ML21305A104
Text
Enclosure 3 contains Sensitive Information - Withhold Under 10 CFR 2.390 When separated from Enclosure 3, this cover letter is decontrolled.
Pacific Gas and Electric Company" PG&E Letter DCL-21-07 4 Paula Gerten Site Vice President Diablo Canyon Power Plant Mail code 104/6/605 P.O. Box 56 Avila Beach, CA 93424 805.545.4596 Internal: 691.4596 Fax: 805.545.4234 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 10 CFR 50.4 10 CFR 50.54 10 CFR 50.71 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units 1 and 2 Submittal of Updated Final Safety Analysis Report, Revision 26
Dear Commissioners and Staff:
Pursuant to 10 CFR 50.71(e), 10 CFR 50.54(a)(3), and 10 CFR 50.4(b)(6), Pacific Gas ano Electric Company (PG&E) hereby submits Diablo Canyon Power Plant (DCPP) "Updated Final Safety Analysis Report" (UFSAR), Revision 26. contains a summary of changes to the UFSAR resulting from 10 CFR 50.59 evaluations. Enclosure 2 provides a list of license amendments that resulted in changes incorporated into Revision 26 of ~he DCPP UFSAR. contains the DCPP UFSAR, Revision 26, including the drawings listed on UFSAR Table 1.6-1, on one Digital Versatile Disc (DVD), labeled "Diablo Canyon Power Plant UFSAR,,Revision 26 (non-redacted), dated September 2021." The contents are in Adobe Acrobat portable document format. Enclosure 3 contains sensitive information and should be withheld from public disclosure in accordance with 10 CFR 2.390(d)(1). provides a list of the information that has been redacted in accordance with NRG Regulatory Issue Summary (RIS) 2015-17, "Review and Submission of Updates to Final Safety Analysis Reports, Emergency Preparedness Documents, and Fire Protection Documents." contains one DVD for DCPP UFSAR, Revision 26, with the redacted information identified in Enclosure 4 removed. This DVD is labeled, "Diablo Canyon Power Plant UFSAR, Revision 26 (redacted), dated S,eptember 2021."
A member of the STARS Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek contains Sensitive Information - Withhold Under 10 CFR 2.390 When separated from Enclosure 3, this cover letter is decontrolled.
contains Sensitive Information - Withhold Under 10 CFR 2.390 When separated from Enclosure 3, this cover letter is decontrolled.
Document Control Desk Page2 PG&E Letter DCL--21-07 4 contains a description of the information that has been removed from the UFSAR in accordance with Appendix A of Nuclear Energy Institute (NEI)
Guideline 98-03, Revision 1, "Guidelines for Updating Final Safety Analysis.
Reports." Deletions and additions are identified by revision bars on the right side of the associated pages of the UFSAR.
PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.
If you have any questions regarding this submittal, please contact Mr. Jim Morris at (805) 545-4609.
This certifies, to the best of my judgement and belief, that Revision 26 of the DCPP UFSAR accurately presents changes that were incorporated into the UFSAR as of May 2021.
Sincerely, Paula Gerten Site Vice President armb/50943987-03 Enclosures cc:
Diablo Distribution cc/enc:
Samson S. Lee, NRG Project Manager Scott A. Morris, NRG Region IV Administrator Winston C. Smith, Acting NRG Senior Resident Inspector A
member of the STARS Alliance Callaway o Diablo Canyon
- Palo Verde
- Wolf Creek contains Sensitive Information - Withhold Under 10 CFR 2.390 When separated from Enclosure 3, this cover letter is decontrolled.
PG&E Letter DCL-21-074 Changes Incorporated into the Diablo Canyon Power Plant Updated Final Safety Analysis Report, Revision 26 Resulting from 10.CFR 50.59 Evaluations
LBIE Number11l 2020-013 2021-002 PG&E Letter DCL-21-074 Changes Incorporated into the Diablo Canyon Power Plant Updated Final Safety Analysis Report, Revision 26 Resulting 1from 10 CFR 50.59 Evaluations Description
)
Adoption of the Tornado Missile Risk Evaluator (TMRE) Methodology.
Accept for use as-is nonconforming structural steel welds that were accepted usinq an alternate visual weld inspection criteria.
<1l 10 CFR 50.59 Licensing Basis Impact Evaluation Number Page 1 of 1 PG&E Letter DCL-21-074 License Amendments (LAs) that Resulted in Changes Incorporated into Revision 26 of the DCPP Updated Final Safety Analysis Report PG&E Letter DCL-21-074 License Amendments (LAs) that Resulted in Changes Incorporated into Revision 26 of the DCPP Updated Final Safety Analysis Report Unit 1 LA 234 235 237 Unit 2 Description LA 236 Incorporation of FULL SPECTRUM LOCA Methodology (EPID L-2018-LLA-0730) 237 Changes to the Intake Structure Physical Security Classification (EPID L-2019-LLA-0029) 239 Relocate Technical Specification 5.3, "Unit Staff Qualifications," to the Updated Final Safety Analysis Report (EPID L-2019-LLA-0268)
Page 1 of 1 contains Sensitive Information - Withhold Under 1 0 CFR 2.390 The DVD in this enclosure contains the following files:
File Name File Size (Mb)
Chapter 1 3.96 Chapter 2 25.0 Chapter 3 30.3 Chapter 4 4.81 Chapter 5 3.38 Chapter 6 15.0 Chapter 7 1.91 Chapter 8 2.65 _
Chapter 9 7.20 Chapter 10
.944 Chapter 11 3.87 Chapter 12 3.52 Chapter 13
.516 Chapter 14 1.32 Chapter 15 16.8 Chapter 16
.100 Chapter 17 1.38 Table 1.6-1 Drawings 701 PG&E Letter DCL-21-074 contains Sensitive Information - Withhold Under 10 CFR 2.390 Page 1 of 1 contains Sensitive Information - Withhold Under 10 CFR 2.390 Digital Versatile Disc Diablo Canyon Power Plant PG&E Letter DCL-21-074 Diablo Canyon Power Plant Updated Final Safety Analysis Report, Revision 26 (non-redacted), dated September 2021 contains Sensitive Information - Withhold Under 10 CFR 2.390 PG&E Letter DCL-21-074 List of Information Redacted from Updated Final Safety Analysis Report, Revision 26 in Accordance with RIS 2015-17 PG&E Letter DCL-21-074 List of Information Redacted from Updated Final Safety Analysis Report, Revision 26 in Accordance with RIS 2015-17 Information Withheld Description Figures 6.2-53, 6.2-54, 6.2-55, and 6.2-56 Containment subcompartment analyses drawings.
Figures 12.1-1, 12.1-2, 12.1-3, 12.1-4, 12.1-Radiation zone maps that contain 5, 12.1-6, 12.1-7, 12.1-8, 12.1-9, 12.1-10, general arrangement features.
12.1-11, 12.1-12 Drawings:
Engineering drawings 57722-1, 57723-1, 57724-1, 57725-1, incorporated by reference.
57726-1, 57727-1, 57728-1, 500966-1, I
500971-1, 500977-1, 515939-1, 515940-1, 515941-1, 515942-1, 515947-1, 521123-1, 521124-1, 500968-1, 57721-1, 57720-1, 57719-1, 57718-1, 500967-1, 500965-1, 500964-1, 57729-1, 57730-1, 57731-: 1, 57732-1, 57733-1, 57734-1; 500969-1, 500972-1, 500973-1, 500974-1, 500976-1, 102023-6, 108023-6, 102023-8, 108023-8, 102023-9, 108023-9, 102023-11, 108023-11, 102023-12, 108023-12, 102023-16, 102023-17C, 102023-17, 102023-18, 108023-18, 515943-1, 515944-1, 515945-1, 515946-1, 515948-1, 515949-1, 438431-1, 438432-1, 439533-1, 438449-1, 438445-1,
507613-1, 521120-1, 521130-1, 521121-1, 521131-1, 521122-1, 521132-1, 521133-1, 521134-1, 521125-1, 521135-1, 508845-1, 500002-1, 500852-1,498992-1,498993-1, 500003-1, 500853-1, 663082-2, 502699-1 Proprietary Drawings:
Engineering d_rawings 6006510-7, 6006510-14, 6006510-21, incorporated by reference.
6006510-22, 6006510-23, 6006510-61, 6006510-156, 6006510-132, 6006510-133, 6006510-155, 6006510-134(2 of 3),
6006510-134(3 of 3), 6006510-65, 6006510-135, 6023231-1, 6021770-30, 6021770-22, 6021770-19,6021770-5 Page 1 of 1
The DVD in this enclosure contains the following files:
File Name File Size (Mb)
Chapter 1 3.96 Chapter 2 25.0 Chapter 3 30.3 Chapter 4 4.81 Chapter 5 3.38 Chapter 6 14.0 Chapter 7 1.91 Chapter 8 2.65 Chapter 9 7.20 Chapter 10
.944 Chapter 11 3.87 Chapter 12 1.13 Chapter 13
.516 Chapter 14 1.32 Chapter 15 16.8 Chapter 16
.100 Chapter 17 1.38 Table 1.6-1 DrawinQs 602 Page 1 of 1 PG&E Letter DCL-21-074
PG&E Letter DCL-21-074 Description of Information Removed from Revision 26 of the Updated Final Safety Analysis Report
Section Tables Figures PG&E Letter DCL-21-074 Description of Information Removed from Revision 26 of the Updated Final Safety Analysis Report Chapter 15 Description of Change 15.3-1 15.3-2 15.4.1-1A 15.4.1-1B 15.4.1-2A 15.4.1-2B Tables removed due to the adoption of the Tornado Missile Risk 15.4.1-3A 15.4.1-3B Evaluator Methodology.
15.4.1-4A 15.4.1-4B 15.4.1-5A 15.4.1-5B 15.4.1-?A 15.4.1-7B Figures removed due to the adoption of the Tornado Missile Risk Evaluator Methodology.
15.1-6 15.3-1 15"3-2 15.3-3 15.3-4 15.3-8 15.3-9 15.3-11 15.3-13 15"3-33 15.3-34 15.3-35 15.3-36 15.3-37 15.3-38 15.3-39 15.3-40 15.3-41 Page 1 of 2
Figures (continued) 15.4.1-1A 15.4.1-18 15.4.1-2A 15.4.1-28 15.4.1-3A 15.4.1-38 15.4.1-4A 15.4.1-48 15.4.1-5A 15.4.1-58 15.4.1-6A 15.4.1-68 15.4.1-7A 15.4.1-78 15.4.1-SA 15.4.1-88 15.4.1-9A 15.4.1-98 15.4.1-10A 15.4.1-108 15.4.1-11A 15.4.1-118 15.4.1-12A 15.4.1-128 15.4.1-13A 15.4.1-138 15.4.1-14A 15.4.1-148 15.4.1-15A 15.4.1-158 PG&E Letter DCL-21-074 Figures removed due to the adoption of the Tornado Missile Risk Evaluator Methodology.
Page 2 of 2