RPSOHWLRQ

7LPHVEDVHGRQWKLVUHHQWU\7KHVHH[FHSWLRQVDUHVWDWHGLQLQGLYLGXDO

6SHFLILFDWLRQV

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

/&2$SSOLFDELOLW\



/&2$33/,&$%,/,7< FRQWLQXHG 

/&2 :KHQDQ/&2LVQRWPHWHQWU\LQWRD02'(RURWKHUVSHFLILHG

FRQGLWLRQLQWKH$SSOLFDELOLW\VKDOORQO\EHPDGH

D :KHQWKHDVVRFLDWHG$&7,216WREHHQWHUHGSHUPLWFRQWLQXHG RSHUDWLRQLQWKH02'(RURWKHUVSHFLILHGFRQGLWLRQLQWKH

$SSOLFDELOLW\IRUDQXQOLPLWHGSHULRGRIWLPH

E $IWHUSHUIRUPDQFHRIDULVNDVVHVVPHQWDGGUHVVLQJLQRSHUDEOH V\VWHPVDQGFRPSRQHQWVFRQVLGHUDWLRQRIWKHUHVXOWV

GHWHUPLQDWLRQRIWKHDFFHSWDELOLW\RIHQWHULQJWKH02'(RU RWKHUVSHFLILHGFRQGLWLRQLQWKH$SSOLFDELOLW\DQGHVWDEOLVKPHQW RIULVNPDQDJHPHQWDFWLRQVLIDSSURSULDWH H[FHSWLRQVWRWKLV 6SHFLILFDWLRQDUHVWDWHGLQWKHLQGLYLGXDO6SHFLILFDWLRQV RU F :KHQDQDOORZDQFHLVVWDWHGLQWKHLQGLYLGXDOYDOXHSDUDPHWHU

RURWKHU6SHFLILFDWLRQ

7KLV6SHFLILFDWLRQVKDOOQRWSUHYHQWFKDQJHVLQ02'(6RURWKHU

VSHFLILHGFRQGLWLRQVLQWKH$SSOLFDELOLW\WKDWDUHUHTXLUHGWRFRPSO\

ZLWK$&7,216RUWKDWDUHSDUWRIDVKXWGRZQRIWKHXQLW

/&2 (TXLSPHQWUHPRYHGIURPVHUYLFHRUGHFODUHGLQRSHUDEOHWRFRPSO\

ZLWK$&7,216PD\EHUHWXUQHGWRVHUYLFHXQGHUDGPLQLVWUDWLYH

FRQWUROVROHO\WRSHUIRUPWHVWLQJUHTXLUHGWRGHPRQVWUDWHLWV

23(5$%,/,7<RUWKH23(5$%,/,7<RIRWKHUHTXLSPHQW7KLVLVDQ

H[FHSWLRQWR/&2IRUWKHV\VWHPUHWXUQHGWRVHUYLFHXQGHU

DGPLQLVWUDWLYHFRQWUROWRSHUIRUPWKHWHVWLQJUHTXLUHGWR

GHPRQVWUDWH23(5$%,/,7<

/&2 :KHQDVXSSRUWHGV\VWHP/&2LVQRWPHWVROHO\GXHWRDVXSSRUW

V\VWHP/&2QRWEHLQJPHWWKH&RQGLWLRQVDQG5HTXLUHG$FWLRQV

DVVRFLDWHGZLWKWKLVVXSSRUWHGV\VWHPDUHQRWUHTXLUHGWREH

HQWHUHG2QO\WKHVXSSRUWV\VWHP/&2$&7,216DUHUHTXLUHGWR

EHHQWHUHG7KLVLVDQH[FHSWLRQWR/&2IRUWKHVXSSRUWHG

V\VWHP,QWKLVHYHQWDQHYDOXDWLRQVKDOOEHSHUIRUPHGLQ

DFFRUGDQFHZLWK6SHFLILFDWLRQ6DIHW\)XQFWLRQ

'HWHUPLQDWLRQ3URJUDP 6)'3 ,IDORVVRIVDIHW\IXQFWLRQLV

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

65$SSOLFDELOLW\



6859(,//$1&(5(48,5(0(17 65 $33/,&$%,/,7<

65 65VVKDOOEHPHWGXULQJWKH02'(6RURWKHUVSHFLILHGFRQGLWLRQV

LQWKH$SSOLFDELOLW\IRULQGLYLGXDO/&2VXQOHVVRWKHUZLVHVWDWHGLQ

WKH65)DLOXUHWRPHHWD6XUYHLOODQFHZKHWKHUVXFKIDLOXUHLV

H[SHULHQFHGGXULQJWKHSHUIRUPDQFHRIWKH6XUYHLOODQFHRUEHWZHHQ

SHUIRUPDQFHVRIWKH6XUYHLOODQFHVKDOOEHIDLOXUHWRPHHWWKH/&2

)DLOXUHWRSHUIRUPD6XUYHLOODQFHZLWKLQWKHVSHFLILHG)UHTXHQF\

VKDOOEHIDLOXUHWRPHHWWKH/&2H[FHSWDVSURYLGHGLQ65

6XUYHLOODQFHVGRQRWKDYHWREHSHUIRUPHGRQLQRSHUDEOH

HTXLSPHQWRUYDULDEOHVRXWVLGHVSHFLILHGOLPLWV

65 7KHVSHFLILHG)UHTXHQF\IRUHDFK65LVPHWLIWKH6XUYHLOODQFHLV

SHUIRUPHGZLWKLQWLPHVWKHLQWHUYDOVSHFLILHGLQWKH)UHTXHQF\

DVPHDVXUHGIURPWKHSUHYLRXVSHUIRUPDQFHRUDVPHDVXUHGIURP

WKHWLPHDVSHFLILHGFRQGLWLRQRIWKH)UHTXHQF\LVPHW

)RU)UHTXHQFLHVVSHFLILHGDVRQFHWKHDERYHLQWHUYDOH[WHQVLRQ

GRHVQRWDSSO\,ID&RPSOHWLRQ7LPHUHTXLUHVSHULRGLF

SHUIRUPDQFHRQDRQFHSHUEDVLVWKHDERYH)UHTXHQF\

H[WHQVLRQDSSOLHVWRHDFKSHUIRUPDQFHDIWHUWKHLQLWLDOSHUIRUPDQFH

([FHSWLRQVWRWKLV6SHFLILFDWLRQDUHVWDWHGLQWKHLQGLYLGXDO

6SHFLILFDWLRQV

65 ,ILWLVGLVFRYHUHGWKDWD6XUYHLOODQFHZDVQRWSHUIRUPHGZLWKLQLWV

VSHFLILHG)UHTXHQF\WKHQFRPSOLDQFHZLWKWKHUHTXLUHPHQWWR

GHFODUHWKH/&2QRWPHWPD\EHGHOD\HGIURPWKHWLPHRI

GLVFRYHU\XSWRKRXUVRUXSWRWKHOLPLWRIWKHVSHFLILHG

)UHTXHQF\ZKLFKHYHULVJUHDWHU7KLVGHOD\SHULRGLVSHUPLWWHGWR

DOORZSHUIRUPDQFHRIWKH6XUYHLOODQFH7KHGHOD\SHULRGLVRQO\

DSSOLFDEOHZKHQWKHUHLVDUHDVRQDEOHH[SHFWDWLRQWKH6XUYHLOODQFH

ZLOOEHPHWZKHQSHUIRUPHG$ULVNHYDOXDWLRQVKDOOEHSHUIRUPHG

IRUDQ\6XUYHLOODQFHGHOD\HGJUHDWHUWKDQKRXUVDQGWKHULVN

LPSDFWVKDOOEHPDQDJHG

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

&RPSOHWLRQ7LPHV



86($1'$33/,&$7,21

&RPSOHWLRQ7LPHV

385326( 7KHSXUSRVHRIWKLVVHFWLRQLVWRHVWDEOLVKWKH&RPSOHWLRQ7LPH

FRQYHQWLRQDQGWRSURYLGHJXLGDQFHIRULWVXVH

%$&.*5281' /LPLWLQJ&RQGLWLRQVIRU2SHUDWLRQ /&2V VSHFLI\PLQLPXPUHTXLUHPHQWV

IRUHQVXULQJVDIHRSHUDWLRQRIWKHXQLW7KH$&7,216DVVRFLDWHGZLWKDQ

/&2VWDWH&RQGLWLRQVWKDWW\SLFDOO\GHVFULEHWKHZD\VLQZKLFKWKH

UHTXLUHPHQWVRIWKH/&2FDQIDLOWREHPHW6SHFLILHGZLWKHDFKVWDWHG

&RQGLWLRQDUH5HTXLUHG$FWLRQ V DQG&RPSOHWLRQ7LPHV V 

'(6&5,37,21 7KH&RPSOHWLRQ7LPHLVWKHDPRXQWRIWLPHDOORZHGIRUFRPSOHWLQJD

5HTXLUHG$FWLRQ,WLVUHIHUHQFHGWRWKHGLVFRYHU\RIDVLWXDWLRQ HJ

LQRSHUDEOHHTXLSPHQWRUYDULDEOHQRWZLWKLQOLPLWV WKDWUHTXLUHVHQWHULQJ

DQ$&7,216&RQGLWLRQXQOHVVRWKHUZLVHVSHFLILHGSURYLGLQJWKHXQLWLVLQ

D02'(RUVSHFLILHGFRQGLWLRQVWDWHGLQWKH$SSOLFDELOLW\RIWKH/&2

8QOHVVRWKHUZLVHVSHFLILHGWKH&RPSOHWLRQ7LPHEHJLQVZKHQDVHQLRU

OLFHQVHGRSHUDWRURQWKHRSHUDWLQJVKLIWFUHZZLWKUHVSRQVLELOLW\IRUSODQW

RSHUDWLRQVPDNHVWKHGHWHUPLQDWLRQWKDWDQ/&2LVQRWPHWDQGDQ

$&7,216&RQGLWLRQLVHQWHUHG7KHRWKHUZLVHVSHFLILHGH[FHSWLRQVDUH

YDULHGVXFKDVD5HTXLUHG$FWLRQ1RWHRU6XUYHLOODQFH5HTXLUHPHQW1RWH

WKDWSURYLGHVDQDOWHUQDWLYHWLPHWRSHUIRUPVSHFLILFWDVNVVXFKDV

WHVWLQJZLWKRXWVWDUWLQJWKH&RPSOHWLRQ7LPH:KLOHXWLOL]LQJWKH1RWH

VKRXOGD&RQGLWLRQEHDSSOLFDEOHIRUDQ\UHDVRQQRWDGGUHVVHGE\WKH

1RWHWKH&RPSOHWLRQ7LPHEHJLQV6KRXOGWKHWLPHDOORZDQFHLQWKH

1RWHEHH[FHHGHGWKH&RPSOHWLRQ7LPHEHJLQVDWWKDWSRLQW7KH

H[FHSWLRQVPD\DOVREHLQFRUSRUDWHGLQWRWKH&RPSOHWLRQ7LPH)RU

H[DPSOH/&2$&6RXUFHV2SHUDWLQJ5HTXLUHG$FWLRQ%

UHTXLUHVGHFODULQJUHTXLUHGIHDWXUH V VXSSRUWHGE\DQLQRSHUDEOHGLHVHO

JHQHUDWRULQRSHUDEOHZKHQWKHUHGXQGDQWUHTXLUHGIHDWXUH V DUH

LQRSHUDEOH7KH&RPSOHWLRQ7LPHVWDWHVKRXUVIURPGLVFRYHU\RI

&RQGLWLRQ%FRQFXUUHQWZLWKLQRSHUDELOLW\RIUHGXQGDQWUHTXLUHG

IHDWXUH V ,QWKLVFDVHWKH&RPSOHWLRQ7LPHGRHVQRWEHJLQXQWLOWKH

FRQGLWLRQVLQWKH&RPSOHWLRQ7LPHDUHVDWLVILHG

5HTXLUHG$FWLRQVPXVWEHFRPSOHWHGSULRUWRWKHH[SLUDWLRQRIWKH

VSHFLILHG&RPSOHWLRQ7LPH$Q$&7,216&RQGLWLRQUHPDLQVLQHIIHFWDQG

WKH5HTXLUHG$FWLRQVDSSO\XQWLOWKH&RQGLWLRQQRORQJHUH[LVWVRUWKHXQLW

LVQRWZLWKLQWKH/&2$SSOLFDELOLW\

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

'(6&5,37,21 ,IVLWXDWLRQVDUHGLVFRYHUHGWKDWUHTXLUHHQWU\LQWRPRUHWKDQRQH

 FRQWLQXHG  &RQGLWLRQDWDWLPHZLWKLQDVLQJOH/&2 PXOWLSOH&RQGLWLRQV WKH

5HTXLUHG$FWLRQVIRUHDFK&RQGLWLRQPXVWEHSHUIRUPHGZLWKLQWKH

DVVRFLDWHG&RPSOHWLRQ7LPH:KHQLQPXOWLSOH&RQGLWLRQVVHSDUDWH

&RPSOHWLRQ7LPHVDUHWUDFNHGIRUHDFK&RQGLWLRQVWDUWLQJIURPWKH

GLVFRYHU\RIWKHVLWXDWLRQWKDWUHTXLUHGHQWU\LQWRWKH&RQGLWLRQXQOHVV

RWKHUZLVHVSHFLILHG

2QFHD&RQGLWLRQKDVEHHQHQWHUHGVXEVHTXHQWGLYLVLRQV

VXEV\VWHPVFRPSRQHQWVRUYDULDEOHVH[SUHVVHGLQWKH&RQGLWLRQ

GLVFRYHUHGWREHLQRSHUDEOHRUQRWZLWKLQOLPLWVZLOOQRWUHVXOWLQVHSDUDWH

HQWU\LQWRWKH&RQGLWLRQXQOHVVVSHFLILFDOO\VWDWHG7KH5HTXLUHG$FWLRQV

RIWKH&RQGLWLRQFRQWLQXHWRDSSO\WRHDFKDGGLWLRQDOIDLOXUHZLWK

&RPSOHWLRQ7LPHVEDVHGRQLQLWLDOHQWU\LQWRWKH&RQGLWLRQXQOHVV

RWKHUZLVHVSHFLILHG

+RZHYHUZKHQDVXEVHTXHQWGLYLVLRQVXEV\VWHPFRPSRQHQWRU

YDULDEOHH[SUHVVHGLQWKH&RQGLWLRQLVGLVFRYHUHGWREHLQRSHUDEOHRUQRW

ZLWKLQOLPLWVWKH&RPSOHWLRQ7LPH V PD\EHH[WHQGHG7RDSSO\WKLV

&RPSOHWLRQ7LPHH[WHQVLRQWZRFULWHULDPXVWILUVWEHPHW7KH

VXEVHTXHQWLQRSHUDELOLW\

D 0XVWH[LVWFRQFXUUHQWZLWKWKHILUVWLQRSHUDELOLW\DQG E 0XVWUHPDLQLQRSHUDEOHRUQRWZLWKLQOLPLWVDIWHUWKHILUVWLQRSHUDELOLW\

LVUHVROYHG

7KHWRWDO&RPSOHWLRQ7LPHDOORZHGIRUFRPSOHWLQJD5HTXLUHG$FWLRQWR

DGGUHVVWKHVXEVHTXHQWLQRSHUDELOLW\VKDOOEHOLPLWHGWRWKHPRUH

UHVWULFWLYHRIHLWKHU

D 7KHVWDWHG&RPSOHWLRQ7LPHDVPHDVXUHGIURPWKHLQLWLDOHQWU\LQWR WKH&RQGLWLRQSOXVDQDGGLWLRQDOKRXUVRU E 7KHVWDWHG&RPSOHWLRQ7LPHDVPHDVXUHGIURPGLVFRYHU\RIWKH VXEVHTXHQWLQRSHUDELOLW\

7KHDERYH&RPSOHWLRQ7LPHH[WHQVLRQVGRQRWDSSO\WRWKRVH

6SHFLILFDWLRQVWKDWKDYHH[FHSWLRQVWKDWDOORZFRPSOHWHO\VHSDUDWH

UHHQWU\LQWRWKH&RQGLWLRQ IRUHDFKGLYLVLRQVXEV\VWHPFRPSRQHQWRU

YDULDEOHH[SUHVVHGLQWKH&RQGLWLRQ DQGVHSDUDWHWUDFNLQJRI&RPSOHWLRQ

7LPHVEDVHGRQWKLVUHHQWU\7KHVHH[FHSWLRQVDUHVWDWHGLQLQGLYLGXDO

6SHFLILFDWLRQV

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

/&2$SSOLFDELOLW\



/&2$33/,&$%,/,7< FRQWLQXHG 

/&2 :KHQDQ/&2LVQRWPHWHQWU\LQWRD02'(RURWKHUVSHFLILHG

FRQGLWLRQLQWKH$SSOLFDELOLW\VKDOORQO\EHPDGH

D :KHQWKHDVVRFLDWHG$&7,216WREHHQWHUHGSHUPLWFRQWLQXHG

RSHUDWLRQLQWKH02'(RURWKHUVSHFLILHGFRQGLWLRQLQWKH

$SSOLFDELOLW\IRUDQXQOLPLWHGSHULRGRIWLPH

E $IWHUSHUIRUPDQFHRIDULVNDVVHVVPHQWDGGUHVVLQJLQRSHUDEOH

V\VWHPVDQGFRPSRQHQWVFRQVLGHUDWLRQRIWKHUHVXOWV

GHWHUPLQDWLRQRIWKHDFFHSWDELOLW\RIHQWHULQJWKH02'(RU

RWKHUVSHFLILHGFRQGLWLRQLQWKH$SSOLFDELOLW\DQGHVWDEOLVKPHQW

RIULVNPDQDJHPHQWDFWLRQVLIDSSURSULDWH H[FHSWLRQVWRWKLV

6SHFLILFDWLRQDUHVWDWHGLQWKHLQGLYLGXDO6SHFLILFDWLRQV RU F :KHQDQDOORZDQFHLVVWDWHGLQWKHLQGLYLGXDOYDOXHSDUDPHWHU

RURWKHU6SHFLILFDWLRQ

7KLV6SHFLILFDWLRQVKDOOQRWSUHYHQWFKDQJHVLQ02'(6RURWKHU

VSHFLILHGFRQGLWLRQVLQWKH$SSOLFDELOLW\WKDWDUHUHTXLUHGWRFRPSO\

ZLWK$&7,216RUWKDWDUHSDUWRIDVKXWGRZQRIWKHXQLW

/&2 (TXLSPHQWUHPRYHGIURPVHUYLFHRUGHFODUHGLQRSHUDEOHWRFRPSO\

ZLWK$&7,216PD\EHUHWXUQHGWRVHUYLFHXQGHUDGPLQLVWUDWLYH

FRQWUROVROHO\WRSHUIRUPWHVWLQJUHTXLUHGWRGHPRQVWUDWHLWV

23(5$%,/,7<RUWKH23(5$%,/,7<RIRWKHUHTXLSPHQW7KLVLVDQ

H[FHSWLRQWR/&2IRUWKHV\VWHPUHWXUQHGWRVHUYLFHXQGHU

DGPLQLVWUDWLYHFRQWUROWRSHUIRUPWKHWHVWLQJUHTXLUHGWR

GHPRQVWUDWH23(5$%,/,7<

/&2 :KHQDVXSSRUWHGV\VWHP/&2LVQRWPHWVROHO\GXHWRDVXSSRUW

V\VWHP/&2QRWEHLQJPHWWKH&RQGLWLRQVDQG5HTXLUHG$FWLRQV

DVVRFLDWHGZLWKWKLVVXSSRUWHGV\VWHPDUHQRWUHTXLUHGWREH

HQWHUHG2QO\WKHVXSSRUWV\VWHP/&2$&7,216DUHUHTXLUHGWR

EHHQWHUHG7KLVLVDQH[FHSWLRQWR/&2IRUWKHVXSSRUWHG

V\VWHP,QWKLVHYHQWDQHYDOXDWLRQVKDOOEHSHUIRUPHGLQ

DFFRUGDQFHZLWK6SHFLILFDWLRQ6DIHW\)XQFWLRQ

'HWHUPLQDWLRQ3URJUDP 6)'3 ,IDORVVRIVDIHW\IXQFWLRQLV

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

65$SSOLFDELOLW\



6859(,//$1&(5(48,5(0(17 65 $33/,&$%,/,7<

65 65VVKDOOEHPHWGXULQJWKH02'(6RURWKHUVSHFLILHGFRQGLWLRQV

LQWKH$SSOLFDELOLW\IRULQGLYLGXDO/&2VXQOHVVRWKHUZLVHVWDWHGLQ

WKH65)DLOXUHWRPHHWD6XUYHLOODQFHZKHWKHUVXFKIDLOXUHLV

H[SHULHQFHGGXULQJWKHSHUIRUPDQFHRIWKH6XUYHLOODQFHRUEHWZHHQ

SHUIRUPDQFHVRIWKH6XUYHLOODQFHVKDOOEHIDLOXUHWRPHHWWKH/&2

)DLOXUHWRSHUIRUPD6XUYHLOODQFHZLWKLQWKHVSHFLILHG)UHTXHQF\

VKDOOEHIDLOXUHWRPHHWWKH/&2H[FHSWDVSURYLGHGLQ65

6XUYHLOODQFHVGRQRWKDYHWREHSHUIRUPHGRQLQRSHUDEOH

HTXLSPHQWRUYDULDEOHVRXWVLGHVSHFLILHGOLPLWV

65 7KHVSHFLILHG)UHTXHQF\IRUHDFK65LVPHWLIWKH6XUYHLOODQFHLV

SHUIRUPHGZLWKLQWLPHVWKHLQWHUYDOVSHFLILHGLQWKH)UHTXHQF\

DVPHDVXUHGIURPWKHSUHYLRXVSHUIRUPDQFHRUDVPHDVXUHGIURP

WKHWLPHDVSHFLILHGFRQGLWLRQRIWKH)UHTXHQF\LVPHW

)RU)UHTXHQFLHVVSHFLILHGDVRQFHWKHDERYHLQWHUYDOH[WHQVLRQ

GRHVQRWDSSO\,ID&RPSOHWLRQ7LPHUHTXLUHVSHULRGLF

SHUIRUPDQFHRQDRQFHSHUEDVLVWKHDERYH)UHTXHQF\

H[WHQVLRQDSSOLHVWRHDFKSHUIRUPDQFHDIWHUWKHLQLWLDOSHUIRUPDQFH

([FHSWLRQVWRWKLV6SHFLILFDWLRQDUHVWDWHGLQWKHLQGLYLGXDO

6SHFLILFDWLRQV

65 ,ILWLVGLVFRYHUHGWKDWD6XUYHLOODQFHZDVQRWSHUIRUPHGZLWKLQLWV

VSHFLILHG)UHTXHQF\WKHQFRPSOLDQFHZLWKWKHUHTXLUHPHQWWR

GHFODUHWKH/&2QRWPHWPD\EHGHOD\HGIURPWKHWLPHRI

GLVFRYHU\XSWRKRXUVRUXSWRWKHOLPLWRIWKHVSHFLILHG

)UHTXHQF\ZKLFKHYHULVJUHDWHU7KLVGHOD\SHULRGLVSHUPLWWHGWR

DOORZSHUIRUPDQFHRIWKH6XUYHLOODQFH7KHGHOD\SHULRGLVRQO\

DSSOLFDEOHZKHQWKHUHLVDUHDVRQDEOHH[SHFWDWLRQWKH6XUYHLOODQFH

ZLOOEHPHWZKHQSHUIRUPHG$ULVNHYDOXDWLRQVKDOOEHSHUIRUPHG

IRUDQ\6XUYHLOODQFHGHOD\HGJUHDWHUWKDQKRXUVDQGWKHULVN

LPSDFWVKDOOEHPDQDJHG

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

&RPSOHWLRQ7LPHV



86($1'$33/,&$7,21

&RPSOHWLRQ7LPHV

385326( 7KHSXUSRVHRIWKLVVHFWLRQLVWRHVWDEOLVKWKH&RPSOHWLRQ7LPH

FRQYHQWLRQDQGWRSURYLGHJXLGDQFHIRULWVXVH

%$&.*5281' /LPLWLQJ&RQGLWLRQVIRU2SHUDWLRQ /&2V VSHFLI\PLQLPXPUHTXLUHPHQWV

IRUHQVXULQJVDIHRSHUDWLRQRIWKHXQLW7KH$&7,216DVVRFLDWHGZLWKDQ

/&2VWDWH&RQGLWLRQVWKDWW\SLFDOO\GHVFULEHWKHZD\VLQZKLFKWKH

UHTXLUHPHQWVRIWKH/&2FDQIDLOWREHPHW6SHFLILHGZLWKHDFKVWDWHG

&RQGLWLRQDUH5HTXLUHG$FWLRQ V DQG&RPSOHWLRQ7LPHV V 

'(6&5,37,21 7KH&RPSOHWLRQ7LPHLVWKHDPRXQWRIWLPHDOORZHGIRUFRPSOHWLQJD

5HTXLUHG$FWLRQ,WLVUHIHUHQFHGWRWKHGLVFRYHU\RIDVLWXDWLRQ HJ

LQRSHUDEOHHTXLSPHQWRUYDULDEOHQRWZLWKLQOLPLWV WKDWUHTXLUHVHQWHULQJ

DQ$&7,216&RQGLWLRQXQOHVVRWKHUZLVHVSHFLILHGSURYLGLQJWKHXQLWLVLQ

D02'(RUVSHFLILHGFRQGLWLRQVWDWHGLQWKH$SSOLFDELOLW\RIWKH/&2

8QOHVVRWKHUZLVHVSHFLILHGWKH&RPSOHWLRQ7LPHEHJLQVZKHQDVHQLRU

OLFHQVHGRSHUDWRURQWKHRSHUDWLQJVKLIWFUHZZLWKUHVSRQVLELOLW\IRUSODQW

RSHUDWLRQVPDNHVWKHGHWHUPLQDWLRQWKDWDQ/&2LVQRWPHWDQGDQ

$&7,216&RQGLWLRQLVHQWHUHG7KHRWKHUZLVHVSHFLILHGH[FHSWLRQVDUH

YDULHGVXFKDVD5HTXLUHG$FWLRQ1RWHRU6XUYHLOODQFH5HTXLUHPHQW1RWH

WKDWSURYLGHVDQDOWHUQDWLYHWLPHWRSHUIRUPVSHFLILFWDVNVVXFKDV

WHVWLQJZLWKRXWVWDUWLQJWKH&RPSOHWLRQ7LPH:KLOHXWLOL]LQJWKH1RWH

VKRXOGD&RQGLWLRQEHDSSOLFDEOHIRUDQ\UHDVRQQRWDGGUHVVHGE\WKH

1RWHWKH&RPSOHWLRQ7LPHEHJLQV6KRXOGWKHWLPHDOORZDQFHLQWKH

1RWHEHH[FHHGHGWKH&RPSOHWLRQ7LPHEHJLQVDWWKDWSRLQW7KH

H[FHSWLRQVPD\DOVREHLQFRUSRUDWHGLQWRWKH&RPSOHWLRQ7LPH)RU

H[DPSOH/&2$&6RXUFHV2SHUDWLQJ5HTXLUHG$FWLRQ%

UHTXLUHVGHFODULQJUHTXLUHGIHDWXUH V VXSSRUWHGE\DQLQRSHUDEOHGLHVHO

JHQHUDWRULQRSHUDEOHZKHQWKHUHGXQGDQWUHTXLUHGIHDWXUH V DUH

LQRSHUDEOH7KH&RPSOHWLRQ7LPHVWDWHVKRXUVIURPGLVFRYHU\RI

&RQGLWLRQ%FRQFXUUHQWZLWKLQRSHUDELOLW\RIUHGXQGDQWUHTXLUHG

IHDWXUH V ,QWKLVFDVHWKH&RPSOHWLRQ7LPHGRHVQRWEHJLQXQWLOWKH

FRQGLWLRQVLQWKH&RPSOHWLRQ7LPHDUHVDWLVILHG

5HTXLUHG$FWLRQVPXVWEHFRPSOHWHGSULRUWRWKHH[SLUDWLRQRIWKH

VSHFLILHG&RPSOHWLRQ7LPH$Q$&7,216&RQGLWLRQUHPDLQVLQHIIHFWDQG

WKH5HTXLUHG$FWLRQVDSSO\XQWLOWKH&RQGLWLRQQRORQJHUH[LVWVRUWKHXQLW

LVQRWZLWKLQWKH/&2$SSOLFDELOLW\

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

'(6&5,37,21 ,IVLWXDWLRQVDUHGLVFRYHUHGWKDWUHTXLUHHQWU\LQWRPRUHWKDQRQH

 FRQWLQXHG  &RQGLWLRQDWDWLPHZLWKLQDVLQJOH/&2 PXOWLSOH&RQGLWLRQV WKH

5HTXLUHG$FWLRQVIRUHDFK&RQGLWLRQPXVWEHSHUIRUPHGZLWKLQWKH

DVVRFLDWHG&RPSOHWLRQ7LPH:KHQLQPXOWLSOH&RQGLWLRQVVHSDUDWH

&RPSOHWLRQ7LPHVDUHWUDFNHGIRUHDFK&RQGLWLRQVWDUWLQJIURPWKH

GLVFRYHU\RIWKHVLWXDWLRQWKDWUHTXLUHGHQWU\LQWRWKH&RQGLWLRQXQOHVV

RWKHUZLVHVSHFLILHG

2QFHD&RQGLWLRQKDVEHHQHQWHUHGVXEVHTXHQWGLYLVLRQV

VXEV\VWHPVFRPSRQHQWVRUYDULDEOHVH[SUHVVHGLQWKH&RQGLWLRQ

GLVFRYHUHGWREHLQRSHUDEOHRUQRWZLWKLQOLPLWVZLOOQRWUHVXOWLQVHSDUDWH

HQWU\LQWRWKH&RQGLWLRQXQOHVVVSHFLILFDOO\VWDWHG7KH5HTXLUHG$FWLRQV

RIWKH&RQGLWLRQFRQWLQXHWRDSSO\WRHDFKDGGLWLRQDOIDLOXUHZLWK

&RPSOHWLRQ7LPHVEDVHGRQLQLWLDOHQWU\LQWRWKH&RQGLWLRQXQOHVV

RWKHUZLVHVSHFLILHG

+RZHYHUZKHQDVXEVHTXHQWGLYLVLRQVXEV\VWHPFRPSRQHQWRU

YDULDEOHH[SUHVVHGLQWKH&RQGLWLRQLVGLVFRYHUHGWREHLQRSHUDEOHRUQRW

ZLWKLQOLPLWVWKH&RPSOHWLRQ7LPH V PD\EHH[WHQGHG7RDSSO\WKLV

&RPSOHWLRQ7LPHH[WHQVLRQWZRFULWHULDPXVWILUVWEHPHW7KH

VXEVHTXHQWLQRSHUDELOLW\

D 0XVWH[LVWFRQFXUUHQWZLWKWKHILUVWLQRSHUDELOLW\DQG E 0XVWUHPDLQLQRSHUDEOHRUQRWZLWKLQOLPLWVDIWHUWKHILUVWLQRSHUDELOLW\

LVUHVROYHG

7KHWRWDO&RPSOHWLRQ7LPHDOORZHGIRUFRPSOHWLQJD5HTXLUHG$FWLRQWR

DGGUHVVWKHVXEVHTXHQWLQRSHUDELOLW\VKDOOEHOLPLWHGWRWKHPRUH

UHVWULFWLYHRIHLWKHU

D 7KHVWDWHG&RPSOHWLRQ7LPHDVPHDVXUHGIURPWKHLQLWLDOHQWU\LQWR WKH&RQGLWLRQSOXVDQDGGLWLRQDOKRXUVRU E 7KHVWDWHG&RPSOHWLRQ7LPHDVPHDVXUHGIURPGLVFRYHU\RIWKH VXEVHTXHQWLQRSHUDELOLW\

7KHDERYH&RPSOHWLRQ7LPHH[WHQVLRQVGRQRWDSSO\WRWKRVH

6SHFLILFDWLRQVWKDWKDYHH[FHSWLRQVWKDWDOORZFRPSOHWHO\VHSDUDWH

UHHQWU\LQWRWKH&RQGLWLRQ IRUHDFKGLYLVLRQVXEV\VWHPFRPSRQHQWRU

YDULDEOHH[SUHVVHGLQWKH&RQGLWLRQ DQGVHSDUDWHWUDFNLQJRI&RPSOHWLRQ

7LPHVEDVHGRQWKLVUHHQWU\7KHVHH[FHSWLRQVDUHVWDWHGLQLQGLYLGXDO

6SHFLILFDWLRQV

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

/&2$SSOLFDELOLW\



/&2$33/,&$%,/,7< FRQWLQXHG 

/&2 :KHQDQ/&2LVQRWPHWHQWU\LQWRD02'(RURWKHUVSHFLILHG

FRQGLWLRQLQWKH$SSOLFDELOLW\VKDOORQO\EHPDGH

D :KHQWKHDVVRFLDWHG$&7,216WREHHQWHUHGSHUPLWFRQWLQXHG

RSHUDWLRQLQWKH02'(RURWKHUVSHFLILHGFRQGLWLRQLQWKH

$SSOLFDELOLW\IRUDQXQOLPLWHGSHULRGRIWLPH

E $IWHUSHUIRUPDQFHRIDULVNDVVHVVPHQWDGGUHVVLQJLQRSHUDEOH

V\VWHPVDQGFRPSRQHQWVFRQVLGHUDWLRQRIWKHUHVXOWV

GHWHUPLQDWLRQRIWKHDFFHSWDELOLW\RIHQWHULQJWKH02'(RU

RWKHUVSHFLILHGFRQGLWLRQLQWKH$SSOLFDELOLW\DQGHVWDEOLVKPHQW

RIULVNPDQDJHPHQWDFWLRQVLIDSSURSULDWH H[FHSWLRQVWRWKLV

6SHFLILFDWLRQDUHVWDWHGLQWKHLQGLYLGXDO6SHFLILFDWLRQV RU F :KHQDQDOORZDQFHLVVWDWHGLQWKHLQGLYLGXDOYDOXHSDUDPHWHU

RURWKHU6SHFLILFDWLRQ

7KLV6SHFLILFDWLRQVKDOOQRWSUHYHQWFKDQJHVLQ02'(6RURWKHU

VSHFLILHGFRQGLWLRQVLQWKH$SSOLFDELOLW\WKDWDUHUHTXLUHGWRFRPSO\

ZLWK$&7,216RUWKDWDUHSDUWRIDVKXWGRZQRIWKHXQLW

/&2 (TXLSPHQWUHPRYHGIURPVHUYLFHRUGHFODUHGLQRSHUDEOHWRFRPSO\

ZLWK$&7,216PD\EHUHWXUQHGWRVHUYLFHXQGHUDGPLQLVWUDWLYH

FRQWUROVROHO\WRSHUIRUPWHVWLQJUHTXLUHGWRGHPRQVWUDWHLWV

23(5$%,/,7<RUWKH23(5$%,/,7<RIRWKHUHTXLSPHQW7KLVLVDQ

H[FHSWLRQWR/&2IRUWKHV\VWHPUHWXUQHGWRVHUYLFHXQGHU

DGPLQLVWUDWLYHFRQWUROWRSHUIRUPWKHWHVWLQJUHTXLUHGWR

GHPRQVWUDWH23(5$%,/,7<

/&2 :KHQDVXSSRUWHGV\VWHP/&2LVQRWPHWVROHO\GXHWRDVXSSRUW

V\VWHP/&2QRWEHLQJPHWWKH&RQGLWLRQVDQG5HTXLUHG$FWLRQV

DVVRFLDWHGZLWKWKLVVXSSRUWHGV\VWHPDUHQRWUHTXLUHGWREH

HQWHUHG2QO\WKHVXSSRUWV\VWHP/&2$&7,216DUHUHTXLUHGWR

EHHQWHUHG7KLVLVDQH[FHSWLRQWR/&2IRUWKHVXSSRUWHG

V\VWHP,QWKLVHYHQWDQHYDOXDWLRQVKDOOEHSHUIRUPHGLQ

DFFRUGDQFHZLWK6SHFLILFDWLRQ6DIHW\)XQFWLRQ

'HWHUPLQDWLRQ3URJUDP 6)'3 ,IDORVVRIVDIHW\IXQFWLRQLV

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

65$SSOLFDELOLW\



6859(,//$1&(5(48,5(0(17 65 $33/,&$%,/,7<

65 65VVKDOOEHPHWGXULQJWKH02'(6RURWKHUVSHFLILHGFRQGLWLRQV

LQWKH$SSOLFDELOLW\IRULQGLYLGXDO/&2VXQOHVVRWKHUZLVHVWDWHGLQ

WKH65)DLOXUHWRPHHWD6XUYHLOODQFHZKHWKHUVXFKIDLOXUHLV

H[SHULHQFHGGXULQJWKHSHUIRUPDQFHRIWKH6XUYHLOODQFHRUEHWZHHQ

SHUIRUPDQFHVRIWKH6XUYHLOODQFHVKDOOEHIDLOXUHWRPHHWWKH/&2

)DLOXUHWRSHUIRUPD6XUYHLOODQFHZLWKLQWKHVSHFLILHG)UHTXHQF\

VKDOOEHIDLOXUHWRPHHWWKH/&2H[FHSWDVSURYLGHGLQ65

6XUYHLOODQFHVGRQRWKDYHWREHSHUIRUPHGRQLQRSHUDEOH

HTXLSPHQWRUYDULDEOHVRXWVLGHVSHFLILHGOLPLWV

65 7KHVSHFLILHG)UHTXHQF\IRUHDFK65LVPHWLIWKH6XUYHLOODQFHLV

SHUIRUPHGZLWKLQWLPHVWKHLQWHUYDOVSHFLILHGLQWKH)UHTXHQF\

DVPHDVXUHGIURPWKHSUHYLRXVSHUIRUPDQFHRUDVPHDVXUHGIURP

WKHWLPHDVSHFLILHGFRQGLWLRQRIWKH)UHTXHQF\LVPHW

)RU)UHTXHQFLHVVSHFLILHGDVRQFHWKHDERYHLQWHUYDOH[WHQVLRQ

GRHVQRWDSSO\,ID&RPSOHWLRQ7LPHUHTXLUHVSHULRGLF

SHUIRUPDQFHRQDRQFHSHUEDVLVWKHDERYH)UHTXHQF\

H[WHQVLRQDSSOLHVWRHDFKSHUIRUPDQFHDIWHUWKHLQLWLDOSHUIRUPDQFH

([FHSWLRQVWRWKLV6SHFLILFDWLRQDUHVWDWHGLQWKHLQGLYLGXDO

6SHFLILFDWLRQV

65 ,ILWLVGLVFRYHUHGWKDWD6XUYHLOODQFHZDVQRWSHUIRUPHGZLWKLQLWV

VSHFLILHG)UHTXHQF\WKHQFRPSOLDQFHZLWKWKHUHTXLUHPHQWWR

GHFODUHWKH/&2QRWPHWPD\EHGHOD\HGIURPWKHWLPHRI

GLVFRYHU\XSWRKRXUVRUXSWRWKHOLPLWRIWKHVSHFLILHG

)UHTXHQF\ZKLFKHYHULVJUHDWHU7KLVGHOD\SHULRGLVSHUPLWWHGWR

DOORZSHUIRUPDQFHRIWKH6XUYHLOODQFH7KHGHOD\SHULRGLVRQO\

DSSOLFDEOHZKHQWKHUHLVDUHDVRQDEOHH[SHFWDWLRQWKH6XUYHLOODQFH

ZLOOEHPHWZKHQSHUIRUPHG$ULVNHYDOXDWLRQVKDOOEHSHUIRUPHG

IRUDQ\6XUYHLOODQFHGHOD\HGJUHDWHUWKDQKRXUVDQGWKHULVN

LPSDFWVKDOOEHPDQDJHG

FRQWLQXHG 

%)181,7  $PHQGPHQW1R

Enclosure Attachment 2.2 Proposed TS Changes (Final Typed)

Sequoyah Nuclear Plant, Units 1 and 2 CNL-22-008

Completion Times 1.3 1.0 USE AND APPLICATION 1.3 Completion Times PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.

BACKGROUND Limiting Conditions for Operation (LCOs) specify minimum requirements for ensuring safe operation of the unit. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Time(s).

DESCRIPTION The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the discovery of a situation (e.g.,

inoperable equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the unit is in a MODE or specified condition stated in the Applicability of the LCO.

Unless otherwise specified, the Completion Time begins when a senior licensed operator on the operating shift crew with responsibility for plant operations makes the determination that an LCO is not met and an ACTIONS Condition is entered. The "otherwise specified" exceptions are varied, such as a Required Action Note or Surveillance Requirement Note that provides an alternative time to perform specific tasks, such as testing, without starting the Completion Time. While utilizing the Note, should a Condition be applicable for any reason not addressed by the Note, the Completion Time begins. Should the time allowance in the Note be exceeded, the Completion Time begins at that point. The exceptions may also be incorporated into the Completion Time. For example, LCO 3.8.1, "AC Sources - Operating," Required Action B.2, requires declaring required feature(s) supported by an inoperable diesel generator, inoperable when the redundant required feature(s) are inoperable. The Completion Time states, "4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition B concurrent with inoperability of redundant required feature(s)." In this case the Completion Time does not begin until the conditions in the Completion Time are satisfied.

Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the unit is not within the LCO Applicability.

If situations are discovered that require entry into more than one Condition at a time within a single LCO (multiple Conditions), the Required Actions for each Condition must be performed within the associated Completion Time. When in multiple Conditions, separate Completion Times are tracked for each Condition starting from the discovery of the situation that required entry into the Condition, unless otherwise specified.

SEQUOYAH - UNIT 1 1.3-1 Amendment 334,

Completion Times 1.3 1.3 Completion Times DESCRIPTION (continued)

Once a Condition has been entered, subsequent trains, subsystems, components, or variables expressed in the Condition, discovered to be inoperable or not within limits, will not result in separate entry into the Condition, unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition, unless otherwise specified.

However, when a subsequent train, subsystem, component, or variable expressed in the Condition is discovered to be inoperable or not within limits, the Completion Time(s) may be extended. To apply this Completion Time extension, two criteria must first be met. The subsequent inoperability:

a. Must exist concurrent with the first inoperability and
b. Must remain inoperable or not within limits after the first inoperability is resolved.

The total Completion Time allowed for completing a Required Action to address the subsequent inoperability shall be limited to the more restrictive of either:

a. The stated Completion Time, as measured from the initial entry into the Condition, plus an additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or
b. The stated Completion Time as measured from discovery of the subsequent inoperability.

The above Completion Time extensions do not apply to those Specifications that have exceptions that allow completely separate re-entry into the Condition (for each train, subsystem, component, or variable expressed in the Condition) and separate tracking of Completion Times based on this re-entry. These exceptions are stated in individual Specifications.

The above Completion Time extension does not apply to a Completion Time with a modified "time zero." This modified "time zero" may be expressed as a repetitive time (i.e., "once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />," where the Completion Time is referenced from a previous completion of the Required Action versus the time of Condition entry) or as a time modified by the phrase "from discovery . . ."

SEQUOYAH - UNIT 1 1.3-2 Amendment 334,

Completion Times 1.3 1.3 Completion Times EXAMPLES The following examples illustrate the use of Completion Times with different types of Conditions and changing Conditions.

EXAMPLE 1.3-1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. Required B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action and associated AND Completion Time not met. B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SEQUOYAH - UNIT 1 1.3- Amendment 334

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

&RQGLWLRQ%KDVWZR5HTXLUHG$FWLRQV(DFK5HTXLUHG$FWLRQKDVLWVRZQ

VHSDUDWH&RPSOHWLRQ7LPH(DFK&RPSOHWLRQ7LPHLVUHIHUHQFHGWRWKH

WLPHWKDW&RQGLWLRQ%LVHQWHUHG

7KH5HTXLUHG$FWLRQVRI&RQGLWLRQ%DUHWREHLQ02'(ZLWKLQKRXUV

$1'LQ02'(ZLWKLQKRXUV$WRWDORIKRXUVLVDOORZHGIRU

UHDFKLQJ02'(DQGDWRWDORIKRXUV QRWKRXUV LVDOORZHGIRU

UHDFKLQJ02'(IURPWKHWLPHWKDW&RQGLWLRQ%ZDVHQWHUHG,I02'(

LVUHDFKHGZLWKLQKRXUVWKHWLPHDOORZHGIRUUHDFKLQJ02'(LVWKH

QH[WKRXUVEHFDXVHWKHWRWDOWLPHDOORZHGIRUUHDFKLQJ02'(LV

KRXUV

,I&RQGLWLRQ%LVHQWHUHGZKLOHLQ02'(WKHWLPHDOORZHGIRUUHDFKLQJ

02'(LVWKHQH[WKRXUV

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QHSXPS $5HVWRUHSXPSWR GD\V

LQRSHUDEOH 23(5$%/(VWDWXV

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG $1'

&RPSOHWLRQ 7LPHQRWPHW  %%HLQ02'( KRXUV

KHQDSXPSLVGHFODUHGLQRSHUDEOH&RQGLWLRQ$LVHQWHUHG,IWKHSXPS

LVQRWUHVWRUHGWR23(5$%/(VWDWXVZLWKLQGD\V&RQGLWLRQ%LVDOVR

HQWHUHGDQGWKH&RPSOHWLRQ7LPHFORFNVIRU5HTXLUHG$FWLRQV%

DQG%VWDUW,IWKHLQRSHUDEOHSXPSLVUHVWRUHGWR23(5$%/(VWDWXV

DIWHU&RQGLWLRQ%LVHQWHUHG&RQGLWLRQV$DQG%DUHH[LWHGDQGWKHUHIRUH

WKH5HTXLUHG$FWLRQVRI&RQGLWLRQ%PD\EHWHUPLQDWHG

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

KHQDVHFRQGSXPSLVGHFODUHGLQRSHUDEOHZKLOHWKHILUVWSXPSLVVWLOO

LQRSHUDEOH&RQGLWLRQ$LVQRWUHHQWHUHGIRUWKHVHFRQGSXPS

/&2LVHQWHUHGVLQFHWKH$&7,216GRQRWLQFOXGHD&RQGLWLRQIRU

PRUHWKDQRQHLQRSHUDEOHSXPS7KH&RPSOHWLRQ7LPHFORFNIRU

&RQGLWLRQ$GRHVQRWVWRSDIWHU/&2LVHQWHUHGEXWFRQWLQXHVWREH

WUDFNHGIURPWKHWLPH&RQGLWLRQ$ZDVLQLWLDOO\HQWHUHG

KLOHLQ/&2LIRQHRIWKHLQRSHUDEOHSXPSVLVUHVWRUHGWR

23(5$%/(VWDWXVDQGWKH&RPSOHWLRQ7LPHIRU&RQGLWLRQ$KDVQRW

H[SLUHG/&2PD\EHH[LWHGDQGRSHUDWLRQFRQWLQXHGLQDFFRUGDQFH

ZLWK&RQGLWLRQ$

KLOHLQ/&2LIRQHRIWKHLQRSHUDEOHSXPSVLVUHVWRUHGWR

23(5$%/(VWDWXVDQGWKH&RPSOHWLRQ7LPHIRU&RQGLWLRQ$KDVH[SLUHG

/&2PD\EHH[LWHGDQGRSHUDWLRQFRQWLQXHGLQDFFRUGDQFHZLWK

&RQGLWLRQ%7KH&RPSOHWLRQ7LPHIRU&RQGLWLRQ%LVWUDFNHGIURPWKH

WLPHWKH&RQGLWLRQ$&RPSOHWLRQ7LPHH[SLUHG

2QUHVWRULQJRQHRIWKHSXPSVWR23(5$%/(VWDWXVWKH&RQGLWLRQ$

&RPSOHWLRQ7LPHLVQRWUHVHWEXWFRQWLQXHVIURPWKHWLPHWKHILUVWSXPS

ZDVGHFODUHGLQRSHUDEOH7KLV&RPSOHWLRQ7LPHPD\EHH[WHQGHGLIWKH

SXPSUHVWRUHGWR23(5$%/(VWDWXVZDVWKHILUVWLQRSHUDEOHSXPS$

KRXUH[WHQVLRQWRWKHVWDWHGGD\VLVDOORZHGSURYLGHGWKLVGRHVQRW

UHVXOWLQWKHVHFRQGSXPSEHLQJLQRSHUDEOHIRU!GD\V

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QH $5HVWRUH)XQFWLRQ; GD\V

)XQFWLRQ; WUDLQWR23(5$%/(

WUDLQ VWDWXV

LQRSHUDEOH

% 2QH  %5HVWRUH)XQFWLRQ< KRXUV

)XQFWLRQ< WUDLQWR23(5$%/(

WUDLQ VWDWXV

LQRSHUDEOH

& 2QH &5HVWRUH)XQFWLRQ; KRXUV

)XQFWLRQ; WUDLQWR23(5$%/(

WUDLQ VWDWXV

LQRSHUDEOH

25

$1'

&5HVWRUH)XQFWLRQ< KRXUV

2QH WUDLQWR23(5$%/(

)XQFWLRQ< VWDWXV

WUDLQ LQRSHUDEOH

KHQRQH)XQFWLRQ;WUDLQDQGRQH)XQFWLRQ<WUDLQDUHLQRSHUDEOH

&RQGLWLRQ$DQG&RQGLWLRQ%DUHFRQFXUUHQWO\DSSOLFDEOH7KH&RPSOHWLRQ

7LPHVIRU&RQGLWLRQ$DQG&RQGLWLRQ%DUHWUDFNHGVHSDUDWHO\IRUHDFK

WUDLQVWDUWLQJIURPWKHWLPHHDFKWUDLQZDVGHFODUHGLQRSHUDEOHDQGWKH

&RQGLWLRQZDVHQWHUHG$VHSDUDWH&RPSOHWLRQ7LPHLVHVWDEOLVKHGIRU

&RQGLWLRQ&DQGWUDFNHGIURPWKHWLPHWKHVHFRQGWUDLQZDVGHFODUHG

LQRSHUDEOH LHWKHWLPHWKHVLWXDWLRQGHVFULEHGLQ&RQGLWLRQ&ZDV

GLVFRYHUHG 

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

,I5HTXLUHG$FWLRQ&LVFRPSOHWHGZLWKLQWKHVSHFLILHG&RPSOHWLRQ7LPH

&RQGLWLRQV%DQG&DUHH[LWHG,IWKH&RPSOHWLRQ7LPHIRU5HTXLUHG

$FWLRQ$KDVQRWH[SLUHGRSHUDWLRQPD\FRQWLQXHLQDFFRUGDQFHZLWK

&RQGLWLRQ$7KHUHPDLQLQJ&RPSOHWLRQ7LPHLQ&RQGLWLRQ$LVPHDVXUHG

IURPWKHWLPHWKHDIIHFWHGWUDLQZDVGHFODUHGLQRSHUDEOH LHLQLWLDOHQWU\

LQWR&RQGLWLRQ$ 

,WLVSRVVLEOHWRDOWHUQDWHEHWZHHQ&RQGLWLRQV$%DQG&LQVXFKD

PDQQHUWKDWRSHUDWLRQFRXOGFRQWLQXHLQGHILQLWHO\ZLWKRXWHYHUUHVWRULQJ

V\VWHPVWRPHHWWKH/&2+RZHYHUGRLQJVRZRXOGEHLQFRQVLVWHQWZLWK

WKHEDVLVRIWKH&RPSOHWLRQ7LPHV7KHUHIRUHWKHUHVKDOOEH

DGPLQLVWUDWLYHFRQWUROVWROLPLWWKHPD[LPXPWLPHDOORZHGIRUDQ\

FRPELQDWLRQRI&RQGLWLRQVWKDWUHVXOWLQDVLQJOHFRQWLJXRXVRFFXUUHQFHRI

IDLOLQJWRPHHWWKH/&27KHVHDGPLQLVWUDWLYHFRQWUROVVKDOOHQVXUHWKDW

WKH&RPSOHWLRQ7LPHVIRUWKRVH&RQGLWLRQVDUHQRWLQDSSURSULDWHO\

H[WHQGHG

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QHRUPRUH $5HVWRUHYDOYH V WR KRXUV

YDOYHV 23(5$%/(VWDWXV

LQRSHUDEOH

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG $1'

&RPSOHWLRQ 7LPHQRWPHW  %%HLQ02'( KRXUV

$VLQJOH&RPSOHWLRQ7LPHLVXVHGIRUDQ\QXPEHURIYDOYHVLQRSHUDEOHDW

WKHVDPHWLPH7KH&RPSOHWLRQ7LPHDVVRFLDWHGZLWK&RQGLWLRQ$LV

EDVHGRQWKHLQLWLDOHQWU\LQWR&RQGLWLRQ$DQGLVQRWWUDFNHGRQDSHU

YDOYHEDVLV'HFODULQJVXEVHTXHQWYDOYHVLQRSHUDEOHZKLOH&RQGLWLRQ$

LVVWLOOLQHIIHFWGRHVQRWWULJJHUWKHWUDFNLQJRIVHSDUDWH&RPSOHWLRQ

7LPHV

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



 &RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

2QFHRQHRIWKHYDOYHVKDVEHHQUHVWRUHGWR23(5$%/(VWDWXVWKH

&RQGLWLRQ$&RPSOHWLRQ7LPHLVQRWUHVHWEXWFRQWLQXHVIURPWKHWLPHWKH

ILUVWYDOYHZDVGHFODUHGLQRSHUDEOH7KH&RPSOHWLRQ7LPHPD\EH

H[WHQGHGLIWKHYDOYHUHVWRUHGWR23(5$%/(VWDWXVZDVWKHILUVW

LQRSHUDEOHYDOYH7KH&RQGLWLRQ$&RPSOHWLRQ7LPHPD\EHH[WHQGHGIRU

XSWRKRXUVSURYLGHGWKLVGRHVQRWUHVXOWLQDQ\VXEVHTXHQWYDOYHEHLQJ

LQRSHUDEOHIRU!KRXUV

,IWKH&RPSOHWLRQ7LPHRIKRXUV LQFOXGLQJWKHH[WHQVLRQ H[SLUHVZKLOH

RQHRUPRUHYDOYHVDUHVWLOOLQRSHUDEOH&RQGLWLRQ%LVHQWHUHG

(;$03/(

$&7,216

127(

6HSDUDWH&RQGLWLRQHQWU\LVDOORZHGIRUHDFKLQRSHUDEOHYDOYH



&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QHRUPRUH $5HVWRUHYDOYH V WR KRXUV

YDOYHV 23(5$%/(VWDWXV

LQRSHUDEOH

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG $1'

&RPSOHWLRQ 7LPHQRWPHW  %%HLQ02'( KRXUV

7KH1RWHDERYHWKH$&7,2167DEOHLVDPHWKRGRIPRGLI\LQJKRZWKH

&RPSOHWLRQ7LPHLVWUDFNHG,IWKLVPHWKRGRIPRGLI\LQJKRZWKH

&RPSOHWLRQ7LPHLVWUDFNHGZDVDSSOLFDEOHRQO\WRDVSHFLILF&RQGLWLRQ

WKH1RWHZRXOGDSSHDULQWKDW&RQGLWLRQUDWKHUWKDQDWWKHWRSRIWKH

$&7,2167DEOH

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



 &RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

7KH1RWHDOORZV&RQGLWLRQ$WREHHQWHUHGVHSDUDWHO\IRUHDFKLQRSHUDEOH

YDOYHDQG&RPSOHWLRQ7LPHVWUDFNHGRQDSHUYDOYHEDVLV:KHQDYDOYH

LVGHFODUHGLQRSHUDEOH&RQGLWLRQ$LVHQWHUHGDQGLWV&RPSOHWLRQ7LPH

VWDUWV,IVXEVHTXHQWYDOYHVDUHGHFODUHGLQRSHUDEOH&RQGLWLRQ$LV

HQWHUHGIRUHDFKYDOYHDQGVHSDUDWH&RPSOHWLRQ7LPHVVWDUWDQGDUH

WUDFNHGIRUHDFKYDOYH

,IWKH&RPSOHWLRQ7LPHDVVRFLDWHGZLWKDYDOYHLQ&RQGLWLRQ$H[SLUHV

&RQGLWLRQ%LVHQWHUHGIRUWKDWYDOYH,IWKH&RPSOHWLRQ7LPHVDVVRFLDWHG

ZLWKVXEVHTXHQWYDOYHVLQ&RQGLWLRQ$H[SLUH&RQGLWLRQ%LVHQWHUHG

VHSDUDWHO\IRUHDFKYDOYHDQGVHSDUDWH&RPSOHWLRQ7LPHVVWDUWDQGDUH

WUDFNHGIRUHDFKYDOYH,IDYDOYHWKDWFDXVHGHQWU\LQWR&RQGLWLRQ%LV

UHVWRUHGWR23(5$%/(VWDWXV&RQGLWLRQ%LVH[LWHGIRUWKDWYDOYH

6LQFHWKH1RWHLQWKLVH[DPSOHDOORZVPXOWLSOH&RQGLWLRQHQWU\DQG

WUDFNLQJRIVHSDUDWH&RPSOHWLRQ7LPHV&RPSOHWLRQ7LPHH[WHQVLRQVGR

QRWDSSO\

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QHFKDQQHO $3HUIRUP65[[[ 2QFHSHUKRXUV

LQRSHUDEOH

25

$5HGXFH7+(50$/ KRXUV

32:(5WR

573

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG

&RPSOHWLRQ 7LPHQRWPHW

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



 &RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

(QWU\LQWR&RQGLWLRQ$RIIHUVDFKRLFHEHWZHHQ5HTXLUHG$FWLRQ$

RU$5HTXLUHG$FWLRQ$KDVDRQFHSHU&RPSOHWLRQ7LPHZKLFK

TXDOLILHVIRUWKHH[WHQVLRQSHU65WRHDFKSHUIRUPDQFHDIWHU

WKHLQLWLDOSHUIRUPDQFH7KHLQLWLDOKRXULQWHUYDORI5HTXLUHG$FWLRQ$

EHJLQVZKHQ&RQGLWLRQ$LVHQWHUHGDQGWKHLQLWLDOSHUIRUPDQFHRI

5HTXLUHG$FWLRQ$PXVWEHFRPSOHWHZLWKLQWKHILUVWKRXULQWHUYDO,I

5HTXLUHG$FWLRQ$LVIROORZHGDQGWKH5HTXLUHG$FWLRQLVQRWPHWZLWKLQ

WKH&RPSOHWLRQ7LPH SOXVWKHH[WHQVLRQDOORZHGE\65 

&RQGLWLRQ%LVHQWHUHG,I5HTXLUHG$FWLRQ$LVIROORZHGDQGWKH

&RPSOHWLRQ7LPHRIKRXUVLVQRWPHW&RQGLWLRQ%LVHQWHUHG

,IDIWHUHQWU\LQWR&RQGLWLRQ%5HTXLUHG$FWLRQ$RU$LVPHW

&RQGLWLRQ%LVH[LWHGDQGRSHUDWLRQPD\WKHQFRQWLQXHLQ&RQGLWLRQ$

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QH $9HULI\DIIHFWHG KRXU

VXEV\VWHP VXEV\VWHPLVRODWHG

LQRSHUDEOH $1'

2QFHSHUKRXUV

WKHUHDIWHU

$1'

$5HVWRUHVXEV\VWHP KRXUV

WR23(5$%/(

VWDWXV

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG $1'

&RPSOHWLRQ 7LPHQRWPHW  %%HLQ02'( KRXUV

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



 &RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

5HTXLUHG$FWLRQ$KDVWZR&RPSOHWLRQ7LPHV7KHKRXU&RPSOHWLRQ

7LPHEHJLQVDWWKHWLPHWKH&RQGLWLRQLVHQWHUHGDQGHDFK2QFHSHU

KRXUVWKHUHDIWHULQWHUYDOEHJLQVXSRQSHUIRUPDQFHRI5HTXLUHG

$FWLRQ$

,IDIWHU&RQGLWLRQ$LVHQWHUHG5HTXLUHG$FWLRQ$LVQRWPHWZLWKLQHLWKHU

WKHLQLWLDOKRXURUDQ\VXEVHTXHQWKRXULQWHUYDOIURPWKHSUHYLRXV

SHUIRUPDQFH SOXVWKHH[WHQVLRQDOORZHGE\65 &RQGLWLRQ%LV

HQWHUHG7KH&RPSOHWLRQ7LPHFORFNIRU&RQGLWLRQ$GRHVQRWVWRSDIWHU

&RQGLWLRQ%LVHQWHUHGEXWFRQWLQXHVIURPWKHWLPH&RQGLWLRQ$ZDV

LQLWLDOO\HQWHUHG,I5HTXLUHG$FWLRQ$LVPHWDIWHU&RQGLWLRQ%LV

HQWHUHG&RQGLWLRQ%LVH[LWHGDQGRSHUDWLRQPD\FRQWLQXHLQDFFRUGDQFH

ZLWK&RQGLWLRQ$SURYLGHGWKH&RPSOHWLRQ7LPHIRU5HTXLUHG$FWLRQ$

KDVQRWH[SLUHG

,00(',$7( :KHQ,PPHGLDWHO\LVXVHGDVD&RPSOHWLRQ7LPHWKH5HTXLUHG$FWLRQ

&203/(7,217,0( VKRXOGEHSXUVXHGZLWKRXWGHOD\DQGLQDFRQWUROOHGPDQQHU

6(482<$++/-81,7  $PHQGPHQW

LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2, LCO 3.0.7, LCO 3.0.8, and LCO 3.0.9.

LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.

If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required unless otherwise stated.

LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:

a. MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;
b. MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and
c. MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.

Exceptions to this Specification are stated in the individual Specifications.

Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.

LCO 3.0.3 is only applicable in MODES 1, 2, 3, and 4.

LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:

D When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicabilityfor an unlimited period of time; E After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate (exceptions to this Specification are stated in the individual Specifications) or SEQUOYAH - UNIT 1 3.0-1 Amendment 334,

SR Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR.

Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

For Frequencies specified as "once," the above interval extension does not apply.

If a Completion Time requires periodic performance on a "once per . . ."

basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance. The delay period is only applicable when there is a reasonable expectation the surveillance will be met when performed. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.

SEQUOYAH - UNIT 1 3.0-4 Amendment 334,

Completion Times 1.3 1.0 USE AND APPLICATION 1.3 Completion Times PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.

BACKGROUND Limiting Conditions for Operation (LCOs) specify minimum requirements for ensuring safe operation of the unit. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Time(s).

DESCRIPTION The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the discovery of a situation (e.g.,

inoperable equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the unit is in a MODE or specified condition stated in the Applicability of the LCO.

Unless otherwise specified, the Completion Time begins when a senior licensed operator on the operating shift crew with responsibility for plant operations makes the determination that an LCO is not met and an ACTIONS Condition is entered. The "otherwise specified" exceptions are varied, such as a Required Action Note or Surveillance Requirement Note that provides an alternative time to perform specific tasks, such as testing, without starting the Completion Time. While utilizing the Note, should a Condition be applicable for any reason not addressed by the Note, the Completion Time begins. Should the time allowance in the Note be exceeded, the Completion Time begins at that point. The exceptions may also be incorporated into the Completion Time. For example, LCO 3.8.1, "AC Sources - Operating," Required Action B.2, requires declaring required feature(s) supported by an inoperable diesel generator, inoperable when the redundant required feature(s) are inoperable. The Completion Time states, "4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition B concurrent with inoperability of redundant required feature(s)." In this case the Completion Time does not begin until the conditions in the Completion Time are satisfied.

Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the unit is not within the LCO Applicability.

If situations are discovered that require entry into more than one Condition at a time within a single LCO (multiple Conditions), the Required Actions for each Condition must be performed within the associated Completion Time. When in multiple Conditions, separate Completion Times are tracked for each Condition starting from the discovery of the situation that required entry into the Condition, unless otherwise specified.

SEQUOYAH - UNIT 2 1.3-1 Amendment 327,

Completion Times 1.3 1.3 Completion Times DESCRIPTION (continued)

Once a Condition has been entered, subsequent trains, subsystems, components, or variables expressed in the Condition, discovered to be inoperable or not within limits, will not result in separate entry into the Condition, unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition, unless otherwise specified.

However, when a subsequent train, subsystem, component, or variable expressed in the Condition is discovered to be inoperable or not within limits, the Completion Time(s) may be extended. To apply this Completion Time extension, two criteria must first be met. The subsequent inoperability:

a. Must exist concurrent with the first inoperability and
b. Must remain inoperable or not within limits after the first inoperability is resolved.

The total Completion Time allowed for completing a Required Action to address the subsequent inoperability shall be limited to the more restrictive of either:

a. The stated Completion Time, as measured from the initial entry into the Condition, plus an additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or
b. The stated Completion Time as measured from discovery of the subsequent inoperability.

The above Completion Time extensions do not apply to those Specifications that have exceptions that allow completely separate re-entry into the Condition (for each train, subsystem, component, or variable expressed in the Condition) and separate tracking of Completion Times based on this re-entry. These exceptions are stated in individual Specifications.

The above Completion Time extension does not apply to a Completion Time with a modified "time zero." This modified "time zero" may be expressed as a repetitive time (i.e., "once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />," where the Completion Time is referenced from a previous completion of the Required Action versus the time of Condition entry) or as a time modified by the phrase "from discovery . . ."

SEQUOYAH - UNIT 2 1.3-2 Amendment 327,

Completion Times 1.3 1.3 Completion Times EXAMPLES The following examples illustrate the use of Completion Times with different types of Conditions and changing Conditions.

EXAMPLE 1.3-1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. Required B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action and associated AND Completion Time not met. B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SEQUOYAH - UNIT 2 1.3- Amendment 327,

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

&RQGLWLRQ%KDVWZR5HTXLUHG$FWLRQV(DFK5HTXLUHG$FWLRQKDVLWVRZQ

VHSDUDWH&RPSOHWLRQ7LPH(DFK&RPSOHWLRQ7LPHLVUHIHUHQFHGWRWKH

WLPHWKDW&RQGLWLRQ%LVHQWHUHG

7KH5HTXLUHG$FWLRQVRI&RQGLWLRQ%DUHWREHLQ02'(ZLWKLQKRXUV

$1'LQ02'(ZLWKLQKRXUV$WRWDORIKRXUVLVDOORZHGIRU

UHDFKLQJ02'(DQGDWRWDORIKRXUV QRWKRXUV LVDOORZHGIRU

UHDFKLQJ02'(IURPWKHWLPHWKDW&RQGLWLRQ%ZDVHQWHUHG,I02'(

LVUHDFKHGZLWKLQKRXUVWKHWLPHDOORZHGIRUUHDFKLQJ02'(LVWKH

QH[WKRXUVEHFDXVHWKHWRWDOWLPHDOORZHGIRUUHDFKLQJ02'(LV

KRXUV

,I&RQGLWLRQ%LVHQWHUHGZKLOHLQ02'(WKHWLPHDOORZHGIRUUHDFKLQJ

02'(LVWKHQH[WKRXUV

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QHSXPS $5HVWRUHSXPSWR GD\V

LQRSHUDEOH 23(5$%/(VWDWXV

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG $1'

&RPSOHWLRQ 7LPHQRWPHW  %%HLQ02'( KRXUV

KHQDSXPSLVGHFODUHGLQRSHUDEOH&RQGLWLRQ$LVHQWHUHG,IWKHSXPS

LVQRWUHVWRUHGWR23(5$%/(VWDWXVZLWKLQGD\V&RQGLWLRQ%LVDOVR

HQWHUHGDQGWKH&RPSOHWLRQ7LPHFORFNVIRU5HTXLUHG$FWLRQV%

DQG%VWDUW,IWKHLQRSHUDEOHSXPSLVUHVWRUHGWR23(5$%/(VWDWXV

DIWHU&RQGLWLRQ%LVHQWHUHG&RQGLWLRQV$DQG%DUHH[LWHGDQGWKHUHIRUH

WKH5HTXLUHG$FWLRQVRI&RQGLWLRQ%PD\EHWHUPLQDWHG

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

KHQDVHFRQGSXPSLVGHFODUHGLQRSHUDEOHZKLOHWKHILUVWSXPSLVVWLOO

LQRSHUDEOH&RQGLWLRQ$LVQRWUHHQWHUHGIRUWKHVHFRQGSXPS

/&2LVHQWHUHGVLQFHWKH$&7,216GRQRWLQFOXGHD&RQGLWLRQIRU

PRUHWKDQRQHLQRSHUDEOHSXPS7KH&RPSOHWLRQ7LPHFORFNIRU

&RQGLWLRQ$GRHVQRWVWRSDIWHU/&2LVHQWHUHGEXWFRQWLQXHVWREH

WUDFNHGIURPWKHWLPH&RQGLWLRQ$ZDVLQLWLDOO\HQWHUHG

KLOHLQ/&2LIRQHRIWKHLQRSHUDEOHSXPSVLVUHVWRUHGWR

23(5$%/(VWDWXVDQGWKH&RPSOHWLRQ7LPHIRU&RQGLWLRQ$KDVQRW

H[SLUHG/&2PD\EHH[LWHGDQGRSHUDWLRQFRQWLQXHGLQDFFRUGDQFH

ZLWK&RQGLWLRQ$

KLOHLQ/&2LIRQHRIWKHLQRSHUDEOHSXPSVLVUHVWRUHGWR

23(5$%/(VWDWXVDQGWKH&RPSOHWLRQ7LPHIRU&RQGLWLRQ$KDVH[SLUHG

/&2PD\EHH[LWHGDQGRSHUDWLRQFRQWLQXHGLQDFFRUGDQFHZLWK

&RQGLWLRQ%7KH&RPSOHWLRQ7LPHIRU&RQGLWLRQ%LVWUDFNHGIURPWKH

WLPHWKH&RQGLWLRQ$&RPSOHWLRQ7LPHH[SLUHG

2QUHVWRULQJRQHRIWKHSXPSVWR23(5$%/(VWDWXVWKH&RQGLWLRQ$

&RPSOHWLRQ7LPHLVQRWUHVHWEXWFRQWLQXHVIURPWKHWLPHWKHILUVWSXPS

ZDVGHFODUHGLQRSHUDEOH7KLV&RPSOHWLRQ7LPHPD\EHH[WHQGHGLIWKH

SXPSUHVWRUHGWR23(5$%/(VWDWXVZDVWKHILUVWLQRSHUDEOHSXPS$

KRXUH[WHQVLRQWRWKHVWDWHGGD\VLVDOORZHGSURYLGHGWKLVGRHVQRW

UHVXOWLQWKHVHFRQGSXPSEHLQJLQRSHUDEOHIRU!GD\V

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QH $5HVWRUH)XQFWLRQ; GD\V

)XQFWLRQ; WUDLQWR23(5$%/(

WUDLQ VWDWXV

LQRSHUDEOH

% 2QH  %5HVWRUH)XQFWLRQ< KRXUV

)XQFWLRQ< WUDLQWR23(5$%/(

WUDLQ VWDWXV

LQRSHUDEOH

& 2QH &5HVWRUH)XQFWLRQ; KRXUV

)XQFWLRQ; WUDLQWR23(5$%/(

WUDLQ VWDWXV

LQRSHUDEOH

25

$1'

&5HVWRUH)XQFWLRQ< KRXUV

2QH WUDLQWR23(5$%/(

)XQFWLRQ< VWDWXV

WUDLQ LQRSHUDEOH

KHQRQH)XQFWLRQ;WUDLQDQGRQH)XQFWLRQ<WUDLQDUHLQRSHUDEOH

&RQGLWLRQ$DQG&RQGLWLRQ%DUHFRQFXUUHQWO\DSSOLFDEOH7KH&RPSOHWLRQ

7LPHVIRU&RQGLWLRQ$DQG&RQGLWLRQ%DUHWUDFNHGVHSDUDWHO\IRUHDFK

WUDLQVWDUWLQJIURPWKHWLPHHDFKWUDLQZDVGHFODUHGLQRSHUDEOHDQGWKH

&RQGLWLRQZDVHQWHUHG$VHSDUDWH&RPSOHWLRQ7LPHLVHVWDEOLVKHGIRU

&RQGLWLRQ&DQGWUDFNHGIURPWKHWLPHWKHVHFRQGWUDLQZDVGHFODUHG

LQRSHUDEOH LHWKHWLPHWKHVLWXDWLRQGHVFULEHGLQ&RQGLWLRQ&ZDV

GLVFRYHUHG 

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



&RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

,I5HTXLUHG$FWLRQ&LVFRPSOHWHGZLWKLQWKHVSHFLILHG&RPSOHWLRQ7LPH

&RQGLWLRQV%DQG&DUHH[LWHG,IWKH&RPSOHWLRQ7LPHIRU5HTXLUHG

$FWLRQ$KDVQRWH[SLUHGRSHUDWLRQPD\FRQWLQXHLQDFFRUGDQFHZLWK

&RQGLWLRQ$7KHUHPDLQLQJ&RPSOHWLRQ7LPHLQ&RQGLWLRQ$LVPHDVXUHG

IURPWKHWLPHWKHDIIHFWHGWUDLQZDVGHFODUHGLQRSHUDEOH LHLQLWLDOHQWU\

LQWR&RQGLWLRQ$ 

,WLVSRVVLEOHWRDOWHUQDWHEHWZHHQ&RQGLWLRQV$%DQG&LQVXFKD

PDQQHUWKDWRSHUDWLRQFRXOGFRQWLQXHLQGHILQLWHO\ZLWKRXWHYHUUHVWRULQJ

V\VWHPVWRPHHWWKH/&2+RZHYHUGRLQJVRZRXOGEHLQFRQVLVWHQWZLWK

WKHEDVLVRIWKH&RPSOHWLRQ7LPHV7KHUHIRUHWKHUHVKDOOEH

DGPLQLVWUDWLYHFRQWUROVWROLPLWWKHPD[LPXPWLPHDOORZHGIRUDQ\

FRPELQDWLRQRI&RQGLWLRQVWKDWUHVXOWLQDVLQJOHFRQWLJXRXVRFFXUUHQFHRI

IDLOLQJWRPHHWWKH/&27KHVHDGPLQLVWUDWLYHFRQWUROVVKDOOHQVXUHWKDW

WKH&RPSOHWLRQ7LPHVIRUWKRVH&RQGLWLRQVDUHQRWLQDSSURSULDWHO\

H[WHQGHG

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QHRUPRUH $5HVWRUHYDOYH V WR KRXUV

YDOYHV 23(5$%/(VWDWXV

LQRSHUDEOH

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG $1'

&RPSOHWLRQ 7LPHQRWPHW  %%HLQ02'( KRXUV

$VLQJOH&RPSOHWLRQ7LPHLVXVHGIRUDQ\QXPEHURIYDOYHVLQRSHUDEOHDW

WKHVDPHWLPH7KH&RPSOHWLRQ7LPHDVVRFLDWHGZLWK&RQGLWLRQ$LV

EDVHGRQWKHLQLWLDOHQWU\LQWR&RQGLWLRQ$DQGLVQRWWUDFNHGRQDSHU

YDOYHEDVLV'HFODULQJVXEVHTXHQWYDOYHVLQRSHUDEOHZKLOH&RQGLWLRQ$

LVVWLOOLQHIIHFWGRHVQRWWULJJHUWKHWUDFNLQJRIVHSDUDWH&RPSOHWLRQ

7LPHV

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



 &RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

2QFHRQHRIWKHYDOYHVKDVEHHQUHVWRUHGWR23(5$%/(VWDWXVWKH

&RQGLWLRQ$&RPSOHWLRQ7LPHLVQRWUHVHWEXWFRQWLQXHVIURPWKHWLPHWKH

ILUVWYDOYHZDVGHFODUHGLQRSHUDEOH7KH&RPSOHWLRQ7LPHPD\EH

H[WHQGHGLIWKHYDOYHUHVWRUHGWR23(5$%/(VWDWXVZDVWKHILUVW

LQRSHUDEOHYDOYH7KH&RQGLWLRQ$&RPSOHWLRQ7LPHPD\EHH[WHQGHGIRU

XSWRKRXUVSURYLGHGWKLVGRHVQRWUHVXOWLQDQ\VXEVHTXHQWYDOYHEHLQJ

LQRSHUDEOHIRU!KRXUV

,IWKH&RPSOHWLRQ7LPHRIKRXUV LQFOXGLQJWKHH[WHQVLRQ H[SLUHVZKLOH

RQHRUPRUHYDOYHVDUHVWLOOLQRSHUDEOH&RQGLWLRQ%LVHQWHUHG

(;$03/(

$&7,216

127(

6HSDUDWH&RQGLWLRQHQWU\LVDOORZHGIRUHDFKLQRSHUDEOHYDOYH



&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QHRUPRUH $5HVWRUHYDOYH V WR KRXUV

YDOYHV 23(5$%/(VWDWXV

LQRSHUDEOH

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG $1'

&RPSOHWLRQ 7LPHQRWPHW  %%HLQ02'( KRXUV

7KH1RWHDERYHWKH$&7,2167DEOHLVDPHWKRGRIPRGLI\LQJKRZWKH

&RPSOHWLRQ7LPHLVWUDFNHG,IWKLVPHWKRGRIPRGLI\LQJKRZWKH

&RPSOHWLRQ7LPHLVWUDFNHGZDVDSSOLFDEOHRQO\WRDVSHFLILF&RQGLWLRQ

WKH1RWHZRXOGDSSHDULQWKDW&RQGLWLRQUDWKHUWKDQDWWKHWRSRIWKH

$&7,2167DEOH

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



 &RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

7KH1RWHDOORZV&RQGLWLRQ$WREHHQWHUHGVHSDUDWHO\IRUHDFKLQRSHUDEOH

YDOYHDQG&RPSOHWLRQ7LPHVWUDFNHGRQDSHUYDOYHEDVLV:KHQDYDOYH

LVGHFODUHGLQRSHUDEOH&RQGLWLRQ$LVHQWHUHGDQGLWV&RPSOHWLRQ7LPH

VWDUWV,IVXEVHTXHQWYDOYHVDUHGHFODUHGLQRSHUDEOH&RQGLWLRQ$LV

HQWHUHGIRUHDFKYDOYHDQGVHSDUDWH&RPSOHWLRQ7LPHVVWDUWDQGDUH

WUDFNHGIRUHDFKYDOYH

,IWKH&RPSOHWLRQ7LPHDVVRFLDWHGZLWKDYDOYHLQ&RQGLWLRQ$H[SLUHV

&RQGLWLRQ%LVHQWHUHGIRUWKDWYDOYH,IWKH&RPSOHWLRQ7LPHVDVVRFLDWHG

ZLWKVXEVHTXHQWYDOYHVLQ&RQGLWLRQ$H[SLUH&RQGLWLRQ%LVHQWHUHG

VHSDUDWHO\IRUHDFKYDOYHDQGVHSDUDWH&RPSOHWLRQ7LPHVVWDUWDQGDUH

WUDFNHGIRUHDFKYDOYH,IDYDOYHWKDWFDXVHGHQWU\LQWR&RQGLWLRQ%LV

UHVWRUHGWR23(5$%/(VWDWXV&RQGLWLRQ%LVH[LWHGIRUWKDWYDOYH

6LQFHWKH1RWHLQWKLVH[DPSOHDOORZVPXOWLSOH&RQGLWLRQHQWU\DQG

WUDFNLQJRIVHSDUDWH&RPSOHWLRQ7LPHV&RPSOHWLRQ7LPHH[WHQVLRQVGR

QRWDSSO\

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QHFKDQQHO $3HUIRUP65[[[ 2QFHSHUKRXUV

LQRSHUDEOH

25

$5HGXFH7+(50$/ KRXUV

32:(5WR

573

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG

&RPSOHWLRQ 7LPHQRWPHW

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



 &RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

(QWU\LQWR&RQGLWLRQ$RIIHUVDFKRLFHEHWZHHQ5HTXLUHG$FWLRQ$

RU$5HTXLUHG$FWLRQ$KDVDRQFHSHU&RPSOHWLRQ7LPHZKLFK

TXDOLILHVIRUWKHH[WHQVLRQSHU65WRHDFKSHUIRUPDQFHDIWHU

WKHLQLWLDOSHUIRUPDQFH7KHLQLWLDOKRXULQWHUYDORI5HTXLUHG$FWLRQ$

EHJLQVZKHQ&RQGLWLRQ$LVHQWHUHGDQGWKHLQLWLDOSHUIRUPDQFHRI

5HTXLUHG$FWLRQ$PXVWEHFRPSOHWHZLWKLQWKHILUVWKRXULQWHUYDO,I

5HTXLUHG$FWLRQ$LVIROORZHGDQGWKH5HTXLUHG$FWLRQLVQRWPHWZLWKLQ

WKH&RPSOHWLRQ7LPH SOXVWKHH[WHQVLRQDOORZHGE\65 

&RQGLWLRQ%LVHQWHUHG,I5HTXLUHG$FWLRQ$LVIROORZHGDQGWKH

&RPSOHWLRQ7LPHRIKRXUVLVQRWPHW&RQGLWLRQ%LVHQWHUHG

,IDIWHUHQWU\LQWR&RQGLWLRQ%5HTXLUHG$FWLRQ$RU$LVPHW

&RQGLWLRQ%LVH[LWHGDQGRSHUDWLRQPD\WKHQFRQWLQXHLQ&RQGLWLRQ$

(;$03/(

$&7,216

&21',7,21 5(48,5('$&7,21 &203/(7,217,0(

$ 2QH $9HULI\DIIHFWHG KRXU

VXEV\VWHP VXEV\VWHPLVRODWHG

LQRSHUDEOH $1'

2QFHSHUKRXUV

WKHUHDIWHU

$1'

$5HVWRUHVXEV\VWHP KRXUV

WR23(5$%/(

VWDWXV

% 5HTXLUHG  %%HLQ02'( KRXUV

$FWLRQDQG DVVRFLDWHG $1'

&RPSOHWLRQ 7LPHQRWPHW  %%HLQ02'( KRXUV

6(482<$++/-81,7  $PHQGPHQW

&RPSOHWLRQ7LPHV



 &RPSOHWLRQ7LPHV

(;$03/(6 FRQWLQXHG 

5HTXLUHG$FWLRQ$KDVWZR&RPSOHWLRQ7LPHV7KHKRXU&RPSOHWLRQ

7LPHEHJLQVDWWKHWLPHWKH&RQGLWLRQLVHQWHUHGDQGHDFK2QFHSHU

KRXUVWKHUHDIWHULQWHUYDOEHJLQVXSRQSHUIRUPDQFHRI5HTXLUHG

$FWLRQ$

,IDIWHU&RQGLWLRQ$LVHQWHUHG5HTXLUHG$FWLRQ$LVQRWPHWZLWKLQHLWKHU

WKHLQLWLDOKRXURUDQ\VXEVHTXHQWKRXULQWHUYDOIURPWKHSUHYLRXV

SHUIRUPDQFH SOXVWKHH[WHQVLRQDOORZHGE\65 &RQGLWLRQ%LV

HQWHUHG7KH&RPSOHWLRQ7LPHFORFNIRU&RQGLWLRQ$GRHVQRWVWRSDIWHU

&RQGLWLRQ%LVHQWHUHGEXWFRQWLQXHVIURPWKHWLPH&RQGLWLRQ$ZDV

LQLWLDOO\HQWHUHG,I5HTXLUHG$FWLRQ$LVPHWDIWHU&RQGLWLRQ%LV

HQWHUHG&RQGLWLRQ%LVH[LWHGDQGRSHUDWLRQPD\FRQWLQXHLQDFFRUGDQFH

ZLWK&RQGLWLRQ$SURYLGHGWKH&RPSOHWLRQ7LPHIRU5HTXLUHG$FWLRQ$

KDVQRWH[SLUHG

,00(',$7( :KHQ,PPHGLDWHO\LVXVHGDVD&RPSOHWLRQ7LPHWKH5HTXLUHG$FWLRQ

&203/(7,217,0( VKRXOGEHSXUVXHGZLWKRXWGHOD\DQGLQDFRQWUROOHGPDQQHU

6(482<$++/-81,7  $PHQGPHQW

LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2, LCO 3.0.7, LCO 3.0.8, and LCO 3.0.9.

LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.

If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required unless otherwise stated.

LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:

a. MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;
b. MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and
c. MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.

Exceptions to this Specification are stated in the individual Specifications.

Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.

LCO 3.0.3 is only applicable in MODES 1, 2, 3, and 4.

LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:

D When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicabilityfor an unlimited period of time; E After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate (exceptions to this Specification are stated in the individual Specifications) or SEQUOYAH - UNIT 2 3.0-1 Amendment 327,

SR Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR.

Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

For Frequencies specified as "once," the above interval extension does not apply.

If a Completion Time requires periodic performance on a "once per . . ."

basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance. The delay period is only applicable when there is a reasonable expectation the surveillance will be met when performed. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.

SEQUOYAH - UNIT 2 3.0-4 Amendment 327,

Enclosure Attachment 2.3 Proposed TS Changes (Final Typed)

Watts Bar Nuclear Plant, Units 1 and 2 CNL-22-008

Completion Times 1.3 1.3 Completion Times 1.0 USE AND APPLICATION 1.3 Completion Times PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.

BACKGROUND Limiting Conditions for Operation (LCOs) specify minimum requirements for ensuring safe operation of the unit. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Time(s).

DESCRIPTION The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the discovery of a situation (e.g., inoperable equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the unit is in a MODE or specified condition stated in the Applicability of the LCO.

Unless otherwise specified, the Completion Time begins when a senior licensed operator on the operating shift crew with responsibility for plant operations makes the determination that an LCO is not met and an ACTIONS Condition is entered.

The "otherwise specified" exceptions are varied, such as a Required Action Note or Surveillance Requirement Note that provides an alternative time to perform specific tasks, such as testing, without starting the Completion Time. While utilizing the Note, should a Condition be applicable for any reason not addressed by the Note, the Completion Time begins. Should the time allowance in the Note be exceeded, the Completion Time begins at that point. The exceptions may also be incorporated into the Completion Time. For example, LCO 3.8.1, "AC Sources - Operating," Required Action B., requires declaring required feature(s) supported by an inoperable diesel generator, inoperable when the redundant required feature(s) are inoperable. The Completion Time states, "4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition B concurrent with inoperability of redundant required feature(s)." In this case the Completion Time does not begin until the conditions in the Completion Time are satisfied.

Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the unit is not within the LCO Applicability.

If situations are discovered that require entry into more than one Condition at a time within a single LCO (multiple Conditions), the Required Actions for each (continued)

Watts Bar-Unit 1 1.3-1 $PHQGPHQW

Completion Times 1.3 1.3 Completion Times DESCRIPTION Condition must be performed within the associated Completion Time. When in (continued) multiple Conditions, separate Completion Times are tracked for each Condition starting from the discovery of the situation that required entry into the Condition, unless otherwise specified.

Once a Condition has been entered, subsequent trains, subsystems, components, or variables expressed in the Condition, discovered to be inoperable or not within limits, will not result in separate entry into the Condition, unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition, unless otherwise specified.

However, when a subsequent train, subsystem, component, or variable expressed in the Condition is discovered to be inoperable or not within limits, the Completion Time(s) may be extended. To apply this Completion Time extension, two criteria must first be met. The subsequent inoperability:

a. Must exist concurrent with the first inoperability; and
b. Must remain inoperable or not within limits after the first inoperability is resolved.

The total Completion Time allowed for completing a Required Action to address the subsequent inoperability shall be limited to the more restrictive of either:

a. The stated Completion Time, as measured from the initial entry into the Condition, plus an additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; or
b. The stated Completion Time as measured from discovery of the subsequent inoperability.

The above Completion Time extensions do not apply to those Specifications that have exceptions that allow completely separate re-entry into the Condition (for each train, subsystem, component, or variable expressed in the Condition) and separate tracking of Completion Times based on this re-entry. These exceptions are stated in individual Specifications.

The above Completion Time extension does not apply to a Completion Time with a modified "time zero." This modified "time zero" may be expressed as a repetitive time (i.e., "once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />," where the Completion Time is referenced from a previous completion of the Required Action versus the time of Condition entry) or as a time modified by the phrase "from discovery . . ." Example 1.3-3 illustrates one use of this type of Completion Time. The 10 day Completion Time specified for Conditions A and B in Example 1.3-3 may not be extended.

(continued)

Watts Bar-Unit 1 1.3-2 $PHQGPHQW

LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.4 b. After performance of a risk assessment addressing inoperable (continued) systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate (exceptions to this Specification are stated in the individual Specifications);or

c. When an allowance is stated in the individual value, parameter, or other Specification.

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.

LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered. Only the support system LCO ACTIONS are required to be entered. This is an exception to LCO 3.0.2 for the supported system. In this event, additional evaluations and limitations may be required in accordance with Specification 5.7.2.18, "Safety Function Determination Program (SFDP)." If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.

(continued)

Watts Bar-Unit 1 3.0-2 Amendment 55,

SR Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3.

Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

For Frequencies specified as "once," the above interval extension does not apply.

If a Completion Time requires periodic performance on a "once per . . ." basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance. The delay period is only applicable when there is a reasonable expectation the surveillance will be met when performed. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

(continued)

Watts Bar-Unit 1 3.0-4 Amendment 42, 114, 121, 135,

Completion Times 1.3 1.3 Completion Times 1.0 USE AND APPLICATION 1.3 Completion Times PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.

BACKGROUND Limiting Conditions for Operation (LCOs) specify minimum requirements for ensuring safe operation of the unit. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Time(s).

DESCRIPTION The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the discovery of a situation (e.g., inoperable equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the unit is in a MODE or specified condition stated in the Applicability of the LCO.

Unless otherwise specified, the Completion Time begins when a senior licensed operator on the operating shift crew with responsibility for plant operations makes the determination that an LCO is not met and an ACTIONS Condition is entered. The "otherwise specified" exceptions are varied, such as a Required Action Note or Surveillance Requirement Note that provides an alternative time to perform specific tasks, such as testing, without starting the Completion Time. While utilizing the Note, should a Condition be applicable for any reason not addressed by the Note, the Completion Time begins. Should the time allowance in the Note be exceeded, the Completion Time begins at that point. The exceptions may also be incorporated into the Completion Time. For example, LCO 3.8.1, "AC Sources - Operating," Required Action B., requires declaring required feature(s) supported by an inoperable diesel generator, inoperable when the redundant required feature(s) are inoperable. The Completion Time states, "4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition B concurrent with inoperability of redundant required feature(s)." In this case the Completion Time does not begin until the conditions in the Completion Time are satisfied.

Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the unit is not within the LCO Applicability.

(continued)

Watts Bar - Unit 2 1.3-1 $PHQGPHQW

Completion Times 1.3 1.3 Completion Times DESCRIPTION If situations are discovered that require entry into more than one (continued) Condition at a time within a single LCO (multiple Conditions), the Required Actions for each Condition must be performed within the associated Completion Time. When in multiple Conditions, separate Completion Times are tracked for each Condition starting from the discovery of the situation that required entry into the Condition, unless otherwise specified.

Once a Condition has been entered, subsequent trains, subsystems, components, or variables expressed in the Condition, discovered to be inoperable or not within limits, will not result in separate entry into the Condition, unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition, unless otherwise specified.

(continued)

Watts Bar - Unit 2 1.3-2 $PHQGPHQW

Completion Times 1.3 1.3 Completion Times However, when a subsequent train, subsystem, component, or variable expressed in the Condition is discovered to be inoperable or not within limits, the Completion Time(s) may be extended. To apply this Completion Time extension, two criteria must first be met. The subsequent inoperability:

a. Must exist concurrent with the first inoperability; and
b. Must remain inoperable or not within limits after the first inoperability is resolved.

The total Completion Time allowed for completing a Required Action to address the subsequent inoperability shall be limited to the more restrictive of either:

a. The stated Completion Time, as measured from the initial entry into the Condition, plus an additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; or
b. The stated Completion Time as measured from discovery of the subsequent inoperability.

The above Completion Time extensions do not apply to those Specifications that have exceptions that allow completely separate re-entry into the Condition (for each train, subsystem, component, or variable expressed in the Condition) and separate tracking of Completion Times based on this re-entry. These exceptions are stated in individual Specifications.

The above Completion Time extension does not apply to a Completion Time with a modified "time zero." This modified "time zero" may be expressed as a repetitive time (i.e., "once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />," where the Completion Time is referenced from a previous completion of the Required Action versus the time of Condition entry) or as a time modified by the phrase "from discovery . . ." Example 1.3-3 illustrates one use of this type of Completion Time. The 10 day Completion Time specified for Conditions A and B in Example 1.3-3 may not be extended.

(continued)

Watts Bar - Unit 2 1.3-2a $PHQGPHQW

LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.4 b. After performance of a risk assessment addressing inoperable (continued) systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate (exceptions to this Specification are stated in the individual Specifications); or

c. When an allowance is stated in the individual value, parameter, or other Specification.

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing required to demonstrate OPERABILITY.

LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered.

Only the support system LCO ACTIONS are required to be entered.

This is an exception to LCO 3.0.2 for the supported system. In this event, additional evaluations and limitations may be required in accordance with Specification 5.7.2.18, "Safety Function Determination Program (SFDP)." If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.

When a support system's Required Action directs a supported system to be declared inoperable or directs entry into Conditions and Required Actions for a supported system, the applicable Conditions and Required Actions shall be entered in accordance with LCO 3.0.2.

(continued)

Watts Bar - Unit 2 3.0-2 $PHQGPHQW

SR Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR.

Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

For Frequencies specified as "once," the above interval extension does not apply.

If a Completion Time requires periodic performance on a "once per . . ."

basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater. This delay period is permitted to allow performance of the Surveillance. The delay period is only applicable when there is a reasonable expectation the surveillance will be met when performed. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

(continued)

Watts Bar - Unit 2 3.0-4 Amendment 3, 12, 39,

Enclosure Attachment 3.1 Proposed TS Bases Changes (Markups) (For Information Only)

Browns Ferry Nuclear Plant, Units 1, 2, and 3 CNL-22-008

/&2$SSOLFDELOLW\

%

% /,0,7,1*&21',7,21)2523(5$7,21 /&2 $33/,&$%,/,7<

%$6(6

/&2V /&2 WKURXJK/&2 HVWDEOLVKWKHJHQHUDOUHTXLUHPHQWV

DSSOLFDEOHWRDOO6SHFLILFDWLRQVDQGDSSO\DWDOOWLPHVXQOHVV

RWKHUZLVHVWDWHG

/&2 /&2 HVWDEOLVKHVWKH$SSOLFDELOLW\VWDWHPHQWZLWKLQHDFK

LQGLYLGXDO6SHFLILFDWLRQDVWKHUHTXLUHPHQWIRUZKHQWKH/&2LV

UHTXLUHGWREHPHW LHZKHQWKHXQLWLVLQWKH02'(6RURWKHU

VSHFLILHGFRQGLWLRQVRIWKH$SSOLFDELOLW\VWDWHPHQWRIHDFK

6SHFLILFDWLRQ  , unless otherwise specified.

/&2 /&2HVWDEOLVKHVWKDWXSRQGLVFRYHU\RIDIDLOXUHWRPHHWDQ

/&2WKHDVVRFLDWHG$&7,216VKDOOEHPHW7KH&RPSOHWLRQ7LPH

RIHDFK5HTXLUHG$FWLRQIRUDQ$&7,216&RQGLWLRQLVDSSOLFDEOH

IURPWKHSRLQWLQWLPHWKDWDQ$&7,216&RQGLWLRQLVHQWHUHG7KH

5HTXLUHG$FWLRQVHVWDEOLVKWKRVHUHPHGLDOPHDVXUHVWKDWPXVWEH

WDNHQZLWKLQVSHFLILHG&RPSOHWLRQ7LPHVZKHQWKHUHTXLUHPHQWVRI

DQ/&2DUHQRWPHW7KLV6SHFLILFDWLRQHVWDEOLVKHVWKDW

D &RPSOHWLRQRIWKH5HTXLUHG$FWLRQVZLWKLQWKHVSHFLILHG

&RPSOHWLRQ7LPHVFRQVWLWXWHVFRPSOLDQFHZLWKD6SHFLILFDWLRQ

DQG E &RPSOHWLRQRIWKH5HTXLUHG$FWLRQVLVQRWUHTXLUHGZKHQDQ

/&2LVPHWZLWKLQWKHVSHFLILHG&RPSOHWLRQ7LPHXQOHVV RWKHUZLVHVSHFLILHG

FRQWLQXHG

%)181,7  % $PHQGPHQW

5HYLVLRQ

/&2$SSOLFDELOLW\

%

%$6(6

/&2 7KLV6SHFLILFDWLRQGHOLQHDWHVWKHWLPHOLPLWVIRUSODFLQJWKHXQLWLQD

 FRQWLQXHG VDIH02'(RURWKHUVSHFLILHGFRQGLWLRQZKHQRSHUDWLRQFDQQRWEH

PDLQWDLQHGZLWKLQWKHOLPLWVIRUVDIHRSHUDWLRQDVGHILQHGE\WKH

/&2DQGLWV$&7,2163ODQQHGHQWU\LQWR/&2VKRXOGEH

DYRLGHG,ILWLVQRWSUDFWLFDOWRDYRLGSODQQHGHQWU\LQWR/&2

SODQWULVNVKRXOGEHDVVHVVHGDQGPDQDJHGLQDFFRUGDQFHZLWK

&)5 D  DQGWKHSODQQHGHQWU\LQWR/&2VKRXOG

KDYHOHVVHIIHFWRQSODQWVDIHW\WKDQRWKHUSUDFWLFDEOHDOWHUQDWLYHV

8SRQHQWHULQJ/&2  KRXULVDOORZHGWRSUHSDUHIRUDQ

RUGHUO\VKXWGRZQEHIRUHLQLWLDWLQJDFKDQJHLQXQLWRSHUDWLRQ7KLV

LQFOXGHVWLPHWRSHUPLWWKHRSHUDWRUWRFRRUGLQDWHWKHUHGXFWLRQLQ

HOHFWULFDOJHQHUDWLRQZLWKWKHORDGGLVSDWFKHUWRHQVXUHWKHVWDELOLW\

DQGDYDLODELOLW\RIWKHHOHFWULFDOJULG7KH/&2SKUDVH³$FWLRQVKDOO

EHLQLWLDWHGZLWKLQ KRXU<<'GRHVQRWPHDQWKDWDFKDQJHLQORDG

PXVWEHFRPPHQFHGE\WKHHQGRIWKHKRXUSHULRG7KHDFWLRQ

LQLWLDWHGDWWKHHQGRIWKHKRXUSHULRGPD\EHDGPLQLVWUDWLYHLQ

QDWXUHVXFKDVSUHSDULQJVKXWGRZQSURFHGXUHV,IFRUUHFWLYH

enter PHDVXUHVZKLFKZRXOGDOORZH[LWLQJ/&2DUHQRWFRPSOHWHDW

WKHHQGRIKRXUEXWWKHUHLVUHDVRQDEOHDVVXUDQFHWKDWWKH\ZLOO

EHFRPSOHWHGZLWKHQRXJKWLPHUHPDLQLQJWRDOORZIRUDQRUGHUO\

XQLWVKXWGRZQLIUHTXLUHGFRPPHQFLQJDORDGGHFUHDVHPD\EH

GHOD\HGXQWLOWKDWWLPH7KHWLPHOLPLWVVSHFLILHGWRUHDFKORZHU

02'(6RIRSHUDWLRQSHUPLWWKHVKXWGRZQWRSURFHHGLQD

FRQWUROOHGDQGRUGHUO\PDQQHUWKDWLVZHOOZLWKLQWKHVSHFLILHG

PD[LPXPFRROGRZQUDWHDQGZLWKLQWKHFDSDELOLWLHVRIWKHXQLW

DVVXPLQJWKDWRQO\WKHPLQLPXPUHTXLUHGHTXLSPHQWLV

23(5$%/(7KLVUHGXFHVWKHUPDOVWUHVVHVRQFRPSRQHQWVRIWKH

5HDFWRU&RRODQW6\VWHPDQGWKHSRWHQWLDOIRUDSODQWXSVHW WKDW

FRXOGFKDOOHQJHVDIHW\V\VWHPVXQGHUFRQGLWLRQVWRZKLFKWKLV

6SHFLILFDWLRQDSSOLHV7KHXVHDQGLQWHUSUHWDWLRQRIVSHFLILHGWLPHV

WRFRPSOHWHWKHDFWLRQVRI/&2 DUHFRQVLVWHQWZLWKWKH

GLVFXVVLRQRI6HFWLRQ &RPSOHWLRQ7LPHV

FRQWLQXHG

$PHQGPHQW

%)181,7  % 5HYLVLRQ

)HEUXDU\



/&2$SSOLFDELOLW\

%

%$6(6

/&2 $XQLWVKXWGRZQUHTXLUHGLQDFFRUGDQFHZLWK/&2 PD\EH FRQWLQXHG WHUPLQDWHGDQG/&2 H[LWHGLIDQ\RIWKHIROORZLQJRFFXUV

D 7KH/&2LVQRZPHW

c. b. TheLCOisnolongerapplicable, E $&RQGLWLRQH[LVWVIRUZKLFKWKH5HTXLUHG$FWLRQVKDYHQRZ

EHHQSHUIRUPHG , or d.

F $&7,216H[LVWWKDWGRQRWKDYHH[SLUHG&RPSOHWLRQ7LPHV

7KHVH&RPSOHWLRQ7LPHVDUHDSSOLFDEOHIURPWKHSRLQWLQWLPH

WKDWWKH&RQGLWLRQLVLQLWLDOO\HQWHUHGDQGQRWIURPWKHWLPH

/&2 LVH[LWHG

FRQWLQXHG

%)181,7  %D $PHQGPHQW

/&2$SSOLFDELOLW\

%

%$6(6 enter enter enter

/&2 7KHWLPHOLPLWVRI6SHFLILFDWLRQ DOORZ KRXUVIRUWKHXQLWWR

 FRQWLQXHG EHLQ02'( ZKHQDVKXWGRZQLVUHTXLUHGGXULQJ02'( 

RSHUDWLRQ,IWKHXQLWLVLQDORZHU02'(RIRSHUDWLRQZKHQD enter enter VKXWGRZQLVUHTXLUHGWKHWLPHOLPLWIRUUHDFKLQJWKHQH[WORZHU

02'(DSSOLHV,IDORZHU02'(LVUHDFKHGLQOHVVWLPHWKDQ

DOORZHGKRZHYHUWKHWRWDODOORZDEOHWLPHWR UHDFK02'( RU enter RWKHUDSSOLFDEOH02'(LVQRWUHGXFHG)RUH[DPSOHLI02'( LV

UHDFKHGLQ KRXUVWKHQWKHWLPHDOORZHGIRUUHDFKLQJ02'( LV

WKHQH[W KRXUVEHFDXVHWKHWRWDOWLPHIRUUHDFKLQJ02'( LV enter QRWUHGXFHGIURPWKHDOORZDEOHOLPLWRI KRXUV7KHUHIRUHLI

UHPHGLDOPHDVXUHVDUHFRPSOHWHGWKDWZRXOGSHUPLWDUHWXUQWR

02'( DSHQDOW\LVQRWLQFXUUHGE\KDYLQJWRUHDFKDORZHU

02'(RIRSHUDWLRQLQOHVVWKDQWKHWRWDOWLPHDOORZHG

,Q02'(6 DQG/&2 SURYLGHVDFWLRQVIRU&RQGLWLRQV

QRWFRYHUHGLQRWKHU6SHFLILFDWLRQV7KHUHTXLUHPHQWVRI/&2 

GRQRWDSSO\LQ02'(6 DQGEHFDXVHWKHXQLWLVDOUHDG\LQWKH

PRVWUHVWULFWLYH&RQGLWLRQUHTXLUHGE\/&2 7KH

UHTXLUHPHQWVRI/&2 GRQRWDSSO\LQRWKHUVSHFLILHG FRQGLWLRQVRIWKH$SSOLFDELOLW\ XQOHVVLQ02'( RU EHFDXVH

WKH$&7,216RILQGLYLGXDO6SHFLILFDWLRQVVXIILFLHQWO\GHILQHWKH

UHPHGLDOPHDVXUHVWREHWDNHQ

([FHSWLRQVWR/&2 DUHSURYLGHGLQLQVWDQFHVZKHUHUHTXLULQJ

DXQLWVKXWGRZQLQDFFRUGDQFHZLWK/&2 ZRXOGQRWSURYLGH

DSSURSULDWHUHPHGLDOPHDVXUHVIRUWKHDVVRFLDWHGFRQGLWLRQRIWKH

XQLW$QH[DPSOHRIWKLVLVLQ/&2 6SHQW)XHO6WRUDJH3RRO

DWHU/HYHO/&2 KDVDQ$SSOLFDELOLW\RI'XULQJPRYHPHQW

RILUUDGLDWHGIXHODVVHPEOLHVLQWKHVSHQWIXHOVWRUDJHSRRO

FRQWLQXHG

%)181,7  % $PHQGPHQW

5HYLVLRQ

/&2$SSOLFDELOLW\

%

%$6(6

/&2 7KHUHIRUHWKLV/&2FDQEHDSSOLFDEOHLQDQ\RUDOO02'(6,IWKH

 FRQWLQXHG /&2DQGWKH5HTXLUHG$FWLRQVRI/&2 DUHQRWPHWZKLOHLQ

02'( RUWKHUHLVQRVDIHW\EHQHILWWREHJDLQHGE\SODFLQJ

WKHXQLWLQDVKXWGRZQFRQGLWLRQ7KH5HTXLUHG$FWLRQRI/&2 

RI6XVSHQGPRYHPHQWRILUUDGLDWHGIXHODVVHPEOLHVLQWKHVSHQW

IXHOVWRUDJHSRROLVWKH DSSURSULDWH5HTXLUHG$FWLRQWRFRPSOHWHLQ

OLHXRIWKHDFWLRQVRI/&2 7KHVHH[FHSWLRQVDUHDGGUHVVHG

LQWKHLQGLYLGXDO6SHFLILFDWLRQV

/&2 /&2HVWDEOLVKHVOLPLWDWLRQVRQFKDQJHVLQ02'(6RURWKHU

VSHFLILHGFRQGLWLRQVLQWKH$SSOLFDELOLW\ZKHQDQ/&2LVQRWPHW,W

DOORZVSODFLQJWKHXQLWLQD02'(RURWKHUVSHFLILHGFRQGLWLRQ

VWDWHGLQWKDW$SSOLFDELOLW\ HJWKH$SSOLFDELOLW\GHVLUHGWREH

HQWHUHG ZKHQXQLWFRQGLWLRQVDUHVXFKWKDWWKHUHTXLUHPHQWVRIWKH

/&2ZRXOGQRWEHPHWLQDFFRUGDQFHZLWK/&2D/&2

ERU/&2F either following entry into

/&2DDOORZVHQWU\LQWRD02'(RURWKHUVSHFLILHGFRQGLWLRQ

ACTIONS LQWKH$SSOLFDELOLW\ZLWKWKH/&2QRWPHWZKHQWKHDVVRFLDWHG

$&7,216WREHHQWHUHGSHUPLWFRQWLQXHGRSHUDWLRQLQWKH02'(RU

RWKHUVSHFLILHGFRQGLWLRQLQWKH$SSOLFDELOLW\IRUDQXQOLPLWHGSHULRG

RIWLPH&RPSOLDQFHZLWK5HTXLUHG$FWLRQVWKDWSHUPLWFRQWLQXHG

and the Required Actions followed after entry into RSHUDWLRQRIWKHXQLWIRUDQXQOLPLWHGSHULRGRIWLPHLQD02'(RU

will permit continued the Applicability RWKHUVSHFLILHGFRQGLWLRQSURYLGHVDQDFFHSWDEOHOHYHO operation RIVDIHW\IRU

within the MODE FRQWLQXHGRSHUDWLRQ7KLVLVZLWKRXWUHJDUGWRWKHVWDWXVRIWKHXQLW condition or other specified EHIRUHRUDIWHUWKH02'(FKDQJH7KHUHIRUHLQVXFKFDVHVHQWU\

LQWRD02'(RURWKHUVSHFLILHGFRQGLWLRQLQWKH$SSOLFDELOLW\PD\EH

PDGHLQDFFRUGDQFHZLWKWKHSURYLVLRQVRIWKH5HTXLUHG$FWLRQV

/&2EDOORZVHQWU\LQWRD02'(RURWKHUVSHFLILHGFRQGLWLRQ

<space> LQWKH$SSOLFDELOLW\ZLWKWKH/&2QRWPHWDIWHUSHUIRUPDQFHRIDULVN

For example, LCO DVVHVVPHQWDGGUHVVLQJLQRSHUDEOHV\VWHPVDQGFRPSRQHQWV

3.0.4.a may be used when the Required Action to be entered states that an FRQVLGHUDWLRQRIWKHUHVXOWVGHWHUPLQDWLRQRIWKHDFFHSWDELOLW\RI

inoperable instrument channel must be placed in the trip condition within the Completion Time.

Transition into aHQWHULQJWKH02'(RURWKHUVSHFLILHGFRQGLWLRQLQWKH$SSOLFDELOLW\

MODE or other specified condition in the Applicability may be made in accordance with LCO 3.0.4 and the channel is subsequently placed in the tripped condition within the Completion DQGHVWDEOLVKPHQWRIULVNPDQDJHPHQWDFWLRQVLIDSSURSULDWH

Time, which begins when the Applicability is entered. If the instrument channel cannot be placed in the tripped condition and the subsequent default ACTION ("Required Action and associated Completion Time not met") allows the OPERABLE train to be placed in operation, use of LCO 3.0.4.a is acceptable because the subsequent ACTIONS to be entered following entry into the MODE include ACTIONS (place the OPERABLE train in operation) that permit safe plant operation for an unlimited period of time in the MODE or other specified condition to be entered. FRQWLQXHG

<space>

%)181,7  % $PHQGPHQW1R

5HYLVLRQ

'HFHPEHU

/&2$SSOLFDELOLW\

%

%$6(6 FRQWLQXHG

/&2 /&2 HVWDEOLVKHVWKHDOORZDQFHIRUUHVWRULQJHTXLSPHQWWR

VHUYLFHXQGHUDGPLQLVWUDWLYHFRQWUROVZKHQLWKDVEHHQUHPRYHG

IURPVHUYLFHRUGHFODUHGLQRSHUDEOHWRFRPSO\ZLWK $&7,2167KH

VROHSXUSRVHRIWKLV6SHFLILFDWLRQLVWRSURYLGHDQH[FHSWLRQWR

/&2  HJWRQRWFRPSO\ZLWKWKHDSSOLFDEOH5HTXLUHG

$FWLRQ V WRDOORZWKHSHUIRUPDQFHRIUHTXLUHGWHVWLQJWR

GHPRQVWUDWH

D 7KH23(5$%,/,7<RIWKHHTXLSPHQWEHLQJUHWXUQHGWRVHUYLFH

RU E 7KH23(5$%,/,7<RIRWKHUHTXLSPHQW

7KHDGPLQLVWUDWLYHFRQWUROVHQVXUHWKHWLPHWKHHTXLSPHQWLV

UHWXUQHGWRVHUYLFHLQFRQIOLFWZLWKWKHUHTXLUHPHQWVRIWKH

$&7,216LVOLPLWHGWRWKHWLPHDEVROXWHO\QHFHVVDU\WRSHUIRUPWKH

UHTXLUHGWHVWLQJWRGHPRQVWUDWH23(5$%,/,7<7KLV6SHFLILFDWLRQ

GRHVQRWSURYLGHWLPHWRSHUIRUPDQ\RWKHUSUHYHQWLYHRUFRUUHFWLYH

PDLQWHQDQFH

LCO 3.0.5 should not be used in lieu of other practicable alternatives that comply with Required Actions and that do not require changing the MODE or other specified conditions in the Applicability in order to demonstrate equipment is OPERABLE. LCO 3.0.5 is not intended to be used repeatedly.

An example of demonstrating equipment is OPERABLE with the Required Actions not met is opening a manual valve that was closed to comply with Required Actions to isolate a flowpath with excessive Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) leakage in order to perform testing to demonstrate that RCS PIV leakage is now within limit.

FRQWLQXHG

%)181,7  %E $PHQGPHQW1R

'HFHPEHU

Examples of demonstrating equipment OPERABILITY include instances in which it is necessary to take an inoperable channel or trip system out of a tripped condition that was directed by a Required Action, if there is no Required Action Note for this purpose. An example of verifying /&2$SSOLFDELOLW\

OPERABILITY of equipment removed from service is taking a tripped  %

channel out of the tripped condition to permit the logic to function and indicate the appropriate response during performance of required

%$6(6 testing on the inoperable channel. Examples

/&2 $QH[DPSOHRIGHPRQVWUDWLQJWKH23(5$%,/,7<RIWKHHTXLSPHQW

 FRQWLQXHG EHLQJUHWXUQHGWRVHUYLFHLVUHRSHQLQJDFRQWDLQPHQWLVRODWLRQYDOYH

WKDWKDVEHHQFORVHGWRFRPSO\ZLWK5HTXLUHG$FWLRQVDQGPXVWEH

UHRSHQHGWRSHUIRUPWKHUHTXLUHGWHVWLQJ

1)

$QH[DPSOHRIGHPRQVWUDWLQJWKH23(5$%,/,7<RIRWKHU

HTXLSPHQWLVWDNLQJDQLQRSHUDEOHFKDQQHORUWULSV\VWHPRXWRIWKH

WULSSHGFRQGLWLRQWRSUHYHQWWKHWULSIXQFWLRQIURPRFFXUULQJGXULQJ

are WKHSHUIRUPDQFHRIUHTXLUHGWHVWLQJRQDQRWKHUFKDQQHOLQ WKHRWKHU

WULSV\VWHP$VLPLODUH[DPSOHRIGHPRQVWUDWLQJWKH23(5$%,/,7<

RIRWKHUHTXLSPHQWLVWDNLQJDQLQRSHUDEOHFKDQQHORUWULSV\VWHP

RXWRIWKHWULSSHGFRQGLWLRQWRSHUPLWWKHORJLFWRIXQFWLRQDQG

LQGLFDWHWKHDSSURSULDWHUHVSRQVHGXULQJWKHSHUIRUPDQFHRI

UHTXLUHGWHVWLQJRQDQRWKHUFKDQQHOLQWKHVDPHWULSV\VWHP

, or 2)

/&2 /&2 HVWDEOLVKHVDQH[FHSWLRQWR/&2 ZKHQDVXSSRUWHG

V\VWHP/&2LVQRWPHWVROHO\GXHWRDVXSSRUWV\VWHP/&2QRW

<space>

EHLQJPHW7KLVH[FHSWLRQLVSURYLGHGEHFDXVH/&2 ZRXOG

The administrative UHTXLUHWKDWWKH&RQGLWLRQVDQG5HTXLUHG$FWLRQVRIWKHDVVRFLDWHG

controls in LCO 3.0.5 apply in all cases to systems or components in LQRSHUDEOHVXSSRUWHGV\VWHP/&2EHHQWHUHGVROHO\GXHWRWKH

Chapter 3 of the Technical Specifications, as long as the testing could not be conducted LQRSHUDELOLW\RIWKHVXSSRUWV\VWHP7KLVH[FHSWLRQLVMXVWLILHG

while complying with the Required Actions. This includes the realignment or repositioning of redundant or alternate equipment or trains previously manipulated to EHFDXVHWKHDFWLRQVWKDWDUHUHTXLUHGWRHQVXUHWKHSODQWLV

comply with ACTIONS, as well as equipment removed from service or declared PDLQWDLQHGLQDVDIHFRQGLWLRQDUHVSHFLILHGLQWKHVXSSRUWV\VWHPV 

inoperable to comply with ACTIONS.

/&2 V5HTXLUHG$FWLRQV7KHSRWHQWLDOFRQIXVLRQDQG

LQFRQVLVWHQF\RIUHTXLUHPHQWVUHODWHGWRWKHHQWU\LQWRPXOWLSOH

VXSSRUWDQGVXSSRUWHGV\VWHPV /&2 V&RQGLWLRQVDQG 5HTXLUHG

$FWLRQVDUHHOLPLQDWHGE\SURYLGLQJDOOWKHDFWLRQVWKDWDUH

QHFHVVDU\WRHQVXUHWKHSODQWLVPDLQWDLQHGLQDVDIHFRQGLWLRQLQ

WKHVXSSRUWV\VWHP V5HTXLUHG$FWLRQV

FRQWLQXHG

%)181,7  % $PHQGPHQW

5HYLVLRQ

65$SSOLFDELOLW\

%

%$6(6 65 $VVWDWHGLQ65 WKHH[WHQVLRQDOVRGRHVQRWDSSO\WR

 FRQWLQXHG WKHLQLWLDOSRUWLRQRIDSHULRGLF&RPSOHWLRQ7LPHWKDWUHTXLUHV

SHUIRUPDQFHRQDRQFHSHUEDVLV7KHH[WHQVLRQDSSOLHV

WRHDFKSHUIRUPDQFHDIWHUWKHLQLWLDOSHUIRUPDQFH7KHLQLWLDO

SHUIRUPDQFHRIWKH5HTXLUHG$FWLRQZKHWKHULWLVDSDUWLFXODU

6XUYHLOODQFHRUVRPHRWKHUUHPHGLDODFWLRQLVFRQVLGHUHGDVLQJOH

DFWLRQZLWKDVLQJOH&RPSOHWLRQ7LPH2QHUHDVRQIRUQRWDOORZLQJ

WKHH[WHQVLRQWRWKLV &RPSOHWLRQ7LPHLVWKDWVXFKDQDFWLRQ

XVXDOO\YHULILHVWKDWQRORVVRIIXQFWLRQKDVRFFXUUHGE\FKHFNLQJ

WKHVWDWXVRIUHGXQGDQWRUGLYHUVHFRPSRQHQWVRUDFFRPSOLVKHVWKH

IXQFWLRQRIWKHLQRSHUDEOHHTXLSPHQWLQDQDOWHUQDWLYHPDQQHU

7KHSURYLVLRQVRI65 DUHQRWLQWHQGHGWREHXVHGUHSHDWHGO\

PHUHO\DVDQRSHUDWLRQDOFRQYHQLHQFHWRH[WHQG6XUYHLOODQFH

LQWHUYDOV RWKHUWKDQWKRVHFRQVLVWHQWZLWKUHIXHOLQJLQWHUYDOV RU

SHULRGLF&RPSOHWLRQ7LPHLQWHUYDOVEH\RQGWKRVHVSHFLILHGZLWKWKH

H[FHSWLRQRI VXUYHLOODQFHVUHTXLUHGWREHSHUIRUPHGRQDGD\

IUHTXHQF\)RUVXUYHLOODQFHVSHUIRUPHGRQDGD\IUHTXHQF\WKH

QRUPDOVXUYHLOODQFHLQWHUYDOPD\EHH[WHQGHGLQDFFRUGDQFHZLWK

6SHFLILFDWLRQF\FOLFDOO\DVUHTXLUHGWRUHPDLQV\QFKURQL]HGWR

WKHZHHNPDLQWHQDQFHZRUNVFKHGXOHV7KLVSUDFWLFHLV

DFFHSWDEOHEDVHGRQWKHUHVXOWVRIDQHYDOXDWLRQRIGD\

IUHTXHQF\VXUYHLOODQFHWHVWKLVWRULHVWKDWGHPRQVWUDWHWKDWQR

DGYHUVHIDLOXUHUDWHFKDQJHVKDYHRFFXUUHGQRUZRXOGEHH[SHFWHG

WRGHYHORSDVD UHVXOWRIF\FOLFDOXVHRIVXUYHLOODQFHLQWHUYDO

H[WHQVLRQVDQGWKHIDFWWKDWWKHWRWDOQXPEHURIGD\IUHTXHQF\

VXUYHLOODQFHVSHUIRUPHGLQDQ\RQH\HDUSHULRGUHPDLQV

XQFKDQJHG performed 65 65 HVWDEOLVKHVWKHIOH[LELOLW\WRGHIHUGHFODULQJDIIHFWHG

HTXLSPHQWLQRSHUDEOHRUDQDIIHFWHGYDULDEOHRXWVLGHWKHVSHFLILHG

OLPLWVZKHQD6XUYHLOODQFHKDVQRWEHHQFRPSOHWHGZLWKLQWKH

VSHFLILHG)UHTXHQF\$GHOD\SHULRGRIXSWR KRXUVRUXSWRWKH

OLPLWRIWKHVSHFLILHGIUHTXHQF\ZKLFKHYHULVJUHDWHUDSSOLHVIURP

WKHSRLQWLQWLPHWKDWLWLVGLVFRYHUHGWKDWWKH6XUYHLOODQFHKDVQRW

EHHQSHUIRUPHGLQDFFRUGDQFHZLWK65 DQGQRWDWWKHWLPH

WKDWWKHVSHFLILHG)UHTXHQF\ZDVQRWPHW

FRQWLQXHG

%)181,7  % $PHQGPHQW

5HYLVLRQ

6HSWHPEHU

65$SSOLFDELOLW\

%

%$6(6 perform 65 7KLVGHOD\SHULRGSURYLGHVDGHTXDWHWLPHWRFRPSOHWH6XUYHLOODQFHV

 FRQWLQXHG WKDWKDYHEHHQPLVVHG7KLVGHOD\SHULRGSHUPLWVWKHFRPSOHWLRQRI

D6XUYHLOODQFHEHIRUHFRPSO\LQJZLWK5HTXLUHG$FWLRQVRURWKHU

UHPHGLDOPHDVXUHVWKDWPLJKWSUHFOXGHFRPSOHWLRQRIWKH

6XUYHLOODQFH performance performance FRQWLQXHG

%)181,7  %D $PHQGPHQW1R

5HYLVLRQ

6HSWHPEHU

65$SSOLFDELOLW\

%

%$6(6 65 7KHEDVLVIRUWKLVGHOD\SHULRGLQFOXGHVFRQVLGHUDWLRQRIXQLW

 FRQWLQXHG

<space> FRQGLWLRQVDGHTXDWHSODQQLQJDYDLODELOLW\RISHUVRQQHOWKHWLPH

SR 3.0.3 is onlyUHTXLUHGWRSHUIRUPWKH6XUYHLOODQFHWKHVDIHW\VLJQLILFDQFHRIWKH

applicable if there is a reasonable expectation the associated equipment is OPERABLE GHOD\LQFRPSOHWLQJWKHUHTXLUHG6XUYHLOODQFHDQGWKHUHFRJQLWLRQ

or that variables are within limits, and it is expected that the Surveillance will be met when performed.

WKDWWKHPRVWSUREDEOHUHVXOWRIDQ\SDUWLFXODU6XUYHLOODQFHEHLQJ

Many factors should be considered, such as the period of time since the Surveillance was last performed, or whether theSHUIRUPHGLVWKHYHULILFDWLRQRIFRQIRUPDQFHZLWKWKHUHTXLUHPHQWV

Surveillance, or a portion thereof, has ever been performed, and any other indications, tests, or activities that might support the expectation that the Surveillance will be met when performed. An example of the use of SR 3.0.3 would be a relay contact that was not tested as required in accordance

KHQD6XUYHLOODQFHZLWKD)UHTXHQF\EDVHGQRWRQWLPHLQWHUYDOV

with a particular SR, but previous successful performances of the SR included the relay contact; the EXWXSRQVSHFLILHGXQLWFRQGLWLRQVRSHUDWLQJVLWXDWLRQVRU

adjacent, physically connected relay contacts were tested during the SR performance; the subject relay contact has beenUHTXLUHPHQWVRIUHJXODWLRQV HJSULRUWRHQWHULQJ02'(DIWHU

tested by another SR; or historical operation of the subject relay contact has been successful. It HDFKIXHOORDGLQJRULQDFFRUGDQFHZLWK&)5$SSHQGL[-DV

is not sufficient to infer the behavior of the associated equipment from the performance of similar equipment. The rigor of determining whether there is aLVGLVFRYHUHGWRQRWKDYH

PRGLILHGE\DSSURYHGH[HPSWLRQVHWF reasonable expectation a Surveillance will be met when performed should increase based on the length of time since the last performance of the EHHQSHUIRUPHGZKHQVSHFLILHG65DOORZVIRUWKHIXOOGHOD\

Surveillance. If the Surveillance has been performed recently, a review of the Surveillance history and SHULRGRIXSWRWKHVSHFLILHG)UHTXHQF\WRSHUIRUPWKH6XUYHLOODQFH

equipment performance may be sufficient to support a reasonable expectation that the Surveillance will be

+RZHYHUVLQFHWKHUHLVQRWDWLPHLQWHUYDOVSHFLILHGWKHPLVVHG

met when performed. For Surveillances that have not been performed for a long period or that have never been performed, 6XUYHLOODQFHVKRXOGEHSHUIRUPHGDWWKHILUVWUHDVRQDEOH

a rigorous evaluation based on objective evidence should provide a high degree of confidence that RSSRUWXQLW\

the equipment is OPERABLE. The evaluation should be documented in sufficient detail to allow a knowledgeable individual to understand the basis for the determination.

<space> 65 SURYLGHVDWLPHOLPLWIRUDQGDOORZDQFHVIRUWKH

SHUIRUPDQFHRI6XUYHLOODQFHVWKDWEHFRPHDSSOLFDEOHDVD

FRQVHTXHQFHRI02'(FKDQJHVLPSRVHGE\5HTXLUHG$FWLRQV

)DLOXUHWRFRPSO\ZLWKVSHFLILHG)UHTXHQFLHVIRU65VLVH[SHFWHGWR

EHDQLQIUHTXHQWRFFXUUHQFH8VHRIWKHGHOD\SHULRGHVWDEOLVKHG

E\65 LVDIOH[LELOLW\ZKLFKLVQRWLQWHQGHGWREHXVHGDVDQ

RSHUDWLRQDOFRQYHQLHQFHWRH[WHQG6XUYHLOODQFHLQWHUYDOV

KLOHXSWRKRXUVRUWKHOLPLWRIWKHVSHFLILHG)UHTXHQF\LV

SURYLGHGWRSHUIRUPWKHPLVVHG6XUYHLOODQFHLWLVH[SHFWHGWKDWWKH

repeatedly PLVVHG6XUYHLOODQFHZLOOEHSHUIRUPHGDWWKHILUVWUHDVRQDEOH

RSSRUWXQLW\ 7KHGHWHUPLQDWLRQRIWKHILUVWUHDVRQDEOHRSSRUWXQLW\

VKRXOGLQFOXGHFRQVLGHUDWLRQRIWKHLPSDFWRQSODQWULVN IURP

GHOD\LQJWKH6XUYHLOODQFHDVZHOODVDQ\SODQWFRQILJXUDWLRQ

FKDQJHVUHTXLUHGRUVKXWWLQJWKHSODQWGRZQWRSHUIRUPWKH

FRQWLQXHG

%)181,7  % $PHQGPHQW1R

5HYLVLRQ

'HFHPEHU

/&2$SSOLFDELOLW\

%

% /,0,7,1*&21',7,21)2523(5$7,21 /&2 $33/,&$%,/,7<

%$6(6

/&2V /&2 WKURXJK/&2 HVWDEOLVKWKHJHQHUDOUHTXLUHPHQWV

DSSOLFDEOHWRDOO6SHFLILFDWLRQVDQGDSSO\DWDOOWLPHVXQOHVV

RWKHUZLVHVWDWHG

/&2 /&2 HVWDEOLVKHVWKH$SSOLFDELOLW\VWDWHPHQWZLWKLQHDFK

LQGLYLGXDO6SHFLILFDWLRQDVWKHUHTXLUHPHQWIRUZKHQWKH/&2LV

UHTXLUHGWREHPHW LHZKHQWKHXQLWLVLQWKH02'(6RURWKHU

VSHFLILHGFRQGLWLRQVRIWKH$SSOLFDELOLW\VWDWHPHQWRIHDFK

6SHFLILFDWLRQ  , unless otherwise specified.

/&2 /&2 HVWDEOLVKHVWKDWXSRQGLVFRYHU\RIDIDLOXUHWRPHHWDQ

/&2WKHDVVRFLDWHG$&7,216VKDOOEHPHW7KH&RPSOHWLRQ7LPH

RIHDFK5HTXLUHG$FWLRQIRUDQ$&7,216&RQGLWLRQLVDSSOLFDEOH

IURPWKHSRLQWLQWLPHWKDWDQ$&7,216&RQGLWLRQLVHQWHUHG7KH

5HTXLUHG$FWLRQVHVWDEOLVKWKRVHUHPHGLDOPHDVXUHVWKDWPXVWEH

WDNHQZLWKLQVSHFLILHG&RPSOHWLRQ7LPHVZKHQWKHUHTXLUHPHQWVRI

DQ/&2DUHQRWPHW7KLV6SHFLILFDWLRQHVWDEOLVKHVWKDW

D &RPSOHWLRQRIWKH5HTXLUHG$FWLRQVZLWKLQWKHVSHFLILHG

&RPSOHWLRQ7LPHVFRQVWLWXWHVFRPSOLDQFHZLWKD6SHFLILFDWLRQ

DQG E &RPSOHWLRQRIWKH5HTXLUHG$FWLRQVLVQRWUHTXLUHGZKHQDQ

/&2LVPHWZLWKLQWKHVSHFLILHG&RPSOHWLRQ7LPHXQOHVV

RWKHUZLVHVSHFLILHG

FRQWLQXHG

%)181,7  % $PHQGPHQW

5HYLVLRQ

/&2$SSOLFDELOLW\

%

%$6(6

/&2 7KLV6SHFLILFDWLRQGHOLQHDWHVWKHWLPHOLPLWVIRUSODFLQJWKHXQLWLQD

 FRQWLQXHG VDIH02'(RURWKHUVSHFLILHGFRQGLWLRQZKHQRSHUDWLRQFDQQRWEH

PDLQWDLQHGZLWKLQWKHOLPLWVIRUVDIHRSHUDWLRQDVGHILQHGE\WKH

/&2DQGLWV$&7,2163ODQQHGHQWU\LQWR/&2VKRXOGEH

DYRLGHG,ILWLVQRWSUDFWLFDOWRDYRLGSODQQHGHQWU\LQWR/&2

SODQWULVNVKRXOGEHDVVHVVHGDQGPDQDJHGLQDFFRUGDQFHZLWK

&)5 D  DQGWKHSODQQHGHQWU\LQWR/&2VKRXOG

KDYHOHVVHIIHFWRQSODQWVDIHW\WKDQRWKHUSUDFWLFDEOHDOWHUQDWLYHV

8SRQHQWHULQJ/&2  KRXULVDOORZHGWRSUHSDUHIRUDQ

RUGHUO\VKXWGRZQEHIRUHLQLWLDWLQJDFKDQJHLQXQLWRSHUDWLRQ7KLV

LQFOXGHVWLPHWRSHUPLWWKHRSHUDWRUWRFRRUGLQDWHWKHUHGXFWLRQLQ

HOHFWULFDOJHQHUDWLRQZLWKWKHORDGGLVSDWFKHUWRHQVXUHWKHVWDELOLW\

DQGDYDLODELOLW\RIWKHHOHFWULFDOJULG7KH/&2SKUDVH³$FWLRQVKDOO

EHLQLWLDWHGZLWKLQ KRXU<<'GRHVQRWPHDQWKDWDFKDQJHLQORDG

PXVWEHFRPPHQFHGE\WKHHQGRIWKHKRXUSHULRG7KHDFWLRQ

LQLWLDWHGDWWKHHQGRIWKHKRXUSHULRGPD\EHDGPLQLVWUDWLYHLQ

QDWXUHVXFKDVSUHSDULQJVKXWGRZQSURFHGXUHV,IFRUUHFWLYH enter PHDVXUHVZKLFKZRXOGDOORZH[LWLQJ/&2DUHQRWFRPSOHWHDW

WKHHQGRIKRXUEXWWKHUHLVUHDVRQDEOHDVVXUDQFHWKDWWKH\ZLOO

EHFRPSOHWHGZLWKHQRXJKWLPHUHPDLQLQJWRDOORZIRUDQRUGHUO\

XQLWVKXWGRZQLIUHTXLUHGFRPPHQFLQJDORDGGHFUHDVHPD\EH

GHOD\HGXQWLOWKDWWLPH7KHWLPHOLPLWVVSHFLILHGWRUHDFKORZHU

02'(6RIRSHUDWLRQSHUPLWWKHVKXWGRZQWRSURFHHGLQD

FRQWUROOHGDQGRUGHUO\PDQQHUWKDWLVZHOOZLWKLQWKHVSHFLILHG

PD[LPXPFRROGRZQUDWHDQGZLWKLQWKHFDSDELOLWLHVRIWKHXQLW

DVVXPLQJWKDWRQO\WKHPLQLPXPUHTXLUHGHTXLSPHQWLV

23(5$%/(7KLVUHGXFHVWKHUPDOVWUHVVHVRQFRPSRQHQWVRIWKH

5HDFWRU&RRODQW6\VWHPDQGWKHSRWHQWLDOIRUDSODQWXSVHWWKDW

FRXOGFKDOOHQJHVDIHW\V\VWHPVXQGHUFRQGLWLRQVWRZKLFKWKLV

6SHFLILFDWLRQDSSOLHV7KHXVHDQGLQWHUSUHWDWLRQRIVSHFLILHGWLPHV

WRFRPSOHWHWKHDFWLRQVRI/&2 DUHFRQVLVWHQWZLWKWKH

GLVFXVVLRQRI6HFWLRQ &RPSOHWLRQ7LPHV

FRQWLQXHG

$PHQGPHQW

%)181,7  % 5HYLVLRQ

0D\

/&2$SSOLFDELOLW\

%

%$6(6

/&2 $XQLWVKXWGRZQUHTXLUHGLQDFFRUGDQFHZLWK/&2 PD\EH

 FRQWLQXHG WHUPLQDWHGDQG/&2 H[LWHGLIDQ\RIWKHIROORZLQJRFFXUV

D 7KH/&2LVQRZPHW

c. b. The LCO is no longer applicable, E $&RQGLWLRQH[LVWVIRUZKLFKWKH5HTXLUHG$FWLRQVKDYHQRZ

EHHQSHUIRUPHG , or d.

F $&7,216H[LVWWKDWGRQRWKDYHH[SLUHG&RPSOHWLRQ7LPHV

7KHVH&RPSOHWLRQ7LPHVDUHDSSOLFDEOHIURPWKHSRLQWLQWLPH

WKDWWKH&RQGLWLRQLVLQLWLDOO\HQWHUHGDQGQRWIURPWKHWLPH

/&2 LVH[LWHG

FRQWLQXHG

%)181,7  %D $PHQGPHQW

5HYLVLRQ

/&2$SSOLFDELOLW\

%

%$6(6 enter enter enter

/&2 7KHWLPHOLPLWVRI6SHFLILFDWLRQ DOORZ KRXUV IRUWKHXQLWWR

 FRQWLQXHG EHLQ02'( ZKHQDVKXWGRZQLVUHTXLUHGGXULQJ02'( 

RSHUDWLRQ,IWKHXQLWLVLQDORZHU02'(RIRSHUDWLRQZKHQD enter enter VKXWGRZQLVUHTXLUHGWKHWLPHOLPLWIRUUHDFKLQJWKHQH[WORZHU

02'(DSSOLHV,IDORZHU02'(LVUHDFKHGLQOHVVWLPHWKDQ

DOORZHGKRZHYHUWKHWRWDODOORZDEOHWLPHWRUHDFK02'( RU enter RWKHUDSSOLFDEOH02'(LVQRWUHGXFHG)RUH[DPSOHLI02'( LV

UHDFKHGLQ KRXUVWKHQWKHWLPHDOORZHGIRUUHDFKLQJ02'( LV

WKHQH[W KRXUVEHFDXVHWKHWRWDOWLPHIRUUHDFKLQJ02'( LV enter QRWUHGXFHGIURPWKHDOORZDEOHOLPLWRI KRXUV7KHUHIRUHLI

UHPHGLDOPHDVXUHVDUHFRPSOHWHGWKDWZRXOGSHUPLWDUHWXUQWR

02'( DSHQDOW\LVQRWLQFXUUHGE\KDYLQJWRUHDFKDORZHU

02'(RIRSHUDWLRQLQOHVVWKDQWKHWRWDOWLPHDOORZHG

,Q02'(6 DQG/&2 SURYLGHVDFWLRQVIRU&RQGLWLRQV

QRWFRYHUHGLQRWKHU6SHFLILFDWLRQV7KHUHTXLUHPHQWVRI/&2 

GRQRWDSSO\LQ02'(6 DQGEHFDXVHWKHXQLWLVDOUHDG\LQWKH

PRVWUHVWULFWLYH&RQGLWLRQUHTXLUHGE\/&2 7KH

UHTXLUHPHQWVRI/&2 GRQRWDSSO\LQRWKHUVSHFLILHG

FRQGLWLRQVRIWKH$SSOLFDELOLW\ XQOHVVLQ02'( RU EHFDXVH

WKH$&7,216RILQGLYLGXDO6SHFLILFDWLRQVVXIILFLHQWO\GHILQHWKH

UHPHGLDOPHDVXUHVWREHWDNHQ

([FHSWLRQVWR/&2 DUHSURYLGHGLQLQVWDQFHVZKHUHUHTXLULQJ

DXQLWVKXWGRZQLQDFFRUGDQFHZLWK/&2 ZRXOGQRWSURYLGH

DSSURSULDWHUHPHGLDOPHDVXUHVIRUWKHDVVRFLDWHGFRQGLWLRQRIWKH

XQLW$QH[DPSOHRIWKLVLVLQ/&2 6SHQW)XHO6WRUDJH3RRO

DWHU/HYHO/&2 KDVDQ$SSOLFDELOLW\RI'XULQJPRYHPHQW

RILUUDGLDWHGIXHODVVHPEOLHVLQWKHVSHQWIXHOVWRUDJHSRRO

FRQWLQXHG

%)181,7  % $PHQGPHQW

5HYLVLRQ

/&2$SSOLFDELOLW\

%

%$6(6

/&2 7KHUHIRUHWKLV/&2FDQEHDSSOLFDEOHLQDQ\RUDOO02'(6,IWKH

 FRQWLQXHG /&2DQGWKH5HTXLUHG$FWLRQVRI/&2 DUHQRWPHWZKLOHLQ

02'( RUWKHUHLVQRVDIHW\EHQHILWWREHJDLQHGE\SODFLQJ

WKHXQLWLQDVKXWGRZQFRQGLWLRQ7KH5HTXLUHG$FWLRQRI/&2 

RI6XVSHQGPRYHPHQWRILUUDGLDWHGIXHODVVHPEOLHVLQWKHVSHQW

IXHOVWRUDJHSRROLVWKHDSSURSULDWH5HTXLUHG$FWLRQWRFRPSOHWHLQ

OLHXRIWKHDFWLRQVRI/&2 7KHVHH[FHSWLRQVDUHDGGUHVVHG

LQWKHLQGLYLGXDO6SHFLILFDWLRQV

/&2 /&2HVWDEOLVKHVOLPLWDWLRQVRQFKDQJHVLQ02'(6RURWKHU

VSHFLILHGFRQGLWLRQVLQWKH$SSOLFDELOLW\ZKHQDQ/&2LVQRWPHW,W

DOORZVSODFLQJWKHXQLWLQD02'(RURWKHUVSHFLILHGFRQGLWLRQ

VWDWHGLQWKDW$SSOLFDELOLW\ HJWKH$SSOLFDELOLW\ GHVLUHGWREH

HQWHUHG ZKHQXQLWFRQGLWLRQVDUHVXFKWKDWWKHUHTXLUHPHQWVRIWKH

/&2ZRXOGQRWEHPHWLQDFFRUGDQFHZLWK/&2D/&2

ERU/&2F either following entry into

/&2DDOORZVHQWU\LQWRD02'(RURWKHUVSHFLILHGFRQGLWLRQ

ACTIONS LQWKH$SSOLFDELOLW\ZLWKWKH/&2QRWPHWZKHQWKHDVVRFLDWHG

$&7,216WREHHQWHUHGSHUPLWFRQWLQXHGRSHUDWLRQLQWKH02'(RU

RWKHUVSHFLILHGFRQGLWLRQLQWKH$SSOLFDELOLW\IRUDQXQOLPLWHGSHULRG

RIWLPH&RPSOLDQFHZLWK5HTXLUHG$FWLRQVWKDWSHUPLWFRQWLQXHG

and the Required Actions RSHUDWLRQRIWKHXQLWIRUDQXQOLPLWHGSHULRGRIWLPH LQD02'(RU

will permit continued followed after entry into the Applicability RWKHUVSHFLILHGFRQGLWLRQSURYLGHVDQDFFHSWDEOHOHYHORIVDIHW\IRU

operation within the MODE FRQWLQXHGRSHUDWLRQ7KLVLVZLWKRXWUHJDUGWRWKHVWDWXVRIWKHXQLW

or other specified condition EHIRUHRUDIWHUWKH02'(FKDQJH7KHUHIRUHLQVXFKFDVHVHQWU\

LQWRD02'(RURWKHUVSHFLILHGFRQGLWLRQLQWKH$SSOLFDELOLW\PD\EH

PDGHLQDFFRUGDQFHZLWKWKHSURYLVLRQVRIWKH5HTXLUHG$FWLRQV

/&2EDOORZVHQWU\LQWRD02'(RURWKHUVSHFLILHGFRQGLWLRQ

<space> LQWKH$SSOLFDELOLW\ZLWKWKH/&2QRWPHWDIWHUSHUIRUPDQFHRIDULVN

For example, LCO DVVHVVPHQWDGGUHVVLQJLQRSHUDEOHV\VWHPVDQGFRPSRQHQWV

3.0.4.a may be used when the Required Action to be entered states that an FRQVLGHUDWLRQRIWKHUHVXOWVGHWHUPLQDWLRQRIWKHDFFHSWDELOLW\RI

inoperable instrument channel must be placed in the trip condition within the Completion Time.

Transition into aHQWHULQJWKH02'(RURWKHUVSHFLILHGFRQGLWLRQLQWKH$SSOLFDELOLW\

MODE or other specified condition in the Applicability may be made in accordance with LCO 3.0.4 and the channel is subsequently placed in the tripped condition within the Completion DQGHVWDEOLVKPHQWRIULVNPDQDJHPHQWDFWLRQVLIDSSURSULDWH

Time, which begins when the Applicability is entered. If the instrument channel cannot be placed in the tripped condition and the subsequent default ACTION ("Required Action and associated Completion Time not met") allows the OPERABLE train to be placed in operation, use of LCO 3.0.4.a is acceptable because the subsequent ACTIONS to be entered following entry into the MODE include ACTIONS (place the OPERABLE train in operation) that permit safe plant operation for an unlimited period of time in the MODE or other specified condition to be entered. FRQWLQXHG

<space>

%)181,7  % $PHQGPHQW1R

5HYLVLRQ

'HFHPEHU

/&2$SSOLFDELOLW\

%

%$6(6 FRQWLQXHG

/&2 /&2 HVWDEOLVKHVWKHDOORZDQFHIRUUHVWRULQJHTXLSPHQWWR

VHUYLFHXQGHUDGPLQLVWUDWLYHFRQWUROVZKHQLWKDVEHHQUHPRYHG

IURPVHUYLFHRUGHFODUHGLQRSHUDEOHWRFRPSO\ZLWK$&7,2167KH

VROHSXUSRVHRIWKLV6SHFLILFDWLRQLVWRSURYLGHDQH[FHSWLRQWR

/&2  HJWRQRWFRPSO\ZLWKWKHDSSOLFDEOH5HTXLUHG

$FWLRQ V WRDOORZWKHSHUIRUPDQFHRIUHTXLUHGWHVWLQJWR

GHPRQVWUDWH

D 7KH23(5$%,/,7<RIWKHHTXLSPHQWEHLQJUHWXUQHGWRVHUYLFH

RU E 7KH23(5$%,/,7<RIRWKHUHTXLSPHQW

7KHDGPLQLVWUDWLYHFRQWUROVHQVXUHWKHWLPHWKHHTXLSPHQWLV

UHWXUQHGWRVHUYLFHLQFRQIOLFWZLWKWKHUHTXLUHPHQWVRIWKH

$&7,216LVOLPLWHGWRWKHWLPHDEVROXWHO\QHFHVVDU\WRSHUIRUPWKH

UHTXLUHGWHVWLQJWRGHPRQVWUDWH23(5$%,/,7<7KLV6SHFLILFDWLRQ

GRHVQRWSURYLGHWLPHWRSHUIRUPDQ\RWKHUSUHYHQWLYHRUFRUUHFWLYH

PDLQWHQDQFH

LCO 3.0.5 should not be used in lieu of other practicable alternatives that comply with Required Actions and that do not require changing the MODE or other specified conditions in the Applicability in order to demonstrate equipment is OPERABLE. LCO 3.0.5 is not intended to be used repeatedly.

An example of demonstrating equipment is OPERABLE with the Required Actions not met is opening a manual valve that was closed to comply with Required Actions to isolate a flowpath with excessive Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) leakage in order to perform testing to demonstrate that RCS PIV leakage is now within limit.

FRQWLQXHG

%)181,7  %E $PHQGPHQW

'HFHPEHU

Examples of demonstrating equipment OPERABILITY include instances in which it is necessary to take an inoperable channel or trip system out of a tripped condition that was directed by a Required Action, if there is no Required Action Note for this purpose. An example of verifying /&2$SSOLFDELOLW\

OPERABILITY of equipment removed from service is taking a tripped  %

channel out of the tripped condition to permit the logic to function and indicate the appropriate response during performance of required

%$6(6 testing on the inoperable channel. Examples

/&2 $QH[DPSOHRIGHPRQVWUDWLQJWKH23(5$%,/,7<RIWKHHTXLSPHQW

 FRQWLQXHG EHLQJUHWXUQHGWRVHUYLFHLVUHRSHQLQJDFRQWDLQPHQWLVRODWLRQYDOYH

WKDWKDVEHHQFORVHGWRFRPSO\ZLWK5HTXLUHG$FWLRQVDQGPXVWEH

UHRSHQHGWRSHUIRUPWKHUHTXLUHGWHVWLQJ 1)

$QH[DPSOHRIGHPRQVWUDWLQJWKH23(5$%,/,7<RIRWKHU

HTXLSPHQWLVWDNLQJDQLQRSHUDEOHFKDQQHORUWULSV\VWHPRXWRIWKH

WULSSHGFRQGLWLRQWRSUHYHQWWKHWULSIXQFWLRQIURPRFFXUULQJGXULQJ

are WKHSHUIRUPDQFHRIUHTXLUHGWHVWLQJRQDQRWKHUFKDQQHOLQWKHRWKHU

WULSV\VWHP$VLPLODUH[DPSOHRIGHPRQVWUDWLQJWKH23(5$%,/,7<

RIRWKHUHTXLSPHQWLVWDNLQJDQLQRSHUDEOHFKDQQHORUWULSV\VWHP

RXWRIWKHWULSSHGFRQGLWLRQWRSHUPLWWKHORJLFWRIXQFWLRQDQG

LQGLFDWHWKHDSSURSULDWHUHVSRQVHGXULQJWKHSHUIRUPDQFHRI

UHTXLUHGWHVWLQJRQDQRWKHUFKDQQHOLQWKHVDPHWULSV\VWHP

, or 2)

/&2 /&2 HVWDEOLVKHVDQH[FHSWLRQWR/&2 ZKHQDVXSSRUWHG

V\VWHP/&2LVQRWPHWVROHO\GXHWRDVXSSRUWV\VWHP/&2QRW

<space>

EHLQJPHW7KLVH[FHSWLRQLVSURYLGHGEHFDXVH/&2 ZRXOG

The administrativeUHTXLUHWKDWWKH&RQGLWLRQVDQG5HTXLUHG$FWLRQVRIWKHDVVRFLDWHG

controls in LCO 3.0.5 apply in all cases to systems or components in LQRSHUDEOHVXSSRUWHGV\VWHP/&2EHHQWHUHGVROHO\GXHWRWKH

Chapter 3 of the Technical Specifications, as long as the testing could not be conducted LQRSHUDELOLW\RIWKHVXSSRUWV\VWHP7KLVH[FHSWLRQLVMXVWLILHG

while complying with the Required Actions. This includes the realignment or repositioning of redundant or alternate equipment or trains previously manipulated to EHFDXVHWKHDFWLRQVWKDWDUHUHTXLUHGWRHQVXUHWKHSODQWLV

comply with ACTIONS, as well as equipment removed from service or declared PDLQWDLQHGLQDVDIHFRQGLWLRQDUHVSHFLILHGLQWKHVXSSRUWV\VWHPV 

inoperable to comply with ACTIONS.

/&2 V5HTXLUHG$FWLRQV7KHSRWHQWLDOFRQIXVLRQDQG

LQFRQVLVWHQF\RIUHTXLUHPHQWVUHODWHGWRWKHHQWU\LQWRPXOWLSOH

VXSSRUWDQGVXSSRUWHGV\VWHPV /&2 V&RQGLWLRQVDQG5HTXLUHG

$FWLRQVDUHHOLPLQDWHGE\SURYLGLQJDOOWKHDFWLRQVWKDWDUH

QHFHVVDU\WRHQVXUHWKHSODQWLVPDLQWDLQHGLQDVDIHFRQGLWLRQLQ

WKHVXSSRUWV\VWHP V5HTXLUHG$FWLRQV

FRQWLQXHG

%)181,7  % $PHQGPHQW

5HYLVLRQ

65$SSOLFDELOLW\

%

%$6(6 65 $VVWDWHGLQ65 WKHH[WHQVLRQDOVRGRHVQRWDSSO\WR

 FRQWLQXHG WKHLQLWLDOSRUWLRQRIDSHULRGLF&RPSOHWLRQ7LPHWKDWUHTXLUHV

SHUIRUPDQFHRQDRQFHSHUEDVLV7KHH[WHQVLRQDSSOLHV

WRHDFKSHUIRUPDQFHDIWHUWKHLQLWLDOSHUIRUPDQFH7KHLQLWLDO

SHUIRUPDQFHRIWKH5HTXLUHG$FWLRQZKHWKHULWLVDSDUWLFXODU

6XUYHLOODQFHRUVRPHRWKHUUHPHGLDODFWLRQLVFRQVLGHUHGDVLQJOH

DFWLRQZLWKDVLQJOH&RPSOHWLRQ7LPH2QHUHDVRQIRUQRWDOORZLQJ

WKH H[WHQVLRQWRWKLV&RPSOHWLRQ7LPHLVWKDWVXFKDQDFWLRQ

XVXDOO\YHULILHVWKDWQRORVVRIIXQFWLRQKDVRFFXUUHGE\FKHFNLQJ

WKHVWDWXVRIUHGXQGDQWRUGLYHUVHFRPSRQHQWVRUDFFRPSOLVKHVWKH

IXQFWLRQRIWKHLQRSHUDEOHHTXLSPHQWLQDQDOWHUQDWLYHPDQQHU

7KHSURYLVLRQVRI65 DUHQRWLQWHQGHGWREHXVHGUHSHDWHGO\

PHUHO\DVDQRSHUDWLRQDOFRQYHQLHQFHWRH[WHQG6XUYHLOODQFH

LQWHUYDOV RWKHUWKDQWKRVHFRQVLVWHQWZLWKUHIXHOLQJLQWHUYDOV RU

SHULRGLF&RPSOHWLRQ7LPHLQWHUYDOVEH\RQGWKRVHVSHFLILHGZLWKWKH

H[FHSWLRQRIVXUYHLOODQFHVUHTXLUHGWREHSHUIRUPHGRQDGD\

IUHTXHQF\)RUVXUYHLOODQFHVSHUIRUPHGRQDGD\IUHTXHQF\WKH

QRUPDOVXUYHLOODQFHLQWHUYDOPD\EHH[WHQGHGLQDFFRUGDQFHZLWK

6SHFLILFDWLRQF\FOLFDOO\DVUHTXLUHGWRUHPDLQ V\QFKURQL]HGWR

WKHZHHNPDLQWHQDQFHZRUNVFKHGXOHV7KLVSUDFWLFHLV

DFFHSWDEOHEDVHGRQWKHUHVXOWVRIDQHYDOXDWLRQRIGD\

IUHTXHQF\VXUYHLOODQFHWHVWKLVWRULHVWKDWGHPRQVWUDWHWKDWQR

DGYHUVHIDLOXUHUDWHFKDQJHVKDYHRFFXUUHGQRUZRXOGEHH[SHFWHG

WRGHYHORSDVDUHVXOWRIF\FOLFDOXVHRIVXUYHLOODQFHLQWHUYDO

H[WHQVLRQVDQGWKHIDFWWKDWWKHWRWDOQXPEHURIGD\IUHTXHQF\

VXUYHLOODQFHVSHUIRUPHGLQDQ\RQH\HDUSHULRGUHPDLQV

XQFKDQJHG performed 65 65 HVWDEOLVKHVWKHIOH[LELOLW\WRGHIHUGHFODULQJDIIHFWHG HTXLSPHQWLQRSHUDEOHRUDQDIIHFWHGYDULDEOHRXWVLGHWKHVSHFLILHG

OLPLWVZKHQD6XUYHLOODQFHKDVQRWEHHQFRPSOHWHG ZLWKLQWKH VSHFLILHG)UHTXHQF\$GHOD\SHULRGRIXSWR KRXUVRUXSWRWKH OLPLWRIWKHVSHFLILHGIUHTXHQF\ZKLFKHYHULVJUHDWHUDSSOLHVIURP WKHSRLQWLQWLPHWKDWLWLVGLVFRYHUHGWKDWWKH6XUYHLOODQFHKDVQRW EHHQSHUIRUPHGLQDFFRUGDQFHZLWK 65 DQGQRWDWWKHWLPH WKDWWKHVSHFLILHG)UHTXHQF\ZDVQRWPHW

FRQWLQXHG

%)181,7  % $PHQGPHQW1R

5HYLVLRQ

6HSWHPEHU

65$SSOLFDELOLW\

%

%$6(6 perform 65 7KLVGHOD\SHULRGSURYLGHVDGHTXDWHWLPHWRFRPSOHWH6XUYHLOODQFHV

 FRQWLQXHG WKDWKDYHEHHQPLVVHG7KLVGHOD\SHULRGSHUPLWVWKHFRPSOHWLRQRI

D6XUYHLOODQFH EHIRUHFRPSO\LQJZLWK5HTXLUHG$FWLRQVRURWKHU

UHPHGLDOPHDVXUHVWKDWPLJKWSUHFOXGHFRPSOHWLRQRIWKH

6XUYHLOODQFH performance performance FRQWLQXHG

%)181,7  %D $PHQGPHQW1R

5HYLVLRQ

6HSWHPEHU

65$SSOLFDELOLW\

%

%$6(6 65 7KHEDVLVIRUWKLVGHOD\SHULRGLQFOXGHVFRQVLGHUDWLRQRIXQLW

 FRQWLQXHG

<space> FRQGLWLRQVDGHTXDWHSODQQLQJDYDLODELOLW\RISHUVRQQHOWKHWLPH

SR 3.0.3 is onlyUHTXLUHGWRSHUIRUPWKH6XUYHLOODQFHWKHVDIHW\VLJQLILFDQFHRIWKH

applicable if there is a reasonable expectation the associated equipment is OPERABLE GHOD\LQFRPSOHWLQJWKHUHTXLUHG or that variables 6XUYHLOODQFHDQGWKHUHFRJQLWLRQ

are within limits, and it is expected that the Surveillance will be met when performed.

WKDWWKHPRVWSUREDEOHUHVXOWRIDQ\SDUWLFXODU6XUYHLOODQFHEHLQJ

Many factors should be considered, such as the period of time since the Surveillance was last performed, or whether theSHUIRUPHGLVWKHYHULILFDWLRQRIFRQIRUPDQFHZLWKWKHUHTXLUHPHQWV

Surveillance, or a portion thereof, has ever been performed, and any other indications, tests, or activities that might support the expectation that the Surveillance will be met when performed. An example of the use of SR 3.0.3 would be a relay contact that was not tested as required in accordance

KHQD6XUYHLOODQFHZLWKD)UHTXHQF\EDVHGQRWRQWLPHLQWHUYDOV

with a particular SR, but previous successful performances of the SR included the relay contact; the EXWXSRQVSHFLILHGXQLWFRQGLWLRQVRSHUDWLQJVLWXDWLRQVRU

adjacent, physically connected relay contacts were tested during the SR performance; the subject relay contact has beenUHTXLUHPHQWVRIUHJXODWLRQV HJSULRUWRHQWHULQJ02'(DIWHU

tested by another SR; or historical operation of the subject relay contact has been successful. ItHDFKIXHOORDGLQJRULQDFFRUGDQFHZLWK&)5$SSHQGL[- DV

is not sufficient to infer the behavior of the associated equipment from the performance of similar equipment. The rigor of determining whether there is aLVGLVFRYHUHGWRQRWKDYH

PRGLILHGE\DSSURYHGH[HPSWLRQVHWF reasonable expectation a Surveillance will be met when performed should increase based on the length of time since the last performance of the EHHQSHUIRUPHGZKHQVSHFLILHG65DOORZVIRUWKHIXOOGHOD\

Surveillance. If the Surveillance has been performed recently, a review of the Surveillance history and SHULRGRIXSWRWKHVSHFLILHG)UHTXHQF\WRSHUIRUPWKH6XUYHLOODQFH

equipment performance may be sufficient to support a reasonable expectation that the Surveillance will be

+RZHYHUVLQFHWKHUHLVQRWDWLPHLQWHUYDOVSHFLILHGWKHPLVVHG

met when performed. For Surveillances that have not been performed for a long period or that have never been performed, 6XUYHLOODQFHVKRXOGEHSHUIRUPHGDWWKHILUVWUHDVRQDEOH

a rigorous evaluation based on objective evidence should provide a high degree of confidence that RSSRUWXQLW\

the equipment is OPERABLE. The evaluation should be documented in sufficient detail to allow a knowledgeable individual to understand the basis for the determination.

<space> 65SURYLGHVDWLPHOLPLWIRUDQGDOORZDQFHVIRUWKH

SHUIRUPDQFHRI6XUYHLOODQFHVWKDWEHFRPHDSSOLFDEOHDVD

FRQVHTXHQFHRI02'(FKDQJHVLPSRVHGE\5HTXLUHG$FWLRQV

)DLOXUHWRFRPSO\ZLWKVSHFLILHG)UHTXHQFLHVIRU65VLVH[SHFWHGWR

EHDQLQIUHTXHQWRFFXUUHQFH8VHRIWKHGHOD\SHULRGHVWDEOLVKHG

E\65 LVDIOH[LELOLW\ZKLFKLVQRWLQWHQGHGWREHXVHGDVDQ

RSHUDWLRQDOFRQYHQLHQFHWRH[WHQG6XUYHLOODQFHLQWHUYDOV

KLOHXSWRKRXUVRUWKHOLPLWRIWKHVSHFLILHG)UHTXHQF\LV

SURYLGHGWRSHUIRUPWKHPLVVHG6XUYHLOODQFHLWLVH[SHFWHGWKDWWKH

repeatedly PLVVHG6XUYHLOODQFHZLOOEHSHUIRUPHGDWWKHILUVWUHDVRQDEOH

RSSRUWXQLW\ 7KHGHWHUPLQDWLRQRIWKHILUVWUHDVRQDEOHRSSRUWXQLW\

VKRXOGLQFOXGHFRQVLGHUDWLRQRIWKHLPSDFWRQSODQWULVN IURP

GHOD\LQJWKH6XUYHLOODQFHDVZHOODVDQ\SODQWFRQILJXUDWLRQ

FKDQJHVUHTXLUHGRUVKXWWLQJWKHSODQWGRZQWRSHUIRUPWKH

FRQWLQXHG

%)181,7  % $PHQGPHQW1R

5HYLVLRQ

'HFHPEHU

/&2$SSOLFDELOLW\

%

% /,0,7,1*&21',7,21)2523(5$7,21 /&2 $33/,&$%,/,7<

%$6(6

/&2V /&2 WKURXJK/&2 HVWDEOLVKWKHJHQHUDOUHTXLUHPHQWV

DSSOLFDEOHWRDOO6SHFLILFDWLRQVDQGDSSO\DWDOOWLPHVXQOHVV

RWKHUZLVHVWDWHG

/&2 /&2 HVWDEOLVKHVWKH$SSOLFDELOLW\VWDWHPHQWZLWKLQHDFK

LQGLYLGXDO6SHFLILFDWLRQDVWKHUHTXLUHPHQWIRUZKHQWKH/&2LV

UHTXLUHGWREHPHW LHZKHQWKHXQLWLVLQWKH02'(6RURWKHU

VSHFLILHGFRQGLWLRQVRIWKH$SSOLFDELOLW\VWDWHPHQWRIHDFK

6SHFLILFDWLRQ  , unless otherwise specified.

/&2 /&2 HVWDEOLVKHVWKDWXSRQGLVFRYHU\RIDIDLOXUHWRPHHWDQ

/&2WKHDVVRFLDWHG$&7,216VKDOOEHPHW7KH&RPSOHWLRQ7LPH

RIHDFK5HTXLUHG$FWLRQIRUDQ$&7,216&RQGLWLRQLVDSSOLFDEOH

IURPWKHSRLQWLQWLPHWKDWDQ$&7,216&RQGLWLRQLVHQWHUHG7KH

5HTXLUHG$FWLRQVHVWDEOLVKWKRVHUHPHGLDOPHDVXUHVWKDWPXVWEH

WDNHQZLWKLQVSHFLILHG&RPSOHWLRQ7LPHVZKHQWKHUHTXLUHPHQWVRI

DQ/&2DUHQRWPHW7KLV6SHFLILFDWLRQHVWDEOLVKHVWKDW

D &RPSOHWLRQRIWKH5HTXLUHG$FWLRQVZLWKLQWKHVSHFLILHG

&RPSOHWLRQ7LPHVFRQVWLWXWHVFRPSOLDQFHZLWKD6SHFLILFDWLRQ

DQG E &RPSOHWLRQRIWKH5HTXLUHG$FWLRQVLVQRWUHTXLUHGZKHQDQ

/&2LVPHWZLWKLQWKHVSHFLILHG&RPSOHWLRQ7LPHXQOHVV

RWKHUZLVHVSHFLILHG

FRQWLQXHG

%)181,7  % $PHQGPHQW

5HYLVLRQ

/&2$SSOLFDELOLW\

%

%$6(6

/&2 7KLV6SHFLILFDWLRQGHOLQHDWHVWKHWLPHOLPLWVIRUSODFLQJWKHXQLWLQD

 FRQWLQXHG VDIH02'(RURWKHUVSHFLILHGFRQGLWLRQZKHQRSHUDWLRQFDQQRWEH

PDLQWDLQHGZLWKLQWKHOLPLWVIRUVDIHRSHUDWLRQDVGHILQHGE\WKH

/&2DQGLWV$&7,2163ODQQHGHQWU\LQWR/&2VKRXOGEH

DYRLGHG,ILWLVQRWSUDFWLFDOWRDYRLGSODQQHGHQWU\LQWR/&2

SODQWULVNVKRXOGEHDVVHVVHGDQG PDQDJHGLQDFFRUGDQFHZLWK

&)5 D  DQGWKHSODQQHGHQWU\LQWR/&2VKRXOG

KDYHOHVVHIIHFWRQSODQWVDIHW\WKDQRWKHUSUDFWLFDEOHDOWHUQDWLYHV

8SRQHQWHULQJ/&2  KRXULVDOORZHGWRSUHSDUHIRUDQ

RUGHUO\VKXWGRZQEHIRUHLQLWLDWLQJDFKDQJHLQXQLWRSHUDWLRQ7KLV

LQFOXGHVWLPHWRSHUPLWWKHRSHUDWRUWRFRRUGLQDWHWKHUHGXFWLRQLQ

HOHFWULFDOJHQHUDWLRQZLWKWKHORDGGLVSDWFKHUWRHQVXUHWKHVWDELOLW\

DQGDYDLODELOLW\RIWKHHOHFWULFDOJULG7KH/&2SKUDVH³$FWLRQVKDOO

EHLQLWLDWHGZLWKLQ KRXU<<'GRHVQRWPHDQWKDWDFKDQJHLQORDG

PXVWEHFRPPHQFHGE\WKHHQGRIWKHKRXUSHULRG7KHDFWLRQ

LQLWLDWHGDWWKHHQGRIWKHKRXUSHULRGPD\EHDGPLQLVWUDWLYHLQ

QDWXUHVXFKDVSUHSDULQJVKXWGRZQSURFHGXUHV,IFRUUHFWLYH enter PHDVXUHVZKLFKZRXOGDOORZH[LWLQJ/&2DUHQRWFRPSOHWHDW

WKHHQGRIKRXUEXWWKHUHLVUHDVRQDEOHDVVXUDQFHWKDWWKH\ZLOO

EHFRPSOHWHGZLWKHQRXJKWLPHUHPDLQLQJWRDOORZIRUDQRUGHUO\

XQLWVKXWGRZQLIUHTXLUHGFRPPHQFLQJDORDGGHFUHDVHPD\EH

GHOD\HGXQWLOWKDWWLPH7KHWLPHOLPLWVVSHFLILHGWRUHDFKORZHU

02'(6RIRSHUDWLRQSHUPLWWKHVKXWGRZQWRSURFHHGLQD

FRQWUROOHGDQGRUGHUO\PDQQHUWKDWLVZHOOZLWKLQWKHVSHFLILHG

PD[LPXPFRROGRZQUDWHDQGZLWKLQWKHFDSDELOLWLHVRIWKHXQLW

DVVXPLQJ WKDWRQO\WKHPLQLPXPUHTXLUHGHTXLSPHQWLV

23(5$%/(7KLVUHGXFHVWKHUPDOVWUHVVHVRQFRPSRQHQWVRIWKH

5HDFWRU&RRODQW6\VWHPDQGWKHSRWHQWLDOIRUDSODQWXSVHWWKDW

FRXOGFKDOOHQJHVDIHW\V\VWHPVXQGHUFRQGLWLRQVWRZKLFKWKLV

6SHFLILFDWLRQDSSOLHV 7KHXVHDQGLQWHUSUHWDWLRQRIVSHFLILHGWLPHV

WRFRPSOHWHWKHDFWLRQVRI/&2 DUHFRQVLVWHQWZLWKWKH

GLVFXVVLRQRI6HFWLRQ &RPSOHWLRQ7LPHV

FRQWLQXHG

%)181,7  % $PHQGPHQW

5HYLVLRQ

)HEUXDU\

/&2$SSOLFDELOLW\

%

%$6(6

/&2 $XQLWVKXWGRZQUHTXLUHGLQDFFRUGDQFHZLWK/&2 PD\EH

 FRQWLQXHG WHUPLQDWHGDQG/&2 H[LWHGLIDQ\RIWKHIROORZLQJRFFXUV

D 7KH/&2LVQRZPHW

c. b. The LCO is no longer applicable, E $&RQGLWLRQH[LVWVIRUZKLFKWKH5HTXLUHG$FWLRQVKDYHQRZ EHHQSHUIRUPHG

, or d.

F $&7,216H[LVWWKDWGRQRWKDYHH[SLUHG&RPSOHWLRQ7LPHV

7KHVH&RPSOHWLRQ7LPHVDUHDSSOLFDEOHIURPWKHSRLQWLQWLPH WKDWWKH&RQGLWLRQLVLQLWLDOO\HQWHUHGDQGQRWIURPWKHWLPH

/&2 LVH[LWHG

FRQWLQXHG

%)181,7  %D $PHQGPHQW

5HYLVLRQ

/&2$SSOLFDELOLW\

%

%$6(6 enter enter enter

/&2 7KHWLPHOLPLWVRI6SHFLILFDWLRQ DOORZ KRXUVIRUWKHXQLWWR

 FRQWLQXHG EHLQ02'( ZKHQDVKXWGRZQLVUHTXLUHGGXULQJ02'( 

RSHUDWLRQ,IWKHXQLWLVLQDORZHU02'(RIRSHUDWLRQZKHQD enter enter VKXWGRZQLVUHTXLUHGWKHWLPHOLPLWIRUUHDFKLQJWKHQH[WORZHU

02'(DSSOLHV,IDORZHU02'(LVUHDFKHGLQOHVVWLPHWKDQ

DOORZHGKRZHYHUWKHWRWDODOORZDEOHWLPHWRUHDFK02'( RU enter RWKHUDSSOLFDEOH02'(LVQRWUHGXFHG)RUH[DPSOHLI02'( LV

UHDFKHGLQ KRXUVWKHQWKHWLPHDOORZHGIRUUHDFKLQJ02'( LV

WKHQH[W KRXUVEHFDXVHWKHWRWDOWLPHIRUUHDFKLQJ02'( LV enter QRWUHGXFHGIURPWKHDOORZDEOHOLPLWRI KRXUV7KHUHIRUHLI

UHPHGLDOPHDVXUHVDUHFRPSOHWHGWKDWZRXOGSHUPLWDUHWXUQWR

02'( DSHQDOW\LVQRWLQFXUUHGE\KDYLQJWRUHDFKDORZHU

02'(RIRSHUDWLRQLQOHVVWKDQWKHWRWDOWLPHDOORZHG

,Q02'(6 DQG/&2 SURYLGHVDFWLRQVIRU&RQGLWLRQV

QRWFRYHUHGLQRWKHU6SHFLILFDWLRQV7KHUHTXLUHPHQWVRI/&2 

GRQRWDSSO\LQ02'(6 DQGEHFDXVHWKHXQLWLVDOUHDG\LQWKH

PRVWUHVWULFWLYH&RQGLWLRQUHTXLUHGE\/&2 7KH

UHTXLUHPHQWVRI/&2 GRQRWDSSO\LQRWKHUVSHFLILHG

FRQGLWLRQVRIWKH$SSOLFDELOLW\ XQOHVVLQ02'( RU EHFDXVH

WKH$&7,216RILQGLYLGXDO6SHFLILFDWLRQVVXIILFLHQWO\GHILQHWKH

UHPHGLDOPHDVXUHVWREHWDNHQ

([FHSWLRQVWR/&2 DUHSURYLGHGLQLQVWDQFHVZKHUHUHTXLULQJ

DXQLWVKXWGRZQLQDFFRUGDQFHZLWK/&2 ZRXOGQRWSURYLGH

DSSURSULDWHUHPHGLDOPHDVXUHVIRUWKHDVVRFLDWHGFRQGLWLRQRIWKH

XQLW$QH[DPSOHRIWKLVLVLQ/&2 6SHQW)XHO6WRUDJH3RRO

DWHU/HYHO/&2 KDVDQ$SSOLFDELOLW\RI'XULQJPRYHPHQW

RILUUDGLDWHGIXHODVVHPEOLHVLQWKHVSHQWIXHOVWRUDJHSRRO

FRQWLQXHG

%)181,7  % $PHQGPHQW

5HYLVLRQ

/&2$SSOLFDELOLW\

%

%$6(6

/&2 7KHUHIRUHWKLV/&2FDQEHDSSOLFDEOHLQDQ\RUDOO02'(6,IWKH

 FRQWLQXHG /&2DQGWKH5HTXLUHG$FWLRQVRI/&2 DUHQRWPHWZKLOHLQ

02'( RUWKHUHLVQRVDIHW\EHQHILWWREHJDLQHGE\SODFLQJ

WKHXQLWLQDVKXWGRZQFRQGLWLRQ7KH5HTXLUHG$FWLRQRI/&2 

RI6XVSHQGPRYHPHQWRILUUDGLDWHGIXHODVVHPEOLHVLQWKHVSHQW

IXHOVWRUDJHSRROLVWKHDSSURSULDWH5HTXLUHG$FWLRQWRFRPSOHWHLQ

OLHXRIWKHDFWLRQVRI/&2 7KHVHH[FHSWLRQVDUH DGGUHVVHG

LQWKHLQGLYLGXDO6SHFLILFDWLRQV

/&2 /&2HVWDEOLVKHVOLPLWDWLRQVRQFKDQJHVLQ02'(6RURWKHU

VSHFLILHGFRQGLWLRQVLQWKH$SSOLFDELOLW\ZKHQDQ/&2LVQRWPHW,W

DOORZVSODFLQJWKHXQLWLQD02'(RURWKHUVSHFLILHGFRQGLWLRQ

VWDWHGLQWKDW$SSOLFDELOLW\ HJWKH$SSOLFDELOLW\GHVLUHGWREH

HQWHUHG ZKHQXQLWFRQGLWLRQVDUHVXFKWKDWWKHUHTXLUHPHQWVRIWKH

/&2ZRXOGQRWEHPHWLQDFFRUGDQFHZLWK/&2D/&2

ERU/&2F either following entry into

/&2DDOORZVHQWU\LQWRD02'(RURWKHUVSHFLILHGFRQGLWLRQ

ACTIONS LQWKH$SSOLFDELOLW\ZLWKWKH/&2QRWPHWZKHQWKHDVVRFLDWHG

$&7,216WREHHQWHUHGSHUPLWFRQWLQXHGRSHUDWLRQLQWKH02'(RU

RWKHUVSHFLILHGFRQGLWLRQLQWKH$SSOLFDELOLW\IRUDQXQOLPLWHGSHULRG

RIWLPH&RPSOLDQFHZLWK5HTXLUHG$FWLRQVWKDWSHUPLWFRQWLQXHG

and the Required Actions RSHUDWLRQRIWKHXQLWIRUDQXQOLPLWHGSHULRGRIWLPHLQD02'(RU

will permit continued followed after entry into the Applicability RWKHUVSHFLILHGFRQGLWLRQSURYLGHVDQDFFHSWDEOHOHYHORIVDIHW\IRU

operation within the MODE FRQWLQXHGRSHUDWLRQ7KLVLVZLWKRXWUHJDUGWRWKHVWDWXVRIWKHXQLW

or other specified condition EHIRUHRUDIWHUWKH02'(FKDQJH7KHUHIRUHLQVXFKFDVHVHQWU\

LQWRD02'(RURWKHUVSHFLILHGFRQGLWLRQLQWKH$SSOLFDELOLW\PD\EH

PDGHLQDFFRUGDQFHZLWKWKHSURYLVLRQVRIWKH5HTXLUHG$FWLRQV

/&2EDOORZVHQWU\LQWRD02'(RURWKHUVSHFLILHGFRQGLWLRQ

<space> LQWKH$SSOLFDELOLW\ZLWKWKH/&2QRWPHWDIWHUSHUIRUPDQFHRIDULVN

For example, LCO 3.0.4.a may be used when the Required Action to be entered states that an DVVHVVPHQWDGGUHVVLQJLQRSHUDEOHV\VWHPVDQGFRPSRQHQWV

inoperable instrument channel must be placed in the trip condition within the Completion Time.

FRQVLGHUDWLRQRIWKHUHVXOWVGHWHUPLQDWLRQRIWKHDFFHSWDELOLW\RI

Transition into a MODE or other specified condition in the Applicability may be made in accordance HQWHULQJWKH02'(RURWKHUVSHFLILHGFRQGLWLRQLQWKH$SSOLFDELOLW\

with LCO 3.0.4 and the channel is subsequently placed in the tripped condition within the Completion DQGHVWDEOLVKPHQWRIULVNPDQDJHPHQWDFWLRQVLIDSSURSULDWH

Time, which begins when the Applicability is entered. If the instrument channel cannot be placed in the tripped condition and the subsequent default ACTION ("Required Action and associated Completion Time not met") allows the OPERABLE train to be placed in operation, use of LCO 3.0.4.a is acceptable because the subsequent ACTIONS to be entered following entry into the MODE include ACTIONS (place the OPERABLE train in operation) that permit safe plant operation for an unlimited period of time in the MODE or other specified condition to be entered. FRQWLQXHG

<space>

%)181,7  %

$PHQGPHQW1R

5HYLVLRQ

'HFHPEHU

/&2$SSOLFDELOLW\

%

%$6(6 FRQWLQXHG

/&2 /&2 HVWDEOLVKHVWKHDOORZDQFHIRUUHVWRULQJHTXLSPHQWWR

VHUYLFHXQGHUDGPLQLVWUDWLYHFRQWUROVZKHQLWKDVEHHQUHPRYHG

IURPVHUYLFHRUGHFODUHGLQRSHUDEOHWRFRPSO\ZLWK$&7,2167KH

VROHSXUSRVHRIWKLV6SHFLILFDWLRQLVWRSURYLGHDQH[FHSWLRQWR

/&2  HJWRQRWFRPSO\ZLWKWKHDSSOLFDEOH5HTXLUHG

$FWLRQ V WRDOORZWKHSHUIRUPDQFHRIUHTXLUHGWHVWLQJWR

GHPRQVWUDWH

D 7KH23(5$%,/,7<RIWKHHTXLSPHQWEHLQJUHWXUQHGWRVHUYLFH

RU E 7KH23(5$%,/,7<RIRWKHUHTXLSPHQW

7KHDGPLQLVWUDWLYHFRQWUROVHQVXUHWKHWLPHWKHHTXLSPHQWLV

UHWXUQHGWRVHUYLFHLQFRQIOLFWZLWKWKHUHTXLUHPHQWVRIWKH

$&7,216LVOLPLWHGWRWKHWLPHDEVROXWHO\QHFHVVDU\WRSHUIRUPWKH

UHTXLUHGWHVWLQJWRGHPRQVWUDWH23(5$%,/,7<7KLV6SHFLILFDWLRQ

GRHVQRWSURYLGHWLPHWRSHUIRUPDQ\RWKHUSUHYHQWLYHRUFRUUHFWLYH

PDLQWHQDQFH

LCO 3.0.5 should not be used in lieu of other practicable alternatives that comply with Required Actions and that do not require changing the MODE or other specified conditions in the Applicability in order to demonstrate equipment is OPERABLE. LCO 3.0.5 is not intended to be used repeatedly.

An example of demonstrating equipment is OPERABLE with the Required Actions not met is opening a manual valve that was closed to comply with Required Actions to isolate a flowpath with excessive Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) leakage in order to perform testing to demonstrate that RCS PIV leakage is now within limit.

FRQWLQXHG

%)181,7  %E $PHQGPHQW1R

'HFHPEHU

Examples of demonstrating equipment OPERABILITY include instances in which it is necessary to take an inoperable channel or trip system out of a tripped condition that was directed by a Required Action, if there is no Required Action Note for this purpose. An /&2$SSOLFDELOLW\

example of verifying OPERABILITY of equipment removed from service  %

is taking a tripped channel out of the tripped condition to permit the logic to function and indicate the appropriate response during

%$6(6 performance of required testing on the inoperable channel. Examples

/&2 $QH[DPSOHRIGHPRQVWUDWLQJWKH23(5$%,/,7<RIWKHHTXLSPHQW

 FRQWLQXHG EHLQJUHWXUQHGWRVHUYLFHLV UHRSHQLQJDFRQWDLQPHQWLVRODWLRQYDOYH

WKDWKDVEHHQFORVHGWRFRPSO\ZLWK5HTXLUHG$FWLRQVDQGPXVWEH

UHRSHQHGWRSHUIRUPWKHUHTXLUHGWHVWLQJ 1)

$QH[DPSOHRIGHPRQVWUDWLQJWKH23(5$%,/,7<RIRWKHU

HTXLSPHQWLVWDNLQJDQLQRSHUDEOHFKDQQHORUWULSV\VWHPRXWRIWKH

WULSSHGFRQGLWLRQWRSUHYHQWWKHWULSIXQFWLRQIURPRFFXUULQJGXULQJ

are WKHSHUIRUPDQFHRIUHTXLUHGWHVWLQJRQDQRWKHUFKDQQHOLQWKHRWKHU

WULSV\VWHP$VLPLODUH[DPSOHRIGHPRQVWUDWLQJWKH23(5$%,/,7<

RIRWKHUHTXLSPHQWLVWDNLQJDQLQRSHUDEOHFKDQQHORUWULSV\VWHP

RXWRIWKHWULSSHGFRQGLWLRQWRSHUPLWWKHORJLFWRIXQFWLRQDQG

LQGLFDWHWKHDSSURSULDWHUHVSRQVHGXULQJWKHSHUIRUPDQFHRI

UHTXLUHGWHVWLQJRQDQRWKHUFKDQQHOLQWKHVDPHWULSV\VWHP

, or 2)

/&2 /&2 HVWDEOLVKHVDQH[FHSWLRQWR/&2 ZKHQDVXSSRUWHG

V\VWHP/&2LVQRWPHWVROHO\GXHWRDVXSSRUWV\VWHP/&2QRW

<space> EHLQJPHW7KLVH[FHSWLRQLVSURYLGHGEHFDXVH/&2 ZRXOG

The administrativeUHTXLUHWKDWWKH&RQGLWLRQVDQG5HTXLUHG$FWLRQVRIWKHDVVRFLDWHG

controls in LCO 3.0.5 apply in all cases to systems or components in LQRSHUDEOHVXSSRUWHGV\VWHP/&2EHHQWHUHGVROHO\GXHWRWKH

Chapter 3 of the Technical Specifications, as long as the testing could not be conducted LQRSHUDELOLW\RIWKHVXSSRUWV\VWHP7KLVH[FHSWLRQLVMXVWLILHG

while complying with the Required Actions. This includes the realignment or repositioning of redundant or alternate equipment or trains previously manipulated to EHFDXVHWKHDFWLRQVWKDWDUHUHTXLUHGWRHQVXUHWKHSODQWLV

comply with ACTIONS, as well as equipment removed from service or declared PDLQWDLQHGLQDVDIHFRQGLWLRQDUHVSHFLILHGLQWKHVXSSRUWV\VWHPV 

inoperable to comply with ACTIONS.

/&2 V5HTXLUHG$FWLRQV7KH SRWHQWLDOFRQIXVLRQDQG

LQFRQVLVWHQF\RIUHTXLUHPHQWVUHODWHGWRWKHHQWU\LQWRPXOWLSOH

VXSSRUWDQGVXSSRUWHGV\VWHPV /&2 V&RQGLWLRQVDQG5HTXLUHG

$FWLRQVDUHHOLPLQDWHGE\SURYLGLQJDOOWKHDFWLRQVWKDWDUH

QHFHVVDU\WRHQVXUHWKHSODQWLVPDLQWDLQHGLQDVDIHFRQGLWLRQLQ

WKHVXSSRUWV\VWHP V5HTXLUHG$FWLRQV

FRQWLQXHG

%)181,7  % $PHQGPHQW

5HYLVLRQ

65$SSOLFDELOLW\

%

%$6(6 65 $VVWDWHGLQ65 WKHH[WHQVLRQDOVRGRHVQRWDSSO\WR

 FRQWLQXHG WKHLQLWLDOSRUWLRQRIDSHULRGLF&RPSOHWLRQ7LPHWKDWUHTXLUHV

SHUIRUPDQFHRQDRQFHSHUEDVLV7KHH[WHQVLRQDSSOLHV

WR HDFKSHUIRUPDQFHDIWHUWKHLQLWLDOSHUIRUPDQFH7KHLQLWLDO

SHUIRUPDQFHRIWKH5HTXLUHG$FWLRQZKHWKHULWLVDSDUWLFXODU

6XUYHLOODQFHRUVRPHRWKHUUHPHGLDODFWLRQLVFRQVLGHUHGDVLQJOH

DFWLRQZLWKDVLQJOH&RPSOHWLRQ7LPH2QHUHDVRQIRUQRWDOORZLQJ

WKHH[WHQVLRQWRWKLV&RPSOHWLRQ7LPHLVWKDWVXFKDQDFWLRQ

XVXDOO\YHULILHVWKDWQRORVVRIIXQFWLRQKDVRFFXUUHGE\FKHFNLQJ

WKHVWDWXVRIUHGXQGDQWRUGLYHUVHFRPSRQHQWVRUDFFRPSOLVKHVWKH

IXQFWLRQRIWKHLQRSHUDEOHHTXLSPHQWLQDQDOWHUQDWLYHPDQQHU

7KHSURYLVLRQVRI65 DUHQRWLQWHQGHGWREHXVHGUHSHDWHGO\

PHUHO\DVDQRSHUDWLRQDOFRQYHQLHQFHWRH[WHQG6XUYHLOODQFH

LQWHUYDOV RWKHUWKDQWKRVHFRQVLVWHQWZLWKUHIXHOLQJLQWHUYDOV RU

SHULRGLF&RPSOHWLRQ7LPHLQWHUYDOVEH\RQGWKRVHVSHFLILHGZLWKWKH

H[FHSWLRQ RIVXUYHLOODQFHVUHTXLUHGWREHSHUIRUPHGRQDGD\

IUHTXHQF\)RUVXUYHLOODQFHVSHUIRUPHGRQDGD\IUHTXHQF\WKH

QRUPDOVXUYHLOODQFHLQWHUYDOPD\EHH[WHQGHGLQDFFRUGDQFHZLWK

6SHFLILFDWLRQF\FOLFDOO\DVUHTXLUHGWR UHPDLQV\QFKURQL]HGWR

WKHZHHNPDLQWHQDQFHZRUNVFKHGXOHV7KLVSUDFWLFHLV

DFFHSWDEOHEDVHGRQWKHUHVXOWVRIDQHYDOXDWLRQRIGD\

IUHTXHQF\VXUYHLOODQFHWHVWKLVWRULHVWKDWGHPRQVWUDWHWKDWQR

DGYHUVHIDLOXUHUDWHFKDQJHVKDYHRFFXUUHGQRUZRXOG EHH[SHFWHG

WRGHYHORSDVDUHVXOWRIF\FOLFDOXVHRIVXUYHLOODQFHLQWHUYDO

H[WHQVLRQVDQGWKHIDFWWKDWWKHWRWDOQXPEHURIGD\IUHTXHQF\

VXUYHLOODQFHVSHUIRUPHGLQDQ\RQH\HDUSHULRGUHPDLQV

XQFKDQJHG performed 65 65 HVWDEOLVKHVWKHIOH[LELOLW\WRGHIHUGHFODULQJDIIHFWHG

HTXLSPHQWLQRSHUDEOHRUDQDIIHFWHGYDULDEOHRXWVLGHWKHVSHFLILHG

OLPLWVZKHQD6XUYHLOODQFHKDVQRWEHHQFRPSOHWHGZLWKLQWKH

VSHFLILHG)UHTXHQF\$GHOD\SHULRGRIXSWR KRXUVRUXSWRWKH

OLPLWRIWKHVSHFLILHGIUHTXHQF\ZKLFKHYHULVJUHDWHUDSSOLHVIURP

WKHSRLQWLQWLPHWKDWLWLVGLVFRYHUHGWKDWWKH6XUYHLOODQFHKDVQRW

EHHQSHUIRUPHGLQDFFRUGDQFHZLWK65 DQGQRWDWWKHWLPH

WKDWWKHVSHFLILHG)UHTXHQF\ZDVQRWPHW

FRQWLQXHG

%)181,7  % $PHQGPHQW1R

5HYLVLRQ

6HSWHPEHU

65$SSOLFDELOLW\

%

%$6(6 perform 65 7KLVGHOD\SHULRGSURYLGHVDGHTXDWHWLPHWRFRPSOHWH6XUYHLOODQFHV

 FRQWLQXHG WKDWKDYHEHHQPLVVHG7KLVGHOD\SHULRGSHUPLWVWKHFRPSOHWLRQRI

D6XUYHLOODQFHEHIRUHFRPSO\LQJZLWK5HTXLUHG$FWLRQVRURWKHU

UHPHGLDOPHDVXUHVWKDWPLJKWSUHFOXGHFRPSOHWLRQRIWKH

6XUYHLOODQFH performance performance FRQWLQXHG

%)181,7  %D $PHQGPHQW1R

5HYLVLRQ

6HSWHPEHU

65$SSOLFDELOLW\

%

%$6(6 65 7KHEDVLVIRUWKLVGHOD\SHULRGLQFOXGHVFRQVLGHUDWLRQRIXQLW

 FRQWLQXHG

<space> FRQGLWLRQVDGHTXDWHSODQQLQJDYDLODELOLW\RISHUVRQQHOWKHWLPH

UHTXLUHGWRSHUIRUPWKH6XUYHLOODQFHWKHVDIHW\VLJQLILFDQFHRIWKH

SR 3.0.3 is only applicable if there is a reasonable expectation the associated equipment is OPERABLE GHOD\LQFRPSOHWLQJWKHUHTXLUHG6XUYHLOODQFHDQGWKHUHFRJQLWLRQ

or that variables are within limits, and it is expected that the Surveillance will be met when performed.

Many factors WKDWWKHPRVWSUREDEOHUHVXOWRIDQ\SDUWLFXODU6XUYHLOODQFHEHLQJ

should be considered, such as the period of time since the Surveillance was last performed, or whether the Surveillance, or a portion thereof, has ever been performed, and any other indications, SHUIRUPHGLVWKHYHULILFDWLRQRIFRQIRUPDQFHZLWKWKHUHTXLUHPHQWV

tests, or activities that might support the expectation that the Surveillance will be met when performed. An example of the use of SR 3.0.3 would be a relay contact that was not tested as required in accordance

KHQD6XUYHLOODQFHZLWKD)UHTXHQF\EDVHGQRWRQWLPHLQWHUYDOV

with a particular SR, but previous successful performances of the SR included the relay contact; the EXWXSRQVSHFLILHGXQLWFRQGLWLRQVRSHUDWLQJVLWXDWLRQVRU

adjacent, physically connected relay contacts were tested during the SR performance; the subject relay UHTXLUHPHQWVRIUHJXODWLRQV

contact has been HJSULRUWRHQWHULQJ02'(DIWHU

tested by another SR; or historical operation of the subject relay contact has been successful. ItHDFKIXHOORDGLQJRULQDFFRUGDQFHZLWK&)5$SSHQGL[-DV

is not sufficient to infer the behavior of the associated equipment from the performance of similar equipment. The rigor of determining whether there is LVGLVFRYHUHGWRQRWKDYH

PRGLILHGE\DSSURYHGH[HPSWLRQVHWF a reasonable expectation a Surveillance will be met when EHHQSHUIRUPHGZKHQVSHFLILHG65DOORZVIRUWKHIXOOGHOD\

performed should increase based on the length of time since the last performance of the Surveillance. If the Surveillance has been performed recently, a review of the Surveillance history and SHULRGRIXSWRWKHVSHFLILHG)UHTXHQF\WRSHUIRUPWKH6XUYHLOODQFH

equipment performance may be sufficient to support a reasonable expectation that the Surveillance will be

+RZHYHUVLQFHWKHUHLVQRWDWLPHLQWHUYDOVSHFLILHGWKHPLVVHG

met when performed. For Surveillances that have not been performed for a long period or that have never been performed,6XUYHLOODQFHVKRXOGEHSHUIRUPHGDWWKHILUVWUHDVRQDEOH

a rigorous evaluation based on objective evidence should provide a high degree of confidence thatRSSRUWXQLW\

the equipment is OPERABLE. The evaluation should be documented in sufficient detail to allow a knowledgeable individual to understand the basis for the determination.

<space> 65SURYLGHVDWLPHOLPLWIRUDQGDOORZDQFHVIRUWKH

SHUIRUPDQFHRI6XUYHLOODQFHVWKDWEHFRPHDSSOLFDEOHDVD

FRQVHTXHQFHRI02'(FKDQJHVLPSRVHGE\5HTXLUHG$FWLRQV

)DLOXUHWRFRPSO\ZLWKVSHFLILHG)UHTXHQFLHVIRU65VLVH[SHFWHGWR

EHDQLQIUHTXHQWRFFXUUHQFH8VHRIWKHGHOD\SHULRGHVWDEOLVKHG

E\65 LVDIOH[LELOLW\ZKLFKLVQRWLQWHQGHGWREHXVHGDVDQ

RSHUDWLRQDOFRQYHQLHQFHWRH[WHQG6XUYHLOODQFHLQWHUYDOV

KLOHXSWRKRXUVRUWKHOLPLWRIWKHVSHFLILHG)UHTXHQF\LV

SURYLGHGWRSHUIRUPWKHPLVVHG6XUYHLOODQFHLWLVH[SHFWHGWKDWWKH

repeatedly PLVVHG6XUYHLOODQFHZLOOEHSHUIRUPHGDWWKHILUVWUHDVRQDEOH

RSSRUWXQLW\ 7KHGHWHUPLQDWLRQRIWKHILUVWUHDVRQDEOHRSSRUWXQLW\

VKRXOGLQFOXGHFRQVLGHUDWLRQRIWKHLPSDFWRQSODQWULVN IURP

GHOD\LQJWKH6XUYHLOODQFHDVZHOODVDQ\SODQWFRQILJXUDWLRQ

FKDQJHVUHTXLUHGRUVKXWWLQJWKHSODQWGRZQWRSHUIRUPWKH

FRQWLQXHG

%)181,7  % $PHQGPHQW1R

5HYLVLRQ

'HFHPEHU

Enclosure Attachment 3.2 Proposed TS Bases Changes (Markups) (For Information Only)

Sequoyah Nuclear Plant, Units 1 and 2 CNL-22-008

LCO Applicability B 3.0 B 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY BASES LCOs LCO 3.0.1 through LCO 3.0.9 establish the general requirements applicable to all Specifications and apply at all times, unless otherwise stated.

LCO 3.0.1 LCO 3.0.1 establishes the Applicability statement within each individual Specification as the requirement for when the LCO is required to be met (i.e., when the unit is in the MODES or other specified conditions of the Applicability statement of each Specification).

LCO 3.0.2 LCO 3.0.2 establishes that upon discovery of a failure to meet an LCO, the associated ACTIONS shall be met. The Completion Time of each Required Action for an ACTIONS Condition is applicable from the point in time that an ACTIONS Condition is entered, unless otherwise specified.

The Required Actions establish those remedial measures that must be taken within specified Completion Times when the requirements of an LCO are not met. This Specification establishes that:

a. Completion of the Required Actions within the specified Completion Times constitutes compliance with a Specification; and
b. Completion of the Required Actions is not required when an LCO is met within the specified Completion Time, unless otherwise specified.

There are two basic types of Required Actions. The first type of Required Action specifies a time limit in which the LCO must be met. This time limit is the Completion Time to restore an inoperable system or component to OPERABLE status or to restore variables to within specified limits. If this type of Required Action is not completed within the specified Completion Time, a shutdown may be required to place the unit in a MODE or condition in which the Specification is not applicable. (Whether stated as a Required Action or not, correction of the entered Condition is an action that may always be considered upon entering ACTIONS.) The second type of Required Action specifies the remedial measures that permit continued operation of the unit that is not further restricted by the Completion Time. In this case, compliance with the Required Actions provides an acceptable level of safety for continued operation.

Completing the Required Actions is not required when an LCO is met or is no longer applicable, unless otherwise stated in the individual Specifications.

SEQUOYAH - UNIT 1 B 3.0-1 Revision 45,

$PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.3 (continued)

This Specification delineates the time limits for placing the unit in a safe MODE or other specified condition when operation cannot be maintained within the limits for safe operation as defined by the LCO and its ACTIONS. It is not intended to be used as an operational convenience that permits routine voluntary removal of redundant systems or components from service in lieu of other alternatives that would not result in redundant systems or components being inoperable.

Upon entering LCO 3.0.3, 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> is allowed to prepare for an orderly shutdown before initiating a change in unit operation. This includes time to permit the operator to coordinate the reduction in electrical generation with the load dispatcher to ensure the stability and availability of the electrical grid. The time limits specified to enterreach lower MODES of operation permit the shutdown to proceed in a controlled and orderly manner that is well within the specified maximum cooldown rate and within the capabilities of the unit, assuming that only the minimum required equipment is OPERABLE. This reduces thermal stresses on components of the Reactor Coolant System and the potential for a plant upset that could challenge safety systems under conditions to which this Specification applies. The use and interpretation of specified times to complete the actions of LCO 3.0.3 are consistent with the discussion of Section 1.3, Completion Times.

A unit shutdown required in accordance with LCO 3.0.3 may be terminated and LCO 3.0.3 exited if any of the following occurs:

a. The LCO is now met;,
b. The LCO is no longer applicable, b.c. A Condition exists for which the Required Actions have now been performed;, or c.d. ACTIONS exist that do not have expired Completion Times. These Completion Times are applicable from the point in time that the Condition is initially entered and not from the time LCO 3.0.3 is exited.

The time limits of LCO 3.0.3 allow 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> for the unit to be in MODE 5 when a shutdown is required during MODE 1 operation. If the unit is in a lower MODE of operation when a shutdown is required, the time limit for enterreaching the next lower MODE applies. If a lower MODE is enterreached in less time than allowed, however, the total allowable time to enterreach MODE 5, or other applicable MODE, is not reduced. For example, if SEQUOYAH - UNIT 1 B 3.0-3 Revision 45,

$PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.3 (continued)

MODE 3 is enterreached in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, then the time allowed for enterreaching MODE 4 is the next 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br />, because the total time for enterreaching MODE 4 is not reduced from the allowable limit of 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />. Therefore, if remedial measures are completed that would permit a return to MODE 1, a penalty is not incurred by having to enterreach a lower MODE of operation in less than the total time allowed.

In MODES 1, 2, 3, and 4, LCO 3.0.3 provides actions for Conditions not covered in other Specifications. The requirements of LCO 3.0.3 do not apply in MODES 5 and 6 because the unit is already in the most restrictive Condition required by LCO 3.0.3. The requirements of LCO 3.0.3 do not apply in other specified conditions of the Applicability (unless in MODE 1, 2, 3, or 4) because the ACTIONS of individual Specifications sufficiently define the remedial measures to be taken.

Exceptions to LCO 3.0.3 are provided in instances where requiring a unit shutdown, in accordance with LCO 3.0.3, would not provide appropriate remedial measures for the associated condition of the unit. An example of this is in LCO 3.7.13, "Spent Fuel Pool Water Level." LCO 3.7.13 has an Applicability of "Whenever irradiated fuel assemblies are in the spent fuel pool." Therefore, this LCO can be applicable in any or all MODES. If the LCO and the Required Actions of LCO 3.7.13 are not met while in MODE 1, 2, or 3, there is no safety benefit to be gained by placing the unit in a shutdown condition. The Required Actions of LCO 3.7.13 of "Suspend all movement of fuel assemblies and crane operations with loads in the fuel storage areas" and "Restore spent fuel pool water level to within limit" are the appropriate Required Actions to complete in lieu of the actions of LCO 3.0.3. These exceptions are addressed in the individual Specifications.

LCO 3.0.4 LCO 3.0.4 establishes limitations on changes in MODES or other specified conditions in the Applicability when an LCO is not met. It allows placing the unit in a MODE or other specified condition stated in that Applicability (e.g., the Applicability desired to be entered) when unit conditions are such that the requirements of the LCO would not be met, in accordance with either LCO 3.0.4.a, LCO 3.0.4.b, or LCO 3.0.4.c.

LCO 3.0.4.a allows entry into a MODE or other specified condition in the Applicability with the LCO not met when the associated ACTIONS to be entered following entry intopermit continued operation in the MODE or other specified condition in the Applicability will permit continued operation within the MODE or other specified condition for an unlimited period of time. Compliance with Required ACTIONSctions that permit continued operation of the unit for an unlimited period of time in a MODE or other specified condition provides an acceptable level of safety for continued operation. This is without regard d SEQUOYAH - UNIT 1 B 3.0-4 Revision 45,

$PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.4 (continued) to the status of the unit before or after the MODE change. Therefore, in such cases, entry into a MODE or other specified condition in the Applicability may be made and the Required Actions followed after entry into the Applicabilityin accordance with the provisions of the Required Actions.

For example, LCO 3.0.4.a may be used when the Required Action to be entered states that an inoperable instrument channel must be placed in the trip condition within the Completion Time. Transition into a MODE or other specified in condition in the Applicability may be made in accordance with LCO 3.0.4 and the channel is subsequently placed in the tripped condition within the Completion Time, which begins when the Applicability is entered. If the instrument channel cannot be placed in the tripped condition and the subsequent default ACTION ("Required Action and associated Completion Time not met") allows the OPERABLE train to be placed in operation, use of LCO 3.0.4.a is acceptable because the subsequent ACTIONS to be entered following entry into the MODE include ACTIONS (place the OPERABLE train in operation) that permit safe plant operation for an unlimited period of time in the MODE or other specified condition to be entered.

LCO 3.0.4.b allows entry into a MODE or other specified condition in the Applicability with the LCO not met after performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate.

The risk assessment may use quantitative, qualitative, or blended approaches, and the risk assessment will be conducted using the plant program, procedures, and criteria in place to implement 10 CFR 50.65(a)(4), which requires that risk impacts of maintenance activities be assessed and managed. The risk assessment, for the purposes of LCO 3.0.4.b, must take into account all inoperable Technical Specification equipment regardless of whether the equipment is included in the normal 10 CFR 50.65(a)(4) risk assessment scope. The risk assessments will be conducted using the procedures and guidance endorsed by Regulatory Guide 1.182, Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants. Regulatory Guide 1.182 endorses the guidance in Section 11 of NUMARC 93-01, Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants. These documents address general guidance for conduct of the risk assessment, quantitative and qualitative guidelines for establishing risk management actions, and example risk management actions. These include actions to plan and conduct other activities in a manner that controls overall risk, increased risk awareness by shift and SEQUOYAH - UNIT 1 B 3.0- Revision 45,

$PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.4 (continued) management personnel, actions to reduce the duration of the condition, actions to minimize the magnitude of risk increases (establishment of backup success paths or compensatory measures), and determination that the proposed MODE change is acceptable. Consideration should also be given to the probability of completing restoration such that the requirements of the LCO would be met prior to the expiration of ACTIONS Completion Times that would require exiting the Applicability.

LCO 3.0.4.b may be used with single, or multiple systems and components unavailable. NUMARC 93-01 provides guidance relative to consideration of simultaneous unavailability of multiple systems and components.

The results of the risk assessment shall be considered in determining the acceptability of entering the MODE or other specified condition in the Applicability, and any corresponding risk management actions. The LCO 3.0.4.b risk assessments do not have to be documented.

SEQUOYAH - UNIT 1 B 3.0-5a Revision 45,

$PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.4 (continued)

The Technical Specifications allow continued operation with equipment unavailable in MODE 1 for the duration of the Completion Time. Since this is allowable, and since in general the risk impact in that particular MODE bounds the risk of transitioning into and through the applicable MODES or other specified conditions in the Applicability of the LCO, the use of the LCO 3.0.4.b allowance should be generally acceptable, as long as the risk is assessed and managed as stated above. However, there is a small subset of systems and components that have been determined to be more important to risk and use of the LCO 3.0.4.b allowance is prohibited. The LCOs governing these systems and components contain Notes prohibiting the use of LCO 3.0.4.b by stating that LCO 3.0.4.b is not applicable.

LCO 3.0.4.c allows entry into a MODE or other specified condition in the Applicability with the LCO not met based on a Note in the Specification which states LCO 3.0.4.c is applicable. These specific allowances permit entry into MODES or other specified conditions in the Applicability when the associated ACTIONS to be entered do not provide for continued operation for an unlimited period of time and a risk assessment has not been performed. This allowance may apply to all the ACTIONS or to a specific Required Action of a Specification. The risk assessments performed to justify the use of LCO 3.0.4.b usually only consider systems and components. For this reason, LCO 3.0.4.c is typically applied to Specifications which describe values and parameters (e.g., RCS Specific ActivityContainment Air Temperature, Containment Pressure, and Moderator Temperature Coefficient), and may be applied to other Specifications based on NRC plant specific approval.

The provisions of this Specification should not be interpreted as endorsing the failure to exercise the good practice of restoring systems or components to OPERABLE status before entering an associated MODE or other specified condition in the Applicability.

The provisions of LCO 3.0.4 shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS. In addition, the provisions of LCO 3.0.4 shall not prevent changes in MODES or other specified conditions in the Applicability that result from any unit shutdown. In this context, a unit shutdown is defined as a change in MODE or other specified condition in the Applicability associated with transitioning from MODE 1 to MODE 2, MODE 2 to MODE 3, MODE 3 to MODE 4, and MODE 4 to MODE 5.

SEQUOYAH - UNIT 1 B 3.0-6 Revision 45,

$PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.4 (continued)

Upon entry into a MODE or other specified condition in the Applicability with the LCO not met, LCO 3.0.1 and LCO 3.0.2 require entry into the applicable Conditions and Required Actions until the Condition is resolved, until the LCO is met, or until the unit is not within the Applicability of the Technical Specification.

Surveillances do not have to be performed on the associated inoperable equipment (or on variables outside the specified limits), as permitted by SR 3.0.1. Therefore, utilizing LCO 3.0.4 is not a violation of SR 3.0.1 or SR 3.0.4 for any Surveillances that have not been performed on inoperable equipment. However, SRs must be met to ensure OPERABILITY prior to declaring the associated equipment OPERABLE (or variable within limits) and restoring compliance with the affected LCO.

LCO 3.0.5 LCO 3.0.5 establishes the allowance for restoring equipment to service under administrative controls when it has been removed from service or declared inoperable to comply with ACTIONS. The sole purpose of this Specification is to provide an exception to LCO 3.0.2 (e.g., to not comply with the applicable Required Action(s)) to allow the performance of required testing to demonstrate:

a. The OPERABILITY of the equipment being returned to service; or
b. The OPERABILITY of other equipment.

The administrative controls ensure the time the equipment is returned to service in conflict with the requirements of the ACTIONS is limited to the time absolutely necessary to perform the required testing to demonstrate OPERABILITY. This Specification does not provide time to perform any other preventive or corrective maintenance. LCO 3.0.5 should not be used in lieu of other practicable alternatives that comply with Required Actions and that do not require changing the MODE or other specified conditions in the Applicability in order to demonstrate equipment is OPERABLE. LCO 3.0.5 is not intended to be used repeatedly.

An example of demonstrating equipment is OPERABLE with the Required Actions not met is opening a manual valve that was closed to comply with Required Actions to isolate a flowpath with excessive Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) leakage in order to perform testing to demonstrate that RCS PIV leakage is now within limit.

An example of demonstrating the OPERABILITY of the equipment being returned to service is reopening a containment isolation valve that has been closed to comply with Required Actions and must be reopened to perform the required testing.

SEQUOYAH - UNIT 1 B 3.0-7 Revision 45,

$PHQGPHQW

LCO Applicability B 3.0 Examples of demonstrating equipment OPERABILITY include instances in which it is necessary to take an inoperable channel or trip system out of a tripped condition that was directed by a Required Action, if there is no Required Action Note for this purpose. An example of verifying SEQUOYAH - UNIT 1 B 3.0-8 Revision 45,

$PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.5 (continued)

OPERABILITY of equipment removed from service is taking a tripped channel out of the tripped condition to permit the logic to function and indicate the appropriate response during performance of required testing on the inoperable channel. ExamplesAn example of demonstrating the OPERABILITY of other equipment is taking an inoperable channel or trip system out of the tripped condition 1) to prevent the trip function from occurring during the performance of required testing on another channel in the other trip system, or 2). A similar example of demonstrating the OPERABILITY of other equipment is taking an inoperable channel or trip system out of the tripped condition to permit the logic to function and indicate the appropriate response during the performance of required testing on another channel in the same trip system.

The administrative controls in LCO 3.0.5 apply in all cases to systems or components in Chapter 3 of the Technical Specifications, as long as the testing could not be conducted while complying with the Required Actions. This includes the realignment or repositioning of redundant or alternate equipment or trains previously manipulated to comply with ACTIONS, as well as equipment removed from service or declared inoperable to comply with ACTIONS.

SEQUOYAH - UNIT 1 B 3.0-7a Revision 45,

$PHQGPHQW

SR Applicability B 3.0 BASES SR 3.0.2 (continued) testing interval, whether stated in the specification or incorporated by reference, is permitted.

The 25 percent extension does not significantly degrade the reliability that results from performing the Surveillance at its specified Frequency. This is based on the recognition that the most probable result of any particular Surveillance being performed is the verification of conformance with the SRs. The exceptions to SR 3.0.2 are those Surveillances for which the 25 percent extension of the interval specified in the Frequency does not apply. These exceptions are stated in the individual Specifications. The requirements of regulations take precedence over the TS. An example of where SR 3.0.2 does not apply is in the Containment Leakage Rate Testing Program. This program establishes testing requirements and Frequencies in accordance with the requirements of regulations. The TS cannot in and of themselves extend a test interval specified in the regulations. As stated in SR 3.0.2, the 25 percent extension also does not apply to the initial portion of a periodic Completion Time that requires performance on a "once per ..." basis. The 25 percent extension applies to each performance after the initial performance. The initial performance of the Required Action, whether it is a particular Surveillance or some other remedial action, is considered a single action with a single Completion Time. One reason for not allowing the 25 percent extension to this Completion Time is that such an action usually verifies that no loss of function has occurred by checking the status of redundant or diverse components or accomplishes the function of the inoperable equipment in an alternative manner.

The provisions of SR 3.0.2 are not intended to be used repeatedly merely as an operational convenience to extend Surveillance intervals (other than those consistent with refueling intervals) or periodic Completion Time intervals beyond those specified.

SR 3.0.3 SR 3.0.3 establishes the flexibility to defer declaring affected equipment inoperable or an affected variable outside the specified limits when a Surveillance has not been performcompleted within the specified Frequency. A delay period of up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater, applies from the point in time that it is discovered that the Surveillance has not been performed in accordance with SR 3.0.2, and not at the time that the specified Frequency was not met.

When a Section 5.5, "Programs and Manuals," specification states that the provisions of SR 3.0.3 are applicable, it permits the flexibility to defer declaring the testing requirement not met in accordance with SR 3.0.3 when the testing has not been completed within the testing interval SEQUOYAH - UNIT 1 B 3.0-17 Revision 45,

$PHQGPHQW

SR Applicability B 3.0 BASES SR 3.0.3 (continued)

(including the allowance of SR 3.0.2 if invoked by the Section 5.5 specification).

This delay period provides adequate time to performcomplete Surveillances that have been missed. This delay period permits the performancecompletion of a Surveillance before complying with Required Actions or other remedial measures that might preclude performancecompletion of the Surveillance.

The basis for this delay period includes consideration of unit conditions, adequate planning, availability of personnel, the time required to perform the Surveillance, the safety significance of the delay in completing the required Surveillance, and the recognition that the most probable result of any particular Surveillance being performed is the verification of conformance with the requirements.

When a Surveillance with a Frequency based not on time intervals, but upon specified unit conditions, operating situations, or requirements of regulations (e.g., prior to entering MODE 1 after each fuel loading, or in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions, etc.) is discovered to not have been performed when specified, SR 3.0.3 allows for the full delay period of up to the specified Frequency to perform the Surveillance. However, since there is not a time interval specified, the missed Surveillance should be performed at the first reasonable opportunity.

SR 3.0.3 provides a time limit for, and allowances for the performance of, Surveillances that become applicable as a consequence of MODE changes imposed by Required Actions.

SR 3.0.3 is only applicable if there is a reasonable expectation the associated equipment is OPERABLE or that variables are within limits, and it is expected that the Surveillance will be met when performed.

Many factors should be considered, such as the period of time since the Surveillance was last performed, or whether the Surveillance, or a portion thereof, has ever been performed, and any other indications, tests, or activities that might support the expectation that the Surveillance will be met when performed. An example of the use of SR 3.0.3 would be a relay contact that was not tested as required in accordance with a particular SR, but previous successful performances of the SR included the relay contact; the adjacent, physically connected relay contacts were tested during the SR performance; the subject relay contact has been tested by another SR; or historical operation of the subject relay contact has been successful. It is not sufficient to infer the behavior of the associated equipment from the performance of similar equipment. The rigor of determining whether there is a reasonable expectation a SEQUOYAH - UNIT 1 B 3.0-18 Revision 45,

$PHQGPHQW

SR Applicability B 3.0 BASES SR 3.0.3 (continued)

Surveillance will be met when performed should increase based on the length of time since the last performance of the Surveillance. If the Surveillance has been performed recently, a review of the Surveillance history and equipment performance may be sufficient to support a reasonable expectation that the Surveillance will be met when performed.

For Surveillances that have not been performed for a long period or that have never been performed, a rigorous evaluation based on objective evidence should provide a high degree of confidence that the equipment is OPERABLE. The evaluation should be documented in sufficient detail to allow a knowledgeable individual to understand the basis for the determination.

Failure to comply with specified Frequencies for SRs is expected to be an infrequent occurrence. Use of the delay period established by SR 3.0.3 is a flexibility which is not intended to be used repeatedlyas an operational convenience to extend Surveillance intervals. While up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or the limit of the specified Frequency is provided to perform the missed Surveillance, it is expected that the missed Surveillance will be performed at the first reasonable opportunity. The determination of the first reasonable opportunity should include consideration of the impact on plant risk (from delaying the Surveillance as well as any plant configuration changes required or shutting the plant down to perform the Surveillance) and impact on any analysis assumptions, in addition to unit conditions, planning, availability of personnel, and the time required to perform the Surveillance. This risk impact should be managed through the program in place to implement 10 CFR 50.65(a)(4) and its implementation guidance, NRC Regulatory Guide 1.182, Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants.

SEQUOYAH - UNIT 1 B 3.0-19 Revision 45,

$PHQGPHQW

SR Applicability B 3.0 BASES SR 3.0.3 (continued)

This Regulatory Guide addresses consideration of temporary and aggregate risk impacts, determination of risk management action thresholds, and risk management action up to and including plant shutdown. The missed Surveillance should be treated as an emergent condition as discussed in the Regulatory Guide. The risk evaluation may use quantitative, qualitative, or blended methods. The degree of depth and rigor of the evaluation should be commensurate with the importance of the component. Missed Surveillances for important components should be analyzed quantitatively. If the results of the risk evaluation determine the risk increase is significant, this evaluation should be used to determine the safest course of action. All missed Surveillances will be placed in the licensees Corrective Action Program.

If a Surveillance is not completed within the allowed delay period, then the equipment is considered inoperable or the variable is considered outside the specified limits and the Completion Times of the Required Actions for the applicable LCO Conditions begin immediately upon expiration of the delay period. If a Surveillance is failed within the delay period, then the equipment is inoperable, or the variable is outside the specified limits and the Completion Times of the Required Actions for the applicable LCO Conditions begin immediately upon the failure of the Surveillance.

Completion of the Surveillance within the delay period allowed by this Specification, or within the Completion Time of the ACTIONS, restores compliance with SR 3.0.1.

SR 3.0.4 SR 3.0.4 establishes the requirement that all applicable SRs must be met before entry into a MODE or other specified condition in the Applicability.

This Specification ensures that system and component OPERABILITY requirements and variable limits are met before entry into MODES or other specified conditions in the Applicability for which these systems and components ensure safe operation of the unit. The provisions of this Specification should not be interpreted as endorsing the failure to exercise the good practice of restoring systems or components to OPERABLE status before entering an associated MODE or other specified condition in the Applicability.

A provision is included to allow entry into a MODE or other specified condition in the Applicability when an LCO is not met due to a Surveillance not being met in accordance with LCO 3.0.4.

However, in certain circumstances, failing to meet an SR will not result in SR 3.0.4 restricting a MODE change or other specified condition change.

SEQUOYAH - UNIT 1 B 3.0-20 Revision 45,

$PHQGPHQW

SR Applicability B 3.0 BASES SR 3.0.4 (continued)

When a system, subsystem, division, component, device, or variable is inoperable or outside its specified limits, the associated SR(s) are not required to be performed, per SR 3.0.1, which states that surveillances do not have to be performed on inoperable equipment. When equipment is inoperable, SR 3.0.4 does not apply to the associated SR(s) since the requirement for the SR(s) to be performed is removed. Therefore, failing to perform the Surveillance(s) within the specified Frequency does not result in an SR 3.0.4 restriction to changing MODES or other specified conditions of the Applicability. However, since the LCO is not met in this instance, LCO 3.0.4 will govern any restrictions that may (or may not) apply to MODE or other specified condition changes. SR 3.0.4 does not restrict changing MODES or other specified conditions of the Applicability when a Surveillance has not been performed within the specified Frequency, provided the requirement to declare the LCO not met has been delayed in accordance with SR 3.0.3.

The provisions of SR 3.0.4 shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS. In addition, the provisions of SR 3.0.4 shall not prevent changes in MODES or other specified conditions in the Applicability that result from any unit shutdown. In this context, a unit shutdown is defined as a change in MODE or other specified condition in the Applicability associated with transitioning from MODE 1 to MODE 2, MODE 2 to MODE 3, MODE 3 to MODE 4, and MODE 4 to MODE 5.

The precise requirements for performance of SRs are specified such that exceptions to SR 3.0.4 are not necessary. The specific time frames and conditions necessary for meeting the SRs are specified in the Frequency, in the Surveillance, or both. This allows performance of Surveillances when the prerequisite condition(s) specified in a Surveillance procedure require entry into the MODE or other specified condition in the Applicability of the associated LCO prior to the performance or completion of a Surveillance. A Surveillance that could not be performed until after entering the LCOs Applicability, would have its Frequency specified such that it is not "due" until the specific conditions needed are met.

Alternately, the Surveillance may be stated in the form of a Note, as not required (to be met or performed) until a particular event, condition, or time has been reached. Further discussion of the specific formats of SRs' annotation is found in Section 1.4, Frequency.

SEQUOYAH - UNIT 1 B 3.0-21 Revision 45,

$PHQGPHQW

LCO Applicability B 3.0 B 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY BASES LCOs LCO 3.0.1 through LCO 3.0.9 establish the general requirements applicable to all Specifications and apply at all times, unless otherwise stated.

LCO 3.0.1 LCO 3.0.1 establishes the Applicability statement within each individual Specification as the requirement for when the LCO is required to be met (i.e., when the unit is in the MODES or other specified conditions of the Applicability statement of each Specification).

LCO 3.0.2 LCO 3.0.2 establishes that upon discovery of a failure to meet an LCO, the associated ACTIONS shall be met. The Completion Time of each Required Action for an ACTIONS Condition is applicable from the point in time that an ACTIONS Condition is entered, unless otherwise specified.

The Required Actions establish those remedial measures that must be taken within specified Completion Times when the requirements of an LCO are not met. This Specification establishes that:

a. Completion of the Required Actions within the specified Completion Times constitutes compliance with a Specification; and
b. Completion of the Required Actions is not required when an LCO is met within the specified Completion Time, unless otherwise specified.

There are two basic types of Required Actions. The first type of Required Action specifies a time limit in which the LCO must be met. This time limit is the Completion Time to restore an inoperable system or component to OPERABLE status or to restore variables to within specified limits. If this type of Required Action is not completed within the specified Completion Time, a shutdown may be required to place the unit in a MODE or condition in which the Specification is not applicable. (Whether stated as a Required Action or not, correction of the entered Condition is an action that may always be considered upon entering ACTIONS.) The second type of Required Action specifies the remedial measures that permit continued operation of the unit that is not further restricted by the Completion Time. In this case, compliance with the Required Actions provides an acceptable level of safety for continued operation.

Completing the Required Actions is not required when an LCO is met or is no longer applicable, unless otherwise stated in the individual Specifications.

SEQUOYAH - UNIT 2 B 3.0-1 Revision 45,

$PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.3 (continued)

This Specification delineates the time limits for placing the unit in a safe MODE or other specified condition when operation cannot be maintained within the limits for safe operation as defined by the LCO and its ACTIONS. It is not intended to be used as an operational convenience that permits routine voluntary removal of redundant systems or components from service in lieu of other alternatives that would not result in redundant systems or components being inoperable.

Upon entering LCO 3.0.3, 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> is allowed to prepare for an orderly shutdown before initiating a change in unit operation. This includes time to permit the operator to coordinate the reduction in electrical generation with the load dispatcher to ensure the stability and availability of the electrical grid. The time limits specified to enterreach lower MODES of operation permit the shutdown to proceed in a controlled and orderly manner that is well within the specified maximum cooldown rate and within the capabilities of the unit, assuming that only the minimum required equipment is OPERABLE. This reduces thermal stresses on components of the Reactor Coolant System and the potential for a plant upset that could challenge safety systems under conditions to which this Specification applies. The use and interpretation of specified times to complete the actions of LCO 3.0.3 are consistent with the discussion of Section 1.3, Completion Times.

A unit shutdown required in accordance with LCO 3.0.3 may be terminated and LCO 3.0.3 exited if any of the following occurs:

a. The LCO is now met;,

a.b. The LCO is no longer applicable, b.c. A Condition exists for which the Required Actions have now been performed;, or c.d. ACTIONS exist that do not have expired Completion Times. These Completion Times are applicable from the point in time that the Condition is initially entered and not from the time LCO 3.0.3 is exited.

The time limits of LCO 3.0.3 allow 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> for the unit to be in MODE 5 when a shutdown is required during MODE 1 operation. If the unit is in a lower MODE of operation when a shutdown is required, the time limit for enterreaching the next lower MODE applies. If a lower MODE is enterreached in less time than allowed, however, the total allowable time to enterreach MODE 5, or other applicable MODE, is not reduced. For example, if SEQUOYAH - UNIT 2 B 3.0-3 Revision 45,

$PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.3 (continued)

MODE 3 is enterreached in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, then the time allowed for enterreaching MODE 4 is the next 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br />, because the total time for enterreaching MODE 4 is not reduced from the allowable limit of 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />. Therefore, if remedial measures are completed that would permit a return to MODE 1, a penalty is not incurred by having to enterreach a lower MODE of operation in less than the total time allowed.

In MODES 1, 2, 3, and 4, LCO 3.0.3 provides actions for Conditions not covered in other Specifications. The requirements of LCO 3.0.3 do not apply in MODES 5 and 6 because the unit is already in the most restrictive Condition required by LCO 3.0.3. The requirements of LCO 3.0.3 do not apply in other specified conditions of the Applicability (unless in MODE 1, 2, 3, or 4) because the ACTIONS of individual Specifications sufficiently define the remedial measures to be taken.

Exceptions to LCO 3.0.3 are provided in instances where requiring a unit shutdown, in accordance with LCO 3.0.3, would not provide appropriate remedial measures for the associated condition of the unit. An example of this is in LCO 3.7.13, "Spent Fuel Pool Water Level." LCO 3.7.13 has an Applicability of "Whenever irradiated fuel assemblies are in the spent fuel pool." Therefore, this LCO can be applicable in any or all MODES. If the LCO and the Required Actions of LCO 3.7.13 are not met while in MODE 1, 2, or 3, there is no safety benefit to be gained by placing the unit in a shutdown condition. The Required Actions of LCO 3.7.13 of "Suspend all movement of fuel assemblies and crane operations with loads in the fuel storage areas" and "Restore spent fuel pool water level to within limit" are the appropriate Required Actions to complete in lieu of the actions of LCO 3.0.3. These exceptions are addressed in the individual Specifications.

LCO 3.0.4 LCO 3.0.4 establishes limitations on changes in MODES or other specified conditions in the Applicability when an LCO is not met. It allows placing the unit in a MODE or other specified condition stated in that Applicability (e.g., the Applicability desired to be entered) when unit conditions are such that the requirements of the LCO would not be met, in accordance with either LCO 3.0.4.a, LCO 3.0.4.b, or LCO 3.0.4.c.

LCO 3.0.4.a allows entry into a MODE or other specified condition in the Applicability with the LCO not met when the associated ACTIONS to be entered following entry intopermit continued operation in the MODE or other specified condition in the Applicability will permit continued operation within the MODE or other specified condition for an unlimited period of time. Compliance with Required ACTIONSctions that permit continued operation of the unit for an unlimited period of time in a MODE or other specified condition provides an SEQUOYAH - UNIT 2 B 3.0-4 Revision 45,

$PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.4 (continued) acceptable level of safety for continued operation. This is without regard to the status of the unit before or after the MODE change. Therefore, in such cases, entry into a MODE or other specified condition in the Applicability may be made and the Required Actions followed after entry into the Applicabilityin accordance with the provisions of the Required Actions.

For example, LCO 3.0.4.a may be used when the Required Action to be entered states that an inoperable instrument channel must be placed in the trip condition within the Completion Time. Transition into a MODE or other specified in condition in the Applicability may be made in accordance with LCO 3.0.4 and the channel is subsequently placed in the tripped condition within the Completion Time, which begins when the Applicability is entered. If the instrument channel cannot be placed in the tripped condition and the subsequent default ACTION ("Required Action and associated Completion Time not met") allows the OPERABLE train to be placed in operation, use of LCO 3.0.4.a is acceptable because the subsequent ACTIONS to be entered following entry into the MODE include ACTIONS (place the OPERABLE train in operation) that permit safe plant operation for an unlimited period of time in the MODE or other specified condition to be entered.

LCO 3.0.4.b allows entry into a MODE or other specified condition in the Applicability with the LCO not met after performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate.

The risk assessment may use quantitative, qualitative, or blended approaches, and the risk assessment will be conducted using the plant program, procedures, and criteria in place to implement 10 CFR 50.65(a)(4), which requires that risk impacts of maintenance activities be assessed and managed. The risk assessment, for the purposes of LCO 3.0.4.b, must take into account all inoperable Technical Specification equipment regardless of whether the equipment is included in the normal 10 CFR 50.65(a)(4) risk assessment scope. The risk assessments will be conducted using the procedures and guidance endorsed by Regulatory Guide 1.182, Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants. Regulatory Guide 1.182 endorses the guidance in Section 11 of NUMARC 93-01, Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants. These documents address general guidance for conduct of the risk assessment, quantitative and qualitative guidelines for establishing risk management actions, and example risk management actions. These include actions to plan and conduct other activities in na SEQUOYAH - UNIT 2 B 3.0-5 Revision 45,

$PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.4 (continued) manner that controls overall risk, increased risk awareness by shift and management personnel, actions to reduce the duration of the condition, actions to minimize the magnitude of risk increases (establishment of backup success paths or compensatory measures), and determination that the proposed MODE change is acceptable. Consideration should also be given to the probability of completing restoration such that the requirements of the LCO would be met prior to the expiration of ACTIONS Completion Times that would require exiting the Applicability.

LCO 3.0.4.b may be used with single, or multiple systems and components unavailable. NUMARC 93-01 provides guidance relative to consideration of simultaneous unavailability of multiple systems and components.

The results of the risk assessment shall be considered in determining the acceptability of entering the MODE or other specified condition in the Applicability, and any corresponding risk management actions. The LCO 3.0.4.b risk assessments do not have to be documented.

SEQUOYAH - UNIT 2 B 3.0-5a Revision 45,

$PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.4 (continued)

The Technical Specifications allow continued operation with equipment unavailable in MODE 1 for the duration of the Completion Time. Since this is allowable, and since in general the risk impact in that particular MODE bounds the risk of transitioning into and through the applicable MODES or other specified conditions in the Applicability of the LCO, the use of the LCO 3.0.4.b allowance should be generally acceptable, as long as the risk is assessed and managed as stated above. However, there is a small subset of systems and components that have been determined to be more important to risk and use of the LCO 3.0.4.b allowance is prohibited. The LCOs governing these systems and components contain Notes prohibiting the use of LCO 3.0.4.b by stating that LCO 3.0.4.b is not applicable.

LCO 3.0.4.c allows entry into a MODE or other specified condition in the Applicability with the LCO not met based on a Note in the Specification which states LCO 3.0.4.c is applicable. These specific allowances permit entry into MODES or other specified conditions in the Applicability when the associated ACTIONS to be entered do not provide for continued operation for an unlimited period of time and a risk assessment has not been performed. This allowance may apply to all the ACTIONS or to a specific Required Action of a Specification. The risk assessments performed to justify the use of LCO 3.0.4.b usually only consider systems and components. For this reason, LCO 3.0.4.c is typically applied to Specifications which describe values and parameters (e.g., Containment Air Temperature, Containment Pressure, and Moderator Temperature CoefficientRCS Specific Activity), and may be applied to other Specifications based on NRC plant specific approval.

The provisions of this Specification should not be interpreted as endorsing the failure to exercise the good practice of restoring systems or components to OPERABLE status before entering an associated MODE or other specified condition in the Applicability.

The provisions of LCO 3.0.4 shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS. In addition, the provisions of LCO 3.0.4 shall not prevent changes in MODES or other specified conditions in the Applicability that result from any unit shutdown. In this context, a unit shutdown is defined as a change in MODE or other specified condition in the Applicability associated with transitioning from MODE 1 to MODE 2, MODE 2 to MODE 3, MODE 3 to MODE 4, and MODE 4 to MODE 5.

SEQUOYAH - UNIT 2 B 3.0-6 Revision 45,

$PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.4 (continued)

Upon entry into a MODE or other specified condition in the Applicability with the LCO not met, LCO 3.0.1 and LCO 3.0.2 require entry into the applicable Conditions and Required Actions until the Condition is resolved, until the LCO is met, or until the unit is not within the Applicability of the Technical Specification.

Surveillances do not have to be performed on the associated inoperable equipment (or on variables outside the specified limits), as permitted by SR 3.0.1. Therefore, utilizing LCO 3.0.4 is not a violation of SR 3.0.1 or SR 3.0.4 for any Surveillances that have not been performed on inoperable equipment. However, SRs must be met to ensure OPERABILITY prior to declaring the associated equipment OPERABLE (or variable within limits) and restoring compliance with the affected LCO.

LCO 3.0.5 LCO 3.0.5 establishes the allowance for restoring equipment to service under administrative controls when it has been removed from service or declared inoperable to comply with ACTIONS. The sole purpose of this Specification is to provide an exception to LCO 3.0.2 (e.g., to not comply with the applicable Required Action(s)) to allow the performance of required testing to demonstrate:

a. The OPERABILITY of the equipment being returned to service; or
b. The OPERABILITY of other equipment.

The administrative controls ensure the time the equipment is returned to service in conflict with the requirements of the ACTIONS is limited to the time absolutely necessary to perform the required testing to demonstrate OPERABILITY. This Specification does not provide time to perform any other preventive or corrective maintenance. LCO 3.0.5 should not be used in lieu of other practicable alternatives that comply with Required Actions and that do not require changing the MODE or other specified conditions in the Applicability in order to demonstrate equipment is OPERABLE. LCO 3.0.5 is not intended to be used repeatedly.

An example of demonstrating equipment is OPERABLE with the Required Actions not met is opening a manual valve that was closed to comply with Required Actions to isolate a flowpath with excessive Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) leakage in order to perform testing to demonstrate that RCS PIV leakage is now within limit.

SEQUOYAH - UNIT 2 B 3.0-7 Revision 45,

$PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.5 (continued)

An example of demonstrating the OPERABILITY of the equipment being returned to service is reopening a containment isolation valve that has been closed to comply with Required Actions and must be reopened to perform the required testing.Examples of demonstrating equipment OPERABILITY include instances in which it is necessary to take an inoperable channel or trip system out of a tripped condition that was directed by a Required Action, if there is no Required Action Note for this purpose. An example of verifying OPERABILITY of equipment removed from service is taking a tripped channel out of the tripped condition to permit the logic to function and indicate the appropriate response during performance of required testing on the inoperable channel. Examples An example of demonstrating the OPERABILITY of other equipment is taking an inoperable channel or trip system out of the tripped condition 1) to prevent the trip function from occurring during the performance of required testing on another channel in the other trip system, or 2). A similar example of demonstrating the OPERABILITY of other equipment is taking an inoperable channel or trip system out of the tripped condition to permit the logic to function and indicate the appropriate response during the performance of required testing on another channel in the same trip system.

The administrative controls in LCO 3.0.5 apply in all cases to systems or components in Chapter 3 of the Technical Specifications, as long as the testing could not be conducted while complying with the Required Actions. This includes the realignment or repositioning of redundant or alternate equipment or trains previously manipulated to comply with ACTIONS, as well as equipment removed from service or declared inoperable to comply with ACTIONS.

SEQUOYAH - UNIT 2 B 3.0-7a Revision 45,

$PHQGPHQW

SR Applicability B 3.0 BASES SR 3.0.2 (continued) testing interval, whether stated in the specification or incorporated by reference, is permitted.

The 25 percent extension does not significantly degrade the reliability that results from performing the Surveillance at its specified Frequency. This is based on the recognition that the most probable result of any particular Surveillance being performed is the verification of conformance with the SRs. The exceptions to SR 3.0.2 are those Surveillances for which the 25 percent extension of the interval specified in the Frequency does not apply. These exceptions are stated in the individual Specifications. The requirements of regulations take precedence over the TS. An example of where SR 3.0.2 does not apply is in the Containment Leakage Rate Testing Program. This program establishes testing requirements and Frequencies in accordance with the requirements of regulations. The TS cannot in and of themselves extend a test interval specified in the regulations. As stated in SR 3.0.2, the 25 percent extension also does not apply to the initial portion of a periodic Completion Time that requires performance on a "once per ..." basis. The 25 percent extension applies to each performance after the initial performance. The initial performance of the Required Action, whether it is a particular Surveillance or some other remedial action, is considered a single action with a single Completion Time. One reason for not allowing the 25 percent extension to this Completion Time is that such an action usually verifies that no loss of function has occurred by checking the status of redundant or diverse components or accomplishes the function of the inoperable equipment in an alternative manner.

The provisions of SR 3.0.2 are not intended to be used repeatedly merely as an operational convenience to extend Surveillance intervals (other than those consistent with refueling intervals) or periodic Completion Time intervals beyond those specified.

SR 3.0.3 SR 3.0.3 establishes the flexibility to defer declaring affected equipment inoperable or an affected variable outside the specified limits when a Surveillance has not been performcompleted within the specified Frequency. A delay period of up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater, applies from the point in time that it is discovered that the Surveillance has not been performed in accordance with SR 3.0.2, and not at the time that the specified Frequency was not met.

When a Section 5.5, "Programs and Manuals," specification states that the provisions of SR 3.0.3 are applicable, it permits the flexibility to defer declaring the testing requirement not met in accordance with SR 3.0.3 when the testing has not been completed within the testing interval SEQUOYAH - UNIT 2 B 3.0-17 Revision 45,

$PHQGPHQW

SR Applicability B 3.0 BASES SR 3.0.3 (continued)

(including the allowance of SR 3.0.2 if invoked by the Section 5.5 specification).

This delay period provides adequate time to performcomplete Surveillances that have been missed. This delay period permits the performancecompletion of a Surveillance before complying with Required Actions or other remedial measures that might preclude performancecompletion of the Surveillance.

The basis for this delay period includes consideration of unit conditions, adequate planning, availability of personnel, the time required to perform the Surveillance, the safety significance of the delay in completing the required Surveillance, and the recognition that the most probable result of any particular Surveillance being performed is the verification of conformance with the requirements.

When a Surveillance with a Frequency based not on time intervals, but upon specified unit conditions, operating situations, or requirements of regulations (e.g., prior to entering MODE 1 after each fuel loading, or in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions, etc.) is discovered to not have been performed when specified, SR 3.0.3 allows for the full delay period of up to the specified Frequency to perform the Surveillance. However, since there is not a time interval specified, the missed Surveillance should be performed at the first reasonable opportunity.

SR 3.0.3 provides a time limit for, and allowances for the performance of, Surveillances that become applicable as a consequence of MODE changes imposed by Required Actions.

SR 3.0.3 is only applicable if there is a reasonable expectation the associated equipment is OPERABLE or that variables are within limits, and it is expected that the Surveillance will be met when performed.

Many factors should be considered, such as the period of time since the Surveillance was last performed, or whether the Surveillance, or a portion thereof, has ever been performed, and any other indications, tests, or activities that might support the expectation that the Surveillance will be met when performed. An example of the use of SR 3.0.3 would be a relay contact that was not tested as required in accordance with a particular SR, but previous successful performances of the SR included the relay contact; the adjacent, physically connected relay contacts were tested during the SR performance; the subject relay contact has been tested by another SR; or historical operation of the subject relay contact has been successful. It is not sufficient to infer the behavior of the associated equipment from the performance of similar equipment. The rigor of determining whether there is a reasonable expectation a Surveillance will be met when performed should increase based on the SEQUOYAH - UNIT 2 B 3.0-18 Revision 45,

$PHQGPHQW

SR Applicability B 3.0 BASES SR 3.0.3 (continued) length of time since the last performance of the Surveillance. If the Surveillance has been performed recently, a review of the Surveillance history and equipment performance may be sufficient to support a reasonable expectation that the Surveillance will be met when performed.

For Surveillances that have not been performed for a long period or that have never been performed, a rigorous evaluation based on objective evidence should provide a high degree of confidence that the equipment is OPERABLE. The evaluation should be documented in sufficient detail to allow a knowledgeable individual to understand the basis for the determination.

Failure to comply with specified Frequencies for SRs is expected to be an infrequent occurrence. Use of the delay period established by SR 3.0.3 is a flexibility which is not intended to be used repeatedlyas an operational convenience to extend Surveillance intervals. While up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or the limit of the specified Frequency is provided to perform the missed Surveillance, it is expected that the missed Surveillance will be performed at the first reasonable opportunity. The determination of the first reasonable opportunity should include consideration of the impact on plant risk (from delaying the Surveillance as well as any plant configuration changes required or shutting the plant down to perform the Surveillance) and impact on any analysis assumptions, in addition to unit conditions, planning, availability of personnel, and the time required to perform the Surveillance. This risk impact should be managed through the program in place to implement 10 CFR 50.65(a)(4) and its implementation guidance, NRC Regulatory Guide 1.182, Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants.

This Regulatory Guide addresses consideration of temporary and aggregate risk impacts, determination of risk management action thresholds, and risk management action up to and including plant shutdown. The missed Surveillance should be treated as an emergent condition as discussed in the Regulatory Guide. The risk evaluation may use quantitative, qualitative, or blended methods. The degree of depth and rigor of the evaluation should be commensurate with the importance of the component. Missed Surveillances for important components should be analyzed quantitatively. If the results of the risk evaluation determine the risk increase is significant, this evaluation should be used to determine the safest course of action. All missed Surveillances will be placed in the licensees Corrective Action Program.

SEQUOYAH - UNIT 2 B 3.0-19 Revision 45,

$PHQGPHQW

SR Applicability B 3.0 BASES SR 3.0.3 (continued)

If a Surveillance is not completed within the allowed delay period, then the equipment is considered inoperable or the variable is considered outside the specified limits and the Completion Times of the Required Actions for the applicable LCO Conditions begin immediately upon expiration of the delay period. If a Surveillance is failed within the delay period, then the equipment is inoperable, or the variable is outside the specified limits and the Completion Times of the Required Actions for the applicable LCO Conditions begin immediately upon the failure of the Surveillance.

Completion of the Surveillance within the delay period allowed by this Specification, or within the Completion Time of the ACTIONS, restores compliance with SR 3.0.1.

SR 3.0.4 SR 3.0.4 establishes the requirement that all applicable SRs must be met before entry into a MODE or other specified condition in the Applicability.

This Specification ensures that system and component OPERABILITY requirements and variable limits are met before entry into MODES or other specified conditions in the Applicability for which these systems and components ensure safe operation of the unit. The provisions of this Specification should not be interpreted as endorsing the failure to exercise the good practice of restoring systems or components to OPERABLE status before entering an associated MODE or other specified condition in the Applicability.

A provision is included to allow entry into a MODE or other specified condition in the Applicability when an LCO is not met due to a Surveillance not being met in accordance with LCO 3.0.4.

However, in certain circumstances, failing to meet an SR will not result in SR 3.0.4 restricting a MODE change or other specified condition change.

When a system, subsystem, division, component, device, or variable is inoperable or outside its specified limits, the associated SR(s) are not SEQUOYAH - UNIT 2 B 3.0-20 Revision 45,

$PHQGPHQW

SR Applicability B 3.0 BASES SR 3.0.4 (continued) required to be performed, per SR 3.0.1, which states that surveillances do not have to be performed on inoperable equipment. When equipment is inoperable, SR 3.0.4 does not apply to the associated SR(s) since the requirement for the SR(s) to be performed is removed. Therefore, failing to perform the Surveillance(s) within the specified Frequency does not result in an SR 3.0.4 restriction to changing MODES or other specified conditions of the Applicability. However, since the LCO is not met in this instance, LCO 3.0.4 will govern any restrictions that may (or may not) apply to MODE or other specified condition changes. SR 3.0.4 does not restrict changing MODES or other specified conditions of the Applicability when a Surveillance has not been performed within the specified Frequency, provided the requirement to declare the LCO not met has been delayed in accordance with SR 3.0.3.

The provisions of SR 3.0.4 shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS. In addition, the provisions of SR 3.0.4 shall not prevent changes in MODES or other specified conditions in the Applicability that result from any unit shutdown. In this context, a unit shutdown is defined as a change in MODE or other specified condition in the Applicability associated with transitioning from MODE 1 to MODE 2, MODE 2 to MODE 3, MODE 3 to MODE 4, and MODE 4 to MODE 5.

The precise requirements for performance of SRs are specified such that exceptions to SR 3.0.4 are not necessary. The specific time frames and conditions necessary for meeting the SRs are specified in the Frequency, in the Surveillance, or both. This allows performance of Surveillances when the prerequisite condition(s) specified in a Surveillance procedure require entry into the MODE or other specified condition in the Applicability of the associated LCO prior to the performance or completion of a Surveillance. A Surveillance that could not be performed until after entering the LCOs Applicability, would have its Frequency specified such that it is not "due" until the specific conditions needed are met.

Alternately, the Surveillance may be stated in the form of a Note, as not required (to be met or performed) until a particular event, condition, or time has been reached. Further discussion of the specific formats of SRs' annotation is found in Section 1.4, Frequency.

SEQUOYAH - UNIT 2 B 3.0-21 Revision 45,

$PHQGPHQW

Enclosure Attachment 3.3 Proposed TS Bases Changes (Markups) (For Information Only)

Watts Bar Nuclear Plant, Units 1 and 2 CNL-22-008

LCO Applicability B 3.0 B 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY BASES LCOs LCO 3.0.1 through LCO 3.0.8 establish the general requirements applicable to all Specifications and apply at all times, unless otherwise stated.

LCO 3.0.1 LCO 3.0.1 establishes the Applicability statement within each individual Specification as the requirement for when the LCO is required to be met (i.e.,

when the unit is in the MODES or other specified conditions of the Applicability statement of each Specification).

LCO 3.0.2 LCO 3.0.2 establishes that upon discovery of a failure to meet an LCO, the associated ACTIONS shall be met. The Completion Time of each Required Action for an ACTIONS Condition is applicable from the point in time that an ACTIONS Condition is entered, unless otherwise specified. The Required Actions establish those remedial measures that must be taken within specified Completion Times when the requirements of an LCO are not met. This Specification establishes that:

a. Completion of the Required Actions within the specified Completion Times constitutes compliance with a Specification; and
b. Completion of the Required Actions is not required when an LCO is met within the specified Completion Time, unless otherwise specified.

There are two basic types of Required Actions. The first type of Required Action specifies a time limit in which the LCO must be met. This time limit is the Completion Time to restore an inoperable system or component to OPERABLE status or to restore variables to within specified limits. If this type of Required Action is not completed within the specified Completion Time, a shutdown may be required to place the unit in a MODE or condition in which the Specification is not applicable. (Whether stated as a Required Action or not, correction of the entered Condition is an action that may always be considered upon entering ACTIONS.) The second type of Required Action specifies the remedial measures that permit continued operation of the unit that is not further restricted by the Completion Time. In this case, compliance with the Required Actions provides an acceptable level of safety for continued operation.

(continued)

Watts Bar-Unit 1 B 3.0-1 Revision 133 Amendment 111,

LCO Applicability B 3.0 BASES LCO 3.0.3 This Specification delineates the time limits for placing the unit in a safe (continued) MODE or other specified condition when operation cannot be maintained within the limits for safe operation as defined by the LCO and its ACTIONS. Planned entry into LCO 3.0.3 should be avoided. If it is not practicable to avoid planned entry into LCO 3.0.3, plant risk should be assessed and managed in accordance with 10 CFR 50.65(a)(4), and the planned entry into LCO 3.0.3 should have less effect on plant safety than other practicable alternatives.

Upon entering LCO 3.0.3, 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> is allowed to prepare for an orderly shutdown before initiating a change in unit operation. This includes time to permit the operator to coordinate the reduction in electrical generation with the load dispatcher to ensure the stability and availability of the electrical grid. The time limits specified to enterreach lower MODES of operation permit the shutdown to proceed in a controlled and orderly manner that is well within the specified maximum cooldown rate and within the capabilities of the unit, assuming that only the minimum required equipment is OPERABLE. This reduces thermal stresses on components of the Reactor Coolant System and the potential for a plant upset that could challenge safety systems under conditions to which this Specification applies. The use and interpretation of specified times to complete the actions of LCO 3.0.3 are consistent with the discussion of Section 1.3, Completion Times.

A unit shutdown required in accordance with LCO 3.0.3 may be terminated and LCO 3.0.3 exited if any of the following occurs:

a. The LCO is now met,
b. The LCO is no longer applicable, bc. A Condition exists for which the Required Actions have now been performed, or cd. ACTIONS exist that do not have expired Completion Times. These Completion Times are applicable from the point in time that the Condition is initially entered and not from the time LCO 3.0.3 is exited.

The time limits of Specification 3.0.3 allow 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> for the unit to be in MODE 5 when a shutdown is required during MODE 1 operation. If the unit is in a lower MODE of operation when a shutdown is required, the time limit for enterreaching the next lower MODE applies. If a lower MODE is enterreached in less time than allowed, however, the total allowable time to enterreach MODE 5, or other applicable MODE, is not reduced. For example, if MODE 3 is enterreached in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, then the time allowed for enterreaching MODE 4 is the next 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br />, because the total time for reaching MODE 4 is not reduced from the allowable limit of 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />. Therefore, if remedial measures are completed that would permit a return to MODE 1, a penalty is not incurred by having to enterreach a lower MODE of operation in less than the total time allowed.

(continued)

Watts Bar-Unit 1 B 3.0-3 Revision 159

$PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.3 In MODES 1, 2, 3, and 4, LCO 3.0.3 provides actions for Conditions not covered (continued) in other Specifications. The requirements of LCO 3.0.3 do not apply in MODES 5 and 6 because the unit is already in the most restrictive Condition required by LCO 3.0.3. The requirements of LCO 3.0.3 do not apply in other specified conditions of the Applicability (unless in MODE 1, 2, 3, or 4) because the ACTIONS of individual Specifications sufficiently define the remedial measures to be taken.

Exceptions to LCO 3.0.3 are provided in instances where requiring a unit shutdown, in accordance with LCO 3.0.3, would not provide appropriate remedial measures for the associated condition of the unit. An example of this is in LCO 3.7.13, "Fuel Storage Pool Water Level." LCO 3.7.13 has an Applicability of "During movement of irradiated fuel assemblies in the fuel storage pool."

Therefore, this LCO can be applicable in any or all MODES. If the LCO and the Required Actions of LCO 3.7.13 are not met while in MODE 1, 2, or 3, there is no safety benefit to be gained by placing the unit in a shutdown condition. The Required Action of LCO 3.7.13 of "Suspend movement of irradiated fuel assemblies in the fuel storage pool" is the appropriate Required Action to complete in lieu of the actions of LCO 3.0.3. These exceptions are addressed in the individual Specifications.

LCO 3.0.4 LCO 3.0.4 establishes limitations on changes in MODES or other specified conditions in the Applicability when an LCO is not met. It allows placing the unit in a MODE or other specified condition stated in that Applicability (e.g., the Applicability desired to be entered) when unit conditions are such that the requirements of the LCO would not be met, in accordance with either LCO 3.0.4.a, LCO 3.0.4.b, or LCO 3.0.4.c.

LCO 3.0.4.a allows entry into a MODE or other specified condition in the Applicability with the LCO not met when the associated ACTIONS to be entered following entry intopermit continued operation in the MODE or other specified condition in the Applicability will permit continued operation within the MODE or other specified condition for an unlimited period of time. Compliance with Required ACTIONSctions that permit continued operation of the unit for an unlimited period of time in a MODE or other specified condition provides an acceptable level of safety for continued operation. This is without regard to the status of the unit before or after the MODE change. Therefore, in such cases, entry into a MODE or other specified condition in the Applicability may be made and the Required Actions followed after entry into the Applicabilityin accordance with the provisions of the Required Actions.

For example, LCO 3.0.4.a may be used when the Required Action to be entered states that an inoperable instrument channel must be placed in the trip condition within the Completion Time. Transition into a MODE or other specified in condition in the Applicability may be made in accordance with LCO 3.0.4 and the channel is subsequently placed in the tripped condition within the Completion Time, which begins when the Applicability is entered. If the instrument channel cannot be placed in the tripped condition and the subsequent default ACTION

5HTXLUHG$FWLRQDQGDVVRFLDWHG&RPSOHWLRQ7LPHQRWPHW DOORZVWKH (continued)

Watts Bar-Unit 1 B 3.0-4 Revision 68 Amendment 55,

LCO Applicability B 3.0 BASES LCO 3.0.4 OPERABLE train to be placed in operation, use of LCO 3.0.4.a is acceptable (continued) because the subsequent ACTIONS to be entered following entry into the MODE include ACTIONS (place the OPERABLE train in operation) that permit safe plant operation for an unlimited period of time in the MODE or other specified condition to be entered. LCO 3.0.4.b allows entry into a MODE or other specified condition in the Applicability with the LCO not met after performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate.

The risk assessment may use quantitative, qualitative, or blended approaches, and the risk assessment will be conducted using the plant program, procedures, and criteria in place to implement 10CFR 50.65(a)(4), which requires that risk impacts of maintenance activities be assessed and managed. The risk assessment, for the purposes of LCO 3.0.4.b, must take into account all inoperable Technical Specification equipment regardless of whether the equipment is included in the normal 10 CFR 50.65(a)(4) risk assessment scope.

The risk assessments will be conducted using the procedures and guidance endorsed by Regulatory Guide 1.182, Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants. Regulatory Guide 1.182 endorses the guidance in Section 11 of NUMARC 93-01, Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants. These documents address general guidance for conduct of the risk assessment, quantitative and qualitative guidelines for establishing risk management actions, and example risk management actions. These include actions to plan and conduct other activities in a manner that controls overall risk, increased risk awareness by shift and management personnel, actions to reduce the duration of the condition, actions to minimize the magnitude of risk increases (establishment of backup success paths or compensatory measures), and determination that the proposed MODE change is acceptable. Consideration should also be given to the probability of completing restoration such that the requirements of the LCO would be met prior to the expiration of ACTIONS Completion Times that would require exiting the Applicability.

LCO 3.0.4.b may be used with single, or multiple systems and components unavailable. NUMARC 93-01 provides guidance relative to consideration of simultaneous unavailability of multiple systems and components. The results of the risk assessment shall be considered in determining the acceptability of entering the MODE or other specified condition in the Applicability, and any corresponding risk management actions. The LCO 3.0.4.b risk assessments do not have to be documented.

The Technical Specifications allow continued operation with equipment unavailable in MODE 1 for the duration of the Completion Time. Since this is allowable, and since in general the risk impact in that particular MODE bounds the risk of transitioning into and through the applicable MODES or other specified conditions in the Applicability of the LCO, the use of the LCO 3.0.4.b allowance should be generally acceptable, as long as the risk is assessed and managed as stated above. However, there is a small subset of systems and components that have been determined to be more important to risk and use of the LCO 3.0.4.b allowance is prohibited. The LCOs governing these system and components contain Notes prohibiting the use of LCO 3.0.4.b by stating that LCO 3.0.4.b is not applicable.

(continued)

Watts Bar-Unit 1 B 3.0- Revision 68 Amendment 55,

LCO Applicability B 3.0 BASES LCO 3.0.4 LCO 3.0.4.c allows entry into a MODE or other specified condition in the (continued) Applicability with the LCO not met based on a Note in the Specification which states LCO 3.0.4.c is applicable. These specific allowances permit entry into MODES or other specified conditions in the Applicability when the associated ACTIONS to be entered do not provide for continued operation for an unlimited period of time and a risk assessment has not been performed. This allowance may apply to all the ACTIONS or to a specific Required Action of a Specification.

The risk assessments performed to justify the use of LCO 3.0.4.b usually only consider systems and components. For this reason, LCO 3.0.4.c is typically applied to Specifications which describe values and parameters (e.g., Reactor Coolant SystemRCS Specific Activity), and may be applied to other Specifications based on NRC plant-specific approval.

The provisions of this Specification should not be interpreted as endorsing the failure to exercise the good practice of restoring systems or components to OPERABLE status before entering an associated MODE or other specified condition in the Applicability.

The provisions of LCO 3.0.4 shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS. In addition, the provisions of LCO 3.0.4 shall not prevent changes in MODES or other specified conditions in the Applicability that result from any unit shutdown. In this context, a unit shutdown is defined as a change in MODE or other specified condition in the Applicability associated with transitioning from MODE 1 to MODE 2, MODE 2 to MODE 3, MODE 3 to MODE 4, and MODE 4 to MODE 5.

Upon entry into a MODE or other specified condition in the Applicability with the LCO not met, LCO 3.0.1 and LCO 3.0.2 require entry into the applicable Conditions and Required Actions until the Condition is resolved, until the LCO is met, or until the unit is not within the Applicability of the Technical Specification.

Surveillances do not have to be performed on the associated inoperable equipment (or on variables outside the specified limits), as permitted by SR 3.0.1.

Therefore, utilizing LCO 3.0.4 is not a violation of SR 3.0.1 or SR 3.0.4 for any Surveillances that have not been performed on inoperable equipment. However, SRs must be met to ensure OPERABILITY prior to declaring the associated equipment OPERABLE (or variable within limits) and restoring compliance with the affected LCO.

(continued)

Watts Bar-Unit 1 B 3.0- Revision 68 Amendment 55,

LCO Applicability B 3.0 BASES (continued)

LCO 3.0.5 LCO 3.0.5 establishes the allowance for restoring equipment to service under administrative controls when it has been removed from service or declared inoperable to comply with ACTIONS. The sole purpose of this Specification is to provide an exception to LCO 3.0.2 (e.g., to not comply with the applicable Required Action(s)) to allow the performance of SRs to demonstrate:

a. The OPERABILITY of the equipment being returned to service; or
b. The OPERABILITY of other equipment.

The administrative controls ensure the time the equipment is returned to service in conflict with the requirements of the ACTIONS is limited to the time absolutely necessary to perform the allowed SRs. This Specification does not provide time to perform any other preventive or corrective maintenance. LCO 3.0.5 should not be used in lieu of other practicable alternatives that comply with Required Actions and that do not require changing the MODE or other specified conditions in the Applicability in order to demonstrate equipment is OPERABLE. LCO 3.0.5 is not intended to be used repeatedly.

An example of demonstrating equipment is OPERABLE with the Required Actions not met is opening a manual valve that was closed to comply with Required Actions to isolate a flowpath with excessive Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) leakage in order to perform testing to demonstrate that RCS PIV leakage is now within limit.

Examples of demonstrating equipment OPERABILITY include instances in which it is necessary to take an inoperable channel or trip system out of a tripped condition that was directed by a Required Action, if there is no Required Action Note for this purpose. An example of verifying OPERABILITY of equipment removed from service is taking a tripped channel out of the tripped condition to permit the logic to function and indicate the appropriate response during performance of required testing on the inoperable channel. Examples An example of demonstrating the OPERABILITY of the equipment being returned to service is reopening a containment isolation valve that has been closed to comply with Required Actions and must be reopened to perform the SRs.

An example of demonstrating the OPERABILITY of other equipment is taking an inoperable channel or trip system out of the tripped condition 1) to prevent the trip function from occurring during the performance of an SR on another channel in the other trip system., or 2) A similar example of demonstrating the OPERABILITY of other equipment is taking an inoperable channel or trip system out of the tripped condition to permit the logic to function and indicate the appropriate response during the performance of an SR on another channel in the same trip system.

The administrative controls in LCO 3.0.5 apply in all cases to systems or components in Chapter 3 of the Technical Specifications, as long as the testing could not be conducted while complying with the Required Actions. This includes the realignment or repositioning of redundant or alternate equipment or trains (continued)

Watts Bar-Unit 1 B 3.0- $PHQGPHQW

LCO Applicability B 3.0 BASES (continued) previously manipulated to comply with ACTIONS, as well as equipment removed from service or declared inoperable to comply with ACTIONS.

(continued)

Watts Bar-Unit 1 B 3.0-D $PHQGPHQW

SR Applicability B 3.0 BASES (continued)

SR 3.0.3 SR 3.0.3 establishes the flexibility to defer declaring affected equipment inoperable or an affected variable outside the specified limits when a Surveillance has not been performedcompleted within the specified Frequency.

A delay period of up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater, applies from the point in time that it is discovered that the Surveillance has not been performed in accordance with SR 3.0.2, and not at the time that the specified Frequency was not met.

This delay period provides adequate time to performcomplete Surveillances that have been missed. This delay period permits the performamcecompletion of a Surveillance before complying with Required Actions or other remedial measures that might preclude performancecompletion of the Surveillance.

The basis for this delay period includes consideration of unit conditions, adequate planning, availability of personnel, the time required to perform the Surveillance, the safety significance of the delay in completing the required Surveillance, and the recognition that the most probable result of any particular Surveillance being performed is the verification of conformance with the requirements.

When a Surveillance with a Frequency based not on time intervals, but upon specified unit conditions, operating situations, or requirements of regulations (e.g., prior to entering MODE 1 after each fuel loading, or in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions, etc.) is discovered to not have been performed when specified, SR 3.0.3 allows for the full delay period of up to the specified Frequency to perform the Surveillance. However, since there is not a time interval specified, the missed Surveillance should be performed at the first reasonable opportunity.

SR 3.0.3 provides a time limit for, and allowances for the performance of, Surveillances that become applicable as a consequence of MODE changes imposed by Required Actions.

SR 3.0.3 is only applicable if there is a reasonable expectation the associated equipment is OPERABLE or that variables are within limits, and it is expected that the Surveillance will be met when performed. Many factors should be considered, such as the period of time since the Surveillance was last performed, or whether the Surveillance, or a portion thereof, has ever been performed, and any other indications, tests, or activities that might support the expectation that the Surveillance will be met when performed. An example of the use of SR 3.0.3 would be a relay contact that was not tested as required in accordance with a particular SR, but previous successful performances of the SR included the relay contact; the adjacent, physically connected relay contacts were tested during the SR performance; the subject relay contact has been tested by another SR; or historical operation of the subject relay contact has been successful. It is not sufficient to infer the behavior of the associated equipment from the performance of similar equipment. The rigor of determining whether there is a reasonable expectation a Surveillance will be met when performed should increase based on the length of time since the last performance of the Surveillance. If the Surveillance has been performed recently, a review of the Surveillance history and equipment performance may be sufficient to support a reasonable (continued)

Watts Bar-Unit 1 B 3.0-1 Revision 53, 159 Amendment 42,

SR Applicability B 3.0 BASES (continued)

SR 3.0.3 expectation that the Surveillance will be met when performed. For Surveillances (continued) that have not been performed for a long period or that have never been performed, a rigorous evaluation based on objective evidence should provide a high degree of confidence that the equipment is OPERABLE. The evaluation should be documented in sufficient detail to allow a knowledgeable individual to understand the basis for the determination.

Failure to comply with specified Frequencies for SRs is expected to be an infrequent occurrence. Use of the delay period established by SR 3.0.3 is a flexibility which is not intended to be used repeatedly to extend Surveillance intervals.

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should be managed through the program in place to implement 10 CFR50.65 a(a)(4)nd its implementation guidance, NRC Regulatory Guide 1.182, Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants.

This Regulatory Guide addresses consideration of temporary and aggregate risk impacts, determination of risk management action thresholds, and risk management action up to and including plant shutdown. The missed Surveillance should be treated as an emergent condition as discussed in the Regulatory Guide. The risk evaluation may use quantitative, qualitative, or blended methods. The degree of depth and rigor of the evaluation should be commensurate with the importance of the component. Missed Surveillances for important components should be analyzed quantitatively. If the results of the risk evaluation determine the risk increase is significant, this evaluation should be used to determine the safest course of action. All missed Surveillances will be placed in the licensee's Corrective Action Program.

If a Surveillance is not completed within the allowed delay period, then the equipment is considered inoperable or the variable is considered outside the specified limits and the Completion Times of the Required Actions for the applicable LCO Conditions begin immediately upon expiration of the delay period. If a Surveillance is failed within the delay period, then the equipment is inoperable, or the variable is outside the specified limits and the Completion Times of the Required Actions for the applicable LCO Conditions begin immediately upon the failure of the Surveillance.

Completion of the Surveillance within the delay period allowed by this Specification, or within the Completion Time of the ACTIONS, restores compliance with SR 3.0.1.

(continued)

Watts Bar-Unit 1 B 3.0-14a Revision 53, 159 Amendment 42,

SR Applicability B.3.0 BASES SR 3.0.4 SR 3.0.4 establishes the requirement that all applicable SRs must be met before entry into a MODE or other specified condition in the Applicability.

This Specification ensures that system and component OPERABILITY requirements and variable limits are met before entry into MODES or other specified conditions in the Applicability for which these systems and components ensure safe operation of the unit. The provisions of the Specification should not be interpreted as endorsing the failure to exercise the good practice of restoring systems or components to OPERABLE status before entering an associated MODE or other specified condition in the Applicability.

A provision is included to allow entry into a MODE or other specified condition in the Applicability when an LCO is not met due to Surveillance not being met in accordance with LCO 3.0.4.

(continued)

Watts Bar-Unit 1 B 3.0-15 Revision 53, 68 Amendment 42, 55

LCO Applicability B 3.0 B 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY BASES LCOs LCO 3.0.1 through LCO 3.0.8 establish the general requirements applicable to all Specifications and apply at all times, unless otherwise stated.

LCO 3.0.1 LCO 3.0.1 establishes the Applicability statement within each individual Specification as the requirement for when the LCO is required to be met (i.e., when the unit is in the MODES or other specified conditions of the Applicability statement of each Specification).

LCO 3.0.2 LCO 3.0.2 establishes that upon discovery of a failure to meet an LCO, the associated ACTIONS shall be met. The Completion Time of each Required Action for an ACTIONS Condition is applicable from the point in time that an ACTIONS Condition is entered, unless otherwise specified. The Required Actions establish those remedial measures that must be taken within specified Completion Times when the requirements of an LCO are not met. This Specification establishes that:

a. Completion of the Required Actions within the specified Completion Times constitutes compliance with a Specification; and
b. Completion of the Required Actions is not required when an LCO is met within the specified Completion Time, unless otherwise specified.

There are two basic types of Required Actions. The first type of Required Action specifies a time limit in which the LCO must be met.

This time limit is the Completion Time to restore an inoperable system or component to OPERABLE status or to restore variables to within specified limits. If this type of Required Action is not completed within the specified Completion Time, a shutdown may be required to place the unit in a MODE or condition in which the Specification is not applicable. (Whether stated as a Required Action or not, correction of the entered Condition is an action that may always be considered upon entering ACTIONS.) The second type of Required Action specifies the remedial measures that permit continued operation of the unit that is not further restricted by the Completion Time. In this case, compliance with the Required Actions provides an acceptable level of safety for continued operation.

(continued)

Watts Bar - Unit 2 B 3.0-1 Revision 7 Amendment 6,

LCO Applicability B 3.0 BASES (continued)

LCO 3.0.3 LCO 3.0.3 establishes the actions that must be implemented when an LCO is not met and:

a. An associated Required Action and Completion Time is not met and no other Condition applies; or
b. The condition of the unit is not specifically addressed by the associated ACTIONS. This means that no combination of Conditions stated in the ACTIONS can be made that exactly corresponds to the actual condition of the unit. Sometimes, possible combinations of Conditions are such that entering LCO 3.0.3 is warranted; in such cases, the ACTIONS specifically state a Condition corresponding to such combinations and also that LCO 3.0.3 be entered immediately.

This Specification delineates the time limits for placing the unit in a safe MODE or other specified condition when operation cannot be maintained within the limits for safe operation as defined by the LCO and its ACTIONS. Planned entry into LCO 3.0.3 should be avoided. If it is not practicable to avoid planned entry into LCO 3.0.3, plant risk should be assessed and managed in accordance with 10 CFR 50.65(a)(4), and the planned entry into LCO 3.0.3 should have less effect on plant safety than other practicable alternatives.

Upon entering LCO 3.0.3, 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> is allowed to prepare for an orderly shutdown before initiating a change in unit operation. This includes time to permit the operator to coordinate the reduction in electrical generation with the load dispatcher to ensure the stability and availability of the electrical grid. The time limits specified to enterreach lower MODES of operation permit the shutdown to proceed in a controlled and orderly manner that is well within the specified maximum cooldown rate and within the capabilities of the unit, assuming that only the minimum required equipment is OPERABLE. This reduces thermal stresses on components of the Reactor Coolant System and the potential for a plant upset that could challenge safety systems under conditions to which this Specification applies. The use and interpretation of specified times to complete the actions of LCO 3.0.3 are consistent with the discussion of Section 1.3, Completion Times.

(continued)

Watts Bar - Unit 2 B 3.0-3 Revision 30

$PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.3 A unit shutdown required in accordance with LCO 3.0.3 may be (continued) terminated and LCO 3.0.3 exited if any of the following occurs:

a. The LCO is now met.,

a.b. The LCO is no longer applicable, b.c. A Condition exists for which the Required Actions have now been performed., or c.d. ACTIONS exist that do not have expired Completion Times. These Completion Times are applicable from the point in time that the Condition is initially entered and not from the time LCO 3.0.3 is exited.

The time limits of Specification 3.0.3 allow 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> for the unit to be in MODE 5 when a shutdown is required during MODE 1 operation. If the unit is in a lower MODE of operation when a shutdown is required, the time limit for reachentering the next lower MODE applies. If a lower MODE is enterreached in less time than allowed, however, the total allowable time to enterreach MODE 5, or other applicable MODE, is not reduced. For example, if MODE 3 is enterreached in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, then the time allowed for enterreaching MODE 4 is the next 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br />, because the total time for enterreaching MODE 4 is not reduced from the allowable limit of 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />. Therefore, if remedial measures are completed that would permit a return to MODE 1, a penalty is not incurred by having to enterreach a lower MODE of operation in less than the total time allowed.

In MODES 1, 2, 3, and 4, LCO 3.0.3 provides actions for Conditions not covered in other Specifications. The requirements of LCO 3.0.3 do not apply in MODES 5 and 6 because the unit is already in the most restrictive Condition required by LCO 3.0.3. The requirements of LCO 3.0.3 do not apply in other specified conditions of the Applicability (unless in MODE 1, 2, 3, or 4) because the ACTIONS of individual Specifications sufficiently define the remedial measures to be taken.

(continued)

Watts Bar - Unit 2 B 3.0-4 $PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.3 Exceptions to LCO 3.0.3 are provided in instances where requiring a (continued) unit shutdown, in accordance with LCO 3.0.3, would not provide appropriate remedial measures for the associated condition of the unit.

An example of this is in LCO 3.7.13, "Fuel Storage Pool Water Level."

LCO 3.7.13 has an Applicability of "During movement of irradiated fuel assemblies in the fuel storage pool." Therefore, this LCO can be applicable in any or all MODES. If the LCO and the Required Actions of LCO 3.7.13 are not met while in MODE 1, 2, or 3, there is no safety benefit to be gained by placing the unit in a shutdown condition. The Required Action of LCO 3.7.13 of "Suspend movement of irradiated fuel assemblies in the fuel storage pool." is the appropriate Required Action to complete in lieu of the actions of LCO 3.0.3. These exceptions are addressed in the individual Specifications.

LCO 3.0.4 LCO 3.0.4 establishes limitations on changes in MODES or other specified conditions in the Applicability when an LCO is not met. It allows placing the unit in a MODE or other specified condition stated in that Applicability (e.g., the Applicability desired to be entered) when unit conditions are such that the requirements of the LCO would not be met, in accordance with either LCO 3.0.4.a, LCO 3.0.4.b, or LCO 3.0.4.c.

LCO 3.0.4.a allows entry into a MODE or other specified condition in the Applicability with the LCO not met when the associated ACTIONS to be entered following entry intopermit continued operation in the MODE or other specified condition in the Applicability will permit continued operation within the MODE or other specified condition for an unlimited period of time. Compliance with Required ACTIONSctions that permit continued operation of the unit for an unlimited period of time in a MODE or other specified condition provides an acceptable level of safety for continued operation. This is without regard to the status of the unit before or after the MODE change. Therefore, in such cases, entry into a MODE or other specified condition in the Applicability may be made and the Required Actions followed after entry into the Applicabilityin accordance with the provisions of the Required Actions.

(continued)

Watts Bar - Unit 2 B 3.0-5 $PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.4 For example, LCO 3.0.4.a may be used when the Required Action to be (continued) entered states that an inoperable instrument channel must be placed in the trip condition within the Completion Time. Transition into a MODE or other specified in condition in the Applicability may be made in accordance with LCO 3.0.4 and the channel is subsequently placed in the tripped condition within the Completion Time, which begins when the Applicability is entered. If the instrument channel cannot be placed in the tripped condition and the subsequent default ACTION ("Required Action and associated Completion Time not met") allows the OPERABLE train to be placed in operation, use of LCO 3.0.4.a is acceptable because the subsequent ACTIONS to be entered following entry into the MODE include ACTIONS (place the OPERABLE train in operation) that permit safe plant operation for an unlimited period of time in the MODE or other specified condition to be entered.

LCO 3.0.4.b allows entry into a MODE or other specified condition in the Applicability with the LCO not met after performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate.

The risk assessment may use quantitative, qualitative, or blended approaches, and the risk assessment will be conducted using the plant program, procedures, and criteria in place to implement 10 CFR 50.65(a)(4), which requires that risk impacts of maintenance (continued)

Watts Bar - Unit 2 B 3.0-5a $PHQGPHQW

LCO Applicability B 3.0 BASES LCO 3.0.4 LCO 3.0.4.c allows entry into a MODE or other specified condition in (continued) the Applicability with the LCO not met based on a Note in the Specification which states LCO 3.0.4.c is applicable. These specific allowances permit entry into MODES or other specified conditions in the Applicability when the associated ACTIONS to be entered do not provide for continued operation for an unlimited period of time and a risk assessment has not been performed. This allowance may apply to all the ACTIONS or to a specific Required Action of a Specification.

The risk assessments performed to justify the use of LCO 3.0.4.b usually only consider systems and components. For this reason, LCO 3.0.4.c is typically applied to Specifications which describe values and parameters (e.g., Reactor Coolant SystemRCS Specific Activity),

and may be applied to other Specifications based on NRC plant-specific approval.

The provisions of this Specification should not be interpreted as endorsing the failure to exercise the good practice of restoring systems or components to OPERABLE status before entering an associated MODE or other specified condition in the Applicability.

The provisions of LCO 3.0.4 shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS. In addition, the provisions of LCO 3.0.4 shall not prevent changes in MODES or other specified conditions in the Applicability that result from any unit shutdown. In this context, a unit shutdown is defined as a change in MODE or other specified condition in the Applicability associated with transitioning from MODE 1 to MODE 2, MODE 2 to MODE 3, MODE 3 to MODE 4, and MODE 4 to MODE 5.

Upon entry into a MODE or other specified condition in the Applicability with the LCO not met, LCO 3.0.1 and LCO 3.0.2 require entry into the applicable Conditions and Required Actions until the Condition is resolved, until the LCO is met, or until the unit is not within the Applicability of the Technical Specification.

Surveillances do not have to be performed on the associated inoperable equipment (or on variables outside the specified limits), as permitted by SR 3.0.1. Therefore, utilizing LCO 3.0.4 is not a violation of SR 3.0.1 or SR 3.0.4 for any Surveillances that have not been performed on inoperable equipment. However, SRs must be met to ensure OPERABILITY prior to declaring the associated equipment OPERABLE (or variable within limits) and restoring compliance with the affected LCO.

(continued)

Watts Bar - Unit 2 B 3.0-7 $PHQGPHQW

LCO Applicability B 3.0 BASES (continued)

LCO 3.0.5 LCO 3.0.5 establishes the allowance for restoring equipment to service under administrative controls when it has been removed from service or declared inoperable to comply with ACTIONS. The sole purpose of this Specification is to provide an exception to LCO 3.0.2 (e.g., to not comply with the applicable Required Action(s)) to allow the performance of SRs to demonstrate:

a. The OPERABILITY of the equipment being returned to service; or
b. The OPERABILITY of other equipment.

The administrative controls ensure the time the equipment is returned to service in conflict with the requirements of the ACTIONS is limited to the time absolutely necessary to perform the allowed SRs. This Specification does not provide time to perform any other preventive or corrective maintenance. LCO 3.0.5 should not be used in lieu of other practicable alternatives that comply with Required Actions and that do not require changing the MODE or other specified conditions in the Applicability in order to demonstrate equipment is OPERABLE. LCO 3.0.5 is not intended to be used repeatedly.

An example of demonstrating equipment is OPERABLE with the Required Actions not met is opening a manual valve that was closed to comply with Required Actions to isolate a flowpath with excessive Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) leakage in order to perform testing to demonstrate that RCS PIV leakage is now within limit.

Examples of demonstrating equipment OPERABILITY include instances in which it is necessary to take an inoperable channel or trip system out of a tripped condition that was directed by a Required Action, if there is no Required Action Note for this purpose. An example of verifying OPERABILITY of equipment removed from service is taking a tripped channel out of the tripped condition to permit the logic to function and indicate the appropriate response during performance of required testing on the inoperable channel. ExamplesAn example of demonstrating the OPERABILITY of the equipment being returned to service is reopening a containment isolation valve that has been closed to comply with Required Actions and must be reopened to perform the SRs.

An example of demonstrating the OPERABILITY of other equipment areis taking an inoperable channel or trip system out of the tripped condition 1) to prevent the trip function from occurring during the performance of an SR on another channel in the other trip system, or 2). A similar example of demonstrating the OPERABILITY of other equipment is taking an inoperable channel or trip system out of the tripped condition to permit the logic to function and indicate the appropriate response during the performance of an SR on another channel in the same trip system.

(continued)

Watts Bar - Unit 2 B 3.0-8 $PHQGPHQW

LCO Applicability B 3.0 BASES (continued) 7KHDGPLQLVWUDWLYHFRQWUROVLQ/&2DSSO\LQDOOFDVHVWRV\VWHPV

LCO 3.0.5 or components in Chapter 3 of the Technical Specifications, as long (continued) as the testing could not be conducted while complying with the Required Actions. This includes the realignment or repositioning of redundant or alternate equipment or trains previously manipulated to comply with ACTIONS, as well as equipment removed from service or declared inoperable to comply with ACTIONS.

LCO 3.0.6 LCO 3.0.6 establishes an exception to LCO 3.0.2 for support systems that have an LCO specified in the Technical Specifications (TS). This exception is provided because LCO 3.0.2 would require that the Conditions and Required Actions of the associated inoperable supported system LCO be entered solely due to the inoperability of the support system. This exception is justified because the actions that are required to ensure the unit is maintained in a safe condition are specified in the support system LCO's Required Actions. These Required Actions may include entering the supported system's Conditions and Required Actions or may specify other Required Actions.

(continued)

Watts Bar - Unit 2 B 3.0-D $PHQGPHQW

SR Applicability B.3.0 BASES SR 3.0.2 Required Action, whether it is a particular Surveillance or some other (continued) remedial action, is considered a single action with a single Completion Time. One reason for not allowing the 25% extension to this Completion Time is that such an action usually verifies that no loss of function has occurred by checking the status of redundant or diverse components or accomplishes the function of the inoperable equipment in an alternative manner.

The provisions of SR 3.0.2 are not intended to be used repeatedly to extend Surveillance intervals (other than those consistent with refueling intervals) or periodic Completion Time intervals beyond those specified, with the exception of surveillances required to be performed on a 31-day frequency. For surveillances performed on a 31-day frequency, the normal surveillance interval may be extended in accordance with Specification 3.0.2 cyclically as required to remain synchronized to the maintenance work schedules. This practice is acceptable based on the results of an evaluation of 31-day frequency surveillance test histories that demonstrate that no adverse failure rate changes have occurred nor would be expected to develop as a result of cyclical use of surveillance interval extensions and the fact that the total number of 31-day frequency surveillances performed in any one-year period remains unchanged.

SR 3.0.3 SR 3.0.3 establishes the flexibility to defer declaring affected equipment inoperable or an affected variable outside the specified limits when a Surveillance has not been performedcompleted within the specified Frequency. A delay period of up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater, applies from the point in time that it is discovered that the Surveillance has not been performed in accordance with SR 3.0.2, and not at the time that the specified Frequency was not met.

This delay period provides adequate time to complete perform Surveillances that have been missed. This delay period permits the performcompletionance of a Surveillance before complying with Required Actions or other remedial measures that might preclude performcompletionance of the Surveillance.

The basis for this delay period includes consideration of unit conditions, adequate planning, availability of personnel, the time required to perform the Surveillance, the safety significance of the delay in completing the required Surveillance, and the recognition that the most probable result of any particular Surveillance being performed is the verification of conformance with the requirements.

(continued)

Watts Bar - Unit 2 Revision 30 B 3.0-13 Amendment

SR Applicability B.3.0 BASES SR 3.0.3 When a Surveillance with a Frequency based not on time intervals, but (continued) upon specified unit conditions, operating situations, or requirements of regulations (e.g., prior to entering MODE 1 after each fuel loading, or in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions, etc.) is discovered to not have been performed when specified, SR 3.0.3 allows for the full delay period of up to the specified Frequency to perform the Surveillance. However, since there is not a time interval specified, the missed Surveillance should be performed at the first reasonable opportunity.

SR 3.0.3 provides a time limit for, and allowances for the performance of, Surveillances that become applicable as a consequence of MODE changes imposed by Required Actions.

SR 3.0.3 is only applicable if there is a reasonable expectation the associated equipment is OPERABLE or that variables are within limits, and it is expected that the Surveillance will be met when performed.

Many factors should be considered, such as the period of time since the Surveillance was last performed, or whether the Surveillance, or a portion thereof, has ever been performed, and any other indications, tests, or activities that might support the expectation that the Surveillance will be met when performed. An example of the use of SR 3.0.3 would be a relay contact that was not tested as required in accordance with a particular SR, but previous successful performances of the SR included the relay contact; the adjacent, physically connected relay contacts were tested during the SR performance; the subject relay contact has been tested by another SR; or historical operation of the subject relay contact has been successful. It is not sufficient to infer the behavior of the associated equipment from the performance of similar equipment. The rigor of determining whether there is a reasonable expectation a Surveillance will be met when performed should increase based on the length of time since the last performance of the Surveillance. If the Surveillance has been performed recently, a review of the Surveillance history and equipment performance may be sufficient to support a reasonable expectation that the Surveillance will be met when performed. For Surveillances that have not been performed for a long period or that have never been performed, a rigorous evaluation based on objective evidence should provide a high degree of confidence that the equipment is OPERABLE. The evaluation should be documented in sufficient detail to allow a knowledgeable individual to understand the basis for the determination.

Failure to comply with specified Frequencies for SRs is expected to be an infrequent occurrence. Use of the delay period established by SR 3.0.3 is a flexibility which is not intended to be used repeatedly to extend Surveillance intervals.

(continued)

Watts Bar - Unit 2 Revision 30 B 3.0-14 Amendment

SR Applicability B.3.0 BASES SR 3.0.3 While up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or the limit of the specified Frequency is provided (continued) to perform the missed Surveillance, it is expected that the missed Surveillance will be performed at the first reasonable opportunity. The determination of the first reasonable opportunity should include consideration of the impact on plant risk (from delaying the Surveillance as well as any plant configuration changes required or shutting the plant down to perform the Surveillance) and impact on any analysis assumptions, in addition to unit conditions, planning, availability of personnel, and the time required to perform the Surveillance. This risk impact should be managed through the program in place to implement 10 CFR 50.65(a)(4) and its implementation guidance, NRC Regulatory Guide 1.182, Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants. This Regulatory Guide addresses consideration of temporary and aggregate risk impacts, determination of risk management action thresholds, and risk management action up to and including plant shutdown. The missed Surveillance should be treated as an emergent condition as discussed in the Regulatory Guide.

The risk evaluation may use quantitative, qualitative, or blended methods. The degree of depth and rigor of the evaluation should be commensurate with the importance of the component. Missed Surveillances for important components should be analyzed quantitatively. If the results of the risk evaluation determine the risk increase is significant, this evaluation should be used to determine the safest course of action. All missed Surveillances will be placed in the licensee's Corrective Action Program.

(continued)

Watts Bar - Unit 2 Revision 30 B3.0-14a Amendment