ML21305A598

From kanterella
Jump to navigation Jump to search
6 to Updated Final Safety Analysis Report, Figure 3.2-21, Sheet 16B of 35, Drawing 108021-9B
ML21305A598
Person / Time
Site: Diablo Canyon  
Issue date: 10/11/2021
From:
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21306A142 List: ... further results
References
DCL-21-074
Download: ML21305A598 (1)


Text

90B 91B A

8 C

D E

8021S9B.MOI I 1-06-95 ROA 92B 93B CRETGl NOTE I

[ATS2J HIA RADIATOR FAN COMPARTMENT MISC.

94B 95B

[RATGl (TI\\

\\::JNOTE I CPYROl NOTE I DIESEL ENGINE 2-3 TP

[OS]

DC 60 I 1476-43 NOTE 3

/\\ 4 Lili 218A-A 36

/\\ I Lili HIA

[CKVSl INSTRUMENTS FOR ENGINE 96B 97B TE-73 T2804A 98B 99B NOTES:

I, MOUNTED ON ENGINE CONTROL PANEL

2.
  • DENOTES MANUFACTURER SUPPLIED INSTRUMENTS AND EQUIPMENT. IT IS ACCEPTABLE TO REPLACE MANUFACTURER SUPPLIED INSTRUMENT TUBING WITH PG&E SUPPLIED S-SPEC STAINLESS STEEL TUBING 1\\4
3.

YS-108 IS MECHANICAL OVERSPEED TRIP DEVICE.(95B-D)

Lili

  • GENERATOR 2-3 DC 60 I 1924 -20 GENERATOR 2-3 UNIT 2 P.G.ScE. co.

DRAWING NUMBER REV I 08021 39 I\\

SHEET 98 OF SHEETS Llli IANJ,n fie 1 :

I MICROFILM I

A 8

C D

E