Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 IR 05000318/20240072024-11-0606 November 2024 Assessment Follow-Up Letter for Calvert Cliffs Nuclear Power Plant, Unit 2 (Report 05000318/2024007) ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0012024-10-0909 October 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 ML24177A1832024-06-25025 June 2024 Inservice Inspection Report RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24161A0012024-06-0909 June 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML24150A0522024-05-29029 May 2024 Operator Licensing Examination Approval ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24136A1962024-05-15015 May 2024 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report IR 05000317/20240012024-05-0707 May 2024 Integrated Inspection Report 05000317/2024001 and 05000318/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000317/LER-2024-002, Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus2024-04-29029 April 2024 Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus 05000318/LER-2024-001, Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip2024-04-24024 April 2024 Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip ML24101A1942024-04-22022 April 2024 Closeout Letter for GL 2004-02 ML24114A0182024-04-18018 April 2024 Electronic Reporting of Occupational Exposure Reporting ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition 05000318/LER-2023-004-01, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-04-12012 April 2024 Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer IR 05000317/20240402024-04-11011 April 2024 95001 Supplemental Inspection Report 05000317/2024040 and Follow-Up Assessment Letter RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24082A0082024-03-22022 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML24078A1152024-03-18018 March 2024 10 CFR 50.46 Annual Report ML24059A0632024-03-15015 March 2024 Authorization and Safety Evaluation for Alternative Request ISI-05-021 (EPID L-2023-LLR-0006) - Non-Proprietary IR 05000317/20230062024-02-28028 February 2024 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, (Reports 05000317/2023006 and 05000318/2023006 ML24052A0072024-02-14014 February 2024 Core Operating Limits Report for Unit 1, Cycle 27, Revision 0 ML24040A0962024-02-0909 February 2024 Notification of Readiness for NRC 95001 Inspection ML24040A1492024-02-0909 February 2024 Response to NRC Request for Additional Information Regarding Final Response to Generic Letter 2004-02 IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank 2024-09-06
[Table view] |
Text
June 1, 2022 Mr. David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT 1 - REVIEW OF REACTOR VESSEL MATERIAL SURVEILLANCE PROGRAM CAPSULE 83° TECHNICAL REPORT (EPID L-2021-LRO-0042)
Dear Mr. Rhoades:
By letter dated July 30, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21210A325), Exelon Generation Company, LLC (the licensee) submitted an evaluation of the testing results of reactor vessel material surveillance program Capsule 83° from Calvert Cliffs Nuclear Power Plant, Unit 1. The evaluation report is WCAP-18624-NP, Analysis of Capsule 83° from the Calvert Cliffs, Unit 1, Reactor Vessel Radiation Surveillance Program, Revision 0, dated April 2021. Capsule 83° was removed at 35.97 effective full-power years (EFPYs) of operation, having received a neutron fluence of 3.82 x 1018 n/cm2 (E > 1.0 MeV). On February 1, 2022 (ML22032A333), Exelon Generation Company, LLC was renamed Constellation Energy Generation, LLC.
The regulations in Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix H, Reactor Vessel Material Surveillance Program Requirements, require that nuclear power plants install and, at certain intervals, remove and analyze the changes in fracture toughness of the reactor vessel materials contained in the surveillance capsules. Irradiation surveillance of the reactor vessel is necessary to assure that the vessel material will maintain its fracture toughness throughout the service life of the plant. The surveillance capsule contains both dosimeters as well as archival material samples to be irradiated to levels comparable to those expected to be accrued by the reactor vessel at the end of its licensed period.
Paragraph IV.A of Appendix H to 10 CFR Part 50 specifies that a summary technical report for each capsule withdrawal and the associated test results must be submitted within 1 year of the date of capsule withdrawal, unless an extension is granted by the Director, Office of Nuclear Reactor Regulation. Capsule 83° was removed in February 2020. By letter dated August 10, 2020 (ML20223A257), the licensee requested to extend the submittal due date for the Calvert Cliffs, Unit 1, reactor vessel material surveillance program capsule technical report from 1 year after capsule withdrawal to approximately 1 year and 6 months after the capsule was withdrawn from the reactor vessel. By letter dated November 16, 2020 (ML20307A500), the U.S. Nuclear Regulatory Commission (NRC) staff approved the requested submittal due date extension to no later than August 26, 2021. Based on the submittal of WCAP-18624-NP, Revision 0, by letter
D. Rhoades dated July 30, 2021, the NRC staff finds the licensee has fulfilled the reporting requirements of paragraph IV.A of 10 CFR Part 50, Appendix H.
Paragraph IV.B of Appendix H to 10 CFR Part 50 requires that capsule evaluation reports include all data specified by ASTM Standard Practice E185-82 and the results of all fracture toughness tests conducted on the surveillance capsule materials in both the unirradiated and irradiated condition. The NRC staff has performed its review of WCAP-18624-NP and has confirmed that the report includes all of the data and test results that are required by Paragraph IV. B of 10 CFR Part 50, Appendix H, and by ASTM Standard Practice E185-82.
In WCAP-18624-NP, Revision 0, the licensee stated that the transport calculations supporting the analysis of the fluence of Capsule 83° were carried out using the RAPTOR-M3G computer code. While RAPTOR-M3G has been reviewed and approved by the NRC staff for referencing in licensing applications via WCAP-18124-NP-A, Fluence Determination with RAPTOR-M3G and FERRET (ML18204A010), the licensee has not requested or been approved by the NRC to incorporate this methodology into the licensing basis for Calvert Cliffs, Unit 1. From the NRC staffs review of Appendix A of WCAP-18624-NP, Validation of the Radiation Transport Models Based on Neutron Dosimetry Measurements, which compares the measured capsule dosimetry results with those of previously withdrawn capsules, the NRC finds that no safety significant issue is presented or implied by the results of the capsule surveillance report.
This statement should not be construed as NRC approval for use of RAPTOR-M3G as a method for evaluation for Calvert Cliffs, Unit 1. The use of RAPTOR-M3G would require appropriate incorporation of the methodology into the Calvert Cliffs, Unit 1 licensing basis. The licensee will be expected to incorporate the updated surveillance data into the next revision of the Calvert Cliffs, Unit 1, pressure-temperature limits report, as required by 10 CFR Part 50, Appendix G.
If you have any questions, please contact me at (301) 415-1474 or Jason.Paige@nrc.gov.
Sincerely,
/RA/
Jason Paige, Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-317 cc: Listserv
ML22097A270 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NRR/DNRL/NVIB/BC NAME AMayer KEntz ABuford DATE 4/12/2022 4/12/2022 4/22/2022 OFFICE NRR/DSS/SNSB NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME SKrepel JDanna JPaige DATE 4/13/2022 05/26/2022 06/01/2022