Licensee Performance Review https://www.nrc.gov/about-nrc/contactus.html Framatome - Richland, Washington Nuclear Regulatory Commission - Region II May 4, 2022, 2:00 PM (EDT)
Presenter: Cynthia Taylor, Senior Project Inspector
Agenda https://www.nrc.gov/about-nrc/contactus.html NRC
Introductions
NRC Our Mission NRC How We Regulate NRC Performance Review Results NRC COVID Response Framatome Remarks NRC Adjourn Business Portion NRC Question & Answer with Public NRC Adjourn Meeting 2
Our Mission https://www.nrc.gov/about-nrc/contactus.html 3
How We Regulate Inspections Investigations Allegations Incident
Response
Enforcement Performance Assessment https://www.nrc.gov/about-nrc/regulatory.html 4
IMC 2600 - Fuel Cycle Facility Operational Safety and Safeguards Inspection Program Baseline (Core)
Reactive Supplemental 12 Inspection Areas for Category III Facilities https://www.nrc.gov/about-nrc/contactus.html Inspection Program 5
LICENSEE PERFORMANCE AREAS Safety Operations
- Safety Controls
- Supporting Safety Programs Operational Safety
- Criticality Controls
- Program Oversight
- Criticality Incident Response Criticality Safety
- Prevention, Detection, & Mitigation
- Supporting Fire Safety Programs Fire Protection 6
https://www.nrc.gov/about-nrc/contactus.html
LICENSEE PERFORMANCE AREAS
- Members of the Public
- Plant Workers Radiation Protection
- Program Implementation
- Liquid and Gaseous Effluents Effluent Control Environmental Protection
- Processing, Handling, Storage
& Transportation of Waste Waste Management
- Receipt, Packaging & Delivery of Radioactive Materials Transportation Radiological Controls 7
https://www.nrc.gov/about-nrc/contactus.html
LICENSEE PERFORMANCE AREAS SAFEGUARDS
- Determines and verifies accurate quantities of required SNM on-site.
Material Control
& Accountability (MC&A)
- Physical protection of SNM on-site.
Examples: storage vaults, fences, and security personnel.
Physical Security of Special Nuclear Material
Classified Material and Information Security 8
https://www.nrc.gov/about-nrc/contactus.html
LICENSEE PERFORMANCE AREAS
- Safety Controls
- Supporting Program Elements Maintenance and Surveillance
- Emergency Plan Implementation
- Evaluation of Emergency Drills Emergency Preparedness
- Configuration Management Program
- Request for NRC Approval Plant Modifications
- Safety Assessment and Follow-up Plant Events Facility Support & Other Areas 9
https://www.nrc.gov/about-nrc/contactus.html
Possess Special Nuclear Material (Low Enriched Uranium)
Process and develop uranium products Operate on-site laboratories Treat and monitor plant effluents LICENSED ACTIVITIES 10 https://www.nrc.gov/about-nrc/contactus.html
https://www.nrc.gov/about-nrc/contactus.html Framatome 17 On-site Inspections 12 Modules 15 Inspectors 680 On-Site Hours 4
Events 0
Violations Inspection Summary 2020-2021 11
Licensee Performance Review Process https://www.nrc.gov/about-nrc/contactus.html Plant Events Safety Significance Assessment Reactive Inspections Inspection Follow-up Emergent Performance or Generic Safety Issues Assessment Inspection Program Adjustment Inputs NRC Review Results NRC Response Other NRC Actions
- Enforcement Actions
- Previous Performance
- Safety Significance
- Performance Trends
- Cross Cutting Issues
- Corrective Actions No Performance Issues
- Core Insp. Program
- Inform the Public Area Needing Improvement (ANI)
- Insp. Program Changes
- LPR Frequency
- Inform the Public Or LPR = Licensee Performance Review Performance Areas 12
LPR Results https://www.nrc.gov/about-nrc/contactus.html 2-Year Assessment Period January 1, 2020 - December 31, 2021 13
Inspection Results https://www.nrc.gov/about-nrc/contactus.html SAFETY OPERATIONS No violations FACILITY SUPPORT No violations SAFEGUARDS No violations RADIOLOGICAL CONTROLS No violations OTHER AREAS No violations 14
LPR RESULTS No program adjustment warranted or ANI identified No NRC Identified Violations Performance Areas No cross-cutting issues No need for additional focus by the licensee or NRC at this time NRC Follow-up No safety-significant issues No security-significant issues 15 https://www.nrc.gov/about-nrc/contactus.html
https://www.nrc.gov/about-nrc/contactus.html LPR
SUMMARY
- Framatome conducted activities safely and securely
- No Violations of Regulatory Compliance were identified
- NRC will maintain a standard core (routine) inspection program in the next performance assessment cycle (January 1, 2022 - December 31, 2023) 16
NRC Response to Mission Critical Functions:
Monitoring plant activities remotely/on-site through inspections and oversight Maintaining emergency response capabilities with Regional IRCs and HQ Limiting and risk-informing on-site inspections for region-based inspectors https://www.nrc.gov/about-nrc/contactus.html 17
Additional Actions:
Expanded use of telework Ongoing Review of Continuity of Operations Plan Coordinating actions with industry to minimize inspection schedule impacts while protecting inspectors and plant staff NRC Response to https://www.nrc.gov/about-nrc/contactus.html 18
List of Publicly Available Documents https://www.nrc.gov/about-nrc/contactus.html
- Public Meeting Link:
Includes:
- Licensee Performance Report
- NRC & Framatome Presentation Slides
- Meeting Announcement
- Framatome Materials License, 40 Year Renewal, Accession No. ML21266A339 19
Framatome Response https://www.nrc.gov/about-nrc/contactus.html 20
Richland Fuel Manufacturing Facility Licensee Performance Review May 4, 2022
Richland Site NRC Licensee Performance Review
© Framatome - All rights reserved 22 CONTENT 01. Framatome Richland Site Overview 02. Our Continuous Improvement Organization 03. Our Safety Culture 04. Summary / Conclusion
Richland Site NRC Licensee Performance Review
© Framatome - All rights reserved Founded by Jersey Nuclear in 1969, we celebrated our golden anniversary in 2019 The facility employs approximately 550 employees and 25-30 contractors - We operate 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day, 7 days a week Received the first 40-year fuel fabrication license in 2009 from the U.S. NRC; license to manufacture fuel until 2049 Provide fuel to U.S. reactors and export to several in the Pacific rim Most flexible fuel manufacturing facility in the world Manufacturing both boiling and pressurized water reactor designs Supporting SMR and advanced reactor designs Manufactured more than 65,000 fuel assemblies Celebrating More Than 50 Years of Fueling the Future Fuel fabricated at the Richland site accounts for approximately 5% of the utility-generated electricity in the U.S.
23 p.23
Richland Site NRC Licensee Performance Review
© Framatome - All rights reserved 24
Richland Site NRC Licensee Performance Review
© Framatome - All rights reserved Recently surpassed 550 days without a lost time incident onsite
- Equates to appoximately 1.8 million hours worked
- Strong environmental stewards
- Safety culture driven daily 25 Continuous Improvement Organization Safety is our overarching value and drives everything we do ISO 45001/OSHAS 18001 certified since 2005 Focused on Operational Excellence Safety, Quality, Performance and Delivery
Richland Site NRC Licensee Performance Review
© Framatome - All rights reserved Richland Site Continuous Improvement Processes Culture of Engagement and Continuous Improvement
Promoting being on-the-floor
Engaging best ideas from where the work is done 26 Corrective Action Program - problem identification/resolution
Trending and actions on low impact events
Rigorous problem analysis and solving Human Performance
Observation Program - reinforce good safety habits and behavior Employees submitted on average 1,200 Good Catches per year
Suggestions for Improvement program for employees to improve/enhance existing processes and programs
Use of Human Performance tools; promotion of Stop Safety and Quality culture
Richland Site NRC Licensee Performance Review
© Framatome - All rights reserved Richland Site Continuous Improvement Processes Radiological and Environmental Controls In more than 50 years of operation, no plant employee has been exposed over NRC exposure limits.
ALARA program resulted in 2021 Collective Total Effective Dose Equivalent that was lowest in 28 years.
Continued installation of portable remote monitoring systems to improve ALARA.
Enhanced uranium accountability processes implemented.
27
Richland Site NRC Licensee Performance Review
© Framatome - All rights reserved Safety Achievements / Improvements Initiated D&D of two obsolete process areas.
Recycled a significant amount of legacy equipment for metal shielding as opposed to disposing of it as radioactive waste.
Continued recycling/re-use activities involving NRC-licensed and support processes (hydrofluoric acid, ammonium hydroxide, used oil, used machine coolants, paper/cardboard, scrap metals, wood, and batteries).
Continued improvement in groundwater quality since removal /
remediation of surface impoundment system. All six down-gradient monitoring wells consistently below Federal primary drinking water limit for fluorides (4 ppm); and continue to be below the Federal uranium drinking water limit of 30 ppb.
More than 500 Class 7 radioactive material shipments completed over CYs 2020/2021 without incident.
28
Richland Site NRC Licensee Performance Review
© Framatome - All rights reserved Safety Achievements / Improvements Top 10 Safety list maintained and continually updated Each year more than 20 plant safety improvement projects are completed.
Multi-year site-wide fire alarm system upgrades have been completed, and all areas are now active.
Criticality accident alarm system has been replaced and was put online in 2018.
Successful startup of a new uranium recovery facility to replace aging uranium recovery facility. Went into commercial operation in 2021 EHS&L Audit/Inspection schedule lists 85 different audits / inspections /
assessments; only 32 specifically NRC-required. Based on required frequencies, over 150 actual audit / inspection activities occur per year.
29
Richland Site NRC Licensee Performance Review
© Framatome - All rights reserved Conclusions Framatome continues to drive improvements in safety and regulatory compliance The Richland Site Management strives for operational excellence daily and promotes a culture of continuous improvement
- Employees encouraged to Stop When Unsure
- Employees are encouraged and engaged in submitting their ideas to improve the site processes and procedures 30 We have operated for more than 50 years and intend to operate for another 50 years
Richland Site NRC Licensee Performance Review
© Framatome - All rights reserved Thank You!
Richland Site NRC Licensee Performance Review
© Framatome - All rights reserved Any reproduction, alteration, transmission to any third party or publication in whole or in part of this document and/or its content is prohibited unless Framatome has provided its prior and written consent.
This document and any information it contains shall not be used for any other purpose than the one for which they were provided. Legal action may be taken against any infringer and/or any person breaching the aforementioned obligations.
32
Richland Site NRC Licensee Performance Review
© Framatome - All rights reserved Editor and Copyright 2020: Framatome. It is forbidden to reproduce the present publication entirely or partially without prior consent in whatever form. Legal action may be taken against any infringer and/or any person breaching the aforementioned conditions.
Subject to change and error without notice. Illustrations may differ from the original. The contained statements and information are for advertising purposes only and do not constitute an offer of contract. They shall neither be construed as a guarantee of quality or durability, nor as warranties of merchantability or fitness for a particular purpose.
These statements, even if they are future-oriented, are based on information that was available to us at the date of publication. Type, quantity and characteristics of goods and services are subject to formal individual formal contracts.
Legal Notice 33
Question and Answer Session between the NRC and the Public https://www.nrc.gov/about-nrc/contactus.html 34
Closing Remarks https://www.nrc.gov/about-nrc/contactus.html 35
Contacting the NRC Website: www.nrc.gov Questions/Information: OPA2.Resource@nrc.gov or call 404-997-4417 For Safety or Security Concerns:
Non-Emergency Hotline: 1-800-695-7403 Emergencies: 301-816-5100 Link: https://www.nrc.gov/about-nrc/regulatory/allegations/safety-concern.html https://www.nrc.gov/about-nrc/contactus.html 36
NRC ON SOCIAL MEDIA Twitter: https://twitter.com/nrcgov Facebook: https://www.facebook.com/nrcgov/
YouTube: https://www.youtube.com/user/NRCgov Flickr: https://www.flickr.com/photos/nrcgov/sets LinkedIn: https://www.linkedin.com/company/u-s--nuclear-regulatory-commission/
GovDelivery: https://service.govdelivery.com/accounts/USNRC/subscriber
/new https://www.nrc.gov/about-nrc/contactus.html 37
Feedback Forms https://www.nrc.gov/about-nrc/contactus.html Feedback forms will be sent out to those members of the public who registered.
An e-mail address is necessary to receive a feedback form. Upon completion, please submit feedback form by e-mailing:
Cynthia.Taylor@nrc.gov or Gregory.Goff@nrc.gov 38