COL Docs - Acceptance Review of Southern Nuclear Operating Companys Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4
ML22096A045
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/06/2022
From:
NRC
To:
NRC/NRR/DNRL
References
Download: ML22096A045 (3)


Text

From: Santos, Cayetano Sent: Wednesday, April 6, 2022 8:28 AM To: Brian Whitley (bhwhitle@southernco.com); Chamberlain, Amy Christine; Grant, Eddie Cc: Hall, Victor; Tseng, Ian; Scarbrough, Thomas; Wong, Yuken; Bowman, Greg; Vogtle PEmails

Subject:

ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS REQUEST FOR ALTERNATIVE: ALTERNATIVE REQUIREMENTS FOR INSERVICE TEST INTERVAL CODE EDITION, UNIT 4 (EPID NO. L-2022-LLR-0035)

Mr. Brian H. Whitley, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.

3535 Colonnade Parkway Birmingham, AL 35243

SUBJECT:

ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS REQUEST FOR ALTERNATIVE: ALTERNATIVE REQUIREMENTS FOR INSERVICE TEST INTERVAL CODE EDITION, UNIT 4 (EPID NO. L-2022-LLR-0035)

Dear Mr. Whitley:

By letter dated March 22, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22081A381), Southern Nuclear Operating Company (SNC) submitted an alternative request for Vogtle Electric Generating Plant (VEGP), Unit 4. The requested alternative would remove a latest date condition imposed by the U.S. Nuclear Regulatory Commission (NRC) in its March 2, 2020 authorization of IST-ALT-01 (ADAMS Accession No. ML20045D487). The condition stated that the NRC staff authorized IST-ALT-01 for initial fuel load dates prior to November 23, 2022.

The purpose of this letter is to provide the results of the NRC staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the staff to complete its detailed technical review. The acceptance review is also intended to identify whether the submittal has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of the 10 CFR, the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

The staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. SNC will

be advised of any further information needed to support the staffs detailed technical review by separate correspondence.

SNC has requested staff approval of this alternative two months prior to the scheduled date for Unit 4 fuel load. The staff will try to complete its review by this date unless we agree to a different date at a later time due to circumstances beyond our control. The staff estimates that it may take 110 hours0.00127 days <br />0.0306 hours <br />1.818783e-4 weeks <br />4.1855e-5 months <br /> to complete this licensing action.

If you have any questions, please contact me at (301) 415-7270 or Cayetano.Santos@nrc.gov.

Sincerely, Cayetano (Tanny) Santos Vogtle Project Office Office of Nuclear Reactor Regulation

Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 632 Mail Envelope Properties (MN2PR09MB5244E80F582EC5ED2630A882E5E79)

Subject:

ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS REQUEST FOR ALTERNATIVE: ALTERNATIVE REQUIREMENTS FOR INSERVICE TEST INTERVAL CODE EDITION, UNIT 4 (EPID NO. L-2022-LLR-0035)

Sent Date: 4/6/2022 8:27:32 AM Received Date: 4/6/2022 8:27:35 AM From: Santos, Cayetano Created By: Cayetano.Santos@nrc.gov Recipients:

"Hall, Victor" <Victor.Hall@nrc.gov>

Tracking Status: None "Tseng, Ian" <Ian.Tseng@nrc.gov>

Tracking Status: None "Scarbrough, Thomas" <Thomas.Scarbrough@nrc.gov>

Tracking Status: None "Wong, Yuken" <Yuken.Wong@nrc.gov>

Tracking Status: None "Bowman, Greg" <Gregory.Bowman@nrc.gov>

Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@usnrc.onmicrosoft.com>

Tracking Status: None "Brian Whitley (bhwhitle@southernco.com)" <bhwhitle@southernco.com>

Tracking Status: None "Chamberlain, Amy Christine" <acchambe@southernco.com>

Tracking Status: None "Grant, Eddie" <X2EDGRAN@SOUTHERNCO.COM>

Tracking Status: None Post Office: MN2PR09MB5244.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3160 4/6/2022 8:27:35 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: