Name: ________________________
Vogtle 2021 (ILT23)
NRC SRO Student Test Start Time: _______
Stop Time: _______
Vogtle 2021 (ILT23) NRC SRO
- 1. 003G2.4.29 001 At time 0800:
- Unit 2 is in Mode 2 with a startup in progress.
- All CETC indications on the PSMS and IPC are lost.
At time 0814:
- OATC is withdrawing control rods 50 steps.
- One control rod drops.
At time 0816:
- OATC places 2HS-40007, Reactor Trip, on QMCB 'C' to TRIP, and the reactor does NOT trip.
- OATC places 2HS-40002, Reactor Trip, on QMCB 'A' to TRIP, and the reactor trips.
Which one of the following completes the following statement?
At time 0814, entry into 18003-C, "Rod Control System Malfunction," __(1)__ required, and at time 0816 and per NMP-EP-141, "Event Classification," the highest emergency action level threshold exceeded is a(n) __(2)__.
REFERENCES PROVIDED
__(1)__
__(2)__
was NOUE was Alert was NOT NOUE was NOT Alert A.
B.
C.
D.
Page 1 of 25
Vogtle 2021 (ILT23) NRC SRO
- 2. 004G2.2.37 001 Given the following:
- Unit 1 is at 100% reactor power.
- BAST is tagged out.
- RWST Sludge Mixing Valves do NOT automatically close on low RWST level during a surveillance.
Which one of the following completes the following statement?
Per the Bases of Tech Spec LCO 3.5.4, "Refueling Water Storage Tank (RWST)," the RWST __(1)__ OPERABLE, and based on the given conditions, TRM TR 13.1.3, "Boration Flow Paths - Operating,"
__(2)__ met.
__(1)__
__(2)__
is is is is NOT is NOT is is NOT is NOT A.
B.
C.
D.
Page 2 of 25
Vogtle 2021 (ILT23) NRC SRO
- 3. 005A2.05 001 Initial conditions:
- Unit 1 is shutdown.
- RCS temperature is 210 F.
- RCS pressure is 315 psig.
- RHR Train 'A' is in service for temperature control.
- RHR Train 'B' is in standby.
Current conditions:
- RHR Heat Exchanger 'A' develops a significant tube leak.
- RHR Train 'A' is shutdown, and its Heat Exchanger is isolated.
- RHR Train 'B' is placed in service for temperature control.
Which one of the following completes the following statement?
Initial indications of the RHR Heat Exchanger tube leak included __(1)__ CCW Surge Tank 'A' level, and based on the current conditions and per the associated Bases, Tech Spec LCO 3.5.3, "ECCS - Shutdown," __(2)__ met.
__(1)__
__(2)__
rising is rising is NOT lowering is lowering is NOT A.
B.
C.
D.
Page 3 of 25
Vogtle 2021 (ILT23) NRC SRO
- 4. 011EG2.4.30 001 At time 1000:
- Unit 2 reactor trip and SI occur due to a LOCA.
At time 1013:
- Site Area Emergency is declared by the Emergency Director.
At time 1040:
- General Emergency is declared by the Emergency Director.
Which one of the following completes the following statement?
Based on the given conditions and per NMP-EP-142, "Emergency Notification," the initial Protective Action Recommendations (PARs) are required to be communicated to the State and Local authorities no later than time __(1)__,
and per NMP-EP-142, determination and approval of the PARs __(2)__ be delegated.
__(1)__
__(2)__
1055 can 1055 can NOT 1110 can 1110 can NOT A.
B.
C.
D.
Page 4 of 25
Vogtle 2021 (ILT23) NRC SRO
- 5. 015A2.04 001 Initial conditions:
- Unit 1 is at 100% reactor power.
- At time 1600 on 09/01/2021, it was discovered that a 7 day surveillance for Tech Spec LCO 3.2.3, "Axial Flux Difference (AFD)," was missed.
- A risk evaluation has been performed.
Current conditions:
- Xenon oscillation is in progress causing AFD to rise toward its target value.
- 12004-1, "Power Operation (Mode 1)," Section 4.3.2.2, is in progress for AFD control.
Which one of the following completes the following statements?
Based on the initial conditions and to delay declaring the LCO NOT met, the surveillance is required to be performed satisfactorily by no later than time 1600 on
__(1)__.
Per 12004-1, in order to properly dampen the xenon oscillation, the crew will insert control rods __(2)__.
(1) 09/02/2021 (2) as Delta I is rising to keep Delta I at target (1) 09/02/2021 (2) after Delta I reaches the right side of the 'doghouse' to lower Delta I to target (1) 09/08/2021 (2) as Delta I is rising to keep Delta I at target (1) 09/08/2021 (2) after Delta I reaches the right side of the 'doghouse' to lower Delta I to target A.
B.
C.
D.
Page 5 of 25
Vogtle 2021 (ILT23) NRC SRO
- 6. 015AA2.01 001 Procedure titles as follows:
- 19000-1, "Reactor Trip or Safety Injection"
- 18005-C, "Partial Loss of Flow" Initial conditions:
- Unit 1 is at 24% reactor power with a startup in progress.
- RCS pressure is 2238 psig.
- VCT pressure is 23 psig.
Current conditions:
- ALB08-C04 RCP 3 NO. 2 SEAL LKOF HI FLOW is received.
- ALB08-C05 RCP 3 CONTROLLED LKG HI/LO FLOW is received.
- 1FI-158A, RCP #3 No. 1 Seal Leak-Off, is 5.9 gpm.
Which one of the following completes the following statement?
Based on the given conditions, the RCP #3, No. __(1)__ seal has failed, and per 13003-1, "Reactor Coolant Pump Operation," the Shift Supervisor is required to
__(2)__.
__(1)__
__(2)__
1 initiate 18005-C 1
trip the reactor and initiate 19000-1 2
initiate 18005-C 2
trip the reactor and initiate 19000-1 A.
B.
C.
D.
Page 6 of 25
Vogtle 2021 (ILT23) NRC SRO
- 7. 025AG2.1.32 001 At time 0200 on 10/02/2021:
- Unit 1 is shutdown for a refueling outage.
At time 0100 on 10/30/2021:
- Core reload has just been completed.
- RCS temperature is 100 F at midloop.
- Complete loss of RHR occurs.
- 18019-C, "Loss of Residual Heat Removal," is in progress.
- Crew is at the Step to "Determine the time to boiling based on existing conditions."
Which one of the following completes the following statements?
Based on the given conditions and per 18019-C, the earliest expected time to core uncovery is __(1)__ minutes.
Per 18019-C, Attachment 1, "RWST Gravity Drain to RCS," if NO pump is available, the preferred gravity drain path to restore inventory is through the __(2)__ pumps to the RCS cold legs.
REFERENCES PROVIDED
__(1)__
__(2)__
260 SI 260 RHR 280 SI 280 RHR A.
B.
C.
D.
Page 7 of 25
Vogtle 2021 (ILT23) NRC SRO
- 8. 035G2.1.19 001 Initial conditions:
- Unit 1 reactor trip and SI occur due to a SG #1 tube rupture.
- 19030-1, "Steam Generator Tube Rupture," is in progress.
- SG #1 is isolated.
- RCS cooldown to target CETC temperature is complete.
Current conditions:
- Crew is at Step 18 to "Check ruptured SG pressure - stable or rising."
- SG #1 pressure is 780 psig and lowering.
- SGs #2, #3, and #4 pressures are 765 psig and stable.
Which one of the following completes the following statement?
Per 19030-1, during the cool down to the target CETC temperature, the cooldown rate
__(1)__ limited to 100 F/hour, and based on the current conditions, the Shift Supervisor __(2)__ required to transition to 19131-1, "SGTR with Loss of Reactor Coolant: Subcooled Recovery Desired."
__(1)__
__(2)__
was is was is NOT was NOT is was NOT is NOT A.
B.
C.
D.
Page 8 of 25
Vogtle 2021 (ILT23) NRC SRO
- 9. 036AA2.05 001 CFR titles as follows:
- 10 CFR 20, "Standards for Protection Against Radiation"
- 10 CFR 100, "Reactor Site Criteria" Initial conditions:
- Unit 1 is in a refueling outage.
- Core off-load is in progress.
- Personnel Airlock is open.
Current conditions:
- Refueling Cavity water level is lowering due to a leak.
- Radiation levels near the Refueling Cavity are rising.
- 18006-C, "Fuel Handling Event," is in progress.
Which one of the following completes the following statement?
Based on the given conditions and per the Bases of Tech Spec LCO 3.9.4, "Containment Penetrations," the Personnel Airlock __(1)__ required to be closed in no later than 15 minutes, and per the Bases of Tech Spec LCO 3.9.7, "Refueling Cavity Water Level," the minimum required water level ensures the radiological consequences of a fuel handling accident are within the acceptable limits of __(2)__.
__(1)__
__(2)__
is 10 CFR 20 is 10 CFR 100 is NOT 10 CFR 20 is NOT 10 CFR 100 A.
B.
C.
D.
Page 9 of 25
Vogtle 2021 (ILT23) NRC SRO
- 10. 040AA2.01 001 Initial conditions:
- Unit 2 is at 100% reactor power.
- All SG pressures are lowering.
- Containment pressure is rising.
- 18008-C, "Secondary Coolant Leakage," is in progress.
Current conditions:
- Reactor is tripped and SLI is actuated.
- SG #1 steam flow rate is 2.4 MPPH.
- SG #2 steam flow rate is 0.2 MPPH.
- SG #3 steam flow rate is 0.0 MPPH.
- SG #4 steam flow rate is 0.0 MPPH.
- SG #1 pressure 860 psig.
- SGs #2, #3, and #4 pressures are 990 psig.
- Containment pressure is 4.0 psig.
Which one of the following completes the following statement?
Based on the given conditions, SG(s) __(1)__ is (are) faulted, and per the Bases of Tech Spec LCO 3.6.4, "Containment Pressure," the maximum peak containment pressure expected during worst case SLB is __(2)__ psig.
__(1)__
__(2)__
- 1 ONLY 36.5
- 1 ONLY 52
- 1 and #2 36.5
- 1 and #2 52 A.
B.
C.
D.
Page 10 of 25
Vogtle 2021 (ILT23) NRC SRO
- 11. 041A2.02 001 Initial conditions:
- Unit 2 reactor trips.
- 19001-2, "Reactor Trip Response," is in progress.
- Steam Dumps are in Steam Pressure Mode in AUTO.
- RCS temperature is stable at 557 F.
Current condition:
- One valve in one Steam Dump Bank fails full open.
Which one of the following completes the following statement?
In response to the failure and with no operator action, 2UI-500, Steam Dump Demand, output will __(1)__,
and if the Steam Dump valve can NOT be isolated, per 19001-1, the crew __(2)__ required to trip both MFPs.
__(1)__
__(2)__
rise is rise is NOT lower is lower is NOT A.
B.
C.
D.
Page 11 of 25
Vogtle 2021 (ILT23) NRC SRO
- 12. 053G2.1.30 001 Initial conditions:
- Unit 1 is at 100% reactor power.
- 1PT-456, Pressurizer Pressure, fails down scale low.
- UO places the 1PT-456 bistables in BYPASS using BTI.
Current condition:
- 1TE-412, RCS Loop #1 Tavg, fails full-scale high.
Which one of the following completes the following statement?
In order to place the 1PT-456 BTI switches to BYPASS, the UO __(1)__ required to obtain a key from the Shift Supervisor, and based on the given conditions, entry into Tech Spec LCO 3.0.3 __(2)__ required.
__(1)__
__(2)__
is is is is NOT is NOT is is NOT is NOT A.
B.
C.
D.
Page 12 of 25
Vogtle 2021 (ILT23) NRC SRO
- 13. 058AG2.2.40 001 Initial conditions:
- Unit 1 is at 24% reactor power and shutting down due to a 3 gpm RCS pressure boundary leak.
- MDAFW pump 'A' is tagged out.
- MDAFW pump 'B' is declared inoperable due to a significant oil leak.
Current condition:
- 1CD1M de-energizes due to a fault.
Which one of the following completes the following statement?
Based on the given conditions, the applicable Tech Spec LCO 3.7.5, "Auxiliary Feedwater (AFW) System," Required Action Completion Time __(1)__ 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and the unit shutdown __(2)__ allowed to continue.
__(1)__
__(2)__
is is is is NOT is NOT is is NOT is NOT A.
B.
C.
D.
Page 13 of 25
Vogtle 2021 (ILT23) NRC SRO
- 14. 059AG2.4.30 001 At time 0945:
- Unit 1 is at 100% reactor power.
- WMT #9 release is in progress per 13216-1, "Liquid Waste Release."
- 1RE-018, Liquid Radwaste Effluent, release permit high alarm setpoint is 2.79E -5 µCi/cc.
At time 1000:
- 1RE-018 indicates 6.11E -5 µCi/cc and is in high alarm.
- 1RV-018, Waste Discharge Isolation, is NOT closed.
- System Operator is dispatched to terminate the release.
At time 1106:
- System Operator reports to the Control Room, the release is terminated.
- 1RE-018 indicates 5.49E -5 µCi/cc and lowering.
Which one of the following completes the following statement?
The 1RE-0018 radiation reading can be monitored on the Unit 1 __(1)__,
and per NMP-EP-141, "Event Classification," an emergency classification threshold value
__(2)__ been exceeded.
REFERENCES PROVIDED
__(1)__
__(2)__
Comms Console has Comms Console has NOT SRDC Panel has SRDC Panel has NOT A.
B.
C.
D.
Page 14 of 25
Vogtle 2021 (ILT23) NRC SRO
- 15. 062AA2.05 001 Initial conditions:
- Unit 1 is at 100% reactor power.
- Containment Spray pump 'A' is tagged out.
Current conditions:
- NSCW Train B supply header pressure is 75 psig.
- NSCW Train B supply header flow rate is 23,000 gpm.
- NSCW Train B return header flow rate is 11,000 gpm.
- 18021-C, "Loss of Nuclear Service Cooling Water System," is entered.
Which one of the following completes the following statement?
Based on the given conditions and per 18021-C, the crew is required to place the standby Train B NSCW pump handswitch __(1)__,
and after completing the actions of 18021-C, the Shift Supervisor will determine per NMP-OS-027, "Recording Limiting Conditions for Operation," that a LOSF __(2)__.
__(1)__
__(2)__
in PTL exists in PTL does NOT exist to START exists to START does NOT exist A.
B.
C.
D.
Page 15 of 25
Vogtle 2021 (ILT23) NRC SRO
- 16. 063G2.2.25 001 Initial conditions:
- Unit 2 is at 100% reactor power.
- DG2A is tagged out.
- Loss of all off-site power occurs.
- DG2B starts and then trips on overspeed.
Current conditions:
- 19100-2, "Loss of All AC Power," is in progress.
- 2BD1 bus voltage is 103 VDC.
Which one of the following completes the following statement?
Based on the given conditions and per the Bases of Tech Spec LCO 3.8.4, "DC Sources - Operating," the 1E batteries are sized to have sufficient capacity to supply the required loads for a minimum of __(1)__ hours, and per 19100-2, to remove 2BD1 from service, the first required action is to __(2)__.
__(1)__
__(2)__
2.75 shutdown its associated inverter(s) 2.75 open its associated battery breaker 4
shutdown its associated inverter(s) 4 open its associated battery breaker A.
B.
C.
D.
Page 16 of 25
Vogtle 2021 (ILT23) NRC SRO
- 17. 103A2.10 001 Radiation monitor names as follows:
- 1RE-002, Containment Low Range Area Monitor
- 1RE-003, Containment Low Range Area Monitor
- 1RE-004, Containment Hatch Initial conditions:
- Unit 1 is in Mode 6.
- Core offload is in progress.
Current condition:
- A malfunction with the Refueling Machine causes an irradiated fuel assembly to be dropped in the Refueling Cavity.
- 1RE-002 is in Intermediate Alarm.
- 1RE-003 is in Intermediate Alarm.
- 1RE-004 is in High Alarm.
- Refueling Cavity water level is 215' and slowly lowering.
Which one of the following completes the following statement?
A CVI actuation __(1)__ automatically occured, and based on the given conditions, the Emergency Director is required to declare a(n)
__(2)__ per NMP-EP-141, "Event Classification."
__(1)__
__(2)__
has NOT ALERT has NOT NOUE has ALERT has NOUE A.
B.
C.
D.
Page 17 of 25
Vogtle 2021 (ILT23) NRC SRO
- 18. G2.1.8 001 Initial condition:
- Unit 1 reactor trip and SI occurs.
Current conditions:
- A Site Area Emergency has been declared by the Emergency Director.
- No radiation release is in progress.
Which one of the following completes the following statement?
Per NMP-EP-141, "Event Classification," the Emergency Director __(1)__ required to order a site evacuation of non-essential personnel, and based on the conditions above, and per NMP-EP-144, IF, the Emergency Director orders a site evacuation, the non-essential personnel will __(2)__.
__(1)__
__(2)__
is proceed to their homes is report to Burke County reception center is NOT proceed to their homes is NOT report to Burke County reception center A.
B.
C.
D.
Page 18 of 25
Vogtle 2021 (ILT23) NRC SRO
- 19. G2.1.39 001 Initial condition:
- Unit 1 is at 95% reactor power.
Current conditions:
- Reactor power is rising.
- Main Generator output is lowering.
- Security Officer reports a substantial amount of steam coming from the cage door of the North Main Steam Valve Room (NMSVR).
- System Operator (SO) is dispatched to the NMSVR.
- 18008-C, "Secondary Coolant Leakage," is entered.
Which one of the following completes the following statements?
Per NMP-OS-007-001, "Conduct of Operations Standards and Expectations," and 18008-C, the Shift Supervisor __(1)__ required to trip the reactor.
and If a reactor trip is required, the Shift Supervisor will __(2)__ procedure 19000-1 "Reactor Trip Response."
__(1)__ __(2)__
is NOT initiate is NOT go to is initiate is go to A.
B.
C.
D.
Page 19 of 25
Vogtle 2021 (ILT23) NRC SRO
- 20. G2.2.05 001 Initial conditions:
- Unit 2 is at 100% reactor power.
- ALB20-E06 TURB EHC FLUID LO TEMP is received and resets multiple times over the last hour.
- System Operator reports the EHC pumps are operating correctly and all EHC indications are within normal operating bands.
Current condition:
- Shift Supervisor directs the UO to pull the ALB20-E06 annunciator card until the cause of the alarm is corrected.
Which one of the following completes the following statement?
Per 10018-C, "Annunciator Control," when the ALB20-E06 annunciator card is pulled, its associated annunciator window is required to have a __(1)__ placed on window, and the Shift Supervisor is required to conduct a review of all disabled annunciators on a
__(2)__ frequency.
(1) blue sticker (2) bi-weekly (1) blue sticker (2) monthly (1) white sticker (2) bi-weekly (1) white sticker (2) monthly A.
B.
C.
D.
Page 20 of 25
Vogtle 2021 (ILT23) NRC SRO
- 21. G2.2.23 001 Initial conditions:
- Unit 2 is at 100% reactor power.
- SI pump 'A' is tagged out.
Current conditions:
- CCP 'B' is declared inoperable.
- As a result, a second entry into Tech Spec LCO 3.5.2, "ECCS - Operating," is made 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> after the initial entry.
Which one of the following completes the following statement?
Per Tech Spec Rules of Use and Application, the maximum Completion Time allowed for completing the Required Actions of Tech Spec LCO 3.5.2 is __(1)__ hours, and in order to apply the Completion Time extension, the component that must first be returned to OPERABLE is __(2)__.
REFERENCES PROVIDED
__(1)__
__(2)__
88 CCP 'B' 88 SI pump 'A' 96 CCP 'B' 96 SI pump 'A' A.
B.
C.
D.
Page 21 of 25
Vogtle 2021 (ILT23) NRC SRO
- 22. G2.3.14 001 Given the following:
- Unit 1 is at 100% reactor power.
- Reactor coolant Dose Equivalent I-131 trend is as follows:
TIME ACTIVITY (Ci/gm) 1145 0.4 1200 0.9 1215 1.1 1230 1.3 1245 1.6 Which one of the following completes the following statement?
Tech Spec LCO 3.4.16, "RCS Specific Activity," was NOT met first at time __(1)__,
and per the Bases of Tech Spec LCO 3.4.16, the Required Action to reduce RCS Tavg below 500 F if the gross specific activity is exceeded is to prevent opening of the
__(2)__ Valves.
__(1)__
__(2)__
1215 Main Steam Safety 1215 Atmospheric Relief 1245 Main Steam Safety 1245 Atmospheric Relief A.
B.
C.
D.
Page 22 of 25
Vogtle 2021 (ILT23) NRC SRO
- 23. G2.4.18 001 Initial conditions:
- Unit 2 is 58% reactor power with a power ascension in progress.
- OATC withdraws control rods 3 steps.
- When the Rod Motion Switch is released, the control rods continue withdrawing.
- Reactor will NOT trip from the Control Room.
- 19211-2, "Response to Nuclear Power Generation/ATWT," is in progress.
Current conditions:
- UO manually trips the Main Turbine.
- Crew is at Step 4.f. to "Check RCS pressure - less than 2335 psig."
Which one of the following completes the following statement?
Based on the given conditions and per the EOP Bases for 19211-2, the reason the Main Turbine is manually tripped __(1)__ to prevent excessive cooldown of the RCS, and the reason RCS pressure is checked less than 2335 psig at Step 4.f. is to ensure
__(2)__.
(1) is (2) the PORVs are closed to limit RCS depressurization (1) is (2) sufficient Charging Pump injection flow into the RCS (1) is NOT (2) the PORVs are closed to limit RCS depressurization (1) is NOT (2) sufficient Charging Pump injection flow into the RCS A.
B.
C.
D.
Page 23 of 25
Vogtle 2021 (ILT23) NRC SRO
- 24. G2.4.26 001 Given the following:
- Both units are at 100% reactor power.
- Shift manning has been reduced to 6 Non-Licensed Operators (SOs) and the following Supervisors:
- 1 Shift Manager
- 2 Shift Supervisors
- 1 Support Shift Supervisor
- All operating crew members are fully qualified.
Which one of the following completes the following statement?
Per NMP-OS-007-013, "Shift Manning Requirements," the Unit 1 Outside Area Operator __(1)__ be assigned to both the Unit 1 SO ERO position and a Fire Brigade position at the same time, and based on the given conditions, the shift STA position is required to be assigned to the
__(2)__.
__(1)__
__(2)__
can Shift Manager can Support Shift Supervisor can NOT Shift Manager can NOT Support Shift Supervisor A.
B.
C.
D.
Page 24 of 25
Vogtle 2021 (ILT23) NRC SRO
- 25. WE13EA2.04 001 Initial condition:
- Unit 1 is at 100% reactor power.
Current conditions:
- Unit 1 reactor is tripped.
- Reactor Trip Breaker 'A' is NOT open.
- Reactor Trip Breaker 'B' is open.
- 19232-1, "Response to Steam Generator Overpressure," is in progress.
- SG #2 pressure is 1250 psig.
- SG #2 NR level is 90%.
Which one of the following completes the following statements?
Based on the given conditions, the Main Feedwater Isolation Valves (MFIVs) were closed __(1)__.
When SG NR level is greater than 93%, steam flow is NOT initiated because of the risk of __(2)__.
(1) automatically by the Feedwater Isolation (FWI) signal (2) water hammer (1) automatically by the Feedwater Isolation (FWI) signal (2) rapid SG pressure drop (1) manually by the UO when verifying FWI valves closed (2) water hammer (1) manually by the UO when verifying FWI valves closed (2) rapid SG pressure drop A.
B.
C.
D.
Page 25 of 25
ILT-23 SRO Exam Provided Reference Index
- 1. 18019-C, Loss of Residual Heat Removal, Figure 3, 4, 5 (ver. 31.2)
- 2. NMP-EP-141-003-F01, EAL Classification Matrix - Hot Conditions, (ver. 3.0)
- 3. NMP-EP-141-003-F02, EAL Classification Matrix - Cold Conditions, (ver. 3.0)
- 4. Unit 2, Tech Spec 3.5.2, ECCS - Operating, page 3.5.2-1 (amend 171)
Vogtle 2021 (ILT23) NRC SRO Examination KEY Answers 0
ID Points Type 1
003G2.4.29 1 1.00 MCS B
2 004G2.2.37 1 1.00 MCS D
3 005A2.05 1 1.00 MCS A
4 011EG2.4.30 1 1.00 MCS B
5 015A2.04 1 1.00 MCS C
6 015AA2.01 1 1.00 MCS B
7 025AG2.1.32 1 1.00 MCS D
8 035G2.1.19 1 1.00 MCS C
9 036AA2.05 1 1.00 MCS B
10 040AA2.01 1 1.00 MCS A
11 041A2.02 1 1.00 MCS C
12 053G2.1.30 1 1.00 MCS A
13 058AG2.2.40 1 1.00 MCS D
14 059AG2.4.30 1 1.00 MCS A
15 062AA2.05 1 1.00 MCS A
16 063G2.2.25 1 1.00 MCS C
17 103A2.10 1 1.00 MCS B
18 G2.1.8 1 1.00 MCS A
19 G2.1.39 1 1.00 MCS D
20 G2.2.05 1 1.00 MCS C
21 G2.2.23 1 1.00 MCS B
22 G2.3.14 1 1.00 MCS A
23 G2.4.18 1 1.00 MCS B
24 G2.4.26 1 1.00 MCS C
25 WE13EA2.04 1 1.00 MCS A
SECTION 1 ( 25 items) 25.00 Page 1 of 1